Cairn India is building the world’s longest have been installed at approximately 20
continuously heated and insulated pipeline km intervals along the pipeline route. In
(~700 km) to evacuate the crude from the addition, 2 intermediary terminals and a AC VOLTS AC VOLTS
(Outside Surface (Inside Surface
Mangala field in Rajasthan. The export total of 36 heating stations are installed to Earth) to Earth)
pipeline route from source at the Mangala along the pipeline route.
Production Terminal to the Gujarat coast
at Bhogat via Salaya passes through the SEHMS technology also known as Heat Tube
(with insulated
states of Rajasthan and Gujarat covering the Skin Trace System (STS) or Skin wire inside
eight districts and more than 250 villages. Electric Current Tracing (SECT), are all Carrier Pipe
In addition, there will be 4 branch lines dependent on the same principles of Fluid
Thermal
ranging in length from 2.5km to 21km skin and proximity effect for operation. Insulation
delivering crude to customers enroute. They are all established and proven
Work is currently in progress across nine electrical heating technology used for
construction spreads. long distance piping and pipelines.

Necessity, as they say, is the mother SEHMS generates heat on the inner
of invention and in the case of Cairn surface of a carbon steel heat tube
STSTM System C Tyco Thermal Controls LLC

it was the same for this innovation of that is welded to the carrier pipe to be
technology. heat traced, in our case the 24” crude the heat tube wall by the current flow way to re-melt the crude oil and keep the
pipeline. An electrically insulated, high through the insulated conductor. The pipeline operational.
The necessity of evacuating the Rajasthan specification temperature-resistant allowable circuit length is determined
crude, which is waxy in nature and in order conductor is installed inside the heat by the power output, heat tube size, The key SEHMS elements are
to ensure its flow has to be maintained tube and connected to the tube at the conductor size, and the carrier pipe transformers, heat tube, pull boxes, end
above 65 degrees centigrade, resulted in circuit end. The tube and conductor temperature. SEHMS ‘s advantage over boxes, and temperature sensors.
customising existing heating technology are connected to an AC voltage source other electrical trace heating systems is
into the Skin Effect Heat Management in a series connection. This method that extremely long circuit lengths are For this project, and in a first for India,
System (SEHMS), an innovative system of heating is called skin-effect heating possible – typically a pipeline of up to 20 an insulation plant was set up at the pipe
by far the longest of its kind in the because the return path of the circuit km may be heated from a single electric manufacturers Mill using cutting edge
world today. SEHMS technology has current is pulled to the inner surface supply point (2 circuits of 10km each). spray applied insulation techniques.
traditionally been most often applied to (approximately 1 mm) of the heat
shorter above ground applications and tube by both the skin effect and the In ideal situations the SEHMS heating Power generating stations of 1 MW each
there were many innovations required to proximity effect between the heat tube system is not required on the Mangala are being installed at the distance of
apply this technology to an underground and the conductor. The outside surface – Bhogat Pipeline as the 90mm of PUF approx 20 km along the pipeline length.
cross country pipeline system. The crude of the heat tube is at ground potential, pipeline insulation will be enough to Fuel for the gas engines producing the
oil pipeline is insulated with 90 mm Poly and completely safe, while the inner keep heat losses within acceptable power for the pipeline heating system
Urethane Foam (PUF) to arrest the heat surface of the tube carries full current. limits. However, certain operational comes from an 8 inch diameter pipeline
loss from pipeline to the surrounding soil, The heating circuit impedance is mainly situations, such as low flows or a laid parallel to the main 24 inch crude
this is further enclosed with a 5 mm HDPE resistive, generating heat in the heat stoppage, could lead to wax formation pipeline. The primary gas source is
jacket for protection and to make it water tube wall and, to a lesser extent, in the at lower temperatures (<65 deg C) and from the Cairn’s Raageshwari field in

Cairn India Limited


Cairn India Limited

tight. Above ground heating stations with insulated conductor. Additional heat for this reason SEHMS is a critical system Rajasthan. A total of 36 intermediate
maximum 1MW power generating units results from eddy currents induced in because without it there would be no power and heating stations are being
4 5
S k i n E f f e c t H e aT M a n a g eme n t S y s t em

S k i n E f f e c t H e aT M a n a g eme n t S y s t em
STSTM System Termination

Power Source
and Temperature
Monitoring

RTD’s

Heat Tube

C w
Tyco Thermal Controls LLC
a
t

Cairn India Limited


e
Cairn India Limited

r
6 7
S k i n E f f e c t H e aT M a n a g eme n t S y s t em

S k i n E f f e c t H e aT M a n a g eme n t S y s t em
A view of the Mangala development pipeline showing the SEHMS and the Raageshwari Gas Pipeline

built along the length of the pipeline The details of the Power Source and A full scale test of the SEHMS system was of the SEHMS, and by extension the
route. Temperature Monitoring are as follows: conducted on a 1.4km section of buried pipeline insulation upon which the
pipeline close to Viramgam in March 09. SEHMS depends.
Skin Effect Heat Management System • Power requirement – 40 W / m
was chosen as a suitable solution for the • Voltage – Approx. 4000 V This test was successful in all respects The Mangala Development Pipeline
below advantages:- • No Current Flow on Outside confirming that the SEHMS system Project is unique as it is believed to be by
Skin of Tube was performing better than expected, far the longest such continuously heated
• Safe • System Earthed & Grounded with achieving the maximum required “re- and insulated pipeline in the world.
• Custom engineered Earth fault automatic trip melt” temperature of 75 degrees Celsius Currently, the longest pipelines using
• Easy to maintain • Remote Emergency Shut-down and able to maintain the operating this technology are in Russia (160 km
• Rugged and reliable capability temperature of 65 degrees C. Heat up long) and Indonesia (115 km long).
• Provides built in redundancy • Current Flows Through Center time to bring the pipeline from ambient
• Cold Re-start capability Conductor temperature were consistent with those

Cairn India Limited


Cairn India Limited

• Successfully used in similar • Current Returns Through Inside predicted. This was a great boost to the
conditions Skin of Outer Tube confidence in the design and installation
S k i n E f f e c t H e aT M a n a g eme n t S y s t em

CAIRN INDIA LIMITED

Cairn India is one of the largest independent oil and gas exploration and production
companies in India. It is headquartered in Gurgaon near Delhi and has material
exploration and production positions in 10 blocks in India and one in Sri Lanka.
Cairn produces oil and gas from three blocks in India: Ravva in Andhra Pradesh,
CB-OS/2 in the Cambay Basin in Gujarat and RJ-ON-90/1 in Rajasthan where it
works in partnership with ONGC. In 2007, Cairn India was listed on the National
and Bombay Stock Exchanges.

Cairn has been operating in India for 15 years and has played an active role in
developing the oil and gas resources in the country. The Mangala field, discovered
in January 2004 near Barmer, Rajasthan and dedicated to the nation in August
2009 by the Prime Minister, the Hon’ble Dr. Manmohan Singh, is the largest
onshore oil discovery in India in more than 20 years. The Mangala, Bhagyam and
Aishwariya fields have recoverable oil reserves and resources of approximately 1
billion barrels.

In total there have been 25 discoveries on the Rajasthan block and the company
is focused on exploiting the full potential.

Cairn India will account for more than 20 percent of India’s domestic crude
oil production when the Rajasthan fields reach the current approved plateau
production rate of 175,000 barrels of oil per day in 2011.

Health, safety and the environment are integral to Cairn India’s business
management and the company is committed to working with all stakeholders to
deliver material growth.
Cairn India Limited.