Inventory of Major Alberta Projects

March 2011
Alberta Finance and Enterprise 4th Floor, Commerce Place Edmonton, Alberta T5J 4L6

Inventory of Major Alberta Projects


Introduction
The Inventory of Major Alberta Projects is produced by Alberta Finance and Enterprise to assist firms in identifying potential supply opportunities. The Inventory lists construction projects in Alberta valued at $5.0 million or greater that are planned, underway, or have recently been completed. This edition also identifies projects that have been put on hold or deferred due to the economic downturn. Project data is obtained from public and private information sources. Where possible, this data has been verified with the project proponent/developer. However, users of the Inventory may wish to confirm project data with the proponent/developer. While efforts have been made to obtain the most recent information, it should be noted that projects are constantly being re-evaluated by industry. Although the Inventory attempts to be as comprehensive as possible, some information may not be available at the time of printing, or not published due to reasons of confidentiality. The Inventory can be accessed on the Internet at www.albertacanada.com/about-alberta/inventory-ofmajor-projects.html. New projects and (where possible) updated information on current projects is added to the Internet database on a monthly basis. The print edition of the report is produced quarterly. Projects added to the Inventory between January 1 and March 31, 2011 are noted in upper case in the Project Description column. If you have questions or require additional information about the Inventory, contact Alberta Finance and Enterprise by phone at (780) 427-6787, or by fax at (780) 422-0061.

Inventory of Major Alberta Projects Summary


Project Sector Agriculture & Related Biofuels Chemicals & Petrochemicals Commercial/Retail Commercial/Retail and Residential Forestry & Related Infrastructure Institutional Manufacturing Mining Oil & Gas Oil Sands Other Industrial Pipelines Power Residential Telecommunications Tourism/Recreation Total
1.

# of Projects 9 12 4 53 8 8 263 136 7 5 7 59 6 30 40 89 2 101 839

Value of All Projects ($Millions) $262.7 $1,449.6 $117.5 $8,507.8 $2,663.8 $298.5 $17,834.6 $8,020.1 $674.2 $4,945.0 $1,440.0 $106,495.6 $1,479.6 $7,526.7 $14,213.7 $4,850.7 $656.0 $3,820.3 $185,256.40

# on Hold 0 1 0 4 4 0 6 9 2 1 0 9 0 1 0 18 0 4 59

Value of Projects on Hold ($ Millions) $210.0 $186.0 $1,227.8 $94.5 $360.5 $24.0 $4,500.0 $15,507.0 $2,000.0 $1,662.0 $125.3 $25,897.1

2. 3. 4.

This Inventory lists projects in Alberta, valued at $5 million or greater, that have recently been completed, are currently under construction, or are proposed to start construction within two years. Not all projects over this threshold are listed due to reasons of confidentiality and/or due to information not being available at the time of printing. Project data is obtained from public information sources. Although, where possible, this data has been verified with the project proponent/developer, users of the Inventory may wish to confirm project data with the proponent/developer. The Inventory does not breakdown project expenditures by any given year. The cost of a project is the value of expenditures expected over all phases of project construction, which may span over two or more years. The cost of projects listed in the Inventory are estimated values only.

Inventory of Major Alberta Projects


Project Sector/ Company Name Agriculture & Related
Agropur Cheese Plant Expansion County of Lethbridge (near Diamond City) across Alberta Calmar Lacombe MD of Smoky River (W of MCLennan) High River St. Albert Ponoka $23.0 2011 Under construction. Stuart Olson Dominion Construction. Under construction. Proposed. Planned completion by 2012. Proposed 2011Announced. FWS Group (Phase 1). Phase 1 to be completed in 2011, phase 2 (grain terminal) to be added at later date. Announced Completed. Maclean Young Construction. Nearing completion. Stretch Construction. Facility will include the Canadian Professional Rodeo Hall of Fame. Nearing completion

Project Description

Project Location

Cost in $ Millions

Construction Schedule

Remarks

Alberta Sustainable Resource Development BioNeutra Biosphere Technologies Inc. Cargill Inc.

Grazing Reserve Maintenance and Infrastructure Upgrades Substitute Sugar Plant and Starch Plant Biorefining Demonstration Facility GRAIN ELEVATOR AND CROP PROTECTION SEED SHED PLANT MODERNIZATION / EXPANSION 'Enjoy Centre' Retail Complex Ag - Event Centre

$9.2 $100.0 $35.0 $13.0

2010-2011

Cargill Meat Solutions Hole's Greenhouses Ponoka Ag - Event Centre Society (PAECS) Western Irrigation District

$42.0 $25.0 $8.5

2011-2012 2009-2011 2010-2011

Canal Upgrades

Wheatland Cty (btwn Chestermere Lk and Strathmore)

$7.0

2010-2011

Biofuels
Alberta Ethanol and Biodiesel GP Integrated Biodiesel and Ethanol Refinery Phase 1 Red Deer County (near Innisfail) $190.0 Proposed. Planned construction start spring 2011.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


All Peace Industries Ltd.

Project Description
Biodiesel Fuel Plant

Project Location
four locations under consideration Lethbridge County (near Chin) Minburn County (near Vegreville) County of Two Hills (Hairy Hill) MD of Smoky River (S of McLennan) Edmonton Edmonton

Cost in $ Millions
$50.0

Construction Schedule

Remarks
Proposed. Locations under consideration include High Prairie, Fort Saskatchewan, Smoky Lake and Waskatenau.

Bfuel Canada Corp.

Biodiesel Plant

$35.0

2011-2012

Announced.

BioStreet Canada BioWaste to Energy for Canada Integration Initiative Corp. (BECii) Blue Horizon Energy Inc.

Biodiesel Plant BECii CLEAN ENERGY CENTRE AT GROW - GEN BIOGAS PLANT 'Blue Horizon' Biodiesel Facility

$210.0 $11.6

On hold. Trimark Engineering. Proposed

$160.0

Proposed. Feasibility study completed. Previously called Bluesky Biofuel Facility. Proposed for 2011 2010-2011 Under construction

City of Edmonton City of Edmonton / Alberta Energy Research Institute / GreenField Ethanol / Enerkem Greenfield Alberta Biofuels CR Fuels Inc.

Biofuel Feedstock Plant Biofuel Facility Producing Ethanol from Municipal Solid Waste

$38.0 $70.0

Alternative Energy (Ethanol, Biodiesel and Biogas Digester) Complex Biofuel Complex (Biofuel Village)

MD of Taber (E of Purple Springs) Wheatland County (N of Strathmore) Lethbridge County County of Two Hills (near Hairy Hill)

$325.0

Proposed for 2011 - 2013.

CR Fuels Inc.

$235.0

2011-2012

Announced. Biodiesel, ethanol and electrical generation. Proposed for 2011.

ECB Enviro North America Inc. Growing Power Hairy Hill / ATCO Midstream

Biogas and Co-gen Plant (3.2MW) Bio - Energy Facility (Integrated Biorefinery)

$25.0 $100.0 2010-2012

Under construction (biogas facility). FWS Construction. Biorefinery proposed for 2011 - 2012.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name

Project Description

Project Location

Cost in $ Millions

Construction Schedule

Remarks

Chemicals & Petrochemicals


Alberta Sulphur Terminals (a division of Hazco Environmental Services) Methanex Corp. NovaGreen NovaGreen Inc. Sulphur Forming and Shipping Facility Plant Infrastructure Upgrade / Re Opening Commercial Facility Demonstration Facility Lamont County (E of Bruderheim) Medicine Hat Killam Killam $35.0 2011 Announced. Planned construction start Q1 2011. NRCB approved July 2009. Completed Proposed for late 2012 or early 2013. 2011 Announced

$40.0 $35.0 $7.5

2010-2011

Commercial/Retail
Alberta Development Partners Inc. Alberta Infrastructure Alliance Pipeline Aquatera Utilities Inc. Aspen Properties Ltd. ATCO Electric Burnet Duckworth & Palmer Cadillac Fairview Corp. 'Stampede Trail' Retail Development, Calgary Stampede Grounds North Petroleum Plaza Tenant Improvements Office Alterations Office Building 'Palliser Square' East and West Towers Office / Warehouse INTERIOR ALTERATIONS 'Calgary City Centre' Development Phase 1 (Office Tower), Eau Claire District 'Century Crossing' Commercial Development Canadian Tire / Marks Work Wearhouse Store, Gateway Calgary $150.0 Proposed for 2011 - 2013. Part of Stampede Park $400M expansion. 2010-2011 Nearing completion. Graham Construction. Proposed Proposed Proposed 2010-2011 Under construction. Clark Builders. Proposed Proposed. Phase 2 onwards on hold.

Edmonton Calgary Grande Prairie Calgary Lloydminster Calgary Calgary

$8.2 $5.5 $20.0 $220.0 $6.0 $12.0 $60.0

Camgill Enterprises Canadian Tire Real Estate Ltd.

Spruce Grove Canmore

$75.0 $7.0

2010-2013 2011

Under construction. Phased development. Under construction

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


CAPP Investments Ltd. Church of Jesus Christ LDS City of Calgary Deloitte Dialog Federated Co - op Genco Development Corp. Gregg Distributors Ltd. GWL Realty Advisors Ltd. / Remington Development Corp. Harvard Developments / Cameron Development Corp. Hertz Rent A Car Husky Energy Imperial Equities Inc.

Project Description
'Skyway Professional Centre' Medical Office Building 'Lethbridge Welfare Complex' Office / Warehouse Building Calgary Public Building Restoration, Stephen Avenue Mall Office Alterations Warehouse Warehouse Expansion '634 Genco Court' Office Building DISTRIBUTION CENTRE Warehouse Building 3, Prospect Business Park 'Currents of Windermere' Retail Development Car Rental Outlet NEW OFFICE BUILDING Industrial Building

Project Location
Red Deer Lethbridge Calgary Calgary Calgary Calgary Calgary Edmonton Edmonton

Cost in $ Millions
$40.0 $5.2 $25.0 $6.0 $16.0 $6.1 $21.0 $38.0 $14.2

Construction Schedule

Remarks
On hold. Timcon Construction. Originally proposed for 2010 - 2011. Proposed

2009-2011 2010-2011

Completed. Chandos Construction. Completed. Stuart Olson Dominion Construction. Proposed Proposed On hold. Originally proposed for 2010 - 2011

2011-2012

Announced. Dawson Wallace Construction. Proposed

Edmonton

$500.0

2008-2011

Under construction. Willl include Cineplex theatre complex. Home Depot, Wal-Mart, Canadian Tire, London Drugs completed. Proposed

Calgary Lloydminster RM of Wood Buffalo (Fort McMurray) Calgary Calgary Edmonton

$5.3 $24.4 $13.0 2010-2011 2010-2011

Under construction. CANA Construction. Completed

Inland Pipe Lowe's Companies Canada Lowe's Companies Canada

PLANT PHASE 2 New Store, Sunridge Lowe's of South Edmonton

$8.3 $15.0 $17.0 2010-2011 2010-2011

Proposed Under construction. Gioffre Companies Inc. Nearing completion. Wright Construction Western Inc.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Matco Investments Ltd. / Alberta Investment Management / SITQ Matthews Southwest Developments McCall Electric Wholesaler MD of Foothills / Town of High River Oxford Properties

Project Description
'Eighth Avenue Place' Office Building East Tower 'The Bow' Office Tower Warehouse / Office Building Charles Clark Medical Centre Oxford Airport Business Park

Project Location
Calgary

Cost in $ Millions
$600.0

Construction Schedule
2007-2011

Remarks
Under construction. EllisDon Construction.

Calgary Calgary High River Calgary

$1,500.0 $5.5 $5.2 $500.0

2007-2012

Under construction. Ledcor Construction. Proposed

2010-2011

Under construction. Chandos Construction. Proposed. Multi - phased project will take eight years to complete. Planned construction first building in 2011 - 2012.

PRISM Developments ProCura Developments Qualico Developments

'Prism Place' Office Building Associated Engineering Building Renovations / Upgrades Conversion of Golden West Golf Course to Light Industrial / Business Park EPCOR Office Tower 'Quarry Park' Mixed-Use Development phases 1 and 2 Westwinds Business Park Phase 3 'Jacksonport' Retail Development

Calgary Edmonton Edmonton

$36.7 $10.0 $500.0

2011-2012

Announced. Planned construction start May 2011. Proposed. Planned start 2011. Proposed

Qualico Developments Remington Development Corp. Remington Developments RioCan RIET / Trinity Development Group / Canada Pension Plan Investment Board Royop Corporation SmartCentres

Edmonton Calgary Calgary Calgary

$250.0 $1,000.0 $13.0 $230.0

2008-2012 2006-2015

Under construction. Ledcor Construction. Under construction. Phase 1 completed. Office building A under construction. Proposed for 2011 - 2012 Proposed

'Gates of Walden' Shopping Centre Sylvan Lake Power Centre Phase 2 (Eight Buildings)

Calgary Sylvan Lake

$10.5 $20.0

2010-2011

Under construction. Dawson Wallace. Proposed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


SmartCentres

Project Description
Sylvan Lake Power Centre (Ten Buildings) Car Dealership Commercial Development INTERIOR ALTERATIONS 'Ironwood Tower' Office Building New Store, Stony Plain Road MEDICAL CENTRE 'Millennium Ridge' Retail Development Interior Alterations South Side Store Expansion to Supercentre NEW STORE NORTHWEST (#1122) 'Stonegate Landing' Retail, Office and Industrial Development 'Hanson Square' Retail / Office Building

Project Location
Sylvan Lake

Cost in $ Millions
$50.0

Construction Schedule
2007-2011

Remarks
Under construction. Wal-Mart anchor tenant. Dollarama nearing completion, Canadian Tire under construction Under construction. Barjac Construction Management. On hold. Domtar site remediation will start by end of August 2010 and last up to two years.

Southgate Chevrolet Buick GMC Springwood Development Sun Life Financial The Ironwood Group Totem Building Supplies Town of St. Paul Trans America Developments Wal - Mart Canada Wal - Mart Canada Wal - Mart Canada Corp. WAM Development Group / AIMCo Western Securities

Calgary Cochrane Calgary Edmonton Edmonton St. Paul Strathcona County (Sherwood Park) Calgary Red Deer Edmonton Calgary Calgary

$6.5 $75.0 $7.3 $50.0 $6.0 $6.0 $14.0

2010-2011

2011

Under construction. Stuart Olson Dominion Construction. On hold. Dominion Construction.

2010-2011

Under construction. Dawson Wallace. Proposed

2010-2011

Under construction.

$7.5 $5.0 $14.0 $2,250.0 $17.4 2010-2016 2010-2011 2010-2011

Proposed Completed. Elan Construction. Proposed Announced. Land servicing underway. Possible construction start industrial area in 2010. Under construction. Stuart Olson Dominion.

Commercial/Retail and Residential


Anderson Builders Group (1989) Inc. Baralot International Mixed Use Building 'Sky Plaza' Development (Office Space and Condo Units) Red Deer Calgary $8.0 $66.0 2010-2011 Nearing completion On hold pending improved market conditions. Originally proposed for 2010 - 2011.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


FRAM Building Group / Slokker Canada Corp. / Tricon Capital Group Harvard Developments Jade Developments River City Developments Torode Commercial Ltd. WAM Development / Opus Building Corp.

Project Description
HIGHRISE AND MEDIUM RISE BUILDINGS, EAST VILLAGE Eau Claire Market Redevelopment 'Copperstone Village' Residential / Commercial Building 'Elements at Rivers Edge' Mixed Use Building 'Ramsay Exchange' Commercial, Retail and Residential Development 'Stampede Station' Retail / Office Space, Hotel and Residential Buildings

Project Location
Calgary

Cost in $ Millions
$300.0

Construction Schedule

Remarks
Proposed. Possible construction start sometime in 2012. On hold On hold

Calgary Airdrie Red Deer Calgary Calgary

$750.0 $11.8 $28.0 $1,100.0 $400.0 2004-2011 2010-2011

Under construction Proposed. Phased development. On hold. Phase 2 (office towers).

Forestry & Related


Alberta - Pacific Forest Industries Ltd. (Al - Pac) Diashowa - Marubeni Peace River Pulp Division Millar Western Forest Products Ltd. Sundre Forest Products West Fraser Mills Ltd. West Fraser Mills Ltd. West Fraser Mills Ltd. PLANT UPGRADES County of Athabasca (Boyle) Peace River Fox Creek Sundre Hinton Hinton Woodlands County (near Whitecourt) County of Grande Prairie $62.9 Proposed for 2011 - 2012.

