Sei sulla pagina 1di 2

U ni te d Dy na m ic s

Vo l um e 2 , Is su e 2
A dv a nce d T ec hno lo g ie s C o r po r a tio n
2 68 1 C or a l R i dge R d A p r il 2 5, 2 0 11
B r o o ks , K Y 4 0 109

T H E I NS PEC TIO NE ER P O S T The Name Behind The Flame


Fueling the Minds of Electricity
INSIDE THIS ISSUE:

 Key Tips to consider THE MORE EYES THE BETTER DURING INSPECTIONS?
while developing a ABSOLUTELY!! UDC WOULD LIKE TO INTRODUCE OUR
“Boiler Inspection NEW “CHECKS AND BALANCES” OR “C&B” PROGRAM.
Repair Prioritization
program”. In a perfect world, we would leader is responsible for the lead rep will likely just
find all equipment repair bringing together all pertinent identify the event, bring the
 Criteria concerns information which may be information down to the
items during a single pass
with Operational through of inspection. deemed helpful to the inspector responsible for that
variations. Unfortunately, additional inspection crew members. region, and
repair items show up Such information includes
routinely through the course previous inspection reports,
Register Online @ www.udc.net
Inter-Relationships of Combustion, of an overhaul. Naturally, it accurate and up-to-date
Efficiency, Reliability & is prudent to identify the material verification of
Air Pollution Control repair item and take the component sections, failure
Training Seminar
necessary action to remedy history, and timeframes with
damage that may result in crew matchups per region.
June 21—23, 2011 Historically speaking, once
failure during operation.
Las Vegas, NV the crew members, including
Through the years, UDC has
STORM TECHNOLOGIES been part of the team in favor the lead man, have
UNITED DYNAMCIS CORP of continued follow-ups during completed their areas of
NEUNDORFER, INC outage projects. Leading the inspection, the inspection
DAVID N. FRENCH METALLURGISTS march in the industry in data is dropped into a report
coal fired electric utilities regard to boiler inspection to be distributed to the plant
 Overview and evolutionary re- and overall reliability improve- contact or the contracted
view of boiler design, reliability, ments, UDC has gone the craft firm. The new “C&B”
lifecycle, and air pollution con- extra step. The “Checks and program requires the lead
trol with perspectives on the Balances” (“C&B”) program man to achieve less initial
U.S. coal industry and the future has been implemented as of inspection time, while
of power generation January 2011 uniting efforts enabling him/her to go back
 Holistic evaluation, process, and to maximize the quality and through and perform cursory
experience with optimizing over- integrity of the inspection inspections (utilizing knowl-
all plant performance process. edge of high priority areas) on
regions completed by the
 Aligning the fundamentals with
crew. The cursory inspection
advancements in today’s power The program runs as follows: will allow the lead man to
generation
Each inspection team will make additional recommen-
 Fuels flexibility and inter- have a team leader for a dations and identify missed
relationships with “whole plant” given project. The team items. If items are minimal,
optimization

THE FORECAST
There are a broad range of items to consider as we move forward to the future of fossil fuels, environ-
mental impact considerations, and governmental regulation for power producers. These items are true
concerns considering the direction of the industry continues to shift. One energy source surfacing now
is that of Heat Recovery Steam Generators (HRSG).
Power generating organizations are currently bringing more HRSG’s online as a prime source of energy
production. These HRSG’s in design were created to operate under base loading operation. The current
environment for operating these units is Cycling. The fact is that HRSG’S are being operated in this
cycling manner in greater volume than the current fleet of fossil units. This out of design operational
practice has thus created a new set of maintenance issues we must prepare to deal with the repercus-
sions moving forward.
The procurement of clean power production is a positive step forward however we are mandated to
utilize all available knowledge to avoid careless mistakes of basic design fundamentals for all of the
maintenance and operational practices we employee today.
U n i t e d D y n am i c s
A d v a n c e d T e c h n ol o g i es

2681 Coral Ridge Road


Brooks KY, 40109

Phone: 502-957-7525
Fax: 502-957-5441
E-mail: Sales@udc.net

Boiler Inspection Techniques Level I & II Training Event

June 7–9, 2011


Visit on the web PAROQUET SPRINGS CONFERE NCE CE NTRE
TUESDAY—THURSDAY 7:30 AM—3:30 PM
www.udc.net Tuition:$1350.00 per person
5% Discount if 2 or More Attendees Register from the same Plant (call for discount code)

The Name Behind The Flame Note:


Note: Enrollment is on a first come first serve basis via Check,
Check, Visa,
Visa, MasterCard,
MasterCard, AMEX or
Purchase Order for billing.
billing.
Early Bird Discounts
Time Period % Discount
Call or log on to reserve your seat
Until March 15, 2011 20 %
March 16 to April 7 15 %
(502) 957-7525
April 8 to May 17 10 %
www.udc.net
May 18 to June 7 0%

CONTINUED FROM PAGE 1


it will be included in the initial inspection report goes service return, and simply to
Would your initial inspection team find
items hidden items under brackets
report PRIOR TO INITIAL out. find additional items to be
and adjacent to alignment straps? REPORT GENERATION. This addressed before they find
Items that are not obvious from the is the key to the program; you during your valuable
identifying the items before Having said all of this, we are summer run.
surface may get missed.
the report is generated. If the certain additional repair items
lead rep finds major items will continue to be found dur-
missed, he/she may elect to ing follow-up inspections once UDC is a firm supporter of the
go back to the inspection assemblies are spread and “The more eyes the better”
office, inform the inspection lighting has been adjusted to philosophy. This program, or a
rep responsible for the area, make adjacent repairs. This program that you implement
and send him/her back up to program was not put into edges in that direction.
re-inspect or identify the place to eliminate the
items missed. This program possibility of discovering
does two things: 1) Puts each additional repair items
inspection rep on their toes, towards the end of an
intensifies motivation to overhaul, but to minimize and
identify everything in their reduce the frequency of the
region with the understanding occurrence.
that a cursory inspection will
be performed. This will UDC feels strongly that you,
increase awareness and the system owners and plant
Written By: focus. engineers, would benefit
Jon Santino Cavote through implementing a
(President / COO) 2) The end result for you, the similar program within your
customer, is increased system. The implementation
performance and an of such a program will
Sherri L. Hart increase outage efficiency,
additional set of eyes on the
Manager Sales, Marketing. areas inspected before the reduce costly change orders/
Education

Potrebbero piacerti anche