Sei sulla pagina 1di 4

ONGC Petro additions Ltd

APPLICATION FORM

Position Applied for: - Project Division/Functionalities: Electrical

Name: NARAYAN MISHRA Father’s Name: ANIL KUMAR MISHRA Date of Birth:15/01/1982

Company: DHARIWAL INFRASTRUCTURE LTD. Current Designation: ASSOCIATE

Total Experience: 2 years 10 months Current Annual CTC: Rs. 5 L/A

Expected Annual CTC: Rs. 7 L/A Notice Period: 3 MONTH

E-mail address: narayan81ee@gmail.com Contact No:+91-9561310904 / 9434947849 (H)

Educational Qualifications Details (Starting from 10th Onwards):

Academic /
Year of
Extra
Stream/ P CGPA/Marks
Name of Name of Curricul
Speci as %/
Course School/Coll Board/U ar
alizat si Divisi
ege niversity Achieve
ion n on
ments (if
g
Any)
S.S.RK.V, Suri,
10th General W.B.B.S.E 1998 75 % / 1st Div
Birbhum
Science (Ph,
Ch,
S.S.RK.V, Suri,
12th Math W.B.C.H.S.E 2000 69.5 % /1st Div
Birbhum
s,
Bio)
B.I.E.T, Suri, 8.00 DGPA /
B.Tech Electrical W.B.U.T 2007
Birbhum 1st Div
Ministry of 72.42 % / 1st
PGDC TPPE NPTI, Nagpur 2008
Power Div

Working Experience Details (Starting from Latest till Last 4 Organization worked with)
ONGC Petro additions Ltd
No of
Duration D
ir
ec
t
Direct
R
M
e
Name of the Organization an
Reporting to p
Organizatio Designation Turn po
(Designation) or
n / Sector From To over we
te
r
es
No
(I
f
a
n
y)
Dhariwal May 2010 Till now Associate DGM 2 755 Cr
Infrastructu
re Ltd /
Power
Hindalco industries July 2008 April 2010 Engineer DGM 1 2850 Cr
limited
Please indicate the date of elevation to the next higher level
Draw Your Position in the Current Organization (Starting with MD till your Direct Reportees)

COO-DGM-Manager-team leader-Lead Associate-Associate-GET-JE#2-JE#1-JE

Details of Training (Domain Area/ Management/Symposium (Please also Mention Assessment workshop you
have been through)
Duration of Training
Name of the Training Courses Name of the Institute in Days & Place of training
Year
On job trainning NPTI-Nagpur 90 days Khaparkhera power plant,
Maharastra
PLC & Scada Gov polytechnic college 90 days Nagpur

Details of Reward/ Recognition received

Name of the Recognition/Reward Year of Receiving Received From

Reference Checks (Any Two Persons)


ONGC Petro additions Ltd
Relationship (How
Designation & present long you
Name of the Person Contact Details Email
Org have known
the person)
Mr R.G.Rathore DGM/Hindalco Boss 09708036919 Ram.rathore@adityab
Industries irla.com
limited
Mr Satish dukare DGM/Dhariwal Boss 09561094675 Satish.dukare@rpg.in
infrastructure
limited
Mr Manikant jha Manager/Dhariwal Boss 09561004363 Manikant.jha@rpg.in
infrastructure
Limited

Specific contributions made by you in the last 3 positions held (50 words max for each
position)

Hindalco industries ltd:- I was looking after the Operation and Maintenance of Boiler, ESP and
other auxiliary system of 30MW, 140 TPH CFBC, Cogeneration power plant.

Dhariwal Infrastructure Ltd: - Erection, Testing and Commissioning of 33KV Transmission


line , 33KV / 6.6 KV Construction power and Distribution to the plant area. I am looking after
project planning and monitoring at site, execution of electrical construction work and carrying
out necessary modification as per requirements from operation and maintenance point of
view. ( 2 x300 MW Green Field Project)

How are you fitting for the position applied for (150 Words Max)

I have completed my PGDC in Thermal power plant Engineering, having work experience in
Operation and maintenance as well as in project in Thermal power plant.
I am capable to work in power plant at any site in india.
ONGC Petro additions Ltd

For Official Purpose

Potrebbero piacerti anche