Construction / Installation of 25MW Generator Sawmill 2011 Capital Improvements Recovery Boiler and Pulp Machine Upgrades Sawmill Equipment Upgrades Facility Upgrades, Blue Ridge Lumber Electrical Turbine (48MW)

$40.0 $45.8 $13.0 $37.8 $39.0 $28.0

2010-2011 2010-2011 2011

Nearing completion Under construction Announced Proposed

2010-2012

Under construction. Proposed

Weyerhaeuser

$32.0

2010-2011

Completed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name Infrastructure


Alberta Infrastructure

Project Description

Project Location

Cost in $ Millions

Construction Schedule

Remarks

Highway 201 Grade, Base and Pave, Bridge (Stoney Tr / Crowchild Tr Interchange) Federal Building Redevelopment Federal Building Parkade and Centennial Plaza Legislature Dome Renovations / Repairs Acheson Industrial Building and Alberta Infrastructure Shop Redevelopment MEDICAL EXAMINER BUILDING ADDITION / RENOVATION Highway Twinning Project (North South Trade Corridor) Southeast Section Calgary Ring Road (Stoney Trail) from 17 Ave SE to Highway 2A Highway 22, Highway 11 and SH 766 Pave

Calgary

$41.6

2009-2011

Under construction. South Rock Ltd.

Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure

Edmonton Edmonton Edmonton Edmonton/Parkla nd Cty Edmonton

$165.0 $110.0 $6.1 $20.1

2008-2011 2009-2011 2010-2012

Under construction. Clark Builders. Under construction. Clark Builders. Announced. Building Science Engineering. Proposed for 2011 - 2012

Alberta Infrastructure / Alberta Health and Wellness Alberta Transportation Alberta Transportation

$12.5

Proposed

across Alberta Calgary

$1,900.0 $769.0

1998-2012 2010-2013

Under construction. 500km across Alberta Under construction. Chinook Roads Partnership.

Alberta Transportation

Clearwater and Lacombe Counties Cold Lake County of Camrose County of Forty Mile

$20.0

2010-2011

Under construction. Riverside Contracting (Montana). Highway 22 from Hwy 11 to Hwy 53; Hwy 11 E of Condor to SH766; SH766 from N of Eckville to Hwy 12. Under construction Proposed. Hwy 56 from S of SH609 to Hwy 13; SH609 from Edberg to Hwy 56; SH833 from Camrose to SH617.

Alberta Transportation Alberta Transportation

Twinning Highway 28 from 57 Ave to 10 St HIGHWAY 56 / SH 609 / SH 833 PAVE HIGHWAY 61 GRADE, BASE AND PAVE

$26.4 $8.0

2009-2011

Alberta Transportation

$7.9

2011

Announced. South Rock.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Alberta Transportation

Project Description
Highway 16 and SH 831 Pave

Project Location
County of Minburn (near Vegreville) County of Newell (SH873 to W of SH884) County of Newell (W of Bassano to SH 550) County of Wetaskiwin Drayton Valley Edmonton Edmonton Edmonton

Cost in $ Millions
$14.4

Construction Schedule
2011

Remarks
Announced. E Construction / Ruel Bros.

Alberta Transportation

Highway 1 Pave

$15.4

2011

Announced. South Rock.

Alberta Transportation

Highway 1 Pave

$16.1

2010-2011

Under construction. Border Paving.

Alberta Transportation Alberta Transportation Alberta Transportation Alberta Transportation Alberta Transportation

Highway 2 / Highway 2A / Highway 13 / SH611 Pave Bridge over N Saskatchewan River Callingwood Rd and Lessard Rd Interchanges, Anthony Henday Drive Anthony Henday Dr / Stony Plain Rd Interchange Anthony Henday Dr (Hwy 216) / Rabbit Hill Rd Interchange and Bridge Anthony Henday / Cameron Heights Drive Interchange Anthony Henday Drive NW

$11.0 $60.0 $45.0 $168.6 $14.0 2010-2013 2009-2011 2009-2011 2010-2011

Proposed Announced. Phase 1 (eastern approach work) under construction. Under construction. Alberco Construction. Under construction. KMC / PCL A Joint Venture. Under construction. PCL Construction Management.

Alberta Transportation Alberta Transportation

Edmonton Edmonton area

$25.0 $1,420.0

2010-2011 2008-2011

Under construction. Graham Construction. Under construction. NORTHWESTCONNECT General Partnership. Yellowhead Tr to Manning Freeway. Announced. E Construction / Ruel Brothers.

Alberta Transportation

Highway 16 and SH 627 Grade, Base and Pave and Intersection Improvements Highway 13 / Highway 36 / SH 602 HIGHWAY 63 CLEARING AND GRADING

Edmonton area

$15.1

2010-2011

Alberta Transportation Alberta Transportation

Flagstaff County Lac la Biche County

$15.5 $0.0

2010-2011 2011-2012

Under construction. Border Paving. Announced. Thompson Bros (Const) Ltd. $20.8 million. Part of Highway 63 twinning project.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Alberta Transportation

Project Description
Highway 12 Road Improvements (Re - alignment) SH 625 Grade, Base and Pave, Bridge Culvert, Lighting Roadwork plus Two Bridges Highway 58 Grade, Base and Pave

Project Location
Lacombe County (Hwy 20 to SH 792) Leduc County (Nisku) Mackenzie County Mackenzie County (S of Negus Ck to High Level) Mackenzie County (Tall Creek IR to Bear R) MD of Big Lakes (Swan Hills area) MD of Foothills (N of Nanton to S of Cayley) MD of Greenview MD of Greenview (Berland R to S of Muskeg Cabins) MD of Greenview (Crooked Ck to Valleyview) MD of Opportunity (N of SH686 to Willow Creek)

Cost in $ Millions
$14.0

Construction Schedule

Remarks
Proposed

Alberta Transportation Alberta Transportation Alberta Transportation

$14.5 $17.9 $26.7

2010-2011 2010-2011 2011-2012

Under construction. Border Paving. Under construction. Prairie North Construction. Under construction. Knelsen Sand & Gravel.

Alberta Transportation

Highway 88 Base and Pave

$18.2

2010-2011

Under construction. Ledcor Alberta.

Alberta Transportation Alberta Transportation

Highway 33 Base, Grade and Pave HIGHWAY 2 GRADE, BASE AND PAVE PLUS BRIDGE REMOVAL Highway 43 Grade, Base and Pave HIGHWAY 40 GRADE, BASE AND PAVE

$11.7 $12.0

2010-2011 2011-2012

Completed. E Construction. Announced. Mesken Contracting.

Alberta Transportation Alberta Transportation

$25.7 $11.5

2010-2011 2011-2012

Under construction. Richardson Bros (Olds) Ltd. From E of Crook Creek to W of Sturgeon Lk IR. Announced. Wapiti Gravel Suppliers.

Alberta Transportation

Twinning Highway 43 near Sturgeon Lake Cree Nation Highway 88 Base and Pave

$26.0

2010-2012

Announced

Alberta Transportation

$11.7

2010-2011

Announced. Carmacks Enterprises.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

10

Project Sector/ Company Name


Alberta Transportation

Project Description
Highway 2A Grade, Base and Pave

Project Location
MD of Peace (Hwy 2 to Grimshaw) MD of Rocky View (E of Hwy 22 to W of SH 766) MD of Rocky View (N of Hwy 1 to N of SH566) Red Deer County Red Deer County (N of Red Deer) Red Deer, Kneehill and Stettelr Counties RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Fort McMurray) to jct Hwy 55 (near Grassland)

Cost in $ Millions
$7.2

Construction Schedule
2011

Remarks
Announced. Ledcor Alberta.

Alberta Transportation

Highway 1A Grade, Base and Pave

$9.5

2010-2011

Under construction. South Rock.

Alberta Transportation

Highway 9 Widen, Base and Pave

$20.4

2010-2011

Under construction. South Rock Ltd.

Alberta Transportation Alberta Transportation

SH 791 EXTENSION FROM SH 590 TO HIGHWAY 42 Interchange Reconfiguration jct Highways 2 / 11 (Grade, Base and Pave) Highway 21, Highway 56, SH 601 and SH 590 Base and Pave North - Bound Bridge across Athabasca River Highway 63 Grading Highway 63 / Thickwood Blvd and Highway 63 / Confederation Way Interchanges Highway 63 Grade, Base and Pave

$14.6 $23.7 2010-2011

Proposed. Part of Alberta Transportations threeyear construction program 2012-2014. Under construction. Border Paving.

Alberta Transportation

$12.6

2010-2011

Under construction. Border Paving. Hwy 21 from N of SH587 to S of Hwy 42; Hwy 56 from S of SH 589 to S of Hwy 12; SH601 from Hwy 12 to Hwy 21. Under construction. Flatiron Construction. Under construction. Prairie Roadbuilders. S of May Tower to S of House River. Under construction. South Rock.

Alberta Transportation Alberta Transportation Alberta Transportation

$127.0 $17.6 $300.0

2008-2011 2010-2011 2009-2012

Alberta Transportation

$43.7

2010-2012

Under construction. Graham Bros. Construction Group. N of Athabasca R to S of Thickwood Blvd. Under construction.. Section N of Wandering River in 2010 - 2011

Alberta Transportation

Twinning Highway 63

$940.0

2007-2015

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

11

Project Sector/ Company Name


Alberta Transportation

Project Description
Highway 63 Pave

Project Location
RM of Wood Buffalo (S of SH881 to S of Hwy 69) Saddle Hills County (Hwy 49 to SH680) Saddle Hills Cty (Hwy 49 to S of SH680) Sturgeon County Vulcan County Vulcan County (Hwy 23 to Bow R) Yellowhead County (N of Hwy 16 to S of Pinto Ck) Grande Prairie Barrhead Drayton Valley Calgary Calgary Calgary Calgary

Cost in $ Millions
$7.1

Construction Schedule
2010-2011

Remarks
Under construction. Knelsen Sand and Gravel.

Alberta Transportation

SH 727 PAVE

$6.7

2011

Announced. Knelsen Sand and Gravel.

Alberta Transportation

SH 727 Grade and Bridges over Howard Creek and Kitsuan River Highway 28 Grade, Base and Pave Carseland - Bow / Travers Reservoir Concrete Structures Highway 24 Crack Repair and Pave

$37.9

2009-2011

Under construction. Sureway Construction.

Alberta Transportation Alberta Transportation Alberta Transportation

$12.0 $11.8 $7.7

2010-2011 2010-2011 2010-2011

Under construction. E Construction / Ruel Brothers. Under construction. Graham Infrastructure. Under construction. Border Paving. Project includes SH817 sideslope repair from SH901 to S of Strathmore. Proposed.

Alberta Transportation

Highway 40 Grade, Base and Pave

$6.0

Aquatera Utilities Inc. Barrhead Regional Water Commission Brazeau County Calgary Airport Authority Calgary Airport Authority Calgary Airport Authority / City of Calgary Calgary Convention Centre Authority
April 01, 2011

Wastewater Treatment Plant Upgrades Water Treatment Plant Expansion Municipal Administration Building and Public Works Facility North - South Parallel Runway International Transborder Concourse Road Improvements to 36 St NE between 48 Ave and Airport Rd Convention and Trade Show Facility

$40.0 $13.0 $19.8 $620.0 $1,400.0 $10.5 $300.0 2009-2011 2011-2015 2011-2015 2010-2011

Proposed Proposed Nearing completion Announced. Planned construction start April 2011. Announced. EllisDon Construction. Under construction Proposed. Planned completion in late 2013.

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

12

Project Sector/ Company Name


Calgary Municipal Land Corp. (CMLC) Calgary Police Services Canadian National Railway (CN) Central Aviation / Springbank Aero Properties City of Airdrie

Project Description
Infrastructure Upgrades, The Rivers (including East Village) Office Alterations 'Calgary Logistics Park' Intermodal Terminal Springbank Airport Development (Office and Hangar Expansion) plus Two New Hangars 'Chinook Winds' Regional Waste Management Facility, Park and Operations Centre Emergency Services Facility, Chinook Winds West Side Emergency Services Station RCMP Detachment St. Patrick's Island Bridge FIRE STATION, SOUTH CALGARY 37 St / Glenmore Tr SW Interchange Interchange at 14 St and 90 Ave SW WEST LRT 69 ST STATION Fire Station, Marda Loop Road Widening Peigan Tr from Barlow Tr to 52 St SE Westbrook LRT Station / Tower 52 St SE Widening Phase 3 (Supporting Road Network)

Project Location
Calgary Calgary Rocky View County (Conrich) Rocky View County (Springbank) Airdrie

Cost in $ Millions
$200.0 $25.0 $100.0 $6.0

Construction Schedule
2007-2012 2009-2011

Remarks
Under construction Under construction Proposed. Pending approvals. Proposed. Scott Builders.

$11.4

2010-

Announced.

City of Airdrie City of Airdrie City of Airdrie City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary

Airdrie Airdrie Airdrie Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary

$9.0 $13.0 $10.5 $15.0 $10.0 $40.0 $12.9 $9.9 $15.0 $9.0 $37.1 $10.0

2010-2011 2010-2011 2010-2012

Under construction. Bird Construction. Under construction. Bird Construction. Under construction Proposed Proposed. Graham Construction and Engineering. Proposed. Detour bridge completed Sept 2010. On hold. Originally scheduled for 2008 - 2010. Proposed Proposed On hold. Proposed Proposed. Planned constructIon start October 2010.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

13

Project Sector/ Company Name


City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary

Project Description
210 AVE TRUNK UTILITIES CONTRACT 3B Rehabilitation of Westbound Bow Trail Bridge over CPR Fire / Ambulance Station, Bridlewood Interchange Trans Canada Highway and Bowfort Rd NW Fire Station, Royal Oak Widen 14 St W from 90 Ave S to Anderson Rd Fire Station, Seton Fire Station, Symons Valley Glenmore Water Treatment Plant Upgrades / Expansion Cranston Bow River Crossing Water Pipeline 'Harvey Passage' Weir Reconstruction, Bow River Emergency Operations Control Centre LRT Extension Northeast, Westwinds to Saddle Ridge LRT Extension NW to Rocky Ridge, Tuscany Lakeview Storm System Improvements

Project Location
Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary

Cost in $ Millions
$6.0 $8.0 $15.8 $47.0 $15.0 $14.5 $15.0 $15.0 $218.7 $12.6 $16.6 $54.0 $124.0

Construction Schedule

Remarks
Proposed Proposed Proposed for 2012. On hold. Proposed for 2011 - 2012. Pending funding approval. On hold. Proposed for 2011 - 2012. Proposed for 2011

2004-2011 2008-2011 2008-2011 2009-2012 2009-2012

Nearing completion. PCL Construction. Under construction. Phased construction. Under construction. Degraaf Excavating Ltd. Under construction. Under construction. Standard General (grading, utilities, noise barrier, park and ride). Whitehorn Station PCL Construction. Under construction. LRT overpass over Stoney Tr. Graham Construction Group. LRT track, station construction start 2012. Nearing completion. Caliber Systems.

City of Calgary

Calgary

$115.0

2009-2014

City of Calgary

Calgary

$17.4

2010-2011

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

14

Project Sector/ Company Name


City of Calgary

Project Description
Metis Trail NE from 64 Ave to 96 Ave

Project Location
Calgary

Cost in $ Millions
$18.6

Construction Schedule
2010-2011

Remarks
Under construction (phase 2). Standard General. Phase 1 64 Ave LRT tunnel. Phase 2 link from 80 to 96 Ave. Announced. Caliber Systems. Nearing completion. Whissell Contractors. Nearing completion. Graham Infrastructure. Under construction Under construction. Nose Creek trunk, Saddle Ridge relief trunk. Nose Creek Phase A contract 3 Whissell Contractors. Completed Under construction Announced Under construction. Aecon Construction.

