Sei sulla pagina 1di 4

PERSONAL DATA

NAME : RAMZI ADIB TAKIEDDINE


DATE & PLACE OF BIRTH : JANUARY 21, 1954
BAAKLINE, LEBANON
NATIONALITY : LEBANESE
Marital Status : Married with two kids (Adib & Rayya)
Languages Fluency : Arabic & English
CONTACT MOB. (Lebanon) : +9613854525
E-MAIL Address : rt59aa58@westpost.net
ADDRESS : P.O.BOX: 113-5503, Beirut
5th floor, Atall
ah Bldg., Thomas
Edison Street, R
amlet El-Baidh
Beirut, LEBANON
EDUCATION

Bachelor degree in Electrical Engineering (1976), from the American University o


f Beirut, Beirut, Lebanon

PROFESSIONAL TRAINING COURSES


* " To be provided upon request

CURRENT EMPLOYMENT
* Gulf Elevators & Escalators Co. Ltd.(GEEC Ltd)
Mar. 1, 2007 - till date: Representative of Board
Reporting to Chairman and overseeing all activities of Operation, Technical Affa
irs, Production & Administration of GEEC Ltd. GEEC Ltd is the first manufacturin
g plant for elevators in Gulf, based at 5th phase-Industrial City of Jeddah repr
esenting two lead Japanese elevator companies since 2000 for FUJI in ME&A and 20
06 for Hitachi in Saudi Arabia.

PREVIOUS EMPLOYMENTS
* HYDROTRANS NIG.LTD
Jan. 2, 2006 - Feb.15th, 2007: Managing Director
Responsibility is to supply Renewal Parts / Upgrade Kits and provide Specialized
Repair Services for Automotive Commercial Business Sector (Diesel / Petrol) thr
oughout Nigeria. HTNL represents BOSCH Automotive, HYVA Hydraulics, ECONOMOS Sea
ls, EUROPOWER Hoses & HASTINGS Filters.
* LINFRA ALGERIE
September 27, 2004 -Sept.30, 2005: General Manager
Responsibility is to provide Telecommunication infrastructure solutions and Serv
ices for GSM and PSTN networks as well as solutions and services to Government p
rivate operators and public clients in Algeria.

* ELECTRO INDUSTRIES GROUP


Dec. 2003 Relocated to Jeddah, Group HQ up to June 11, 2004
June 1999 - Nov. 30, 2003: Director, Projects - Telecom - Riyadh
As well Sales & Marketing of Telecom and Electrical manufactured products for Sa
udi, Middle East & International.
Key Responsibilities:
* Contractual responsibility for all projects with STC including MDF compressio
n/ cut-over/Replacement , ISP projects and OSP Construction & Maintenance in S
audi Arabia
* Sales & Marketing responsibilities for Utilities' Enclosures as well export fo
r MDF/OSP Telecom Access Network Passive Manufactured products at Electro's Jedd
ah facilities, as well for Pair Gain Systems, DLC & WLL products representing
international OEM.
Major Accomplishments:
1) Started and developed the new telecom contracting department
2) Supervised and completed the challenging contract for full compression of Mal
az Exchange (95k lines)
3) Managed to grow the contracting business from 3 million SR to 15 million SR i
n the second year.
4) Negotiated and signed number of technology transfer agreements for telecom &
utilities' products with international companies.
5) Negotiated and signed number of representation agreements for international c
ompanies in the Middle East Region.
6) Negotiated and signed number of export distribution agreements in African cou
ntries.
7) Proven success in export sales to new markets such as ETHIOPIA, LIBYA, SUDAN,
PAKISTAN, YEMEN, EGYPT & UAE.
8) Developed and maintained good relations with Executives of SCECO & STC
* TELECOM & SIGNAGE- BEIRUT
May 1997- June 11, 1999: Director, Sales & Marketing/Projects -
Telecom & Signage- Beirut (ME [non-gulf] & Africa)
Started Beirut operations for the group Tendered and negotiated/signed number of
contracts for Signage business with Solidere and other private companies such a
s McDonald Restaurants.
* WESTINGHOUSE SAUDI ARABIA LTD., POWER SYSTEMS INTL. ALKHOBAR, SAUDI ARABIA
January 1991 - April 1997: DISTRICT MANAGER, POWER GENERATION
- Lead Corporate & Marketing responsibility for new power
- Plant projects and O&M Services for Power
- Plants in Saudi Arabia, Kuwait, Lebanon, Jordan,
- Oman, Syria, UAE, Qatar, Bahrain & Pakistan.
- Managed to negotiate and complete the final handing
- Over of three Key projects: KAMC P/P with GDMW;
- Qassim S/S with SCECO-C; MOI P/P with Hyundai.
- Lead efforts to regain acceptance and managed to
- Negotiate the award of Assir P/P Expansion after years
- Of absence from the Saudi Market.
- Selected after screening long list of candidates for special
- Representation or Distribution agreements in the Middle
- East Region.
- Developed & maintained excellent relation with Key
- Executives in Power Utilities Sector.
Jan. 1988 - Dec. 1990 : TECHNICAL ADVISOR
o Providing technical and commercial support to Westinghouse T&D Subsidiaries an
d Westinghouse Distributors in contracts as well as in marketing and sales of hi
gh-tech electrical apparatus, Advanced system technologies, etc. and mainly P
ower Generation contracts as well renewal Parts & services for the Westinghouse
clients.
o Renewal parts business has grown annually over 50%.

