Regd. Office: Vidyut Bhavan, Race Course, VADODARA – 390 007.

Telephone No. (0265) 2310582-86/2337884 (D)


Fax No. (0265) 2339066 (GETCO) / (0265) 2337918/2338164 (GUVNL)
Wes site: www.gseb.com Email: seengg.getco@gebmail.com
Ref No.: CEP/SE (Engg)/II/Std documentation Date: -08-07

To,
All Adl. CE, Zone,
GETCO,

All SE (TR),
GETCO

Sub: Standardization of drawings and documents.

In order to standardize the drawings and documents for GETCO, following points are deliberated
and finalized those may please be noted and implemented with immediate effect.

1) How to give Drg. No-Standard format (Pl. refer Ann-I)


2) Standard Title Block for the drawings (Pl. refer Ann-II)
3) How to give Document NO –e.g. Specifications, Quality Plans etc. (Pl. refer Ann-III)
4) Standard procedure for Approval of Drawing/Document (Pl. refer Ann-IV)

Related formats are enclosed here with.

All are requested to keep those as permanent reference. Drawing/Documents may be prepared on
the basis of the same. No change in any of this format should be made without approval of
Competent Authority at Corporate Office.

For, Gujarat Energy Transmission Corporation Ltd

(K.S.DAVE)
Chief Engineer (Project)

C.F.W.C to:
1) MD GETCO
CC to:
1) CE (TR)/(R & M) Corporate Office
GETCO -with request to prepare the respective
2) CE (LDC) Gotri formats for drawing/documents as per the
3) ACE (Tel & Testing) (R & C) standard guidelines given herein and to
Corporate office GETCO adopt the same for ISO documentation
4) SE (Civil) Corporate Office GETCO
5) SE (Project) Corporate Office GETCO
Annexure-I

Standard format to give drawing numbers

GETCO / E or C / 4S-002 / P or S-001

Drawing ID

P- Primary
S- Secondary

Project ID
First Digit 06 for 66 kV
1 for 132 kV
2 for 220 kV
4 for 400 kV
Second digit S-for SS
L-for Line
Last three digits- Sr. No. of project

E for Electrical
C for Civil
Annexure-III

Standard format to give document number

GETCO / E or C / TS- BATT 016 / R0 Dt.

Date w.e.f.

Revision No.

Short description of Equipment


Specification and its ID in standard list

TS-Technical Specification
GTP-General Technical Particulars
QR-Qualifying Requirements
FQP-Field Quality Plan

E for Electrical
C for Civil
Annexure-IV

Standard procedure for drawing/document approval

1) Stamp with RED Ink on each sheet of Drawing/Document.

GETCO Approval Letter/Mail No.________Dt___________

GETCO ENGG. CELL


DRAWING APPROVAL

Cat-1 Approved. ---------------------


Cat-2 Approved with Comments. ---------------------
Cat- 3 Approved For Information. --------------------
Cat-4 Not Approved. ---------------------

The above approval, in general, does not absolve you


from Contractual Obligations.

2) Stamp with GREEN Ink on each sheet of Drawing/Document.

GETCO
Released For Manufacture
Released for Construction
Released for Information