FEASIBILITY STUDY IN
STEAM CYCLE WITH HARD COAL
By
Marcus Göpel
Anders Ljung
Armando Pirone
Andrea Vecchi
HAPPY2000 2000-02-22
Feasibility Study in Three Heat and Power Technologies Intermediate Report
STOCKHOLM Department of Energy Technology
8-Mar-2000 Chair of Heat and Power Technology
Royal Institute of Technology
100 44 STOCKHOLM
Sweden
HAPPY2000 2000-03-14
Feasibility Study in actual cycle Final Report
ABSTRACT
The need of a deeper analysis for a unit fired by hard coal, comes as a request from
the buyer, in case the natural gas supply would be too restricted or too costly, thus
making this alternative interesting.
The developed subcritical hard coal fired steam cycle requires these main
components:
1 CFBC boiler
1 High pressure steam turbine
1 Low pressure steam turbine
2 District heating condensers
1 Deareator
1 Feed-water pre-heater
1 Air-cooled condenser
The proposed full load time for the production of district heating is around 4320 hours
with a heat output of 200 MWh. In order to accomplish the heat request during the
year and maximise the production of electricity, the electrical output can vary from 94
to 122 MWe depending on the district heating load. The input power is set to 321 MW
LHV heat load. The total efficiency η tot of the cycle is 92.4% when full loaded (that is
during the coldest months). During the summer, when the district heating section is
shut down, the electrical efficiency η el is 38%. Anyway for economical matters the
plant will be shut down during the warmest months, as not profitable at all. The full
load time for the electricity production is suggested to be 5760 after which the plant
becomes unprofitable.
The coal is transported by railway from the harbour (30 km from the site) and there
are no restrictions concerning the amount of delivered fuel.
The main pollutants from coal combustion are SOx, NOx, CO2 and dust. To reduce
SOx emissions, there are principally four different methods, namely changing to low-
sulphur coal, coal preparation, sorbent injection, and installing a flue gas
desulphurization plant. Techniques for NOx reduction include selective catalytic and
selective non-catalytic reduction. To control dust emissions, dynamic separators,
electrostatic filters, scrubbers, and fabric filters are used. For the developed plant we
have decided to use sorbent injection, SCR, and electrostatic filters. Thanks to them
the specifications given by the buyer are fulfilled.
The economical analysis shows that the payback time is above ten years, value
requested by the buyer (see appendix A7). This is due to the low price of the
electricity, especially during the summer. Two different alternatives have been
analysed. While in the first case the plant would run 4320 hours full load and finally
shut down for the remaining six months (when the electricity price is low), in the
second, the plant would run for 4320 hours full load and for 1440 hours partial load
(150 MWh 104.5 MWe for 720 hours and 100 MWh 108.5 MWe for 720 hours). The
results are better for the second case (15.6 years payback time), but still not
profitable in a ten years sight.
HAPPY2000 2000-03-14
Feasibility Study in actual cycle Final Report
CONTENTS
INTRODUCTION...........................................................................................................1
OBJECTIVES................................................................................................................1
......................................................................................................................................1
TECHNICAL SECTION.................................................................................................2
Implementation..........................................................................................................2
General Description of the Plant................................................................................3
Main components.......................................................................................................7
Plant layout..............................................................................................................11
Discussion................................................................................................................12
ENVIRONMENTAL CONSIDERATIONS....................................................................13
Description of the used fuel.....................................................................................13
Emissions of sulphur oxides....................................................................................13
Emissions of nitrogen oxides...................................................................................15
Emissions of dust ....................................................................................................16
Emissions of carbon dioxide....................................................................................18
Ash...........................................................................................................................18
Fuel manufacturing and transportation....................................................................19
Noise........................................................................................................................19
Determining equipment to reduce emissions..........................................................20
Discussion................................................................................................................20
ECONOMY..................................................................................................................21
Investment costs......................................................................................................21
Total.........................................................................................................................21
Cash flows...............................................................................................................22
Results.....................................................................................................................22
Discussion................................................................................................................23
FUTURE WORK..........................................................................................................24
REFERENCES............................................................................................................25
APPENDIX A1
Economical Summary
APPENDIX A2
Cash Flow Trend
APPENDIX A3
Data report from GateCycle
APPENDIX A4
T-s diagram
Deleted to save disk space
APPENDIX A5
Duration curve and outside temperature dependance
APPENDIX A6
Circulating fluidised bed boiler
APPENDIX A7
General information
Additional specifications
HAPPY2000 –1– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
INTRODUCTION
After the first phase of the Heat and Power Project, the literature study, the buyer
decided to continue with three cycles.
The three cycles fit to different possible future developments based on the
assumption that:
This report represents the feasibility study of a hard coal fired steam power plant for
production of both district heating and electricity. The technical, economical and
environmental parts have been analysed.
OBJECTIVES
The task of this part of the project is to evaluate, in a deeper way, the possibility of
building a steam power plant with hard coal for district heating and electricity
production. In the technical part the following points have been taken into
consideration: general description of the plant, preliminary process diagram with
main data, preliminary type and dimensions of main components, rough layout of the
plant and estimation of the ground size needed.