City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary

54 St SE Stormwater Wetland Pond Mahogany Storm Trunk 'Peace Bridge' Pedestrian Bridge over Bow R near Prince's Island Sunalta West LRT Wastewater Sanitary Trunk / Lift Station Projects 2010 - 2011 7 Ave LRT Station Rehabilitation West LRT Parkade Downtown Accommodation Plan (Three Buildings) 96 Ave N Extension from Deerfoot Tr to Airport Trail and Deerfoot Tr / Airport Tr Interchange West LRT Line from Downtown to Westside Rec Centre 13 Avenue Greenway Phase 1 (1 St SE to 4 St SW) STORM WATER QUALITY RETROFITS East Calgary Landfill Scalehouse and Entrance Replacement East McKenzie Feedermain Spyhill Landfill Scale House and Entrance Replacement

Calgary Calgary Calgary Calgary Calgary

$6.5 $6.4 $24.5 $9.4 $62.0

2010-2011 2010-2011 2010-2011 2010-2011 2010-2011

City of Calgary City of Calgary City of Calgary City of Calgary

Calgary Calgary Calgary Calgary

$20.0 $28.0 $7.0 $28.7

2010-2011 2010-2011 2010-2012 2010-2012

City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary

Calgary Calgary Calgary Calgary Calgary Calgary

$1,000.0 $8.5 $17.0 $14.0 $20.0 $13.0

2010-2012 2011 2011-2012 2011-2012 2011-2012 2011-2012

Under construction. SNC Lavelin Construction (Pacific). Under construction. Volker Stein Contracting. Announced. Planned construction of three ponds. Announced Announced Announced

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

15

Project Sector/ Company Name


City of Calgary City of Calgary

Project Description
LAKEVIEW STORM SYSTEM UPGRADES PHASE 2 SPYHILL LANDFILL GAS COLLECTION SYSTEM AND TREATMENT SHEPARD LANDFILL COLLECTION SERVICES DEPOT II MacLeod Trail Feedermain phase 2 SHEPARD LANDFILL STORMWATER COLLECTION AND TREATMENT EXPANSION SADDLE RIDGE RELIEF TRUNK NOSE CREEK SANITARY TRUNK PHASE B CRESTMONT PUMP STATION WEST PINE CREEK SANITARY TRUNK PART 1 and MACLEOD TRAIL FEEDERMAIN PHASE 2 CURRIE PUMP STATION Fire Station, Douglas Glen EAST CALGARY LANDFILL COLLECTION SERVICES DEPOT Four Lane Underpass connecting East Village and Victoria Park / Stampede Grounds (4 St SE) Wastewater Treatment Facility Kennedale Waste Management Facility Expansion FIRE STATION, HERITAGE VALLEY

Project Location
Calgary Calgary

Cost in $ Millions
$8.0 $10.0

Construction Schedule
2011-2012 2011-2012

Remarks
Announced Announced

City of Calgary City of Calgary City of Calgary

Calgary Calgary Calgary

$8.0 $7.0 $10.0

2011-2012 2011-2012 2011-2012

Announced Announced Announced

City of Calgary City of Calgary City of Calgary City of Calgary

Calgary Calgary Calgary Calgary

$5.0 $32.0 $10.0 $16.0

2011-2012 2011-2012 2011-2012 2011-2012

Announced Announced Announced Announced. Caliber Systems.

City of Calgary City of Calgary City of Calgary City of Calgary / Calgary Municipal Land Corporation City of Camrose City of Edmonton City of Edmonton

Calgary Calgary Calgary Calgary

$15.0 $7.0 $13.0 $70.0

2011-2012 2011-2012 2011-2012 2010-2011

Announced Announced Announced Under construction. Graham Construction.

Camrose Edmonton Edmonton

$55.0 $9.0 $7.6

Proposed Proposed for 2011 - 2012. Proposed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

16

Project Sector/ Company Name


City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton

Project Description
Heavy Repair and Equipment Facility, Ellerslie LRT Parkade at Century Park Kennedale Traffic Operations Building Quesnell Bridge Widening and Rehabilitation Transit Park and Ride, Eaux Claires Fire Station 27, Ellerslie Fulton Place and Capilano Neighbourhood Rehabilitation Police Station, Southwest LRT Extension from Downtown to NAIT Scona Road Improvements 2011 SOUTH RESIDENTIAL AND INDUSTRIAL OVERLAY 2011 Neighbourhood Renewal Projects GATEWAY BLVD / 23 AVE INTERCHANGE CONTRACT 2 (ROAD UPGRADING / REALIGNMENT) Engineering Services Office and Lab Facility WHITEMUD DRIVE / 17 ST INTERCHANGE REPLACEMENT FOR WALTERDALE BRIDGE

Project Location
Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton

Cost in $ Millions
$56.0 $15.0 $7.0 $161.0 $12.0 $10.1 $11.5 $20.8 $725.0 $24.0 $8.8 $140.0 $11.2

Construction Schedule

Remarks
Proposed. Proposed Proposed

2009-2011 2010-2011 2010-2011 2010-2012 2010-2012 2010-2014 2011 2011 2011 2011

Under construction. Concreate USL Ltd. Completed Under construction. Stuart Olson Dominion Construction. Under construction. Carmacks Enterprises. Under construction. Clark Builders. Announced. EPCOR Tower tunnel nearing completion. Planned construction start spring 2011. Announced. Announced. Lafarge Canada Ltd. Greenview residential, McIntyre Industrial, Weir Industrial. Announced Under construction. Park Paving.

City of Edmonton City of Edmonton City of Edmonton

Edmonton Edmonton Edmonton

$15.7 $19.0 $132.0

2011 2011-2012 2013-2014

Announced. Chandos Construction. Announced. Graham Construction. Announced

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

17

Project Sector/ Company Name


City of Fort Saskatchewan City of Fort Saskatchewan City of Fort Saskatchewan City of Grande Prairie City of Grande Prairie City of Grande Prairie City of Leduc City of Lethbridge City of Lethbridge City of Lethbridge City of Lethbridge City of Lloydminster City of Lloydminster City of Medicine Hat City of Medicine Hat

Project Description
Police Building Expansion Civic Office Building (City Hall) / Library 100 Ave Downtown Improvements Program Wastewater Treatment Plant Upgrades Phase 2 Fire Station #3, Centre West Industrial Park 116 ST UPGRADES BETWEEN 68 AVE AND 97 AVE Public Services Buildings Transit Administration Centre Expansion Police Headquarters Expansion Upgrades to 28 St N Fleet Services Building plus Other Work RCMP Detachment Building Sewage Treatment Plant Expansion Water Treatment Plant Discharge Treatment Facility Alterations to Existing Building ( future location of Environmental Utilities Dept) Fire Station, South Ridge

Project Location
Fort Saskatchewan Fort Saskatchewan Fort Saskatchewan Grande Prairie Grande Prairie Grande Prairie Leduc Lethbridge Lethbridge Lethbridge Lethbridge Lloydminster Lloydminster Medicine Hat Medicine Hat

Cost in $ Millions
$5.6 $18.0 $10.0 $45.0 $6.3 $7.0 $10.7 $16.0 $26.7 $10.0 $17.3 $10.2 $7.8 $30.0 $6.0

Construction Schedule

Remarks
Proposed for 2012. Proposed for 2011. To be built beside existing city hall.

2010-2012

Under construction. Three - year project. Proposed for 2011 - 2014. Tender call for general contractor anticipated summer 2011.

2010-2012 2011 2010-2011

Under construction. Clark Builders. Announced Nearing completion. PCL Construction. Four buildings. Proposed for 2011 - 2013. Proposed for 2013 - 2015. Proposed.

2010-2011

Nearing completion. Western Construction and Combustion Services. Proposed

2010-2011

Announced Proposed. Planned completion in 2014. Proposed. Tender call expected late May / early June. Proposed. Planned completion by / in 2014.

City of Medicine Hat

Medicine Hat

$7.5

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

18

Project Sector/ Company Name


City of Medicine Hat

Project Description
SOUTH RIDGE DRIVE UPGRADE TO FOUR LANES FROM HIGHWAY 1 (TCH) TO STRACHAN ROAD Gaetz Avenue Revitalization Project Intersection Upgrades 32 St between Spruce Drive and 40 Avenue Intersection Improvements on Spruce Drive, Springfield Ave and 40 Ave Sanitary Sewer and Storm Water Sewer Improvements Wastewater Treatment Plant Upgrade phases 1 to 3 2011 PAVING PROJECTS North Side Highway Connector Project phase 1A Western Boundary Road Phase 3 (Ray Gibbon Drive) Arterial Road Connections to Anthony Henday Drive Landfill / Sewage Lagoon Remediation in Riel Park, phases 1 and 2 Wastewater Capacity Expansion 2011 Local Roadwork Inland Multi - Modal Logistics Park (Integrated Rail / Truck Container Depot) Phase 1

Project Location
Medicine Hat

Cost in $ Millions
$11.7

Construction Schedule

Remarks
Proposed

City of Red Deer City of Red Deer

Red Deer Red Deer

$8.6 $8.0

Proposed. Gaetz Avenue between 46 St. and 53 St. Proposed for 2013.

City of Red Deer

Red Deer

$8.5

Proposed for 2011 and / or 2012.

City of Red Deer City of Red Deer City of Red Deer City of Red Deer City of St. Albert City of St. Albert City of St. Albert

Red Deer Red Deer Red Deer Red Deer St. Albert St. Albert St. Albert

$36.0 $70.2 $5.5 $15.5 $47.0 $11.2 $24.0 2008-2011 2007-2011 2011 2011-2012

Proposed Under construction. Graham Industrial Services. Announced Announced. Northside Construction Partnership (grading Gaetz Ave to 78 St). Proposed. Giroux Rd to Villeneuve Rd. Proposed Nearing completion (phase 2).

City of St. Albert Clearwater County County of Grande Prairie

St. Albert Clearwater County County of Grande Prairie

$15.0 $5.7 $28.0

2010-2011 2011

Announced Announced. Sandstar Construction. Proposed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

19

Project Sector/ Company Name


County of Grande Prairie County of Newell County of St. Paul County of Vermilion River

Project Description
2011 Road Construction Projects County Office Building Krider Road Base and Pave ACE REGIONAL WATER SYSTEM PHASE 1 WATERMAIN CONTRACTS 1 AND 2 ACE REGIONAL WATER SYSTEM PHASE 1 WATER TRANSFER STATION Eagle Butte Road Grade, Base and Pave Infrastructure Upgrades, CFB Cold Lake Fire Station, CFB Suffield Training Accommodation Building, CFB Edmonton Community Centre, CFB Wainwright Edmonton International Airport Expansion

Project Location
County of Grande Prairie County of Newell County of St. Paul County of Vermilion River Vegreville

Cost in $ Millions
$17.3 $13.0 $5.0 $14.3

Construction Schedule
2011 2010-2012

Remarks
Announced Under construction. Ledcor Construction. Proposed

2011

Announced. Nu Edge Construction.

County of Vermilion River

$6.0

Proposed

Cypress County Defence Construction Canada Defence Construction Canada Defence Construction Canada Defence Construction Canada Edmonton Regional Airport Authority

Cypress County Cold Lake Cypress County (Ralston) Edmonton Wainwright Leduc County

$6.0 $120.0 $6.0 $11.6 $5.1 $1,800.0 2009-2012 2011-2012 2006-2015

Proposed for 2011. Under construction Proposed for 2011. Tender closes April 14. Under construction. Pentagon Structures. On hold. Originally proposed for 2011 - 2012. Under construction. Central utilities plant 2010 2011 Stuart Olson. Apron expansion Dufferin Construction. Control tower and office building 2010 - 2012 EllisDon. Main terminal expansion 2009-2012 PCL Construction. Proposed 2011 Announced Proposed for 2011 - 2013. Terminal and expanded parking. Tender for general contractor expected June 2011.

EPCOR EPCOR Fort McMurray Regional Airport Authority

North LRT Extension -- Distribution and Transmission Power Facilities 2011 WATER MAIN RENEWALS Fort McMurray Airport Upgrade / Expansion

Edmonton Edmonton RM of Wood Buffalo (Fort McMurray)

$17.0 $30.6 $198.0

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

20

Project Sector/ Company Name


Hangar Development / Edmonton Airports Lac la Biche County Lac la Biche County

Project Description
Combined Hangar / Office Building, Edmonton International Airport Wastewater Treatment Facility, Lift Station and Forcemain Wastewater Biological Nutrient Removal Facility 2011 Road Construction and Paving Programs 54 Ave Reconstruction SH 543 (Tongue Creek Rd) Extension Forestry Trunk Road Upgrading Project Phase 3 2011 LOCAL ROAD SURFACING Government Building South Shore Wastewater Project RIBSTONE ROAD, TRUCK PIT ROAD BASE AND PAVE Road Restoration Upgrades to Frank Sewer Plant 'New Water' Regional Water Project Phase 2A Twinning Highway 1

Project Location
Leduc County Lac la Biche County Lac la Biche County (Lac la Biche) Lacombe County Bonnyville MD of Foothills / High River MD of Greenview MD of Greenview Valleyview MD of Lesser Slave River MD of Wainwright Mountain View County Crowsnest Pass Northern Sunrise County Banff National Park (Castle Jct to BC border)

Cost in $ Millions
$20.0 $22.0 $5.0

Construction Schedule
2010-2011

Remarks
Under construction. Clarke Builders. Proposed for 2011 - 2012. Maple Reinders. Proposed for 2011. Maple Reinders.

Lacombe County MD of Bonnyville MD of Foothills / Town of High River MD of Greenview MD of Greenview MD of Greenview MD of Lesser Slave River MD of Wainwright Mountain View County Municipality of Crowsnest Pass Northern Sunrise County / Woodland Cree First Nation / Village of Nampa Parks Canada

$18.2 $5.6 $17.4 $10.0 $5.8 $5.2 $10.0 $5.9 $12.0 $30.0 $10.8

2011

Announced. Proposed

2010-2011

Under construction. Graham Infrastructure. Proposed

2011 2010-2011 2009-2011 2011 2010-

Announced. Wapiti Gravel Suppliers. Completed. Dawson Wallace. Under construction. Phase 4 Urban Underground Solutions. Announced. Border Paving. Proposed. Multi - year project. Proposed for 2011 - 2019. To be completed in stages over eight and a half years.

2010-2011

Announced. Good Brothers Construction (water pipeline Cadotte Lake to Little Buffalo). Under construction. Dawson Construction. Phase 3B completed.

$30.3

2009-2012

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

21

Project Sector/ Company Name


Parks Canada

Project Description
Twinning Trans - Canada Highway and Associated Bridges Km 76 to 82 RCMP Detachment Building

Project Location
Banff National Park (near Lake Louise to BC) High Level

Cost in $ Millions
$46.7

Construction Schedule
2010-2011

Remarks
Under construction. Aecon Group.

Public Works and Government Services Canada Red Deer Regional Airport Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo

$7.8

Proposed

Airport Alteration and Runway Extension REGIONAL LANDFILL CELLS 2, 3 AND STOCKPILE PAD PARSONS CREEK WATER RESERVOIR AND PUMP STATION REPLACEMENT BRIDGE FOR FORT MACKAY RIVER BRIDGE GREGOIRE EAST SANITARY OUTFALL CONTRACT 2 (HDD SIPHON) Highway 69 Improvements Contract 1 Saline Creek Outfall Sewer, Water Supply 2011 SOLID WASTE PROJECTS 2011 WATER SERVICES PROJECTS 2011 ROAD REHABILITATION AND INFRASTRUCTURE PROJECTS 2011 TRANSPORTATION PROJECTS Water Supply Line Upgrade Contract 1

Red Deer County RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (Conklin)

$6.0 $8.0 $12.0 $10.0 $14.0

On hold pending funding. Originally proposed for 2010 - 2011. Proposed Proposed Proposed Proposed

$8.0 $11.4 $23.0 $148.0 $153.0 $144.0 $12.7 2010-2011 2011 2011 2011 2011 2010-2011

Proposed. Planned construction start March. Under construction. Tri - City Contracting. Announced Announced Announced Announced Under construction. Alpha Construction.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

22

Project Sector/ Company Name


Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo

Project Description
Franklin Ave / Highway 63 Interchange Parsons Creek Site Grading Stage 2

Project Location
RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) Rocky View County Rocky View County (Dalroy to Langdon)

Cost in $ Millions
$10.0

Construction Schedule

Remarks
Proposed

$16.9

2010-2011

Under construction. Sureway Construction.

Fire Station #5 (South Station)

$19.4

2010-2011

Under construction. Marshall-Lee Construction.

Athabasca Water Treatment Plant Upgrades LOWER TOWNSITE REDEVELOPMENT (WATER LINES, SEWER LINES, STORM LINES, SURFACE WORK) LOWER TOWNSITE RESERVOIR AND PUMP STATION Lower Townsite West Loop Road Contract 1 (Roadwork, Sanitary Sewer, Watermain) Parsons Development Area Water Transmission Main Phase 1 Holding Cell Facility

$161.5

2010-2012

Under construction. Bird Construction.

$60.0

2011-2013

Announced

Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Rocky View County Rocky View County

$13.0

Proposed

$6.0

Proposed for 2011.

$12.4

2010-2011

Under construction. Tri - City Contracting.

$20.0

2011-2012

Announced. Planned construction start summer 2011. Under construction (Elbow). Balzac Devitt & Forand. Proposed

Two Fire Stations, East Balzac and Elbow Valley Wastewater Pipeline

$10.0 $18.0

2010-2011

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

23

Project Sector/ Company Name


Saddle Lake Cree Nation Santas Anonymous / Christmas Bureau of Edmonton South Red Deer Regional Wastewater Commission

Project Description
Water Treatment Plant Upgrades Contract 5 Jerry Forbes Centre for Community Spirit Regional Wastewater Pipeline

Project Location
Saddle Lake Cree Nation Edmonton

Cost in $ Millions
$7.0 $21.0

Construction Schedule

Remarks
Proposed Proposed for 2011 - 2012. Synergy Projects.

Olds to Red Deer

$96.0

2009-2014

Under construction. Three phases: Innisfail Penhold; Penhold - Red Deer; Olds - Innisfail. Olds - Innisfail section to start construction late summer 2011. Penhold - Red Deer to be built after the other two phases. Proposed for 2011 - 2012.

