Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Lentsch
626 East Kilbourn Ave. # 2301
e-mail: daniel.j.lentsch@gmail.com
Milwaukee, Wisconsin 53202
Telephone: 414.460.6937
Director of Program / Project Engineering Management
Expert in the Planning and Management of Multiple Complex Projects
that increase Efficiency, Productivity and Profitability.
Accomplished Engineering Program Management Professional with 23 years of Game C
hanging Innovation to organizations across diverse markets and industries, I hav
e been instrumental on an international platform, taking Ideas and market driven
requirements to produce new product solutions and service developments. I have
a strong track record of managing cross-functional teams in a matrix environment
that collaborate as a focused unit to achieve aggressive business goals. With e
xtensive experience in medical device, electronics and pharmaceutical manufactur
ing, I have been a strategic planning leader in product and process development
leading multiple multi-million dollar initiatives. In addition I have been parti
cularly effective directing the evolution of technical and non-technical solutio
ns from concept to implementation, while consistently managing the needs of the
customer, the team, and the project. I provide excellent leadership, management,
communication, customer service and problem solving skills. Finally, as a manuf
acturing expert, I fully recognize that productivity and LEAN efficiency improve
ments lead to cost reduction and avoidance and have proven that with my results.
Professional Experience
Baxter International Healthcare
Round Lake, Il.
Sr. Manager, Engineering
200
7 - Present
* Member of the Senior Management Team, I am one of seven members to oversee ope
rations at the RLDD Aseptic Drug Manufacturing Site. I have been influential in
leading the technical aspects at this 24/7/365 production facility. I interact d
aily in production planning, budget issues, facility planning and operations alo
ng with aspects of Quality Control.
* Introduced the Lean Manufacturing management to RLDD to remove the " silo " ma
nufacturing culture and integrated engineering, manufacturing, quality and manag
ement to pinpoint nagging historic problems to successful conclusions.
* Working with production and maintenance, our engineering group has worked to i
nsure our goal of 95% uptime is being met while establish T.P.M. in the organiza
tion.
* Over the past three years, expansion has been part of our portfolio, as we add
ed 75% capacity and a portfolio of new products from the Bio-Science Division. T
his expansion, with an International customer base, has had complexities with th
e packaging and labeling features, manufacturing process, handling and storage r
equirements. In addition, simultaneously, RLDD continues to have an expanding mo
lecule base in the Non-Cefozopran area with a 20% Capacity expansion.
Responsibilities and Accomplishments:
* Increased dramatically the efficiency and productivity of my staff of electric
al / software, IT and mechanical engineering personal along with my multiple pro
ject teams directing a portfolio of over 150 projects with a composite value of
over 55 million dollars.
* Being an influential member of the Baxter Bio-Science leadership team, I devis
ed a strategic plan to penetrate worldwide markets with a multi faceted manufact
uring solution. In June 2010 I made a presentation of my solution to the C.E.O,
and Division Presidents.
* A member of the Molecule Development Team as the manufacturing expert in exec
utive bi-weekly status meetings working with representation from CHINA, EUROPE a
nd INDIA while traveling to Brussels, Lucerne, and Vienna.
* I energized the defunct Value Improvement Program with a series of projects dr
iven through employee involvement. This program has over 80 active projects with
a yearly savings value of 3.7 million dollars.
* Instrumental in bringing the Toyota Lean Manufacturing System to Baxter Intern
ational RLDD Facility. I participated in the Director Level Lean Training Progr
am and brought Lean Tools to the daily operation.
* Directed I.T. Team with updating our manufacturing SCADA /POMS information sy
stem to include interactive O.E.E. for production/maintenance and engineering u
tilization over 19 production lines
Dr.Prog.Proj.Eng.v5.2010