In the economical part an estimation of the economy has been carried out, dealing
with investment costs, cash flows, payback times. In particular two cases have been
analysed.
HAPPY2000 –2– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
TECHNICAL SECTION
Implementation
The needed information to start and accomplish this phase have been taken from the
previous literature study [Vecchi et al, 1999] supplemented by the discussion at
DRTM 1 (1999/12/8), DRTM 2 (2000/02/15), and from some additional specifications
given by Per Almqvist (Appendix A7).
Concerning the technical part the most relevant ones are:
- About the district heating, the energy requested by the town is 1400 GWh per
year. Nowadays, two hot water boilers with oil of 200 MW each and an old heat
and power plant supply the required hot water. Because of a local environmental
demand, in five years from now, only 600 GWh of heat will be produced in a
typical year with old boilers and heavy oil, so that our new unit will have to
produce at least 800 GWh a year.
- The problem found in the literature study about the small area for locating the new
unit has been solved as the site could be enlarged up to 40,000 m2 (at a price of
40 Euro/ m2).
In order to study better the process and calculate heat, mass and energy balances,
GateCycle program [Enter Software, 1998] has been used. Furthermore,
experienced technical experts have been consulted (see References).
HAPPY2000 –3– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Considering the restrictions and the specifications given by the buyer, the unit will
have an output of about 200 MWh district heating running 4320 hours per year full
load and 1440 hours partial loaded. In this way the designed plant will supply more
than the 800 GWh/year requested by the local environmental restrictions. According
to the duration diagram (see figure 1) the left amount of GWh not supplied by the
new unit, will be eventually supplied by one of the two 200 MW h oil boiler and the
converted 300 MWh old plant already existing.
The α value is equal to 0.46 in full load conditions, it means during the coldest
months.
The LHV heat load is set to 321 MW hard coal with a total efficiency of 92.4% when
full load conditions are fulfilled.
From a technical point of view, during the summer the electrical output would be 122
MWe with an electrical efficiency of 38 %, but it should be underlined that during this
period the plant will not be operating because economically unprofitable.
When full load conditions are set, the cycle presents around 2000 kW generator
losses and the electrical own consumption of the plant is computed by the GateCycle
Program to be 1800 kW, even if in reality it should be probably larger.
To reach 120 °C outlet maximum temperature for the district heating, we have used
two district heating condensers, loaded by two extractions from the low-pressure
turbine (see figure 2). These extractions are lead by valves that can be closed when
the heat load from the district network decreases, typically during the warm months,
thus giving an enhanced electrical production. The valves are independent from each
other, so that it is possible to set the best extraction flow from each of them at any
time, corresponding to the heat load required, giving an optimised use of the district
heating section.
HAPPY2000 –4– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Dimensioning
We have decided to implement the plant following the general layout [Alvarez, 1990],
[Hunyadi; 1999]. Thus, the unit will be characterised by the following components
(see also Figure 2):
1 CFBC boiler
1 High pressure steam turbine
1 Low pressure steam turbine
2 District heating condensers
1 Deareator
1 Feed-water pre-heater
1 Air-cooled condenser
The dimensioning of the cycle has been accomplished by using the GateCycle
program [Enter Software, 1998].
To start the process, we have chosen 560 °C and 160 bar of pressure as admission
data for the high-pressure turbine. After a reheat stage in the boiler the steam
reaches the low-pressure turbine at 560 °C and 20 bar (18.7 bar due to pressure
losses).
The inlet data of the boiler are 210 °C, 163 bar with a water mass flow of 84.5 kg/s. A
superheat and reheat process (see appendix A3 for data) characterise this
component.
To improve the efficiency of the cycle we have used a feed-water pre-heater fed by
steam coming from the only one extraction of the high-pressure turbine.
An air-cooled condenser cools down the water closing the cycle when operating in a
condensing mode. We have excluded the choice of a water-cooled condenser, as
seawater is located too far (30 km) from the site.
The main results obtained from the GateCycle Program can be seen in appendix A3.
HAPPY2000 –5– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Process Diagram
The output data can be found in figure 1. We can underline that, if it would be
possible to increase the price for electricity during the summer time, we would
produce only electricity (122 MWe), while during the winter the electrical production
drops to 94 MWe.
600
Duration Curve
500
Heat
400 Electricity
MW 300
200
100
0
0 1000 2000 3000 4000 5000 6000 7000
Running Hours
Decreasing the heat load, the electricity production increases, reaching the maximum
value of 122 MWe.
Five cases have been computed with the help of GateCycle (70/120, 60/100, 55/90,
45/75, 40/75 inlet/outlet district water temperature in degree Celsius), depending on
the outside temperature (see appendix A5).
The process diagram developed with the help of GateCycle can be seen in figure 2.