South Red Deer Regional Wastewater Commission (SRDRWC) / City of Red Deer Strathcona County Strathcona County Strathcona County

Wastewater Treatment Plant Upgrade Phase 4

Red Deer

$80.0

17 St Water Reservoir / Pumphouse Upgrades 2011 RURAL ROAD OVERLAY PROGRAM Ardrossan Wastewater Line

Strathcona County Strathcona County Strathcona County (Ardrossan) Strathcona County (N from Hwy 15) Strathcona County (Sherwood Park) Sturgeon County Beaumont Beaumont

$19.0 $5.1 $30.0

2009-2011 2011

Under construction. Sure - Form Construction. Announced Proposed. To be considered in 2011 budget.

Strathcona County

Rge Rd 220 Pave and Intersection Upgrade (Rge Rd 220 / Hwy 15) Firefighter Training Centre / Fire Station 6 195 Ave E and 82 St Grade, Base and Pave St. Vital Park Reservoir and Pumphouse 50 St Widening from SH625 to 41 Ave in Edmonton

$12.6

2011-2012

Announced. Carmacks Enterprises.

Strathcona County

$17.5

Proposed

Sturgeon County Town of Beaumont Town of Beaumont / City of Edmonton

$7.1 $6.2 $40.0

2010-2011 2009-2011

Under construction. Carmacks Enterprises. Nearing completion. Gabriel Construction. Proposed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

24

Project Sector/ Company Name


Town of Blackfalds Town of Bonnyville Town of Bragg Creek / Rocky View County / Province of Alberta Town of Chestermere Town of Chestermere Town of Cochrane Town of Devon Town of Didsbury Town of Drayton Valley Town of Drayton Valley Town of High River / MD of Foothills Town of Lacombe Town of Mundare Town of Okotoks Town of Peace River

Project Description
RCMP Detachment Building and Fire Station RCMP Detachment Building Water and Wastewater Treatment Facility Sanitary Forcemain Lift Station 13 (Sanitary Lift Station) Centre Avenue Redevelopment Water Treatment Plant North Industrial Area Roadwork and Stormwater Management New Water Treatment Plant WASTEWATER TREATMENT FACILITY EXPANSION BRIDGE OVER HIGHWOOD RIVER HIGHWAY 2A GRADE, BASE AND PAVE Main Street Revitalization Southridge Emergency Services Building Shaftesbury Water Treatment Plant Upgrades (part of regional water system with MD of Northern Lights) Water Treatment Plant Upgrades Treated Water Reservoir and UV Disinfection

Project Location
Blackfalds Bonnyville Rocky View County / Bragg Creek Chestermere Chestermere Cochrane Devon Didsbury Drayton Valley Drayton Valley High River Lacombe Mundare Okotoks Peace River

Cost in $ Millions
$5.3 $5.5 $26.0

Construction Schedule
2010-2011 2010-2011 2010-2012

Remarks
Nearing completion. Shunda Consulting and Construction Management. Under construction. GenMec ACL Inc. Under construction (phase 1 -- water treatment plant). Proposed for 2012 or 2013. Proposed for 2012 or 2013. Proposed for 2012

$13.8 $9.0 $9.0 $5.6 $6.4 $19.0 $7.7 $18.0 $17.1 $6.3 $11.0 $20.0 2011 2011-2012 2010-2011 2011-2012 2010-2011

Under construction. Nason Contracting Group. Proposed Proposed for 2011 - 2012. Proposed Under construction Announced. Border Paving. Under construction Announced. RCMP, municipal enforcement and fire station. Proposed for 2011 - 2012. Regional system also includes line to Dixonville, reservoir on West Hill.

Town of Slave Lake Town of Slave Lake

Slave Lake Slave Lake

$9.8 $8.1

2010-2011 2010-2011

Completed. Alpha Construction. Nearing completion. Alpha Construction.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

25

Project Sector/ Company Name


Town of Sundre Town of Sylvan Lake

Project Description
EAST SIDE SERVICING PROJECT Town Administration Building

Project Location
Sundre Sylvan Lake

Cost in $ Millions
$19.0 $6.4

Construction Schedule

Remarks
Proposed Proposed for 2011 - 2012. Tender for general contractor expected early 2011. Planned construction start mid 2011. Proposed for 2011.

Town of Sylvan Lake Town of Vauxhall / MD of Taber Town of Wetaskiwin

Lakeshore Drive Redevelopment Phase 3 Regional Water Treatment Plant and Pipework 50 Ave (Main St) Makeover (Water / Sewer Lines and Streetscape) phases 1 and 2 Water and Sewer Lines at Whitecourt Airport Water Treatment Plant Upgrades and Wastewater Lagoon Water Treatment Plant Water Treatment Plant

Sylvan Lake MD of Taber Wetaskiwin

$6.0 $19.3 $11.0 2011-2012 2011-2012

Announced. Vauxhall to Enchant and Vauxhall to Hays. Announced. Phase 1 (48 St to 50 St) in 2011, phase 2 (50 St to 53 St) in 2012. The remainder of downtown (47 St to 48 St and 53 St to 56 St) to be completed at a later date. Completed Proposed for 2011

Town of Whitecourt / Woodlands County Village of Longview Village of Thorsby Vulcan County

Whitecourt MD of Foothills (Longview) Leduc County (Thorsby) Vulcan County (near Vulcan)

$7.0 $5.8 $6.3 $6.7

2010-2011

2010-2011

Under construction. Nason Contracting Group. Proposed for 2011 - 2012.

Institutional
Acadia Foundation Acadia Foundation / East Central Housing Society AgeCare Health Services Ltd. AgeCare Health Services Ltd. Alberta Health and Wellness / Good Samaritan Society
April 01, 2011

*Procurement activities under direction of associated School Board


New Seniors Lodge Consort Lodge Renovations / Expansion 'Walden' SUPPORTIVE LIVING FACILITY Seniors Supportive Housing Units, Sagewood Lodge (Phase 1) Designated Assisted Living (DAL) Facility Hanna Special Area 4 (Consort) Calgary Strathmore Taber $15.0 $9.2 $19.8 $12.2 $13.0 2009-2011 2008-2011 2010-2011 2009-2011 Nearing completion. Kellar Construction. Completed. Shunda Consulting and Construction Management. Proposed for 2011 - 2012 Under construction On hold. FWS Construction.

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

26

Project Sector/ Company Name


Alberta Health and Wellness / University of Alberta Alberta Health and Wellness / University of Alberta Alberta Infrastructure Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness

Project Description
Edmonton Clinic South Building (Ambulatory Learning Centre) Edmonton Clinic North Building

Project Location
Edmonton

Cost in $ Millions
$300.0

Construction Schedule
2008-2012

Remarks
Under construction. PCL Construction.

Edmonton

$250.0

2008-2012

Under construction. PCL Construction Management.

Bow Island Health Centre Renovations Barrhead Healthcare Centre Redevelopment HOSPITAL RENOVATIONS

Bow Island Barrhead

$5.0 $17.3

2011-2012

Announced. Planned construction start August. Proposed. Deferred pending results of Alberta Health Services review. Proposed

Beaverlodge

$5.3

Calgary Cancer Infrastructure Plan

Calgary

$141.0

Proposed for 2012 - 2015

Cross Cancer Institute Renovations

Calgary

$67.0

Proposed

Hospital for South Calgary (South Health Campus phase 1) Pediatric Intensive Care Unit Expansion, Stollery Children's Hospital Edmonton Cancer Infrastructure Plan

Calgary

$1,310.0

2007-2012

Under construction. EllisDon Construction. Kasian Architecture / HDR Inc. Proposed for 2012 - 2013

Edmonton

$8.1

Edmonton

$67.0

Proposed

Endoscopy Suite Expansion, U of Alberta Hospital

Edmonton

$14.5

Proposed for 2011 - 2012

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

27

Project Sector/ Company Name


Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness

Project Description
Northern Alberta Urology Centre (Prostate Cancer Clinic) Norwood - Glenrose Long Term Care Facility Emergency Dept Expansion, Stollery Childrens Hospital / University of Alberta Hospital New Food Services Facility, Alberta Hospital Edson Healthcare Centre (previously described as New Hospital) Fort Saskatchewan Community Hospital QEII Hospital Emergency Room Renovations / Expansion Phase 2 High Prairie Health Complex (previously described as New Hospital) Continuing Care Centre Renovations / Upgrades and Dementia Cottage CHINOOK REGIONAL HOSPITAL FIRST FLOOR RENOVATIONS Chinook Regional Hospital Parkade

Project Location
Edmonton

Cost in $ Millions
$0.0

Construction Schedule

Remarks
Proposed for 2012 - 2013. Part of the Edmonton Clinic South project. On hold. Jen - Col Construction. Originally scheduled for 2008 - 2010.

Edmonton

$68.0

Edmonton

$18.5

2010-2012

Under construction. PCL Construction.

Edmonton

$9.5

2011-2012

Announced. Planned construction start May.

Edson

$108.0

2011-2014

Announced.

Fort Saskatchewan Grande Prairie

$87.0

2008-2012

Under construction. EllisDon Construction.

$9.0

2010-2011

Under construction. Delnor Construction.

High Prairie

$90.0

2011-2013

Announced. Planned construction start late summer 2011. On hold. Previously proposed for 2009 - 2010. Deferred pending results of Alberta Health Services review. Proposed.

Lacombe

$10.0

Lethbridge

$10.0

Lethbridge

$17.5

2010-2011

Under construction. Graham Construction.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

28

Project Sector/ Company Name


Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness / Alberta Cancer Board Alberta Infrastructure / Alberta Health and Wellness / Bethany Care Society Alberta Infrastructure / Alberta Health and Wellness / Carewest Alberta Infrastructure / Alberta Health and Wellness / Good Samaritan Society

Project Description
Chinook Regional Hospital Redevelopment Phase 1 (Addition) Lloydminster Continuing Care Project (Replacement for Nursing Home Wing at Dr. Cooke Extended Care Centre) Medicine Hat Hospital Renovations phase 1 Fort McMurray Continuing Care Centre (previously described as Long Term Care Centre) Strathcona Community County Hospital Phase 2 Strathcona Community Hospital Phase 1 Central Alberta Cancer Centre Radiation Therapy Clinic (Cancer Clinic) Long Term Care Centre (Affordable Supportive Living Spaces)

Project Location
Lethbridge

Cost in $ Millions
$112.7

Construction Schedule
2012-2015

Remarks
Announced

Lloydminster

$40.0

Proposed for 2011 - 2012.

Medicine Hat

$200.0

2011-2015

Announced. Site work in 2011.

RM of Wood Buffalo (Fort McMurray) Strathcona County (Sherwood Park) Strathcona County (Sherwood Park) Red Deer

$35.0

Proposed for 2011 - 2012.

$69.0

Proposed for 2013 - 2014

$84.0

2010-2012

Under construction. EllisDon Construction. CASA House completed. Under construction. Stuart Olson Dominion Construction.

$59.5

2010-2013

Didsbury

$26.5

Proposed for 2011 - 2012.

'Community of Care' Personal Care Facility Good Samaritan Care Centre Replacement Facility

Strathmore

$35.0

On hold. Project scope under review by Alberta Health Services. 2010-2011 Under construction. Chandos Construction.

Stony Plain

$31.0

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

29

Project Sector/ Company Name


Alberta Infrastructure / Alberta Health and Wellness / Grande Prairie Regional College Alberta Infrastructure*

Project Description
Grande Prairie Regional Healthcare Centre (Peace Country Health Centre) Four High Schools

Project Location
Grande Prairie

Cost in $ Millions
$520.0

Construction Schedule
2011-2014

Remarks
Announced. Planned construction start fall 2011. Includes cancer treatment centre.

across Alberta

$96.8

2010-2012

Under construction. Clark Builders. Edmonton (Mother Margaret Mary Grades 10-12), Calgary (Northwest Grades 10-12), Spruce Grove (St. Peter the Apostle Grades 9-12) and Sherwood Park (Archbishop Jordan Grades 9-12). Under construction. Western Canada HS. Clark Builders. Under construction. West Calgary High School. Stuart Olson Constructors. Under construction. Lord Shaughnessy HS. Westcor Construction. Under construction. St. Anthony's. Under construction. Victoria School of Performing and Visual Arts. Aman Building Corp. Under construction. Prince Charles and Forest Heights Schools. Synergy Projects. Under construction. Eastglen High School. Jen Col Construction. Under construction. Fort Saskatchewan Elementary School / Christian School. Chandos Construction. Proposed. Griffiths - Scott Middle School.

Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure*

Modernization Replacement School for Ernest Manning HS CAREER AND TECHNOLOGY CENTRE MODERNIZATION New School (K to Grade 12) Replacement Facility Modernization (previously listed as Renovations) Renovations Addition / Modernization Replacement School (Grades 5 to 9) Elementary School (K to Grade 6) Modernization

Calgary Calgary Calgary Drumheller Edmonton Edmonton Edmonton Fort Saskatchewan Millet Olds Picture Butte

$35.0 $33.6 $6.2 $13.5 $60.0 $6.0 $7.8 $13.2 $5.4 $8.0 $13.4

2009-2011 2009-2011 2011 2008-2011 2008-2011 2010-2011 2010-2011 2009-2011

2010-2011 2010-2011

Completed. Holy Trinity. Reed Atwood Builders. Nearing completion. Picture Butte Jr / Sr High School. Western Construction and Combustion Services. Under construction. Ponoka Composite HS. Graham Construction.

Alberta Infrastructure*

Modernization (Phases 1 and 2)

Ponoka

$11.0

2010-2012

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

30

Project Sector/ Company Name


Alberta Infrastructure*

Project Description
High School (Grades 7 to 12), Timberlea New Junior High School (Grades 7 to 9) High School (Grades 7 to 12) Modernization / Addition Modernization Modernization Ten Schools (P3 Project)

Project Location
RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Fort McMurray) Slave Lake Smoky Lake County (Vilna) Vauxhall Vauxhall across Alberta

Cost in $ Millions
$53.0

Construction Schedule
2009-2011

Remarks
Nearing completion. Holy Trinity, including performing arts centre. Aman Building Corp. Under construction. Ecole McTavish Jr HS. Dowland Contracting. Completed. St. Francis of Assisi. UFA Construction. Completed. Vilna School. Binder Construction. Under construction. Vauxhall Elementary. UFA Construction. Under construction. Vauxhall HS. UFA Construction. Under construction. Edmonton (three K to Grade 9), Calgary(four Grade 5 to 9, one K to Grade 9), Okotoks (K to Grade 9) and Langdon (Sarah Thompson School, K to Grade 4). Announced. Planned construction start summer 2012. Proposed for 2013 - 2015. Consolidation of St. Basil's, Assumption and St. Patrick's parishes.

Alberta Infrastructure*

$40.8

2010-2011

Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* Alberta Infrastructure* / B2L Partnership

$13.7 $10.2 $6.1 $15.5 $253.0

2009-2011 2010-2011 2010-2011 2010-2011 2010-2012

Alberta Solicitor General and Public Security All Saints Parish All Seniors Care Living Centres Athabasca University Bearspaw Christian School Bethany Care Society Bethany Group Bow Valley College

Provincial Police and Peace Officer Training Centre New Catholic Church 'Laurel' Retirement Residence Laboratory Addition / Renovations Athletics Facility Affordable Housing Complex, Riverview Village 'Peace Hills Lodge' Seniors Facility Campus Redevelopment and Expansion

Fort MacLeod Lethbridge Edmonton Athabasca Calgary Calgary Wetaskiwin Calgary

$120.0 $15.0 $20.0 $11.0 $5.6 $11.0 $8.5 $170.0

2012-2013

2010-2012 2010-2011 2010-2011 2011-2013 2009-2011 2006-2012

Under construction. Man - Shield Construction. Completed Completed Announced. Planned construction start spring 2011. Nearing completion. Replacement for current Peace Hills Lodge. Under construction. Stuart Olson Constructors.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

31

Project Sector/ Company Name


Brenda Stafford Foundation Calgary Academy / Tanbridge Academy Calgary Board of Education Carrington Communities Choices in Community Living Inc. Christenson Communities Ltd. / Good Samaritans Society City of Calgary City of Edmonton City of Edmonton City of Edmonton City of Red Deer City of Red Deer Continuum Health Care / Eldercare Communities Continuum Health Care Holdings Ltd. Covenant Health

Project Description
Affordable Assisted Living Facility 'The Academies' Shared Campus (K to Grade 12 Educational Space and Recreation Centre) Education Centre Including Dr. Carl Safran Centre Seniors Complex Rebuild after Fire 'Copper Sky Lodge' Assisted Living Facility Royal Oak Village Seniors Housing Phases 2 and 3 (Phase 2 Life Lease, Phase 3 Designated Assisted Living) Signal Hill Library Addition / Renovation Library Renovations / Expansion, Highlands NEW LIBRARY BRANCH MILL WOODS Jasper Place Library Renewal / Expansion Civic Centre (City Hall) Renovations / Expansion Phase 1 Native Friendship Centre Supportive Living Complex Affordable Supportive Living Units, Sunrise Village New Designated Assisted Living Facility

Project Location
Okotoks Calgary

Cost in $ Millions
$15.3 $60.0

Construction Schedule
2010-2012

Remarks
Under construction. Medican Construction. Proposed for 2010 - 2011.

