POLAK 8716 Dallas Street a- La Mesa, CA 91942 619-772-2461 a- jpfa40da@westpost.net
PROJECT SUPERINTENDENT / PROPERTY MANAGER / OWNERaS REP LAND DEVELOPMENT
PROFILE Project Superintendent with an extensive Construction background including comme rcial, industrial, retail, multi-use and residential projects both from a ground -up status and tenant interior work from a new and remodel status. Expertise wi th on and off site work including wet and dry utilities, grading, paving, concre te and other related civil engineering disciplines. Skilled in managing crews e nsuring job site safety and on time completion of projects. Construction Disciplines: Tilt-up Type 5 Masonry Structural Steel Post tension concrete General concrete Metal deck systems Hybrid roof systems Glazing systems Roofing systems Metal stud systems Shot-crete wall systems including drainage and water proofing systems Management Philosophy: * Pro active attitude towards resolution of on-site issues including design and owners/users desires. * Working knowledge of building code issues of electrical, plumbing, and HVAC sy stems in addition to structural issues, building codes and utility companyas req uirements as well as site development. * Enforce job site safety and sub-contractor compliance with applicable rules an d regulations. PROFESSIONAL EXPERIENCE Project Superintendent - Commercial, Retail, and Industrial projects throughout San Diego JAYNES CORPORATION, San Diego, CA 2008 - 2009 Managed construction of a new building for Escondido High School at the San Pasq ual Campus. Coordinated subcontractors and worked with the Foreman to review an d approve scheduling, production, and quality control. TSA CONTRACTING INC. San Diego, CA 2005 - 2007 Structural retro-fit of the Candy Factory and Schiefer and Sons Building, at Pet co Ballpark. R.G. PETTY / LEDCOR PETTY, San Diego, CA 1995 - 2005 Selected projects include: Gen-Probe Phase 2 - 300,000 sq. ft. tilt up Quarry Creek Retail Subdivision - 15 acre site development and improvements plus 15,000 sq. ft. retail frame and stucco for the Quarry Creek Shop buildings Hitachi of America - 180,000 sq. ft. tilt up Parkway 4, 5, & 6 - Industrial Buildings in Poway from 45,000 to 130,000 sq. ft. tilt up Iron Mountain Storage - 3 story tilt up Eastgate Office Complex - 4 buildings tilt up with extensive site work Carmel Mountain Office Complex - 2 buildings, 150,000 sq. ft. tilt up PROFESSIONAL REFERENCES TOM COKER RCI REINFORCING 619-520-9176 BRUCE REID OWNER SOUTH BAY WELDING 619-401-5880 BRIAN JONES THUNDER-JONES CONCRETE 760-522-3864 STEVE FICK OWNER FICK AND SONS PLUMBING TERRY PETERSON SUPT. GOOD AND ROBERTS CONTRACTORS 760-801-2427 JEFF BALDWIN MANAGER HEALTH AND SAFETY LEDCOR CONSTRUCTION U. S. DIVISIONS 702-596-6339 DWIGHT BRISERETTE V. P. HEALTH AND SAFETY DIVISION LEDCOR COMPANIES VANCOUVER, CANADA 604-230-2597 VINCE GOREMAN H&K CONSTRUCTION 619-390-3395 GREG TORWICK SAW CORE 619-654-7914 BRUCE REID SOUTH BAY WELDING OWNER 619-401-5880 KEVIN CLARK OWNER-CLARK STEEL FABRICATIONS 619-390-1502 REED GILLETTE SUPERINTENDENT TSA CONTRACTING 858-357-3133
RON JENKINS ARCHITECT
619-871-2688 STEVE MANSON OWNER- MANSON ENGINEERING CONSTRUCTION 619-670-6777
DON ALLEN PE-KPFF STRUCTURAL ENGINEERS
619-521-8500 GREG ASLAND SENIOR SUPERVISOR OF INSPECTORS CONSTRUCTION TESTING AND ENGINEERS 760-481-5964 CHUNG SONG OWNER-PRIME STRUCTURAL ENGINEERS 858-485-7433 BUD HENRICKSON DSA INSPECTOR 760-644-3204 MIKE WISE PROJECT MANAGER ESCONDIDO HIGH SCHOOL DIST. BYRON ANDERSON NTD ARCHICTECTURE PROJECT MANAGER 858-565-4440 PREVIOUS EMPLOYERS
HARBOR MANAGEMENT CORPORATION 12 YEARS
LUSARDI CONSTRUCTION 3 YEARS HANNAH-GILLARD CONSTRUCTION 4 YEARS CAL-STAR CONSTRUCTION 2 YEARS R. G. PETTY/LEDCOR PETTY 10 YEARS TSA CONTRACTING 2 YEARS JAYNES CORPORATION