HAPPY2000 –6– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
1 3
4
5
2
9
1. CFBC Boiler
3. High-pressure Turbine
5. Air-cooled Condenser
8. Deareator
9. Feed-water Pre-heater
HAPPY2000 –7– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Main components
F L U E G A SF L U E G S AT AS C K G A S
T R E A T M E N T
C O A L R E C E P T I O N ,
C O A L S T O R A G E A N D
P R E P A R A T I O N
F E E D C O M B U S T I O N
S T E A M T U R B I N E
H A N D L I N G S Y S T E M
P L A N T
S Y S T E M ( C F B C S )T E A M
S O R B E N T
R E C E P T I O N ,
L I M E S T O N E
S T O R A G E A N D
P R E P A R A T I O N
A I R A S H D I S P O S A L
A S H P L A N T
The principal volume of the heat transfer is obtained within the bed itself, but the hot
gases leaving the bed (app. 850 oC) are cooled first by radiation to the tubes lining,
then in the boiler’s furnace and finally by convection to the convection tube banks.
HAPPY2000 –8– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
A major importance of the fluidised bed combustion process is the potential for a
direct reduction in the emission of pollutants. The bed operating temperatures (about
850 oC) reduce the formation of nitrogen oxides, while the use of limestone reduces
the formation of SO2.
We have assumed an efficiency for the boiler around 98%. For more data about the
boiler see appendix A3.
In the deareator, heat from the incoming steam flow is used to preheat the boiler feed
water. The deaerator accomplishes this by bringing the feed water up to saturation
conditions at the current operating condition.
In the feed water pre-heater the condensing steam is used to heat up the feed water.
Steam Turbines
The high-pressure turbine power output is around 42 MW. The overall efficiency is
equal to 0.88. Only one extraction is present and leads a small amount of steam to
the feed-water pre-heater.
The low-pressure turbine has a maximum power output of 85 MW when full loaded
(condensing mode). In order to accomplish the district heating during the winter and
increase the electricity production during the warmer months, we have decided to
implement a so-called “quality condensing tail” system (see figure 4).
STEAM INLET
1 2
TO AIR-
TO DISTRICT
COOLED
HEATING CONDENSER
CONDENSERS
Figure 4: Quality-condensing tail (low-pressure turbine)
With this system, when the heat load decreases, it is possible to enhance the
electricity produced by the turbine just reducing the steam flows through the valves 1
and 2 so that the flow through the valve 3 increases and more steam is expanded in
the turbine (see figure 4). It is important to stress that when the heat load is at its
maximum, the flow through the valve 3 will be as low as possible, although still
HAPPY2000 –9– 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
present, to avoid that the temperature of the blades of the turbine would become too
high with consequent risks of damage.
The thermodynamic efficiency of the low-pressure turbine is less than the high-
pressure one, in this case we have assumed an overall efficiency equal to 0.86. For
more data about the turbines see also appendix A3.
The district heating section is constituted by two district heating condensers fed by
steam coming from the low-pressure turbine. Two valves regulate the extraction
flows depending on the heat load request. The power output for the condensers vary
during the year with a full load heat output of 200 MW. The pressure of the district
heating water is assumed to be 5 bar while the inlet and outlet temperature depends
on the outside temperature (see appendix A5). No particular types of condensers
have been chosen in this part of the project.
Air-cooled condenser
The need of this component comes mostly during the warm months when the low-
pressure turbine works in a condensing mode.
Storage
It is important to build a handling system that makes the maintenance easy and safe.
The fuel handling inside the gates consists of receiving hopper, storage, conveyors
and boiler fuel bunkers. The coal and limestone is transported to the plant twice a
week by railroad and left at the receiving hopper. The receiving hopper is placed next
to the storehouse and it needs to be as large as one carriage, about 15 m and with
air suction so that the dust from the coal is kept inside.
The coal is then stored in a large storehouse with the dimension 100x40x15 meter.
This gives a total of 60,000 m3. The maximum load for the boiler per day is about
1370 m3 coal (the coal flow is around 12.65 kg/s with a density of 800 kg/m3). This
makes possible to store more than one month needs.
Also the storage of limestone has to be taken into consideration, which is about 10%
of the coal storage. The storehouse can either be built on the ground or partly be built
down into the ground. The house gives protection against rain, wind and lower the
possibility of disturbance for the neighbours.
The whole fuel handling system contains several different conveyors. Depending of
use and the incline different conveyors will be needed. Scraper conveyor, buckets
elevators, stoker conveyor and screw conveyor.
HAPPY2000 – 10 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
The coal is stored a second time in the boiler fuel bunkers. It contains fuel for about
four hour’s operation. The bunkers is placed close to the furnace and serve as a
reserve if there is problem with the conveyors. It also serves as a safety, in case of a
fire it will minimise the spread.
HAPPY2000 – 11 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Plant layout
When doing a layout the first thing to be considered is the placement of the boiler.
The placing should be efficient both in technical and economical matter. For instance
the turbine house should be placed close to one side of the boiler so that the cost of
expensive high-pressure tubes is reduced. The ash-silo is another component that
should be close to the boiler. At the same time it needs to be easy to get to for the
trucks which collect the ashes.
We have estimated the plant ground size to be about 120 m times 180 m, so that we
do not need to buy more ground for the station.