Calgary Edmonton Spruce Grove Lacombe

$80.5 $10.0 $28.0 $16.8

2008-2011

Under construction. EllisDon Construction. Proposed. Planned completion by spring 2012.

2010-2012 2010-2012

Under construction. Krawford Construction. Announced. Planned construction start Phase 3 fall 2010. Phase 2 (life lease) to follow phase 3.

Calgary Edmonton Edmonton Edmonton Red Deer Red Deer High River Camrose Red Deer

$5.4 $9.5 $30.0 $14.0 $58.5 $5.0 $6.0 $11.0 $25.0

2010-2011

Completed. Devitt and Forand Contractors. Proposed Proposed

2011-2012

Announced On hold. Project has been deferred to 2015 in 2010 budget. Proposed. Estimated cost range $5M to $8M. Proposed

2009-2011

Completed. Shunda Consulting and Construction Management. Proposed for 2011 - 2012. In design stage.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

32

Project Sector/ Company Name


Extendicare Fort McMurray Family Crisis Society Fresh Start Recovery Centre Government of Alberta Grande Prairie and District Society for Christian Education Grant MacEwan University Green Acres Foundation High Prairie School Division Kopernik Polish Heritage Society / Good Samaritan Society Lac Ste. Anne Foundation LDS Church Mount Royal University

Project Description
Seniors Facility, Eaux Claires New Women's Shelter

Project Location
Edmonton RM of Wood Buffalo (Ft McMurray) Calgary Edmonton Grande Prairie

Cost in $ Millions
$25.2 $50.0

Construction Schedule
2009-2011

Remarks
Under construction Proposed

Special Care Facility New Remand Facility School Expansion (Phases 1 to 3)

$6.8 $620.0 $9.0

2009-2011 2008-2012 2010-

Nearing completion Under construction. Stuart Olson Constructors. Under construction (phase 1).

University Service Centre Building Sunny South Lodge Modernization / Renovations Support Services Building Kopernik Seniors Complex and Community Centre Pleasant View Lodge Modernization (New Building) LDS Calgary Temple 'The Bella Concert Hall' Conservatory of Music / Performance Hall Library Roderick Mah Centre for Continuous Learning Expansion and Technology Wing Expansion Seniors Lodge and Life Lease Building (Replacement Facility for Mount View Seniors Lodge)

Edmonton Coaldale High Prairie Edmonton

$20.0 $6.8 $10.0 $55.0

2010-2011 2009-2011

Completed Completed. Sebring Construction. Proposed. Pending funding approval. On hold

Mayerthorpe Calgary Calgary

$14.0 $24.5 $73.0

2010-2011 2010-2011

Completed. Krawford Construction. Announced Proposed. Planned completion in 2013.

Mount Royal University Mount Royal University

Calgary Calgary

$41.0 $35.5 2009-2011

Proposed. Pending funding. Nearing completion. PCL Construction.

Mountain View Seniors Housing

Olds

$21.6

2008-2011

Completed. Shunda Consulting and Construction Management.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

33

Project Sector/ Company Name


Oi Kwan Foundation Peace Country Health / Chantelle Management Ltd. Points West Living Cold Lake / Alberta Health Services Points West Living Inc. Points West Living Inc. Points West Living Ltd. Public Works and Government Services Canada Public Works and Government Services Canada Public Works and Government Services Canada Public Works and Government Services Canada Red Deer College

Project Description
Oi Kwan Place Addition / Renovations Grande Prairie Campus of Care

Project Location
Calgary Grande Prairie

Cost in $ Millions
$22.1 $20.0

Construction Schedule
2010-2012 2010-2011

Remarks
Under construction. Graham Construction. Under construction. Nahanni Construction.

Supportive Living Facility

Cold Lake

$17.0

Proposed

Supportive Living Units, Westgate Seniors Assisted Living Facility Continuing Care Facility (Affordable Supportive Living Spaces) Bowden Institute Expansion

Grande Prairie Grande Prairie Stettler Bowden

$11.0 $35.0 $8.8 $8.8 2009-2011 2011-2012 2011

Proposed for 2011. Nearing completion Announced Announced. UPA Construction Group.

Drumheller Institute Expansion

Drumheller

$25.0

Proposed

Edmonton Maximum Security Institution Expansion Edmonton Institute for Women Addition / Renovations Sports and Wellness Centre and Health Education Centre (Building Communities Through Learning Phase 2) Westview Lodge Replacement Facility New Seniors Residence (Supportive Living Units)

Edmonton

$22.7

Proposed

Edmonton

$8.0

Proposed.

Red Deer

$100.0

On hold.

Rocky Senior Housing Council Rocky View Foundation

Rocky Mountain House Crossfield

$10.0 $9.2

2010-2012 2010-2012

Under construction. Chandos Construction. Two phases. Under construction. Keller Construction.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

34

Project Sector/ Company Name


Santos Property Inc. Shalem Society for Senior Citizens Care Slim Thorpe Recovery Centre Southern Alberta Institute of Technology (SAIT) Stoney Tribal Administration Strathcona Shelter Society

Project Description
'The Gardens at Highway 2' Assisted Living Facility Phase 1 CARE CENTRE (SENIOR CITIZENS HOME) New Detox and Treatment Facility

Project Location
Red Deer Calgary County of Vermilion River (W of Blackfoot) Calgary Stoney IR 142,143,144 (Morley) Strathcona County (Sherwood Park) Calgary

Cost in $ Millions
$23.0 $5.8 $16.2

Construction Schedule

Remarks
Proposed for 2011 - 2012. Proposed

2009-2011

Under construction

Trades and Technology Complex Elementary School

$445.0 $12.0

2010-2012 2010-2011

Under construction. PCL Construction. Under construction. Trumbley and Hampton.

NEW WOMEN'S SHELTER (REPLACEMENT BUILDING FOR 'A SAFE PLACE') Experiential Learning Centre (ELC)

$6.8

Proposed

The University of Calgary

$300.0

2008-

Under construction (phase 1 Energy, Environmental, Experiential Learning Centre). EllisDon. Completed. Cana Construction. Completed. Intertech Construction Group. Completed. EllisDon Construction. Under construction. PCL Construction. Announced Announced. Graham Construction. Completed. Graham Construction.

The University of Calgary The University of Calgary The University of Calgary The University of Calgary The University of Calgary The University of Calgary The University of Calgary / NorthWest Healthcare Properties
April 01, 2011

Taylor Family Digital Library (TFDL) New Student Residence (Yamnuska Hall) Schulich School of Engineering Renovation / Expansion Phase 1 Interior Alterations, Clara Christie Centre for Mouse Genomics SCIENCE BUILDING 'A' RENOVATIONS / REMEDIATION WASTEWATER TREATMENT PLANT Renovation of Former 8th and 8th Health Centre for Urban Campus

Calgary Calgary Calgary Calgary Calgary Calgary Calgary

$163.0 $60.0 $23.4 $6.0 $8.0 $16.0 $40.0

2008-2011 2009-2011 2009-2011 2010-2011 2011-2013 2011-2013 2009-2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

35

Project Sector/ Company Name


Town of Beaverlodge / Integrated Life Care Inc. Town of High River Town of Innisfail

Project Description
Seniors' Supportive Living Facility Library Expansion and Theatre Complex Innisfail Gathering Place (New Library, Seniors Centre and Meeting Rooms) 'Glenway' Seniors Housing Facility STUDENT PHYSICAL ACTIVITY AND WELLNESS CENTRE Stem Cell Research Facility CPOC Building Devonian Botanic Garden Ecological Learning Centre Performing Arts Centre, Augustana Campus APERTURE RESIDENTIAL PARK STUDENT RESIDENCES PHASE 3 (APARTMENTS) Performing Arts Centre Pembina Lodge Expansion 'Elk Island View - Bison Place' Assisted Living Facility

Project Location
Beaverlodge High River Innisfail

Cost in $ Millions
$15.0 $16.7 $9.0

Construction Schedule

Remarks
On hold Proposed.

2010-2011

Nearing completion. Pentagon Structures.

Trinity Place Foundation University of Alberta University of Alberta University of Alberta University of Alberta University of Alberta / City of Camrose / Camrose County University of Lethbridge

Calgary Edmonton Edmonton Edmonton Parkland County Camrose

$6.0 $57.0 $26.5 $35.0 $30.0 $11.5 2009-2011

Proposed. Planned start July 2010. Proposed. Four - year project. Proposed. Planned completion in 2 1/2 years (mid 2013). Under construction. Chandos Construction. Proposed Proposed. Fundraising underway.

Lethbridge

$15.0

Proposed for 2012.

Webber Academy Westlock Foundation Wimco Properties Ltd.

Calgary Westlock Lamont

$9.9 $14.4 $6.0

2010-2011

Under construction. Stuart Olson Dominion. Proposed On hold pending improved market conditions.

Manufacturing
Fiberex Glass Corp. Hi - Tech Canada Developments Ltd. Manufacturing Plant Manufacturing Plant Phase 2 Leduc Ponoka $30.0 $12.0 Proposed. Pending funding. On hold. Fundraising underway.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

36

Project Sector/ Company Name


Hi Tech Canada Development Inc. Hi Tech Canada Development Ltd. Lafarge Canada Leading Manufacturing Group Ltd. Quantiam Technologies

Project Description
Manufacturing Plant Phase 3 Manufacturing Plant Phase 4 Plant Modernization (Upgrades and Development) Oil Tank Manufacturing Facility Furnace Coatings Manufacturing Facility

Project Location
Ponoka Ponoka MD of Bighorn (Exshaw) Vermilion Edmonton

Cost in $ Millions
$6.0 $12.0 $600.0 $5.0 $9.2

Construction Schedule

Remarks
Proposed for 2011. Pre - built building to be assembled on site. On hold. Dependent on market conditions. Proposed

2010-2011 2010-2011

Announced. Planned construction start fall 2010. Completed. Scott Builders.

Mining
Alter NRG Corp. Coalspur Mines Ltd. Fox Creek Coal Gasification Project 'Vista' Thermal Coal Mine MD of Greenview (near Fox Creek) Yellowhead County (near Hinton) Grande Cache Grande Cache RM of Wood Buffalo (N of Ft McMurray) $4,500.0 $185.0 On hold. Defining project scope. Looking for strategic partner. Proposed for 2013 - 2014.

Grande Cache Coal Corporation MAXIM Power Corp. Parsons Creek Aggregates

Development of #8 Surface Mine and #12 South B2 Underground Mine Development of #14 Coal Mine Parsons Creek Aggregates Limestone Quarry

$180.0 $50.0 $30.0

2009-2012

Under construction. ERCB approval for #8 mine November 2009. Proposed for 2010 - 2011. ERCB approval October 2009. Proposed for 2011 - 2012, pending approvals.

Oil & Gas


AltaGas Income Trust Harmattan Co - Stream Project Mountain View County (Harmattan complex) MD of Big Lakes $100.0 2011-2012 Announced. Cost range $100M to $120M. ERCB approval December 2010.

Free Energy International Inc.

Geothermal Heat to Power Plant(s)

$7.0

Proposed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

37

Project Sector/ Company Name


Inclusive Energy Ltd.

Project Description
Liquids Storage Facility

Project Location
Yellowhead County (near Edson) near Vegreville across Alberta MD of Opportunity MD of Big Lakes (Swan Hills area)

Cost in $ Millions
$40.0

Construction Schedule

Remarks
Proposed. Planned completion spring 2011.

Paramount Energy Trust Pembina Pipeline Corp. Sunshine Oilsands Swan Hills Synfuels LP

Conversion of Depleted Gas Pool to Natural Gas Storage Facility Midstream Capital Projects 20112013 'Muskwa' Heavy Oil Project Phase 1 Coal Gasification Plant

$37.0 $225.0 $31.0 $1,000.0

2010 2011-2013

Announced Announced Proposed. Five phases in total. Proposed for 2011 - 2014. PCL Industrial Management (syngas processing facility).

Oil Sands
Alberta Oilsands Inc. 'Clearwater West' SAGD Production RM of Wood Buffalo (S of Fort McMurray) RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo Sturgeon County (near Redwater) RM of Wood Buffalo (N of Fort McMurray) RM of Wood Buffalo (SE of Conklin) Lac la Biche County $415.0 Proposed. Planned construction start in 2011, pending approvals. Application filed January 2010. On hold pending financing. Proposed. Approved Jan 2004. 2010-2013 2012-2014 Under construction. Application approved Q3 - 2010. Announced. EPC SNC-Lavalin, PCL Industrial Management. Site preparation complete. On hold. Owner expects construction start 2014.

BP Canada / Value Creation Inc. Canadian Natural Resources Ltd. (CNRL) Canadian Natural Resources Ltd. (CNRL) Canadian Natural Resources Ltd. (CNRL) / North West Upgrading Inc. Cenovus Energy

'Terre de Grace' SAGD Oil Sands Project 'Project Horizon' Mining and Drilling Project phase 2 / 3 'Kirby' In - Situ Oil Sands Project Phase 1 Bitumen Upgrader Phase 1

$3,500.0 $1,080.0 $1,250.0 $4,000.0

'Borealis' SAGD Project Phase 1

$1,000.0

Cenovus Energy Inc.

Christina Lake Thermal Expansion Project Phases 1E, 1F and 1G

$3,000.0

Proposed for 2011 - 2016. Applications filed October 2009. Estimated construction Phase 1E 2011- 2014; Phase 1F 2012 - 2015; Phase 1G 2014 - 2016. 2011-2017 Announced. ERCB approval September 2010. Site preparation underway. 38

Cenovus Energy / ConocoPhillips


April 01, 2011

'Foster Creek' Oil Sands Project Phases F, G and H

$2,000.0

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Cenovus Energy Inc. / ConocoPhillips Connacher Oil & Gas Ltd.

Project Description
'Narrows Lake' In Situ Oil Sand Project using Solvents 'Great Divide' SAGD Expansion Phase 1 'Surmont Phase 2' Oil Sands Development 'Jackfish' Oil Sands Project Phase 3

Project Location
RM of Wood Buffalo (Narrow Lake) RM of Wood Buffalo (S of Ft McMurray) RM of Wood Buffalo RM of Wood Buffalo (SE of Conklin) RM of Wood Buffalo (SE of Conklin) RM of Wood Buffalo Strathcona County RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (SW of Fort McMurray) northern Alberta RM of Wood Buffalo (near Ft McMurray)

Cost in $ Millions
$1,600.0

Construction Schedule

Remarks
Proposed. Application filed early February.

$600.0

Proposed for 2012 - 2013

ConocoPhillips Canada / Total Canada Devon Canada Corp.

$2,000.0 $1,000.0

2010-2014

Under construction Proposed for 2011 - 2015. Application filed Q3 2010.

Devon Canada Corp.

'Jackfish' SAGD Oil Sands Project Phase 2 (J2) 'Dover' COMMERCIAL OILSANDS PROJECT PHASE 1 Terminal Tankage (Storage Capacity) Expansion Phases 1 and 2 'Poplar Creek' Bitumen Extraction Project 'Fort Hills' Oil Sands Mine

$1,060.0

2008-2011

Completed

Dover Operating Corp. (Dover OPCO) Enbridge Inc. E-T Energy Ltd. Fort Hills Energy Corp. (Suncor Energy Inc. / Total SA / Teck Cominco) Grizzly Oil Sands ULC

$2,500.0 $260.0 $103.0 $9,600.0

Proposed for 2013 - 2015. Application filed February 2011. Five phases in total. Proposed for 2011 - 2012, pending regulatory approval. Proposed for 2011 - 2013. Planned construction start late 2011, pending regulatory approvals. Proposed. Corporate approval for construction expected by end of 2012. Planned to come onstream in 2016. Proposed for 2011 - 2012. SNC - Lavelin.

'Algar Lake' SAGD Oil Sands Project

$500.0

Horizon North Logistics Inc. Horizon North Logistics Ltd.

