Sei sulla pagina 1di 2

Objective

Seeking a position where I can utilize my production supervisor/Group leader ski


lls
And gain opportunities for future career
Education
1981-1983 Marshall high school Los Angeles CA
1988-1989 Webster career institute Los Angeles CA
1999-2001 Chino Adult school Chino CA
Qualifications
Excel, Microsoft, WMS
Work Experience
2008-2010 McCain Food Colton, CA
Group Leader
-Leading production employees in continuous improvement activities
-Develop, direct and manage manufacturing personnel and train them properly util
ize all equipments and tools, communicated with employees on a regular basis.
-Verify and coordinate all necessary materials and equipment required are availa
ble for shift
- Direct manufacturing personnel to maintain product quality and meet customeras
requirement
-Participate in activities such as training and safety programs in order to enha
nce the overall effectiveness of the work areas
-Reconcile counts with total units recorded by line leads calculated yields and
investigate any discrepancies
-Communicate information to next shift supervisor, mechanics, and line leads as
needed.
2005-2008 Reliable Packaging Los Angeles CA
Production Supervisor
-Supervised 15 trough 30 employees on multiples production lines
-Check all lines periodically to ensure that codes, components ,counts, product
and pallet count are correct, Verified numbers for the assorting product and set
up linens for next job project.
-Reviewed and released all work orders which includes the next day work, plus Ha
ve paper work on time.
2000-2005 Quetico LLC Chino CA
Production Supervisor
-Managed 50 trough 75 employees on daily basis running lines.
-Direct and assign packaging activities and personnel on all lines running durin
g shift
-Print and distributes labels for finish good sub assemblies and rework, check a
nd issues labels to lines,
-Have ready Inventory numbers every time I finish an item numbers, Brake down me
rchandise by item and PO#
-Experiences with RTV product and WMS plus Training personnel.
1996-200 Motivational Fulfillment Chino CA
Production Lead
-Manage 50 employees in the assembling production lines, verified labels accordi
ng of the work orders and make sure all package have all components and instruct
ions sheet before sealed the boxes.
- Ensured the entire procedure of work is finished on time
-Ensured timely planning and scheduling to meet on-time deliver goals.

References: David Giroux, McCain a"909-825-2672 Fernando Barragan ,Reliable 323-


215-6970
PERSONAL INFORMATION.
909-947-7873
909-230-1498
3635 Fox glen loop
Ontario CA91761

Potrebbero piacerti anche