External conection to rest of the
plant. (electricity, heat etc)
Railway
for Coal
Stack
Turbine
Condenser
Boiler *
Storage
Coal & limestone
120 m
Receiving
Office
hopper
Electrostaticfilter
Ash-silo
Parking Cooling tower
180 m
Main entrance
Employee
Goods Secondary
Ash-handling entrance
(emergency)
Discussion
The technical results of the subcritical cycle implemented with the software
GateCycle seem to be reasonable according to the literature consulted and the
lectures (see References). Instead, when trying to develop a supercritical cycle we
have found some problems in running the program. The efficiency we got from the
software was not reasonable and moreover we got different errors as the data for
some components were out of the range of the software. This was one of the
reasons that made us focuses only on the subcritical plant.
Anyway to make our data completely reliable, we should also implement the same
cycle with other software and compare the final results.
An optimisation of the cycle should be carried out in the eventual next phase of the
project (design study), thus making the data more accurate.
HAPPY2000 – 13 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
ENVIRONMENTAL CONSIDERATIONS
World coal deposits are vast. They are approx. ten times greater than conventional
oil and gas resources combined. The known resource is estimated to be more than
10¹² metric tons. If coal consumption continued at present levels, this would amount
to more than 350 years’ supply.
Coal is not a uniform substance. It can be divided in different ways. The percentage
of carbon in brown coal by weight is 65-75%. Hard coal contains approx. 85%
carbon, while anthracite might contain up to 95%. The rest consists mainly of
nitrogen, hydrogen, sulphur, ash, and trace elements. The sulphur content of hard
coal varies between 0.5 and 5%. The ash content is often 5-15%, while the moisture
content normally is 1-10%.
Fuel switching
Undoubtedly, the best way to prevent sulphur oxide pollution is to avoid creating it.
Switching from coal with a high sulphur content to low-sulphur coal can greatly
reduce sulphur emissions. Some coals have extremely low sulphur content, down to
about 0.3%.
HAPPY2000 – 14 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Coal preparation
Pyritic sulphur and organic sulphur are the main sulphur forms in hard coal. Pyrite
can be partly removed by crushing the coal to such a small size that the pyrites are
mostly present as free pyrite particles. Gravity methods are then used to separate the
low-density coal from the high-density pyrites. Preparation of coal also removes to
some extent mineral matter, chlorine, and trace elements. Among the trace elements
found in hard coal, eleven of them are considered to be hazardous air pollutants.
They include cobalt, nickel, arsenic, cadmium, mercury, and lead.
Sorbent injection
The efficient combustion in fluidised beds allows the use of a wide range of low-
grade fuels, such as lignite, unwashed high-sulphur and high-ash coals, rather than
high-priced hard coal.
More than 90% of SO2 is captured by the limestone particles. NOx formation is
reduced by keeping temperatures around 850 °C instead of twice that figure in other
boilers. Unfortunately, a higher proportion of nitrous oxide (N2O) is formed.
SO2 and other gaseous emissions are more difficult to control due to their similarity to
the air stream in which they are transported. However, SO2 may be cleaned from a
flue gas by chemical processes. There are several FGD processes currently
available commercially. They can be divided in wet systems, dry systems, and wet-
dry systems. The first two kinds will not be treated here. The most widely used wet-
dry systems are spray dryers. A reagent slurry containing solids is dispersed as
droplets into a hot gas stream. The hot gas is well above the boiling point of water, so
that the water in the droplets evaporates rapidly. The particles formed from the
evaporating drops are dried and can be separated.
The two main methods to reduce NOx emissions during combustion are
The combustion problem is that decreased air excess decreases the formation of
NOx but increases the formation of CO and hydrocarbons.
There are several techniques to reduce the NOx content in flue gas streams. Two of
them, selective catalytic reduction (SCR) and selective non-catalytic reduction
(SNCR) are treated in the following section.
SCR gives rise to the chemical reduction of NOx back to nitrogen and water. This is
achieved by injecting a chemical reducing agent, ammonia or urea, into the flue gas
stream. The flue gas and the reducing agent pass through a catalyst unit where the
reduction reactions take place. The main reactions are
Catalysts are supported on large surface area structures such as plates. The
catalysts include titanium and vanadium oxides. Very high reduction efficiencies can
be achieved (> 90%), though the investment and operating costs of an SCR system
are high. The catalyst units are expensive to install and the catalyst is consumable
due to fouling and erosion. Without careful control, ammonia or urea slippage can
occur, giving rise to emissions as undesirable as NOx. Reagent handling and storage
can present safety problems.
SNCR involves the same reduction chemistry and the same chemical reagents as
SCR. However, there is no need for catalyst units, because the reagents are injected
into hotter parts of the boiler system. These higher temperatures promote the
necessary reduction reactions. A typical SNCR system involves multiple injection
points at several levels of the boiler. Gas temperatures of 900-1100 °C give very fast
reaction rates for the reduction of NOx to nitrogen. The solid or liquid reagents are
injected with steam or air into zones where mixing conditions are optimal. SNCR is
considerably cheaper to install than SCR, as no catalyst unit is needed. Operation
costs can be lower, as no catalyst replacement is required but increased reagent of
consumption (typically 2 to 3 times) can offset this advantage. The collection
efficiency is lower than the one for SCR.