Oil Sands Work Camp OIL SANDS ACCOMMODATION CAMP

$25.0 $20.0 2011

Proposed Announced

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

39

Project Sector/ Company Name


Husky Energy Inc. / BP PLC Husky Energy Inc. / BP Plc. Imperial Oil Ltd. Imperial Oil Resources / ExxonMobil Canada Ivanhoe Energy

Project Description
'Sunrise Thermal Project' SAGD Oil Sands Project Phase 1 'Sunrise Thermal Project' Phase 2 'Nabiye' Oil Sands Project 'Kearl Lake' Oil Sands Mine Phase 1

Project Location
RM of Wood Buffalo (N of Fort McMurray) RM of Wood Buffalo MD of Bonnyville (Cold Lake area) RM of Wood Buffalo RM of Wood Buffalo (near Fort McMurray) RM of Wood Buffalo (S of Fort McMurray) RM of Wood Buffalo (SE of Conklin) RM of Wood Buffalo (SE of Conklin) MD of Opportunity

Cost in $ Millions
$2,500.0

Construction Schedule
2012-2013

Remarks
Announced. SaipamSpA. Application approved. Corporate approval Nov 2010. WorleyParsons Canada EPC field facilities. On hold pending review of costs and project optimization Proposed. Planned on - stream by 2015.

$1,900.0 $1,300.0 $8,000.0 2009-2012

Under construction. Three production trains / phases in total. Application approved (all phases). AMEC (EPC). Fluor Corp infrastructure and facilities. Proposed for 2012 - 2013. Application filed November 2010. Proposed for 2011 - 2014. Application filed. Approval expected Q3 2011

'Tamarack' Bitumen Project Phase 1

$1,250.0

Japan Canada Oil Sands Limited (JACOS) / Nexen Inc. Korea National Oil Company (KNOC) Korea National Oil Corporation (KNOC) Laricina Energy Ltd.

Hangingstone SAGD Commercial Production Project 'BlackGold' In Situ Oil Sands Project Phase 1 'BlackGold' Oil Sands Project Phase 2 'Germain' Commercial Demonstration Project (Solvent Cyclic SAGD) In Situ Oil Sands Project Phase 2B

$1,200.0

$300.0

2011-2012

Announced. GS Engineering and Construction Corp.

$540.0

Proposed for 2013 - 2015, pending approvals.

$250.0

Proposed for 2011 - 2012, pending approvals. Smaller scale pilot plant approved by ERCB completed. 2011-2012 Announced. Planned construction start early 2011. Corporate approval December 2010. Proposed On hold due to uncertain financial markets and escalating capital cost. Cost estimates are preliminary. Corporate approval deferred til late 2011. 40

MEG Energy Corp.

RM of Wood Buffalo (Christina Lake) RM of Wood Buffalo RM of Wood Buffalo

$1,400.0

N-Solv Corp. OPTI Canada / Nexen Inc.

Pilot Plant 'Long Lake South' SAGD Project Phase 2 (Kinosis)

$50.0 $2,790.0

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


OPTI Canada Inc / Nexen Inc. Osum Oil Sands Corp. Pengrowth Energy Trust Penn West Energy Trust / China Investment Corp. Petrobank Energy and Resources PTI Group

Project Description
Ash Processing Pit (part of Long Lake project) 'Taiga' Oil Sands Project SAGD Pilot Project, Lindbergh Development of Seal Lake Operations 'May River' Commercial Bitumen Project Phase 1 Wapasu Creek Lodge Expansion

Project Location
RM of Wood Buffalo MD of Bonnyville (N of Cold Lake) RM of Wood Buffalo MD of Big Lakes (N of High Prairie) RM of Wood Buffalo RM of Wood Buffalo (N of Fort McMurray) MD of Bonnyville (Hilda Lake) RM of Wood Buffalo / Strathcona County near Ft Saskatchewan to Thorhild Cty Northern Sunrise County (NE of Peace River) RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (N of Fort McMurray)

Cost in $ Millions
$175.0 $1,570.0 $50.0 $150.0 $250.0 $460.0

Construction Schedule
2008-2011

Remarks
Under construction. Proposed for 2011 - 2018. Application filed January 2010.

2011 2010-2011

Announced Announced Proposed for 2010 - 2012. Application filed December 2008. FEED underway.

2009-2011

Nearing completion

Royal Dutch Shell

'Orion' Heavy Oil SAGD Facility (Phases 1 and 2) ATHABASCA OIL SANDS PROJECT DEBOTTLENECK PHASE 1 'Quest' CARBON CAPTURE AND STORAGE PROJECT 'Carmon Creek' Bitumen Project

$340.0

2005-2010

On hold. Phase 1 completed, phase 2 on hold pending review. Approved Oct 2004. Phased development, building to 20,000 bpd. Proposed. Muskeg River Mine, Jackpine Mine and Scotford. Corporate decision in 2011.

Shell Canada

$2,000.0

Shell Canada / Chevron / Marathon Oil Shell Canada Ltd.

$900.0

Proposed for 2012 - 2015. Pending corporate approval. Application filed November 2010. Proposed for 2011 - 2016. Two central processing facilities and three co-generation units. Proposed. Application to be filed early 2011. Approval expected in 2014. Proposed. Application to be filed with Frontier in early 2011. 2011-2012 Under construction. Application filed May 2009. Approval October 2010.

$3,450.0

SilverBirch Energy SilverBirch Energy Southern Pacific Resource Corp.

'Frontier' Oil Sands Mine Phase 1 'Equinox' Oil Sands Mine (Lease 14) 'McKay' SAGD Oil Sands Project Phase 1

$6,000.0 $2,500.0 $450.0

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

41

Project Sector/ Company Name


Suncor Energy Inc. Suncor Energy Inc. Suncor Energy Inc. Suncor Energy Inc. Suncor Energy Inc.

Project Description
North Steepbank Mine Extension 'Voyageur South' Oil Sands Mining Operation 'Firebag' Oil Sands Project Phase 4 'Firebag' Oil Sands Project Stage 3 MacKay River SAGD Expansion

Project Location
RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (NW of Fort McMurray) RM of Wood Buffalo RM of Wood Buffalo (N of Fort McMurray) MD of Opportunity RM of Wood Buffalo RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Mildred Lake) RM of Wood Buffalo RM of Wood Buffalo (S of Ft McMurray)

Cost in $ Millions
$400.0 $4,400.0 $2,000.0 $900.0 $1,000.0

Construction Schedule

Remarks
On hold. Application approved November 2006. On hold pending market conditions. Application filed July 2007. Corporate approval January 2008. Proposed for 2011 - 2013. ERCB approval March 2010.

2010-2011

Nearing completion. Cord WorleyParsons. On hold pending review of project costs. Application filed Dec 2005.

Suncor Energy Inc. / Total SA Suncor Energy Services

'Voyageur' Oil Sands Third Upgrader (U3) 'Firebag' Administration Complex and Village Camp Core 'West Ells' Oil Sands Project South West Sand Storage Conversion Phase 4: Upgrader Expansion Phase 2 / Aurora South Mine Trains 1 and 2 Sulphur Emission Reduction Program (SERP) Joslyn North Mine

$11,600.0 $177.0

2011-2016

Announced. Project does not include bitumen feed to upgrader. On hold. Bird Construction.

Sunshine Oilsands Syncrude Canada Ltd. Syncrude Canada Ltd.

$385.0 $34.6 $2,300.0

Proposed for 2011 - 2012. Proposed. Application filed. Proposed. Pre-engineering study underway (AMEC). Expansion SNC-Lavalin, Fluor Daniel. Train 3 AMEC. 2005-2011 Under construction

Syncrude Canada Ltd.

$1,600.0

Total E&P Canada Ltd. / Suncor Energy Inc. TriStar

$6,000.0

Proposed. Application filed early 2006. ERCB conditional approval January 2011. Corporate approval to proceed expected by end of 2012. Proposed

SAGD Pilot Project

$100.0

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

42

Project Sector/ Company Name


Williams Canada

Project Description
OFF- GAS EXTRACTION PLANT MODIFICATIONS AND CONSTRUCTION OF DE ETHANIZER

Project Location
RM of Wood Buffalo and Redwater

Cost in $ Millions
$311.0

Construction Schedule
2011-2013

Remarks
Announced

Other Industrial
Defence Construction Canada Defence Construction Canada Defence Construction Canada Defence Construction Canada Public Works and Government Services Canada TransAlta Corp. / TransCanada Pipelines Ltd. Range Control Facility, CFB Suffield Land Force Western Area Headquarters, CFB Edmonton Kitting Facility, Canadian Manoeuvre Training Centre, CFB Wainwright Maintenance Facility, CFB Wainwright Lethbridge Research Centre Building 102 Exterior Envelope Replacement 'Project Pioneer' Carbon Capture and Storage (CCS) Project at Keephills Cypress County Edmonton Wainwright Wainwright Lethbridge $5.1 $17.0 $19.5 $30.0 $8.0 2011-2012 Under construction. Wahl Construction. Proposed for 2011. Proposed for 2011. Cost estimate includes demolition of existing facility. Pending approval. Proposed for 2011 - 2013. Tender call anticipated spring 2011. Proposed. Tenders close April 19.

Parkland County

$1,400.0

Proposed for 2012 - 2014. FEED underway.

Pipelines
Athabasca County Enbridge Inc. Enbridge Inc. Enbridge Inc. Enbridge Inc. Athabasca Regional Water Pipeline 'Athabasca' Pipeline Capacity Expansion 2 'Waupisoo' Pipeline Expansion 'Norealis' Bitumen Pipeline, Husky Sunrise to Cheecham Terminal 'Wood Buffalo' Crude Oil Pipeline County of Athabasca between Cold Lake and Hardisty Edmonton to Fort McMuyrray RM of Wood Buffalo RM of Wood Buffalo $28.0 $200.0 $400.0 $475.0 $370.0 2011-2013 Proposed for 2011 - 2012. From Boyle to Grassland / Wandering River. Proposed. To be completed by early 2014. Announced. Planned construction start June 2011. Proposed for 2012 - 2013. Proposed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

43

Project Sector/ Company Name


Enbridge Inc. Enbridge Inc.

Project Description
Pipelines and Terminal Facilities, Christina Lake Heavy Oil Project 'Athabasca' Oil Pipeline Expansion 1

Project Location
RM of Wood Buffalo RM of Wood Buffalo to Hardisty RM of Wood Buffalo to near Edmonton RM of Wood Buffalo (Kearl to Cheecham Terminal) RM of Wood Buffalo to Alberta / BC border near Edmonton to Camrose and Lacombe Counties Cty of Forty Mile / MD of Taber Cold Lake area Cold Lake area Edmonton area to Kearl Lake oilsands project central Alberta central Alberta Edmonton / Fort Saskatchewan

Cost in $ Millions
$250.0 $185.0

Construction Schedule

Remarks
Proposed Proposed for 2012 - 2013. Application to be filed early 2011. On hold til markets improve. Originally proposed for 2010 - 2012. Pending approvals. Proposed for 2011 - 2012

Enbridge Inc.

'Fort Hills' Bitumen / Diluent Pipelines and Terminal Facilities 'Woodland' BITUMEN PIPELINE

$2,000.0

Enbridge Pipelines

$100.0

Enbridge Pipelines Inc.

'Northern Gateway' Bitumen and Condensate Pipelines (Alberta portion) CO2 Pipeline (Alberta Carbon Trunk Line)

$1,500.0

Proposed for 2014 - 2015. Application filed May 2010. Construction cost entire pipeline (Alberta and BC) $5.5 billion. 2012-2014 Announced. Revised application submitted to ERCB November 2010.

Enhance Energy Inc.

$600.0

Highway 3 Water Committee Inter Pipeline Fund Inter Pipeline Fund Inter Pipeline Fund

Regional Water System Bow Island / Grassy Lake / Burdett PIPELINE SYSTEM CONNECTION UPGRADES AND EXPANSIONS COLD LAKE MAIN LINE EXPANSION 'Polaris Pipeline' Expansion / Extension of Existing Diluent Pipeline Pipeline and Storage Facilities 'Carlos' NATURAL GAS PIPELINE Pipeline and Connections

$8.5 $14.0 $11.0 $135.0 2011 2011

Proposed Announced Announced Proposed for 2010 - 2012. Planned construction start mid - 2010 pending approvals. 2010 2010-2011 Completed Nearing completion Proposed

Keyera Corp. Keyera Corp. Keyera Corp.

$11.0 $30.0 $58.0

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

44

Project Sector/ Company Name


Keyera Corp.

Project Description
Two 4KM Pipelines Connecting new ADT Facility to Fort Saskatchewan Pipeline System Water Line Twinning

Project Location
Edmonton / Strathcona County Innisfail to Olds

Cost in $ Millions
$18.0

Construction Schedule
2011

Remarks
Under construction. One pipeline has been completed, the other is nearing completion. Under construction (Phase 1 nearing completion).

Mountain View Regional Water Services Commission Pembina Pipeline Corp.

$34.0

2010-

Willesden Green Pipeline Expansion, Trunk Line Improvements and Debottlenecking Drayton Valley Trunk Line Extension Pipeline Debottleneck and Construction of Truck Terminals Oil Pipeline Capacity Expansion PIPELINE REACTIVATION / RECERTIFICATION 'Nipisi' Heavy Oil and 'Mitsue' Condensate Pipelines 'Rainbow Pipeline II' Butane and Condensate Pipeline

across Alberta

$40.0

2011-2012

Announced

Pembina Pipeline Corp. Pembina Pipeline Corp. Pembina Pipeline Corp. Pembina Pipeline Corp.

central Alberta central Alberta central Alberta Yellowhead County (Edson area) Slave Lake and Whitecourt areas to Edmonton Northern Sunrise County to Strathcona County Swan Hills to Whitecourt Counties of Vermilion River, Minburn and Two Hills Fort McMurray to Redwater

$6.0 $11.0 $23.0 $15.0 2010-2011 2011

Proposed Proposed Announced. Pipeline runs from Willseden Green to Buck Creek. Announced

Pembina Pipelines Income Fund Plains Midstream Canada (Plains)

$440.0

2010-2011

Under construction

$200.0

Proposed for 2011 - 2012.

Swan Hills Synfuels Vermilion River Regional Water System (VRRWS)

Synthetic Gas Pipeline Regional Water System Phase 1

$50.0 $31.2

Proposed Proposed

Williams Energy

'Boreal' Natural Gas Liquids (NGL) Pipeline

$283.0

2010-2011

Announced. $US.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

45

Project Sector/ Company Name Power


Alberta Electric System Operator (AESO) Alberta Electric System Operator (AESO) Alberta Electric System Operator (AESO) Alberta Electric Systems Operator (AESO) Alberta Electric Systems Operator (AESO) Alberta Electric Systems Operator (AESO) Alberta Wind Energy Corp. Alberta Wind Energy Corp. / Mainstream Renewable Power Alberta Wind Energy Corporation / Mainstream Canada AltaLink AltaLink AltaLink

Project Description

Project Location

Cost in $ Millions

Construction Schedule

Remarks

Rebuild of Electricity Infrastructure

Drayton Valley, Wabamun, Edson, Hinton east central Alberta Wetaskiwin to Didsbury central Alberta

$30.0

2010-2013

Under construction. Hinton nearing completion.

Transmission Reinforcement, Hanna Region TRANSMISSION LINE REBUILD (138kV) TRANSMISSION SYSTEM UPGRADE Transmission Line, Poplar Hills to Grande Prairie Transmission Line

$1,000.0 $60.0 $206.0

Proposed. Stage 1 to be in service by 2012, stage 2 in service by 2017. Proposed. Project includes new substation near Didsbury and upgrades to Ponoka substation Proposed. New substations near Didsbury, Ponoka and Innisfail, substation upgrades Benalto and west Lacombe. Proposed over five to seven years (completion between 2015 and 2017). Proposed over five to seven years (completion between 2015 and 2017). Line from hamlet of Little Smoky to Grande Prairie. Proposed. Pending completion of transmission line Pincher Creek to Lethbridge. Proposed. Windy Point (62MW, planned construction start 2012) and Waterton Colony. 2012 Announced. Planned construction start spring 2012.

County of Grande Prairie MD of Greenview / Cty of Grande Prairie MD of Pincher Creek (NE of Pincher Creek) southern Alberta

$20.0 $150.0

'Oldman River' Wind Farm (50MW)

$47.0

Two Wind Generation Projects (350MW total) 'Oldman 2' Wind Farm (46MW)

$840.0

MD of Pincher Creek (NE of Pincher Creek) Edmonton to Calgary Fort Macleod to High River MD of Pincher Creek (Pincher Creek to Lundbreck)

$120.0

Western Alberta Transmission Line (500kV) South Foothills Transmission Project (240kV) TRANSMISSION LINE (240kV) AND 'Chapel Rock' SUBSTATION

$1,100.0 $345.0 $300.0

Proposed for 2012 - 2014.. Application filed March 2011. Proposed to start construction summer 2012, pending approvals. Proposed. Application to be filed in 2012.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

46

Project Sector/ Company Name


AltaLink AltaLink Management Ltd. AltaLink Management Ltd. ATCO Electric

Project Description
TRANSMISSION LINE (240kV) FROM CASSILS TO BOWMANTON TRANSMISSION LINE 666L RUSSELL 632S SUBSTATION Transmission Line High Level to Sulphur Point

Project Location
southern Alberta County of Newell (W of Brooks) MD of Pincher Creek Mackenzie County (High Level to near Rainbow Lake) Edmonton to Calgary Whitecourt Medicine Hat Calgary Calgary Wabamun to Ind Heartland NE of Fort Saskatchewan Red Deer County (between Red Deer and Pine Lake) Vulcan County (near Carmangay) Warner County (Stirling)

Cost in $ Millions
$400.0 $8.0 $17.2 $77.5

Construction Schedule

Remarks
Proposed Proposed. AUC approval January 2011. Proposed. AUC approval January 2011.

