00 Limestone Quarry and Crushing Plant

The major raw material for cement production is limestone. The limestone most suitable for
cement production must have some ingredients in specified quantities i.e., calcium carbonates,
silica, alumina, iron, etc.

Typically, cement plants locations are based upon the availability of good quality limestone in
the vicinity. The quarrying operations are done by the cement producer using the open cast
mining process.

Quarrying is done through drilling and subsequently, using heavy earth moving equipment such
as bulldozers, payloaders and dumpers.

The quarried raw material is then transported to the cement plant, using mechanical conveying
equipment such as ropeways or belt conveyors, or by vehicles like wagons and trucks.

The quarried limestone is normally in the form of big boulders, ranging from a few inches to
meters in size. These varying sizes of limestone need to be crushed to a size of about 10 mm in
order to be prepared for finish-grinding.

There are mainly two types of crushers available for this purpose- compression type or impact
type crushers. There are many types of compression type crushers such as jaw crusher, gyratory
crusher, cone crusher, roll crusher. The impact technology is used in hammer crusher/impact
crusher.

Crushing is done either in two stages or in a single stage. In the two stage crushing system, a
compression type crusher is used in the first stage for raw crushing, followed by impact/hammer
crusher in the second stage. In single stage crushing, an impact type crusher is used.

The selection of the crusher depends mainly on the characteristics of the raw materials. This
selection is further guided by the particle-size distribution requirements of the down-stream
equipment such as raw mills and lastly by financial considerations.

01 Limestone Stock Pile

The raw material is stored at either the quarry or at the plant. Typically, circular or longitudinal
stock piles are used to store the material.

A number of layers are stacked in circular or longitudinal piles and are reclaimed in transverse,
cross-sectional slices.

The stock piles consist of separate layers/piles of different kinds of raw material. This is used in
segregating the raw material quality-wise. The required quantity of the various raw materials is
thus easily extracted for use.
The extraction of different qualities of raw material is monitored and controlled in order to
maintain the desired composition of raw meal, suitable for feeding into the kiln.

02 & 03 Additives Storage Hopper

In order to get the required composition of raw material, certain additives such as iron ore,
bauxite, laterite, quartzite and flourspar are added in required quantities.

These additives are stored at the plant in separate hoppers and are extracted using belt conveyors
in conjunction with belt-weighing equipment. This ensures that only the required quantities are
extracted and added to the raw material.

04 Raw Mill Building

The raw material is finish-ground before being fed into the kiln for clinkering. This grinding is
done using either ball mills or vertical roller mills (VRM). The raw material is simultaneously
dried.

Ball mills use impact with attrition principles for grinding the raw material. Inside the ball mills,
various sizes of balls are used and classifying liners are used to maintain the position of different
sizes of balls. The larger sized balls are utilized for impact grinding and the smaller balls for
attrition. VRM uses the compression principle to grind the raw material.

The choice between a ball mill and VRM is governed by many factors such as the moisture
content of the raw material, the size of the plant, the abrasiveness of the material, the energy
consumption levels, reliability, and finally financial considerations.

Ball mills are suitable for low and medium moisture content in the range of five to six per cent
and are preferred for abrasive material. The main advantage of VRM is higher grinding
efficiency and ability to accept material with higher moisture content.

Normally the energy consumption level in VRM is 10 to 20 percent lower than in ball mills.

05 Blending and Storage Silo

Normally there are various sources of limestone, each with different qualities, which are added
with various additives to get the required composition of raw mix. As there are various sources
of raw materials, it becomes necessary to blend and homogenize these different materials
efficiently to counteract fluctuation in the chemical composition of the raw meal.
The variations in the composition of kiln feed have very adverse impacts on the efficiency of the
kiln. It results in undesired coating and ring formation inside the kiln. In order to blend and
homogenize the raw materials properly, continuous blending silos are used.

06 Preheater

The most important activity in cement manufacturing is clinkering (or burning) of raw material.
Clinkering takes place in the kiln and the preheater system.

Preheater systems offer heat transfer from the hot kiln gases.