The SNCR process is sensitive to temperature changes. Wrong operation can lead to
HAPPY2000 – 16 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Emissions of dust
There are four principally different devices for dust separation. They are dynamic
separators, electrostatic filters, scrubbers, and fabric filters.
The ash collected by the four dust separation techniques mentioned is a solid waste.
It’s often hazardous due to the heavy metals and other trace components of coal. It is
often buried in landfills or other solid waste disposal sites.
Dynamic separators
The separation efficiency is proportional to the square root of the tangential velocity
and in inverse proportion to the radius of curvature. Consequently, a small cyclone
has a better separation efficiency than a large one. However, large cyclones are
often needed due to pressure losses. The tangential velocity and the radius of
curvature can be controlled to maximise the movement of particles toward the wall.
Several cyclones can be mounted to a multi-cyclone device. The main advantages
are the simple and robust design, and the low investment and operation costs. The
main disadvantage is the low separation efficiency for particles smaller than 3-5 µ m.
Electrostatic filters
The cyclones cannot be used to effectively remove small particles (<1-10 µ m) from
a gas stream. Unfortunately, it is precisely these particles that are most injurious to
the health. Electrostatic filters are the most common particulate controls in power
plants. If the fly ash particles are electrically charged as they pass between large
electrodes, an electric field will result in deflection of their motion in the effluent
stream.
A commonly used electrostatic filter consists of a number of plates and wires. A very
high voltage, e.g. 50,000 V, is applied between the electrodes. The gap between the
electrodes might be a few centimetres, creating electric field intensities of the order of
10,000 V/cm. Under these high electric fields, electrons are discharged from the
HAPPY2000 – 17 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
negatively charged wire electrode and migrate towards the positive electrode (the
plate). Molecules in the gas stream are ionised by collisions with the electrons. The
negatively charged ions migrate toward the collecting electrode. The subsequent
collision of particles with these negative ions results in charging and migration of the
particles, accumulating on the collecting plate.
Unlike the cyclone, the velocity of the particles toward the collecting plate depends
only linearly on the particle diameter. Performance depends on particle size and
chemistry, strength of the electric field, and the flue gas velocity. The efficiency of
electrostatic filters for collection of fine particles does not decrease as rapidly as with
the other settling equipment.
Scrubbers
Liquid droplets can be used to enhance the collection of particles in scrubbers (wet
collectors). Fine particles adhere to a droplet if they contact it. The liquid drops with
the fine particles stuck on them can easily be collected in a cheap and simple
cyclone. Instead of dynamic separators, electrostatic filters can be used as well. The
formed sludge (i.e. the mixture of particles and liquid) flows to the bottom of the
scrubber. Thus, the need for mechanical removal of dust layers is eliminated. For
particles of primary interest (i.e. particles between 0.1 and 10 μm), the dominant
mechanism of collection is inertial impaction. This means that the particles, due to
their inertia, are unable to follow the flow path around the liquid droplets. They
continue on and contact the droplets. Water is usually used as liquid. Scrubbers can
trap gaseous pollutants as well.
There are a few disadvantages with scrubbers. They are expensive to construct and
operate. In addition, they use considerable amounts of energy and water. The
contaminated water requires further treatment.
Fabric filters
Fabric filters (baghouse filters) were one of the earliest means of controlling
particulate emissions, but they have become more common in recent years due to
improvements in fabric material, their relative simplicity, and their ability to remove
very fine particles in the 0.1 to 1 μm range. These filters remove particles physically
by trapping them in a porous mesh of cotton cloth, glass fibres, or asbestos-cellulose.
The mesh allows air to pass through but holds back solids. Filters are generally
shaped into huge bags 10 to 15 metres long and 2 to 3 metres wide. Effluent gas is
blown into the bottom of the bag and escapes through the sides. Unlike other
collection systems, the efficiency of a fabric filter system tends to increase with use.
The reason for this is that the total collecting surface increases as a dust layer
collects in the filter. This occurs to the expense of a pressure drop through the
collection system. Increased dust loading reduces the void space available for flow
and decreases the permeability of the filter. Ultimately, of course, the pressure drop
through a fabric filter exceeds acceptable limits for economic operation of the gas
HAPPY2000 – 18 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
cleaning. Then the bags are replaced or opened to remove the dust cake. Often a
high-pressure backflow of short duration is introduced to the filters to remove the
particles. Because this backflow is of low volume with a high particulate
concentration, collection and disposal of the particles is generally easy.
Collection efficiency is relatively insensitive to fuel type, fly ash composition, particle
size, and electrical properties. These filters are usually cheaper to install and operate
than electrostatic filters. However, there are some disadvantages as well. Low flue
gas temperatures might cause problems, because the filter cake is difficult to remove
when there is condensed water in it. In addition, most fabric filter materials do not
resist well acid components.
Fabric filters have found increasing application, particularly in electric power plants.
Particle emission regulations have become steadily more stringent, making it
necessary to collect particles in the size range from 0.1 to 0.5 µ m. Such minute
particles are difficult for electrostatic filters to collect.