2009-2011

Completed

ATCO Power Chickadee Creek Energy Inc. / Millar Western City of Medicine Hat ENMAX Corp. ENMAX Energy Corp. EPCOR Distribution and Transmission / AltaLink Management Greengate Power Corp.

Eastern Alberta Transmission Line (500kV) Biomass Energy Project (24MW) Concentrating Solar Thermal Energy Demonstration Project 'Shepard Energy Centre' Natural Gas Fired Generating Plant (800MW) 'Bonnybrook Energy Centre' Power Plant (165MW) 'Heartland' Transmission Line (500kV)

$1,650.0 $100.0 $9.0 $1,400.0 $200.0 $387.0

Proposed for 2012 - 2014. Proposed for 2010 -2012. Proposed for 2010 - 2012 Proposed for 2011 - 2015. AUC conditional approval October 2010. Proposed. Pending approvals. Planned in - service early 2013. Proposed. Public hearing begins April 11, 2011. Application filed with Alberta Utilities Commission (AUC) September 2010. Proposed

'Radar Hill' Wind Farm (100MW)

$200.0

Greengate Power Corp.

'Blackspring Ridge' Wind Power Project (300MW) 'Stirling' Wind Farm (100MW)

$700.0

Proposed for 2012 - 2013 (phase 1).

Greengate Power Corp.

$250.0

Proposed for 2011. Pending AUC approval.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

47

Project Sector/ Company Name


Greengate Power Corp. / Capital Power Corp. MAXIM Power Corp.

Project Description
'Halkirk' Wind Farm phases 1 and 2 (150MW each) Gas Fired Electric Plant (190MW)

Project Location
Paintearth County (near Halkirk) Lamont County (NE of Bruderheim) MD of Greenview (near Grande Cache) near Lethbridge County of Warner Cypress County Cypress County (S of Irvine) Cypress County (S of Medicine Hat) Starland County (E of Delia) Brazeau County (near Drayton Valley) Red Deer County (Horn Hill Waste Transfer Site) Wheatland County (near Drumheller) Whitecourt Calgary

Cost in $ Millions
$350.0

Construction Schedule
2011-2013

Remarks
Announced

$140.0

Proposed. To be built next to existing Deerland substation. Pending financing. Proposed

MAXIM Power Corp.

'Milner Expansion' Coal - Fired Generating Plant (500MW) Electrical Substation 'Prairie Home' Wind Farm Phase 2 (89 MW) East Palliser Transmission Line 'Wild Rose' Wind Farm (200MW) Phase 1 'Wild Rose' Wind Farm Phase 2 (162MW) 'Hand Hills' Wind Farm (80MW) Waste to Energy Gasification Plant (25MW) Plasma Gasification Plant (waste to - energy conversion) 'Wintering Hills' Wind Farm (88MW)

$1,400.0

Montana Alberta Tie Ltd. (MATL) Naturener Energy Canada Naturener Energy Canada Naturener Energy Canada Naturener Energy Canada

$6.0 $100.0 $100.0 $400.0 $410.0

2010

Under construction. SNC-Lavelin. Proposed for 2011 - 2012 Proposed Proposed. AUC approval October 2010. Dependent on approval of East Palliser Transmission Line. Proposed. Planned to be in - service in 2012.

Nexen / Joss Power Otoka Energy Corp.

$200.0 $100.0

Proposed for 2010 - 2011 Proposed construction start phase 1 in 2011. Three phases. Pending approvals. Proposed for 2011 - 2012. Pending federal funding.

Plasco Energy Group / Central Waste Management Commission Suncor Energy / Teck Resources Ltd. Swan Hills Synfuels The University of Calgary
April 01, 2011

$93.0

$350.0

2010-2011

Under construction. AUC approval June 2010.

Power Generation Plant (300MW) Cogeneration Plant (12MW)

$500.0 $48.0 2010-2011

Proposed. Planned construction start 2012. Completed 48

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Trans Canada Corp.

Project Description
'Saddlebrook' Natural Gas Fired Power Plant (350MW)

Project Location
MD of Foothills (near High River)

Cost in $ Millions
$400.0

Construction Schedule

Remarks
Proposed. Pending approvals.

Residential
Alberta Ronald Macdonald House Alpha - Anderson Joint Venture Amacon Ronald McDonald House Affordable Housing Project 'St. Albert Village' Condo Towers and Urban Village on Grandin Park Plaza Site 'Waterfront' Condominiums (Three Towers and Five Podiums) plus Townhouses 'Union Square' Condominium Apartment Building Phase 2 'Astoria on 10th' Condominium Tower Row Housing Complex 'Akoya at the Bridges' Apartment Building Phase 2 'Verde in Clearview Ridge' Townhouse Development 'The Maxx' Condominiums 'Brookside' Seniors Condominiums 'The Bond Centre' Condominium Towers 1 and 2 Residential / Retail Complex (Three Towers), East Village Red Deer Edson St. Albert $12.0 $6.5 $450.0 2010-2011 2010-2011 Under construction. Timcon Construction. Announced On hold. Approved by city council May 2008.

Anthem Riverfront Land Holdings Apex Lifestyle Communities Arcus Developments Asset Builders Corp. Assured Developments Avalon Central Alberta BCM Developments Bethany Group Bond Street Properties

Calgary

$750.0

On hold (sites 2 and 3). EllisDon Construction. Building 1 nearing completion. On hold. EllisDon Construction. On hold. Ledcor Construction. Original schedule 2007 - 2010 Proposed On hold. 2011-2013 2009-2011 2010-2011 Under construction Completed Under construction. WCMI Construction Services. Proposed. Pending financing.

Calgary Calgary Sylvan Lake Calgary Red Deer Edmonton Camrose RM of Wood Buffalo (Fort McMurray) Calgary

$25.0 $60.0 $6.2 $40.1 $35.0 $15.8 $18.0 $160.0

Bosa Development / Embassy Development

$300.0

Proposed. Construction over five to seven years.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

49

Project Sector/ Company Name


Brenda Strafford Foundation Ltd. CAIRN Corporation Calgary Homeless Foundation Cardel Homes Cardel Lifestyles Cardel Lifestyles Carma Developers / Urban Landmarks Master Builder Carrington Properties Century Group Lands Corp. Christenson Developments / Western Asset Management Group (WAM) City of Calgary

Project Description
Affordable Housing Project (Apartment Building) 'Cairn on the Boulevard' Affordable Housing Project HOME CONSTRUCTION PROJECT 'Lighthouse Landing' Townhouses Building A5 'Village at Prestwick' Building B (Apartment Building) Prestwick Place' Apartment Buildings 'Aurora' Phase 1: Mira Condominium Tower plus Townhouses 'L'Attitude' Condominium Apartment Building 'Liberty Junction' Apartments and Town House Complex 'Centre in the Park' Housing / Retail / Commercial Development

Project Location
Calgary Grande Prairie Calgary Calgary Calgary Calgary Edmonton

Cost in $ Millions
$29.0 $14.0 $24.0 $9.2 $6.6 $20.0 $325.0

Construction Schedule
2008-2011 2011-2013

Remarks
Completed. Golden Triangle Construction Management. Announced Proposed

2010-2011

Under construction Proposed

2010-2011 2007-2011

Under construction Under construction

Edmonton Red Deer County Strathcona County (Sherwood Park) Calgary

$15.9 $41.5 $230.0

2010-2011

Completed On hold until spring 2011 (Phase 1).

2006-2011

Under construction. Can-Der Construction.

The Bridges Phase 2 Site 15 Affordable Housing Project (Mcpherson Place) Wild Rose Arena Site Affordable Housing Project Apartment Complex Row Housing Development

$18.5

Proposed

City of Camrose / Bethany Group Cold Lake Affordable Housing Society (CLAHS) Concept Homes

Camrose Cold Lake Edmonton

$9.0 $5.5 $11.0

2010-2011

Under construction. WCMI Construction Services. On hold. Proposed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

50

Project Sector/ Company Name


Concord Pacific Inc. Cove Properties Cove Properties Cove Properties Ltd. Devonian Properties

Project Description
Condominium Apartment Building and Townhouses, Eau Claire 'Monarch at Mackenzie' BUILDING 1 PHASE 2 'Nuera 2' Apartment Building 'Monarch at Mackenzie Towne' Condominium Apartment Building 'Longboat Landing' Townhouses and Apartments 'Longboat Landing' Earthworks and Deep Services 'Sky Tower' Apartment Building Boyle Renaissance Phase 1 -'Welcome Village' Affordable Housing and Community Centre 'Origins at Cranston' APARTMENT CONDOMINIUM BUILDING 'Valour Park' TOWNHOUSE COMPLEX Rosslyn Place Apartment Building Addition (New Building) 'Drake' Apartment Building TOWNHOUSES 'Mosaic Cranston' Townhouses Kai Mortenson Towers (Two Residential Towers)

Project Location
Calgary Calgary Calgary Calgary RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Ft McMurray) Calgary Edmonton

Cost in $ Millions
$30.0 $7.4 $31.0 $25.0 $560.0

Construction Schedule

Remarks
On hold pending a shift in the economy. Proposed for 2011 - 2012 Proposed for 2011 - 2012 Proposed Proposed (phase 2 and phase 4 onwards). Earthworks and deep services anticipated to be completed by early 2013.

Devonian Properties

$90.0

2010-2012

Under construction

Diamond Trust Development Edmonton YMCA

$47.8 $42.2 2010-2012

On hold. ITC Construction Group. Under construction. Clark Builders.

Evolution by Greenboro Evolution by Greenboro Greater Edmonton Foundation Grosvenor Canada Ltd. Habitat for Humanity / Trico Homes Hawthorne Homes Homburg - Centron Teamworks

Calgary Calgary Edmonton Calgary Calgary Calgary Calgary

$5.6 $5.0 $10.0 $12.0 $13.5 $20.0 $130.0 2010-2012 2010-2012 2010-2011

Proposed Proposed Nearing completion. Delnor Construction. Proposed Proposed Under construction Under construction (tower 1 Oslo parkade). Centron Construction. Construction of tower expected to start spring 2011. 51

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Homes by Avi Horizon Housing Society IMC Construction Intergulf Cidex Intergulf Cidex Intergulf Cidex Jarvis Bay Developments Kanas Corporation Kanas Corporation Kanas Corporation Kanas Corporation Lake Placid Developments Leaside Development Corp. Libbie Young Centre Luxe Developments Luxe Developments

Project Description
Townhouses AFFORDABLE HOUSING Condominium Building 'Treo Beacon Heights' Apartment Building 1 'Treo Beacon Heights' Apartment Building 4 'Treo Beacon Heights' Apartment Buildings 2 and 3 'The Savanna' Condominium Complex Apartment Building Lumino Building C Condo Apartment Building 'Lumino West' Affordable Housing (Apartment Building) Lumino Building B Apartment Building 'Centuria on the Park' Condo Apartments 'Cornerstone Village' Residential Development (Apartment Building and Villa Bungalows) SUPPORTIVE LIVING UNITS AND COMMUNITY CENTRE Condominium Apartment Building 'Vida' CONDOMINIUM APARTMENT BUILDING

Project Location
Calgary Calgary Sylvan Lake Calgary Calgary Calgary Sylvan Lake Calgary Calgary Calgary Calgary Calgary Olds

Cost in $ Millions
$7.0 $9.0 $5.2 $7.2 $6.3 $6.4 $20.0 $11.1 $9.0 $11.1 $14.8 $27.0 $50.0

Construction Schedule

Remarks
Proposed Proposed

2010-2011

Announced. Planned construction start spring 2010. Proposed Proposed Proposed Proposed. Scope of work revised. Proposed Proposed for 2011 - 2012.

2010-2011 2011-2012

Nearing completion Under construction Proposed to bring building to grade by March 2011.

2008-2011

Under construction (phase 2). Four phases. Phases 3 and 4 apartment condominiums. Announced. Tender closes April 14. On hold

Lloydminster Calgary Calgary

$5.0 $32.0 $6.3

2011-2012

2010-2011

Under construction

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

52

Project Sector/ Company Name


Medican Developments Medican Developments Monarch Group (took over from Medican Developments) Mustard Seed Ministry North Peace Housing Foundation Park Place Communities Perera Shawnee Ltd. Perera Shawnee Ltd. Pointe of View Development ProCura Real Estate ProCura Real Estate Services ProCura Real Estate Services Qualex - Landmark Group Schizophrenia Society of Alberta Source Development Corp.

Project Description
'Canvas at Millrise' Condo Building Postfire Renovations 'Sierras of Michener Hill' Condominium Complex Phase 1 'Axxess' and 'Reflections' Condo Complexes, Beacon Hill Affordable Housing Tower (Apartment Building) Affordable Housing Project Row Housing Complex, Schonsee 'Highbury Tower Residences' Condominiums Phase 2 'Highbury Tower Residences' Condominiums Phase 3 'Rocky View Pointe' Condo Apartment Building 'Mayfair Village' Highrise Apartment Complex phase 1 (South Tower) 'Azure' Condo Complex Phase 1 'Mayfair Village' North (Second) Tower 'Luna' Condominium Apartment Building 'Iris Court' Affordable Supportive Living Facility 'Manchester Station' Condo Apartments

Project Location
Calgary Red Deer Sylvan Lake

Cost in $ Millions
$12.0 $8.5 $8.1

Construction Schedule
2010-2011 2009-2011 2008-2011

Remarks
Completed Nearing completion Under construction. Title to Axxess project transferred to Monarch Land Development. Announced. Clark Builders. Planned construction start July. Proposed for 2010 - 2011. Proposed On hold. Perera Development Group. On hold. Originally proposed for 2011 - 2013 Proposed

Calgary Peace River Edmonton Calgary Calgary Cochrane Edmonton Edmonton Edmonton Calgary Edmonton Calgary

$60.0 $7.0 $7.5 $40.5 $32.0 $25.0 $56.5 $6.5 $100.0 $50.0 $5.1 $25.0

2011-2012

2010-2011

Under construction. Clark Builders. Proposed. Proposed. Clark Builders.

2010-2011

Under construction. Intertech Construction Group. On hold. On hold.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

53

Project Sector/ Company Name


Statesman Group of Companies Statesman Group of Companies Statesman Group of Companies Streetside Development Streetside Development Corp. Streetside Developments Swerve Living Unity Builders Group Urban Landmarks Valour Place Society

Project Description
'Riverside Quays' Condominium Apartments Phase 5 'Riverside Quays' Condo Apartments and Townhouses Phase 4 'Landings at Cougar Ridge' Townhouse Development Townhouses and Condo Apartments 'Pefect Fit' CONDOMINIUM APARTMENT BUILDING 'Ginger Park' Townhouse Complex (Buildings S,T,V,X,Y) 'Swerve Living' Condominium Building 'Wilderness Ridge' Buildings A, B, C, D Rebuild after 2009 Fire 'The Britnell' Apartments (Two Buildings) 'Valour Place' APARTMENT HOUSING FOR MILITARY DURING REHABILITATION / TREATMENT 'London at Heritage Station' Condominium Towers 'Elk Island View - Heron Place' Condominium Apartment Building 'Elk Island View - Swan Place' Condominium Apartment Building 'Hawthorne Heights at Eagle Ridge' Townhouses and Apartment Condos

Project Location
Calgary Calgary Calgary Calgary Calgary Calgary Red Deer Canmore Edmonton Edmonton

Cost in $ Millions
$28.0 $18.0 $30.0 $28.0 $12.5 $6.8 $9.5 $15.0 $20.5 $10.0

Construction Schedule

Remarks
Proposed for 2012 - 2013. Proposed for 2012 - 2013. Planned start within a year after completion Phase 3.

2010-2012 2011-2013

Announced. Planned construction start spring 2011. Under construction Proposed. In redesign Proposed Proposed. Pending funding.

2010-2011

Completed On hold. Urban Landmarks. Proposed

Westcorp Inc. Wimco Properties Ltd.

Calgary Lamont

$200.0 $6.0

2006-

Under construction. Towers 1 and 2 completed. To be built in five stages. On hold. Wimco Construction Ltd. Project expected to start after Motel 6, pending improved market conditions. On hold pending improved market conditions.