07 Gas Conditioning Tower and ESP

The conditioning tower is used to reduce the temperature and to increase the moisture level of
the dusty exhaust gas from the kiln, before it is passed through the bag house and ESPs. It is
called a conditioning tower because it conditions the hot gas, thus making it more suitable for the
ESP and bag house to extract dust from it.

The Electrostatic Precipitators are used in cement plants particularly for removal of dust from the
exit gases of cement kilns and from the exhaust air discharged by dryers, combined grinding and
drying plants, finishing mills and raw mills through water injection.

Through ESPs, the dust-laden gas is made to flow through a chamber usually horizontally,
during which it passes through one or more high voltage electric fields formed by alternate
discharge electrodes and plate type collecting electrodes.

By the action of electric field, the dust particles, which have become electrically charged by
negative gas ions which are formed at the discharge electrodes and attach themselves to the
particles, fly to the collecting electrodes and are deposited there. The dust is dislodged from
these electrodes by rapping and thus falls into the receiving hopper at the base of the precipitator
casing.

08 Kiln

A kiln is the heart of any cement plant. It is basically a long cylindrical-shaped pipe, and rotates
in a horizontal position. Its internal surface is lined by refractory bricks. Limestone and additives
are calcined in this. The output of the kiln is called clinker.
09 Cooler

The clinker coming out of the kiln is hot. It is cooled in a set-up called a cooler. In the cooler,
cold air is blown to effect heat exchange between hot clinker and cold air.

10 Deep Bucket Conveyor

The deep bucket conveyor is essentially an equipment to lift material vertically.

11/12 Clinker/Gypsum Storage

The output of the kiln is stored before it is fed to the cement mill for conversion to cement. This
storage is called clinker storage, if it is used for clinker storage purpose. If the storage space is
used for gypsum storage, it is called gypsum storage.

The storage may be of silo type or covered stacker reclaimer type or simply a gantry type. Silo
type clinker storage has the advantage that there is no dust pollution and spillage of clinker.
Same advantage can be achieved through stacker reclaimer type as well. However, there is a
little bit of dust generated. Gantry type is not used in modern cement plants because of its
environmental unfriendly nature.

12 Gypsum Storage

The output of the kiln is stored before it is fed to the cement mill for conversion to into cement.
This storage is called clinker storage, if it is used for clinker storage purpose. If the storage space
is used for gypsum storage, it is called gypsum storage.

The storage may be of silo type or covered stacker reclaimer type or simply a gantry type. Silo
type clinker storage has the advantage that there is no dust pollution and spillage of clinker.
Same advantage can be achieved through stacker reclaimer type as well However, there is a little
bit of dust generated. Gantry type is not used in modern cement plants because of its
environmental unfriendly nature.

Limestone coming out of quarry is crushed in multiple stages in a sizing plant before it is put in
limestone stockpile. Crusher are mainly of two types viz. Jaw crusher and Hammer crusher. Jaw
crusher is basically a simple mechanism having two plates one fixed and another moving. This is
also called primary
crusher. Hammer crusher has got metallic hammer mounted on the axes and the sizing achieved
by the impact of the hammer.

13 Coal Mill Building

The coal mill building houses the mill for grinding lumpy coals. This fine ground coal is used for
burning in the kiln.

The mills used for coal grinding and drying are either trumbling mills (tube mills) or roller mills.

14 Cement Mill and Bag House

Clinker, along with additives, is ground in a cement mill. The output of a cement mill is the final
product viz. Cement. In a cement mill, there is a cylindrical shell lying horizontal which contains
metallic balls and as it rotates, the crushing action of the balls helps in grinding the clinker to
fine powder.

The term bag house is applied to large filters containing a number of tubular bags mounted in a
usually rectangular casing. The dust laden air is drawn through them by suction.

The bag house is used to remove dusty particles from discharge of different equipment such as
cement mill, coal mill and kiln. In a bag house system discharge gas containing dusty particles is
passed through a series of bags made of strong fabrics.

15 Cement Storage Silo

The cement storage silo is used for storing the finished product - cement.

16 Packing and Dispatch

The cement is packed with the help of a rotary packer and finally dispatched to the market.
17 Central Control Room

It is the nerve center of the cement plant since all equipment is controlled from this place. It is
the place from where all the process parameters are controlled