Investment costs of fabric filter systems vary with collection efficiency required, type
of dust, air-to-cloth ratio, system type, and system size. In 1988 in USA, fabric filter
capital costs were USD20/kW for large utility systems. Fabric filter operating costs at
large utilities were about 0.8 mills/kWh. The main energy cost in a fabric filter system
is the gas-pumping cost. On a monetary basis, the electrical costs for a fabric filter
system typically ranged from 5-13% of the total operation costs in 1988.
Ash
The by-products or wastes from coal combustion include bed ash and slag from the
combustion bed and fly ash from the flue gas cleaning equipment. The amount of ash
depends on the fuel ash content, the combustion method, and the flue gas cleaning
equipment. The ash formed varies between 3 and 30% of the fuel amount.
The use of sorbent in the CFBC boiler means that the coal ash is mixed together with
calcium sulphate and unreacted sorbent. The unreacted sorbent decomposes to
calcium oxide. Thus, the solid material withdrawn from the furnace is composed of
ash, quicklime and calcium sulphate. When the mixed ash from an FBC plant is
HAPPY2000 – 19 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
mixed with water, significant amounts of heat are evolved. This can be quite
hazardous because of the possibility of fires in the ash handling plant and the injuries
that would arise if this material came into contact with skin or eyes. The wet ash has
to be dealt with quickly.
Some FBC ash can be disposed of to landfills, but there is the potential to use it as
ballast roads, embankments etc.
The miners are also exposed to high temperatures and humidity, noise, and
strenuous working postures. Black lung is a respiratory disease caused by
accumulation of coal dust in the lungs or airways.
The energy consumption during coal mining is large in comparison to other fossil
fuels. It runs up to approx. 4% of the energy content of the coal.
Coal-fired plants require large quantities of fuel. Due to the large volumes needed,
ship and rail are often the only possible modes of transport between the mine and the
storage site. The energy consumption for transport usually corresponds to 1-2% of
the energy content in coal.
Noise
The Buyer has a requirement of maximum 45 dB(A) at 50 m from the plant.
It is possible to fulfil the requirement above using a normal boiler housing and a
noise-absorbing material around the steam turbines [Dahl, 2000].
There are several ways to control the noise levels. Measures to take into
consideration include [Forsgren, 2000]
To control the NOx emissions SCR is chosen, because the temperatures are too low
for a SNCR system. SNCR works at temperatures of 900-1100 °C.
The SCR investment costs normally amount to 100-120 Euro/kWel [Wester, 1991].
Electrostatic filters will be sufficient to control the dust emissions in this case.
To give an idea of the dimensions needed, they might be approx. 10× 10× 15 m3. The
investment costs amount to some 2 MEuro, including installation and dust handling
equipment. Operation and maintenance costs are likely to be 1-2% of the investment
costs [Eriksson, 2000].
Discussion
As sulphur can be captured in the CFB combustor by limestone injection, the
investment cost of SOx reduction equipment is limited largely to the cost for the
limestone and ash handling system. The SCR system should be located before the
air pre-heater.
The dust emissions from coal-fired plants are generally larger than those from other
fossil-fired plants. For this reason, somewhat expensive dust pollutant control
devices will probably be needed, as cyclones will not meet the requirements.
Important parameters for the electrostatic filter dimensions are the flue gas amount
and temperatures.
The noise from boilers, turbines, feed-water pumps, fans and other plant components
is difficult to predict. It is very much based on manufacturers’ expected levels [Evans,
2000]. This is a complicated matter that has to be treated thoroughly in the next
phase of the project.
HAPPY2000 – 21 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
ECONOMY
The economical analysis is a fundamental step during the design of the plant. It is
important that the economy group and the technical group work side by side in order
to be able to see the feasibility of the different layouts.
The different cost and cash flow has been evaluated after comparing values obtained
from several sources: manufactures, literature, consulted experts. Not always it has
been possible to have satisfactory information, or even an answer. That’s why in the
next step all the values that will be use in this analysis should be checked again.
The main tool used it has been Power Invest, an Excel based program developed by
last year groups and modified to fit better to our needs. The program input are the
investment costs, the cash flow, the interest rate, and the costs for planning and
permits. As output we have the payback time and the present value, and a year per
year report of the economical situation of the plant.
Investment costs
Investments are all the costs related to the erection of the plant and installation of all
components that will allow the plant to produce. Especially in this stage it is very
important that the technical and economical group do the choice of all the
components of the plant together. In fact a solution that could increase the efficiency
of the plant can result in an economical failure and consequently should not be
considered. Power Invest calculates year per year the present value and allows to
decide how to divide the investment costs during the erection period and to see
immediately the consequences on the present value. Besides also investments that
occur after the plant is running can be introduced.
The boiler (CFB) includes cyclones, flue gas system, feed and ash handling, stack
and steam system, while the steam turbines (ABB HP16 and ATP-C720) include also
generator, control system and all the necessary auxiliary equipment.