Wimco Properties Ltd. Wood Buffalo Housing and Development Corporation

Lamont RM of Wood Buffalo (Fort McMurray)

$6.0 $45.0 2009-2011

Completed

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

54

Project Sector/ Company Name


Wood Buffalo Housing and Development Corporation (WBHDC) Woodfine Developments

Project Description
'Stony Mountain Plaza' Affordable Housing Project 'Fusion Plaza' Apartments Phase 1

Project Location
RM of Wood Buffalo (Fort McMurray) Grande Prairie

Cost in $ Millions
$32.0

Construction Schedule

Remarks
Proposed

$45.0

On hold indefinitely.

Telecommunications
City of Grande Prairie TELUS Outdoor Wireless Network Initiative 2011 NETWORK EXPANSION / ENHANCEMENT Grande Prairie across Alberta $6.0 $650.0 2011 Proposed Announced. Fibreoptic lines and cellphone towers.

Tourism/Recreation
Alberta Infrastructure Alberta Tourism, Parks and Recreation Argyll Velodrome Association BCP Construction Bear Development Corp. Bearspaw - Glendale Community Association Calgary Exhibition and Stampede Calgary Science Centre Calgary Winter Club Calgary Zoo Cantos Music Foundation Royal Alberta Museum Renewal / Expansion Phase 1 Parks Infrastructure Projects 20092011 Indoor Velodrome and Multi-Use Sports Facility Hotel Hotel SPORTS FACILITY Edmonton across Alberta Edmonton Blackfalds Sylvan Lake Rocky View County (Bearspaw) Calgary Calgary Calgary Calgary Calgary $147.0 $5.4 $32.0 $7.5 $7.0 $6.0 2010-2011 2009-2011 Proposed. Bird Construction. Project re-design underway. Completed Proposed for location by Peter Hemingway Pool Proposed Completed Proposed for 2011 - 2012. Phased development.

'Western Event Centre' Agriculture Arena and Exhibit Hall New 'Telus World of Science Calgary' Science Centre PHASE 1 - ADDITION 'Antarctic Landing' Penguin Exhibit King Edward Hotel Redevelopment and Cantos at the King Eddy National Music Centre

$65.0 $69.8 $14.0 $24.5 $125.0 2009-2011 2011-2012 2010-2011

Proposed for 2012 - 2014. Part of Stampede Park $400M expansion. Under construction. Cana Construction. Location near Calgary Zoo. Under construction. Chandos Construction. Nearing completion. Ledcor Construction. Proposed. Museum, recording studio and music centre.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

55

Project Sector/ Company Name


Carlson Hotels

Project Description
Radisson Calgary Airport East Hotel and Conference Centre, near Calgary Airport Best Western Hotel MUSEUM AND CULTURAL HERITAGE CENTRE Genesis Place Phase 3 (Twin Ice Arena, Meeting and Multi-Use Space) Devonian Gardens Renovation Phase 2 Brighton Athletic Park (four soccer fields) Development of Lynnview Ridge as Parkland, Golf Course Centennial Arena Expansion 'Fields for Life' Artificial Turf Soccer Fields Recreation Centre, Seton

Project Location
Calgary

Cost in $ Millions
$19.0

Construction Schedule
2011-2012

Remarks
Announced. Anticpated construction start spring 2011. Nearing completion Proposed Proposed

Chateau Inn Ltd. Chinatown and Little Italy Business Association City of Airdrie

Sylvan Lake Edmonton Airdrie

$10.0 $6.0 $18.0

2010-2011

City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary / Calgary Soccer Federation City of Calgary / Seton Sport Recreation Culture and Wellness Society City of Calgary / South Fish Creek Recreation Association City of Calgary / YMCA / Martindale Community Association / United Way / Genesis Land Development Corp. City of Cold Lake

Calgary Calgary Calgary Calgary Calgary Calgary

$14.5 $8.0 $22.0 $17.0 $13.0 $70.0 2010-2011

Proposed. Project will be completed as a continuation of Phase 1. Proposed. Part of city's ten - year infrastructure plan (2008 - 2017) Proposed Completed. Cana Construction. Proposed. Fundraising underway. Proposed

South Fish Creek Recreation Centre Expansion (Two Ice Surfaces) Genesis Centre of Community Wellness

Calgary

$21.0

2010-2011

Under construction. Chandos Construction.

Calgary

$66.0

2009-2011

Under construction. Stuart Olson Constructors.

Community Event Centre Phase 1 at the Energy Centre

Cold Lake

$15.3

2010-2012

Under construction. Scott Builders. Stage 1 is the hockey rink. Stages 2 / 3 second hockey rink and additional facilities. Estimated cost phases 1 and 2 range $20M to $25M. 56

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


City of Cold Lake

Project Description
COLD LAKE ENERGY CENTRE PHASE 2 (COMMUNITY EVENT CENTRE) Recreation Centre / Library, Meadows Multi - Purpose Facility, Clareview Outdoor Pool, Kinsmen Park (Replacement for Queen Elizabeth Pool) North Centre Community Recreation Centre, Commonwealth Stadium 'Polar Extremes Arctic Shores' Sea Mammals (Pinniped) Exhibit, Valley Zoo Valley Zoo Entrance and Wander Path Project JUBILEE RECREATION CENTRE RENOVATIONS Dave Barr Arena Expansion Aquatics and Wellness Multiplex Prairie Art Gallery Restoration Two Sheet Ice Arena, West Lethbridge North Lethbridge Regional Park Community Arts Centre ENMAX Centre Renovations / Expansion

Project Location
Cold Lake

Cost in $ Millions
$20.0

Construction Schedule
2010-2012

Remarks
Under construction. Scott Builders.

City of Edmonton City of Edmonton City of Edmonton

Edmonton Edmonton Edmonton

$80.0 $90.0 $5.5 2009-2011

Proposed for 2011-2013. Proposed. Renovation / expansion of Clareview Twin Arenas, plus new library, Catholic high school. Nearing completion. Jen - Col Construction.

City of Edmonton City of Edmonton

Edmonton Edmonton

$95.0 $15.0

2009-2012 2010-2011

Under construction. Clark Builders. Field house completed. Under construction. PCL Construction.

City of Edmonton City of Fort Saskatchewan City of Grande Prairie City of Grande Prairie City of Grande Prairie City of Lethbridge City of Lethbridge City of Lethbridge City of Lethbridge

Edmonton Fort Saskatchewan Grande Prairie Grande Prairie Grande Prairie Lethbridge Lethbridge Lethbridge Lethbridge

$35.0 $7.0 $14.0 $98.2 $10.0 $19.0 $15.0 $12.6 $33.7

2011-2012

Announced. Planned construction start August 2011. Proposed. To be undertaken after Sportsplex renovations. on hold

2009-2011 2010-2011

Under construction. Wright Construction Western Inc. Part of the Community Knowledge Campus. Under construction. Chandos Construction. Proposed for 2011 - 2012. Tender call general contractor possible spring 2011. Proposed for completion by 2017. Estimated cost range $15M to $20M. Proposed for 2012. Tenders close April 7.

2009-2012

Under construction. Ward Bros Construction.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

57

Project Sector/ Company Name


City of Medicine Hat City of Red Deer

Project Description
Regional Event Centre, Box Springs Business Park Rotary Recreation Park Phase 2

Project Location
Medicine Hat Red Deer

Cost in $ Millions
$89.8 $23.0

Construction Schedule

Remarks
On hold. Proposed for 2011 - 2012. Conversion of current museum to accommodate the Golden Circle Seniors Centre. On hold

City of St. Albert City of St. Albert City of Wetaskiwin / County of Wetaskiwin Clearwater County

Redevelopment Red Willow Park West Riel Park Reclamation Phase 2 Aquatic Facility Multi - Use Trail

St. Albert St. Albert Wetaskiwin Clearwater County (Rocky Mtn House to Nordegg) County of Grande Prairie (Clairmont) Calgary Edmonton Edmonton

$11.0 $8.5 $18.6 $6.8 2010-2011

Nearing completion Proposed Proposed

County of Grande Prairie

Regional Sportsplex (Twin Ice Arena and Soccer Pitch) 'Edworthy Club' Health Club Redevelopment of Alberta Hotel Multicultural Centre, Ellerslie

$26.0

2011-2012

Announced. Kaldon Construction.

Dolemo Developments Dub Architects Ltd. Edmonton Korean Community Centre Foundation Edmonton Minor Soccer Association Edmonton Volleyball Centre / Edmonton Grads Basketball Centre / Ortona Gymnastics Club Fort Edmonton Foundation

$1,000.0 $15.0 $8.4 2009-2011

Proposed. Spa, squash courts, hockey rinks, movie theatre and condo hotel. Nearing completion Proposed

Soccer Facility (27 to 29 Playing Fields) GO Community Centre Court Sports Complex

Parkland County Edmonton

$6.0 $36.0 2010-2011

Proposed to start construction 2012. Phased project over several years. Under construction. Clark Builders.

'Spirit of the First Nations' Aboriginal Village, Fort Edmonton Park

Edmonton

$15.0

Proposed.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

58

Project Sector/ Company Name


Fort Edmonton Historical Foundation Hilton Hotels Innoka Point Resort Corp. Louis Bull Tribe Marmot Basin

Project Description
Fort Edmonton Park Renovations / Revitalization (Capitol Theatre) Homewood Suites Extended Stay Hotel Innoka Resort Casino New High Speed Ski Lift (Paradise Express) and Relocation of Paradise Triple Chair Marriott Calgary Airport Marriott Hotel

Project Location
Edmonton Calgary Canmore Wetaskiwin County Jasper National Park Calgary RM of Wood Buffalo (Fort McMurray) Medicine Hat MD of Foothills Banff National Park

Cost in $ Millions
$13.9 $36.3 $15.0 $12.0 $7.0

Construction Schedule
2010-2011 2010-2012 2010-2012

Remarks
Under construction. PCL Construction. Under construction. Chamberlain Construction Services. Under construction. Phased development (five buildings). Proposed. Pending approvals.

2011

Announced

Marriott Hotels Marriott Hotels and Resorts Mayfield Hospitality MD of Foothills / Dunbow Recreation Board Parks Canada

$21.8 $20.0

2010-2011

Completed. Graham Construction. Proposed

Hotel and Convention Centre Indoor Arena next to Heritage Heights School Infrastructure Upgrades

$25.0 $5.8 $9.7

Proposed. Contingent on Regional Event Centre. Proposed Proposed. Projects include Cave and Basin parking lot, roadwork in Banff, washrooms at C&B and Johnston Canyon, improvements to Banff Museum exterior, Sulphur Mtn boardwalk repairs. 2010-2012 2009-2011 20102011-2012 Announced. Under construction Under construction. Multi-year project. Announced. Expected RFP for general contractor early spring 2011.

Parks Canada Parks Canada Parks Foundation Calgary Pipestone Creek Dinosaur Bed Project Committee

Cave and Basin National Historic Site Renovations Waterton Lakes National Park Upgrades and Repairs Perimeter Pathway System (Beltway) 'River of Death and Discovery' Dinosaur Centre

Banff National Park (Banff) Waterton Lakes National Park Calgary Wembley

$13.8 $9.4 $50.0 $26.4

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

59

Project Sector/ Company Name


Platinum Investments Inc. Pomeroy Inn & Suites / Olds College Pumphouse Theatre Red Deer Curling Club Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo River Valley Alliance Royal Canadian Legion, Kingsway Branch #175 Strathcona County

Project Description
Marriott Courtyard Hotel, Edmonton West Hotel at Olds College (Part of Canadian Institute for Rural Entrepreneurship) Theatre Expansion Phase 1 Building Renovation 2011 PARKS PROJECTS Anzac Leisure Facility Performing Arts Centre, MacDonald Island Park Athletic Field, Timberlea High School Site North Saskatchewan River Valley Trail Phase 1 New Legion Building Recreation Complex Addition / Renovation Broadmoor Golf Club Addition / Modernization Millennium Place Expansion

Project Location
Edmonton Olds

Cost in $ Millions
$7.5 $12.0

Construction Schedule
2010-2011

Remarks
Completed Proposed for 2011 - 2012.

Calgary Red Deer RM of Wood Buffalo RM of Wood Buffalo (Anzac) RM of Wood Buffalo (Fort McMurray) RM of Wood Buffalo (Ft McMurray) Devon to Fort Saskatchewan Edmonton Strathcona County (Ardrossan) Strathcona County (Sherwood Park) Strathcona County (Sherwood Park) Red Deer

$10.5 $5.6 $22.0 $24.0 $10.0 2011 2011

On hold Under construction Announced Proposed. Possible construction start spring 2011. Proposed. Feasibility study to be done.

$15.0

2011-2012

Under construction. Wilco Contractors NW.

$110.0 $8.7 $17.1 2010-2011 2010-2011

Proposed Nearing completion. PCL Construction. Completed. Delnor Construction.

Strathcona County

$5.1

2010-2011

Under construction. Atkinson Construction.

Strathcona County

$8.4

2010-2011

Under construction. Delnor Construction.

Temple REIT

Refurbishment of Capri Centre as Sheraton Hotel

$8.0

2011

Announced

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

60

Project Sector/ Company Name


The Friends of Medalta Society The Titan Entertainment Group Inc. Town of Banff Town of Beaumont Town of Beaverlodge Town of Blackfalds Town of Canmore

Project Description
Medalta Site Restoration, Historic Clay District 'The Titan Project' Entertainment Venue Recreation Centre Redevelopment Phases 1 and 2 Centre Communautaire Beaumont Community Centre (CCBCC) New Indoor Pool / Community Centre Fieldhouse (Recreation Facility) Multiplex

Project Location
Medicine Hat Rocky View County (Balzac) Banff Beaumont Beaverlodge Blackfalds Canmore

Cost in $ Millions
$7.5 $40.0 $31.0 $6.2 $11.6 $8.0 $31.4

Construction Schedule
2009-2011

Remarks
Under construction Proposed for completion in late 2011 or early 2012.

2009-2011

Completed. Stuart Olson Dominion Construction. Proposed. Project has been placed in the Town's 10-year capital plan.

2010-2012

Under construction. Proposed. Pending funding.

2011-2012

Announced. Graham Construction and Engineering. Will include library, daycare, aquatics facility, climbing wall, retail space, administration space and community space. Proposed. Feasibility study completed.

Town of Cochrane Town of Drumheller Town of Grande Cache Town of Grimshaw

New Aquatic Facility Badlands Community (Multi - Use) Facility Phase 1 Recreation Centre Expansion / Revitalization Community Multiplex

Cochrane Drumheller Grande Cache Grimshaw

$26.0 $14.0 $19.8 $16.0 2010-2011 2009-2011 2010-2011

Under construction. Dawson Wallace Construction. Completed. Chandos Construction. Nearing completion. Cormode & Dickson Construction. Arena, fitness centre, walking track and field house. Proposed. No construction expected in 2011.

Town of High River Town of Mayerthorpe Town of Morinville Town of Slave Lake Town of Westlock / Westlock County

New Recreation Facility Hockey Arena (Exhibition Centre) Community Cultural Centre Arctic Ice Centre Upgrades and Fieldhouse Westlock 'Spirit Centre' Sports Complex

High River Mayerthorpe Morinville Slave Lake Westlock

$20.0 $5.2 $11.0 $11.9 $12.6 2010-2011 2010-2011 2010-2011 2010-2011

Nearing completion. Chandos Construction. Nearing completion. PCL Construction. Under construction. Jen-Col Construction. Under construction. Brenex Construction.

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

61

Project Sector/ Company Name


Trestle Creek Golf Resort

Project Description
RV Resort, Recreation Centre, Equine Centre, Sports Park and 27 Hole Golf Course Horse Racing Complex Phase 1

Project Location
Parkland County

Cost in $ Millions
$30.0

Construction Schedule

Remarks
Proposed for 2010 - 2014. Construction schedule is for golf course. First nine hole to be completed for play in summer 2011. Proposed for 2011 - 2012.

United Horsemen of Alberta Village of Standard / Standard Community Hall Association Winsport Canada Winsport Canada

Rocky View County (near Balzac) Wheatland County (Standard) Calgary Calgary

$35.0

New Community Hall

$6.0

Proposed construction start spring 2011. Fundraising underway. 2007-2011 2011 Under construction. Cana Construction. Freestyle ski area completed. Athletic and ice complex. Announced

Canada Olympic Park Facility Expansion and Upgrade Olympic Oval Roof Restoration

$322.0 $8.0

April 01, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

62

Alberta Finance and Enterprise 4th Floor Commerce Place 10155-102 Street Edmonton, AB T5J 4L6 Canada Telephone: 780.427.6787 Fax: 780.422.0061 Website:www.albertacanada.com 2011 Government of Alberta ISSN: 1702-2851 ISSN: 1718-1399 (pdf) Printed in Canada

You can access the Inventory of Major Alberta Projects and the following related department publications on the Internet at: http://albertacanada.com/about-alberta/statistics-and-publications.html :

Alberta Oil Sands Industry Quarterly Update Monthly Economic Review Highlights of the Alberta Economy Facts on Alberta Place-to-Place Price Comparison Survey