* SAUDI ELECTRO-MECHANICAL COMPANY (SAEMCO)


Jan. 1986- Dec.1987: PROJECT MANAGER, Al-Aflaj Electrification Project.
The client was being the Electricity Corporation Riyadh and the consultant being
Saudi Consulting Services Riyadh. The project covered the design, supply of Equ
ipment/ material, erection testing and commissioning of:
- 255 km of 132KV Transmission Lines (single Circuit)
- 6 Substation described as follows :
- 5 * 132/33kV
- 1 * 33/13.8kV
Lead and managed team of 750 managers, engineers and technicians to complete the
project to the satisfaction of our esteemed client EC/SCECO-C.
* AL - TIHAMA
March 1984- Dec. 86: PROJECT MANAGER -Electrification Manager
The client being SCECO-South/ESR Abha and the consultant being AL-BAWARDY consul
ting Engineers. The project covered the design, supply of equipment/material, er
ection, testing and commissioning of:
- 450km of 33kV Overhead Transmission Lines
- 300km of Low Voltage Overhead Distribution lines
- 5000 Consumer Connections
- 550Substation (33/0.23kV)
Lead and managed team of 250 managers, engineers and technicians to complete the
original contract and negotiated /completed 10% additional profitable scope of
work .

* TAKI ELECTRIFICATION NIGERIA LTD.


July 1980 - Feb. 1984: MANAGING DIRECTOR
Lead and managed execution of Various Industrial Electrification Projects
in Lagos, Ibadan, Kaduna and Abuja.

* ARABIAN POLYFAB, ALKHOBAR


April 1979- June 1980: PROJECT ENGINEER
- The client being the "Royal Commission of Jubail and Yanbu "and the consultant
being "BECHTEL" (for Jubail Projects) and "PARSONS" (for Yanbu Project). The jo
b was covering (but not limited to) the responsibility of electricity design in
general and power distribution in particular.
- Complied with international standards of design and met the satisfaction of o
ur clients.
* Al- MABANI GENERAL CONTRACTORS , JEDDAH
March 1978- Mar 1979: PROJECT ENGINEER
- The client being the "Royal Commission of Jubail and Yanbu" and the consultant
being "BECTHEL" For infrastructure for labor camps 4&5 in Jubail.
- The job was covering (but not limited to) the Responsibility of electrical des
ign in general and Execution of 34.5kV underground network, in
- Addition to the continuous follow-up of matters with the consultant and manufa
cturers.
- Supervised Int'l sub-contractors and coordinated with Bechtel Project Manageme
nt team.
Sept. 76 - Feb. 1978: SITE ENGINEER
- The client being the Civil Aviation Bureau and the Consultant AVCO. The job wa
s mainly the Supervision of all electrical and mechanical Activities in "Saudia"
and "International" Buildings and the stand-by power plant for these Airport te
rminals in Dhahran.
- Supervised execution and coordinated commissioning & training activities to th
e satisfaction of our ultimate client.

Potrebbero piacerti anche