Investment EUR
Boiler 60,000,000.00
Steam turbines 11,500,000.00
District heating 5,000,000.00
Buildings 5,000,000.00
Fuel handling system 10,000,000.00
Others 23,000,000.00
Total 114,500,000.00
HAPPY2000 – 22 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Cash flows
Cash flows are all the costs and incomes due to the operation of the plant. In details
Power Invest considers incomes from sold electricity and from the so-called “avoided
costs”. Avoided costs are represented by the reduced consumption of oil in the
existing water boilers. This choice comes from the consideration that the heat we
produce will substitute the production in the old and polluting hot water boiler present
in the location. Again Power Invest calculates the cash flow year per year, and it
allows seeing how variation in the flow is reflected on the pay-back time and in the
present value. Important factors to be decided are when the plant will be able to
produce electricity and heat. That will influence when cash flows will occur. In our
case we have suppose an erection time of 4 years.
Due to the low price of the electricity during the summer, we have decide not to
produce at all in these months. The winter heat production is enough to cover the
minimum heat production requested by the buyer in order to substitute the old boiler.
Other alternatives has been considered: decreasing the heat production and
increasing the electricity output during the summer it is possible to run the plant
longer with a further gain. The two different alternatives are illustrated in the
diagrams in appendix A2. In one case the plant would run for 4320 hours full load
and finally shut down it for the remaining six months (when the electricity price is
low). In the second case, the plant would run for 4320 hours full load and for 1440
hours partial load (150 MWh 104.5 MWe for 720 hours and 100 MWh 108.5 MWe for
720 hours). More detailed data can be found in appendix A1 and A2.
About the salary, as we don’t know where the plant is located it is not possible to give
an exact figure of it, so the value given should be evaluated better in the next step.
Results
The results of the calculation are summarised in the following table showing the
present value after 10 years and the payback time. Further diagrams are very easy to
HAPPY2000 – 23 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
perform as the program work on Excel. As it can be seen the payback time is above
ten years.
Alternative 1
Pay-back time [year] 17.80
Present value after 10 years [EUR] -22,925,458
Alternative 2
Pay-back time [year] 15.68
Present value after 10 years [EUR] -14,518,586
Discussion
Supercritical plant
Planned programs for building new coal-fired power plant dating from the early 90s
have been cut back, particularly in Germany. This seems to be due mainly to the
deregulation of the electrical market, and partly to reduce forecast demands.
The additional capacity coming during 2000 will be gas-fired. This is because such
units can be built more quickly than coal-fired ones, they can meet environmental
requirements with less emissions control equipment, and can be operated flexibly.
On the other hand coal is a cheap and available fuel; its cost can be influenced by
the local availability of nature gas. However low cost gas may only be available at a
competitive cost on a “interruptible” contract basis, so that there may not be a secure
supply at times of peak load. Besides with deregulation, industrial generators who
produce power as a “by-product” can sell it into the new electricity market, increasing
competition and lowering the prices.
HAPPY2000 – 24 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
FUTURE WORK
From a technical point of view, in the next task of the project, the design study, a
more exact design of the plant should be done. Also an optimization of the cycle
should be carried out. Furthermore, the control system, the connection to the
electrical grid and the connection to the district heating net should be taken into
account in the next step of the project.
To improve the economical analysis in the next step, all the investment costs should
be checked again, and also collecting values from different manufactures could be a
good idea. For example the price we got for the boiler includes cyclones, flue gas
system, feed and ash handling, stack and steam system, but it should be better to
have the price of each components. Moreover maintenance costs and salary has
been only roughly quantified, but with a deeper analysis of the layout of the plant can
be determined better.
The results of the economical analysis indicate that the plant will pay back the
investments after 15 years. The calculations have been done supposing at year zero
an investment equal to the total investment plus the interest over half lead time, thus
2 year. The cash flow also occurs at year zero.
The influence of the maintenance costs and salary on the payback time is relevant,
and as these data have been only roughly estimated, the pay-back time could be
quite different from the value we have calculated.
About the supercritical plant, from what we have found on the literature and from oral
discussion with experts, it could be a good business. But for several reasons (time,
difficulty on using GateCycle) we have decided to ocus on a subcritical plant.
Probably now it is too late to start a study on this kind of plant, but anyway some
indications are given above in the dedicated section.
HAPPY2000 – 25 – 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
REFERENCES
Alvarez, H; 1990
“Energiteknik”
Studentlitteratur, Sweden
Hunyadi, L; 1999
“Overview of different power cycles, part 1,2 and 3”
Chair of Heat and Power Technology, KTH, Stockholm, Sweden
Cavani, A; 1999
Consultation Adrin Cavani, Vattenfall utveckling AB
Hunyadi, L; 1999
Consultation Laszlo Hunyadi, Vattenfall utveckling AB
Persson, P-O;
“Miljöskyddsteknik-kompendium i miljöskydd, del 2”
Institutionen för miljöskydd och arbetsvetenskap, KTH, Stockholm, Sweden
APPENDIX A1
Economical Summary
CASE 1
Interest 6%
Currency 8.43 SEK
Equals 1 EUR
Cost for planning, permits 10 %/Total
etc. investments
Investment
Cash Flow
Fuel
Electricity
Avoided costs
CASE 2
Interest 6%
Currency 8.43 SEK
Equals 1 EUR
Cost for planning, permits 10 %/Total investments
etc.
