PROJECT SUPERINTENDENT / PROPERTY MANAGER / OWNERaS REP LAND DEVELOPMENT


PROFILE
Project Superintendent with an extensive Construction background including comme
rcial, industrial, retail, multi-use and residential projects both from a ground
-up status and tenant interior work from a new and remodel status. Expertise wi
th on and off site work including wet and dry utilities, grading, paving, concre
te and other related civil engineering disciplines. Skilled in managing crews e
nsuring job site safety and on time completion of projects.
Construction Disciplines:
Tilt-up Type 5 Masonry Structural Steel
Post tension concrete General concrete Metal deck systems Hybrid roof systems
Glazing systems Roofing systems Metal stud systems
Shot-crete wall systems including drainage and water proofing systems
Management Philosophy:
* Pro active attitude towards resolution of on-site issues including design and
owners/users desires.
* Working knowledge of building code issues of electrical, plumbing, and HVAC sy
stems in addition to structural issues, building codes and utility companyas req
uirements as well as site development.
* Enforce job site safety and sub-contractor compliance with applicable rules an
d regulations.
PROFESSIONAL EXPERIENCE
Project Superintendent - Commercial, Retail, and Industrial projects throughout
San Diego
JAYNES CORPORATION, San Diego, CA 2008 - 2009
Managed construction of a new building for Escondido High School at the San Pasq
ual Campus. Coordinated subcontractors and worked with the Foreman to review an
d approve scheduling, production, and quality control.
TSA CONTRACTING INC. San Diego, CA 2005 - 2007
Structural retro-fit of the Candy Factory and Schiefer and Sons Building, at Pet
co Ballpark.
R.G. PETTY / LEDCOR PETTY, San Diego, CA 1995 - 2005
Selected projects include:
Gen-Probe Phase 2 - 300,000 sq. ft. tilt up
Quarry Creek Retail Subdivision - 15 acre site development and improvements plus
15,000 sq. ft. retail frame and stucco for the Quarry Creek Shop buildings
Hitachi of America - 180,000 sq. ft. tilt up
Parkway 4, 5, & 6 - Industrial Buildings in Poway from 45,000 to 130,000 sq. ft.
tilt up
Iron Mountain Storage - 3 story tilt up
Eastgate Office Complex - 4 buildings tilt up with extensive site work
Carmel Mountain Office Complex - 2 buildings, 150,000 sq. ft. tilt up
PROFESSIONAL REFERENCES
TOM COKER RCI REINFORCING
619-520-9176
BRUCE REID OWNER SOUTH BAY WELDING
619-401-5880
BRIAN JONES THUNDER-JONES CONCRETE
760-522-3864
STEVE FICK OWNER FICK AND SONS PLUMBING
TERRY PETERSON SUPT. GOOD AND ROBERTS CONTRACTORS
760-801-2427
JEFF BALDWIN MANAGER HEALTH AND SAFETY
LEDCOR CONSTRUCTION
U. S. DIVISIONS
702-596-6339
DWIGHT BRISERETTE V. P. HEALTH AND SAFETY DIVISION
LEDCOR COMPANIES
VANCOUVER, CANADA
604-230-2597
VINCE GOREMAN H&K CONSTRUCTION
619-390-3395
GREG TORWICK SAW CORE
619-654-7914
BRUCE REID SOUTH BAY WELDING OWNER
619-401-5880
KEVIN CLARK OWNER-CLARK STEEL FABRICATIONS
619-390-1502
REED GILLETTE SUPERINTENDENT TSA CONTRACTING
858-357-3133

RON JENKINS ARCHITECT


619-871-2688
STEVE MANSON OWNER- MANSON ENGINEERING CONSTRUCTION
619-670-6777

DON ALLEN PE-KPFF STRUCTURAL ENGINEERS


619-521-8500
GREG ASLAND SENIOR SUPERVISOR OF INSPECTORS
CONSTRUCTION TESTING AND ENGINEERS
760-481-5964
CHUNG SONG OWNER-PRIME STRUCTURAL ENGINEERS
858-485-7433
BUD HENRICKSON DSA INSPECTOR
760-644-3204
MIKE WISE PROJECT MANAGER
ESCONDIDO HIGH SCHOOL DIST.
BYRON ANDERSON NTD ARCHICTECTURE PROJECT MANAGER
858-565-4440
PREVIOUS EMPLOYERS

HARBOR MANAGEMENT CORPORATION 12 YEARS


LUSARDI CONSTRUCTION 3 YEARS
HANNAH-GILLARD CONSTRUCTION 4 YEARS
CAL-STAR CONSTRUCTION 2 YEARS
R. G. PETTY/LEDCOR PETTY 10 YEARS
TSA CONTRACTING 2 YEARS
JAYNES CORPORATION