Cuenta Descripción Debe Haber
Sem
Proveedores(Concretec) $ -
2-Apr 2-Apr 214 Concretos Concretec Remision A 41351
3-Apr A 41367
4-Apr A 41396
5-Apr A 41353
6-Apr A 41355
7-Apr A 41370
Proveedores(Concretec) $ -
130 Estimacion de Obra Administrativa 0 247 $ 8,760.00
230 Estimacion de Obra Albañ ileria 0 250 $ 9,450.00
DOS
$ 199,426.73
TRES 4-Apr 213 Materiales Cemento gris 15 Ton
Proveedores(Caresatero)
5-Mar 211 Material Permanente Serviacero Comercial CE034829 $ 11,716.00
4-Mar Pago Con Cheque $ 11,716.00
4-Mar 211 Material Permanente InBlock (15943) 10404 $ 15,519.41
Pago Con Cheque $ 15,519.41
TRES
7-Apr
proveedores(GravArena) $ 4,900.00
6-Apr 211 Material Permanente Plom. y Ferret, Leó n F9857 $ 5,111.22
Proveedores(plo.ferr.Leon) $ 5,111.22
212 Material No permanente Madereria el Salto $ 9,837.96
CUATRO
A537
Proveedores(madSalto) $ 9,837.96
TRES
0 254
230 Estimacion de Obra Fontaneria 0 251 $ 1,000.00
230 Estimacion de Obra Fontaneria 0 252 $ 1,750.00
Pago Estimacion $ 51,750.00
CUATRO
$ 211,817.10
11-Apr 211 Material Permanente Representaciones Plastic $ 1,990.56
12-Apr 212 Material No permanente Madereria Irapuato(tablo) 2046 $ 2,053.20
Pago Con Cheque $ 4,043.76
12-Apr 215 Equipos y Herramientas Herram(Barriles)Distribumez $ 2,000.00
CUATRO
15-Apr 213
Proveedores(GravArena) $ -
214 Concreto Concretec Remision A 41579
Concretec Remision A 41581
Concretec Remision A 41589
Concretec Remision A 41592
Proveedores (Concretec) $ -
CINCO CUATRO
$ 213,853.47
18-Apr 124 Fianzas Pago de Fianzas $ 67,599.48
Pago Con Cheque $ 67,599.48
18-Apr 213 Materiales Caresat(cemento Gris 20t)
Proveedores(Caresatero)
211 Materiales Permanentes Cemen y Aceros Irapuato FEA 358 $ 9,130.00
Pagado en Efectivo $ 9,130.00
211 Materiales Permanentes Procon (10,800pz) $ 50,613.12
Pago con Transferencia $ 50,613.12
Entrada material 1800 Pz $8,435,52
CINCO
22-Apr
6 687 CINCO
23-Apr
$ 175,581.80
25-Apr
26-Apr 211 Material Permanente Tabique Rojo (1700pzas)
6 11
Proveedores(Reinaldo)
68 6 116 786 10
27-Apr
28-Apr
29-Apr
30-Apr
107 128 11 71012
$ -
2-May
3-May
4-May
5-May
8 13
6-May
7 11
7-May
$ -
8 12
9-May
10 13
10-May
11
11-May
10 13 12
12-May
8
13-May
14-May
9 811
$ -
16-May
12
9
12 91011 13
9
17-May
9
18-May
9
19-May
9
20-May
9
13 10 91113
9
9
21-May
$ -
9
23-May
24-May
12
25-May
11
26-May
27-May
1113
28-May
10
12
$ -
30-May
31-May
1-Jun
13
12 11
2-Jun
3-Jun
4-Jun
1311
$ -
6-Jun
12
7-Jun
8-Jun
9-Jun
13
10-Jun
11-Jun
12
$ -
13-Jun
14-Jun
13
15-Jun
16-Jun
17-Jun
18-Jun
13
$ -
14 20-Jun
21-Jun
22-Jun
14
23-Jun
24-Jun
25-Jun
14
$ -
15 27-Jun
28-Jun
29-Jun
30-Jun
1-Jul
2-Jul
$ -
16 4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
$ -
$ 961,942.24
$ -
$ 961,942.24
Costo (Directos)
Total
Material Permanente Clave: 211 $ 561,266.36
1 24-Mar Distri de Cobre Bajio $ 3,243.02 Pagado $ 9,520.99
1 24-Mar Serviacero Comercial $ 5,750.70
1 25-Mar Representaciones Plast $ 3,279.32
1 25-Mar Plom. Y Ferreteria León $ 1,073.36
1 25-Mar Plom. Y Ferreteria León $ 80,773.51
1 25-Mar Plom. Y Ferreteria León $ 3,028.92
1 25-Mar Plom. Y Ferreteria León $ 419.44
1 26-Mar Ferreteria (caja chica) $ 455.97
1 26-Mar Diversos (caja chica) $ 35.00
$ 770,712.36
Saldo AnterioAbono Nuevo Saldo
pago Grava y Arena $ 4,900.00 $ 4,500.00 $ 400.00
Costo (Indirectos)
sem Cargos Ind de Campo Clave: 121 ###
1 25-Mar Recarga Celular $ 188.00 pagado $ 3,418.00
1 26-Mar Gasolina $ 1,600.00
1 26-Mar Recarga Celular $ 60.00
1 26-Mar Gasolina $ 500.00
1 26-Mar Consumo $ 220.00
1 26-Mar Gasolina $ 550.00
1 26-Mar Consumo $ 300.00
212
213
214
215
216
220
221
222
223
224
225
226
227
228
229
230
Costo Directo
Semana
211 212 213 214 215 216
Materiales Equipos/Herramientas
Permanente No Permanente Suministros Concretos Herram menor Consumibles
#NAME?
Costo Directo
Semana
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ 112,275.00 $ 322.50 $ 5,200.00 $ 48.50 $ 105.00 $ 14,107.20
#NAME?
$ 130,842.68 $ 130,842.68
o de obra
122 130 124 Total
Imprevistos Nom.Admi Fianzas
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ - $ - $ - $ -
$ -
3/21/2011
3/22/2011
3/23/2011
3/24/2011
3/25/2011
3/26/2011
3/27/2011
3/28/2011
3/29/2011
3/30/2011
3/31/2011
4/1/2011
4/2/2011
4/3/2011
4/4/2011