Investment
Cash Flow
Fuel
Electricity
Avoided costs
APPENDIX A2
Cash Flow Trend
16000000
14000000
12000000
10000000
el
avoided
EUR
8000000
fuel
netto result
6000000
4000000
2000000
0
00
40
80
20
60
00
40
80
20
60
00
40
80
20
60
00
40
80
20
60
00
0
0
0
0
0
72
24
48
96
12
28
31
55
14
16
19
21
24
26
33
36
38
40
43
45
48
50
52
57
60
hours
20000000
18000000
12000000
el
avoided
EUR
10000000
150 MWh fuel
netto result
8000000
6000000
100 MWh
4000000
2000000
0
00
40
80
20
60
00
40
80
20
60
00
40
80
20
60
00
40
80
20
60
00
0
0
0
0
0
48
72
24
96
19
24
26
28
43
45
48
50
12
14
16
21
31
33
36
38
40
52
55
57
60
hours
HAPPY2000 Appendix A3 – 1 (3) 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
APPENDIX A3
Data report from GateCycle
Condensing tail
APPENDIX A4
T-s diagram
APPENDIX A5
Duration curve and outside temperature dependance
600
500 Heatload
160 400
Heatload (MW)
80 200 DH-in
40 100
0
-25 -20 -15 -10 -5 0 5 10 15 20 25
Tout (°C)
HAPPY2000 Appendix A6 – 1 (1) 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
APPENDIX A6
Circulating fluidised bed boiler
1 2
1 0
8 8
1 . F u e l 6 . C y c l o n e
2 . L im e s t o n e 7 . A s h o u t l e t
3 . F i r e p l a c e 8 . A ir
4 . B a r r i e r f i l t e r 9 . S e c o n d a r y a i r
5 . f l u e g a s 1 0 . B u b b l e z o n e
HAPPY2000 Appendix A7 – 1 (3) 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
APPENDIX A7
General information
The Company has decided to investigate the possibility to build a new Unit for
production of electricity and district heating on a sit near the Town. The Company will
later on order planning and design of the Unit if the conditions are feasible.
The Company has appointed Per Almqvist to represent them in the contacts with the
Project Team.
The progress of the work will have to be reported according to a given time schedule.
The Project will be divided into three separate phases: literature overview, a
feasibility study and the main design phase. After each phase the Project Team has
to present a report of the work and put forward the recommendations of the Team.
The Town has about 160000 inhabitants. It has a district heating system supplied by
hot water boilers only. The new Unit will be designed for combined production of
district heating and electricity.
Conditions
Production of electricity
Average price of electricity 30 Euro/MWh
Fuels
Prices of fuels at the fence of the unit (Euro/MWh)
Natural Gas 12
Light oil 25
Heavy oil 14
Hard coal 10
Wood chips 11
Pellets 16
Site
The Unit is to be situated 3 km from the city centre in an industrial region.
The ground is flat and the area at disposal is 120 x 180 m. There are roads, railway,
electrical grid (110 kV) and district heating supply tubes close to the site.
Climate
The outdoor temperatures are: Winter min. -25 ºC, average
-2 ºC
Summer max.
30 ºC, average 15 ºC
HAPPY2000 Appendix A7 – 2 (3) 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Normally the rainfall is 500 mm per year and the dust content 0,05 mg / m3
Environment
The maximum noise level at 50 m from the fence is 45 dBA
The cost for planning, permits, ground etc. is estimated to 10 % of the cost of the
Unit.
Financing is calculated with interest rate of 6 %.
The company expects the investment to be returned 10 years after start of operation.
All prices are total prices to the Company, including taxis etc.
HAPPY2000 Appendix A7 – 3 (3) 2000-03-14
Feasibility Study in Steam Cycle with Hard Coal Final Report
Additional specifications
In the district heating system there are two plants with hot water boilers only and an
old heat and power unit that is planned to be converted to a hot water plant when the
new heat and power unit is put into operation. All plants can be fired with oil and gas
but have no special equipment for cleaning the smoke gases.
The two hot water plants have each a capacity of 200 MW and the converted heat
and power plant will produce 300 MW. It is planned to take one of the hot water
plants out of operation when the new heat and power plant is finished. All units and
the district heating network are owned by a municipal company. There are 40 people
in the present heat and power plant and three in each hot water plant.
There is a local environmental demand that five years from now only 600 GWh of
heat can be produced in a typical year with old boilers and heavy oil.
At the site of the new unit there are industrial buildings at 100 m distance, a
recreation area close to the site and dwellings at 500 m. It is possible to enlarge the
site up to 40 000 m2 at a price of 40 Euro/m2. The distance to harbour is 30 km.
Oil is transported by trucks and coal by railway from the harbour. Wood chips is
available corresponding to a heating value of 800 GWh per year and can be
transported by trucks at a mean distance of 50 km. Pellets is transported by boat and
with trucks from the harbour.
There have been political discussions on rising the CO2 taxes, but some people with
influence like to see it as a part of a total harmonising of taxes in Europe. The most
probable additional CO2 tax is 0,01 Euro/kg CO2 and there is also discussions to
subsidise biofuel units with up to 20 % of the erection cost.