Mahlatse has spent 4 yrs with a leading construction company, G-LTA (3 as a student and 1 as a site
engineer). He worked as section engineer for a R40 million section on a R190 million Civils Project, the
Sishen Expansion Project at the Sishen Mine in Kathu in 2006. He then spent 3 yrs with a leading Civil
and Structural engineering consulting company within the petrochemical and mining industry (LB
Engineers). He then worked on several water supply scheme projects including the Ohlanga Pump
Station in Ethekwini and the Thune Dam project in Botswana as a Structural Engineer with Aurecon.
Mahlatse also completed his Graduate Diploma in Engineering at the University of the Witwatersrand
(Dec 2010) majoring in Structural Engineering and Project Management.
EMPLOYMENT RECORD
March 2007 to Oct 2008: Junior Engineer and Junior Engineering Manager, LB Engineers, Secunda
Jan 2006 to Feb 2007: Site Engineer, G-LTA, SEP Project, Kathu
EXPERIENCE RECORD
The project entails the tender and construction design phases for the 100 Ml additional modules for the
Activated Sludge Waste Water Treatment Works in Sebokeng as the present works are operating beyond
capacity.
l mrmokwatlo@gmail.com l 1
May 2010 to Jan 2011 Thune Dam: Botswana
Structural Engineer
The dam construction is clay core earthfill embarkment 34.5 m high and 1633 m long. The gross storage
capacity is 90 Ml. The central spillway comprises 115m long mass gravity ogee weir with retaining walls on
either side including the intake works.
The 48m high Massingir dam completed in 1977 displayed major defect due to high pore pressures at the
toe form the onset. The top section of the outlet structure burst open on the 22nd may 2008 due to the dam
operating above capacity. The project entailed the investigation into the failure that occurred in 2008.
Remedial works included the replacement of a concrete pipe section with a steel bifurcation.
The project involved the design of a DN 1250 outfall sewer, approximately 7850m long, a reinforced
concrete pumpstation and a DN 560 rising main approximately 1000m long. The project also included the
design of connection valve chambers, manholes, road and stream crossings as well as wastewater
treatment works.
The project entailed the connection designs for the Medupi Powerstation’s Boilerhouses.
2
Oct 2008 to Jan 2010 Genrec Workshop and Lifting Devices, Wadeville
Project Coordinator and structural engineer
The project entailed the design of workshop handling and lifting devices.
This project entailed the design a new Oxygen plant in the SASOL Secunda plant.
Personal responsibilities included:
Phase 1
• Appointing a surveyor to perform a landscape survey. Assisting surveyor in meeting plant safety
requirements as well as required safety nominations.
• Oversee the production of drawings of existing structures and underground services.
• Responsible for final drawings produced for the survey and existing services within the plant.
Phase 2
• Perform pile, and pile cap designs for the 25m Chiller tower structure, Noisehood structure and the
various vertical and horizontal vessel structures
• Perform the designs for the 25-m concrete Chiller tower
• Perform designs for the structural steel Noisehood structure and lifting plan design for the
removable roof structure.
As a junior engineering manager, I attended site briefing meetings, perform cost estimates for the company
to perform the works. Upon subsequent employment, my responsibilities included the following:
The projects entailed multiple maintenance works for structural steel and concrete structures.
The project entailed the construction of bulk concrete works. I was responsible for my own section worth
R40 million on a R190 million rand project.
• Running numerous sites including the Jig Plant, Dewatering plant, Control room and the pipe racks.
• Ordering of materials required to do the works including long lead items
• Monitoring and chasing of the construction programme
• Management of the construction team, foremen and the workers.
• Adhere to stringent mine safety requirements and still produce work on time
• Plan large pours and coordinate and motivate construction team.
• Setting out survey and site inspections
• Compile man-hour job costing
• Perform quality assurance tasks
• Record dayworks
• Client liaison
As a student engineer I was privileged to work on the SASOL Poly III project in Sasolburg.
• Site inspections
• Site survey
• Quality control
• Toolbox meetings
4