Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Individual Assignment
Matrix no : SX070791MMJ04
1
BIL CONTENT PAGE
INTRODUCTION
Profile Company
1.0 Background of Indah Water Konsortium(IWK) Sdn Bhd pg 1
1.1 Corporate Structure pg 2
1.2 Indah Water Konsortium mission and Visions pg 3
2.0 Main text
2.1 Indah Water Services pg 4
2.4 Refurbishment pg 7
2
5.0 Conclusion pg 14
6.0 Reference pg 15
1.0 INTRODUCTION
3
PROFILE COMPANY
In 1994, the Federal Government awarded the company the concession for nationwide
sewerage services which prior to that, was under the responsibility of local authorities.
Since then, Indah Water has taken over the sewerage services from local authorities in all
areas except the States of Kelantan, Sabah, Sarawak and the Majlis Perbandaran Johor Bahru.
A modern and efficient sewerage system is vital for the country so as to ensure that
wastewater is treated before being discharged into our rivers. This will help preserve the
country's waste resources, protect public health and provide a cleaner and safer environment.
In June 2000, as testimony of the Government's seriousness in ensuring that a proper and
efficient sewerage system will be successfully put in place and maintained, the Government,
through the Minister of Finance Incorporated, took over the entire equity in Indah Water from
its previous private owners.
Indah Water is now well-positioned to undertake the vital task of ensuring that Malaysians
today and in the future will be able to enjoy a clean and healthy environment through a
proper and well-maintained sewerage system.
4
1.2 Corporate Structure
5
1.3 Indah Water Konsortium mission and Vision
6
2.0 Main Text
7
2.2 Connected Service
Connected sewerage service customers have sewage outlets that are directly linked to
a sewage treatment plant via an underground network of sewer pipes. IWK is responsible for
the operations and maintenance of all public sewage treatment plants. Public sewage
treatment plants are plants which have been handed over to the Government (National Water
Services Commission, Ministry of Energy, Green Technology & Water) by the Developer.
8
Premise with connected sewerage service/system has one rectangular metal cover,
which is called an inspection chamber and usually located outside the premises compound
either at the side, rear or front. In the inspection chamber are sewage outlets from the
premises' toilets, bathrooms and kitchen that are connected to the public sewerage pipelines
to the public sewage treatment plant. If there is any blockage, the checking and clearing of
the blockage will be done via the inspection chamber.
However, in the case of bungalow houses, there are usually more than one inspection
chambers depending on the number of toilets and kitchen in the house. If the house has 5
toilets and one kitchen, there will be 6 inspection chambers located outside the premises
compound instead of just one inspection chamber. More often than not, owners of bungalow
houses tend to think that the inspection chambers are septic tanks. (Septic tanks are usually
arranged in series and not located in various places outside the premises' compound)
Another frequent confusion with this type of system is the differentiation between
internal or private and public sewerage pipes. Many users are unaware of their ownership and
responsibility to repair or replace broken pipes and remove clogged pipes between the
inspection chamber and the public sewerage pipes or manhole at their own expense. IWK is
mainly responsible for the maintenance of the public sewerage pipes.
Malaysia's most common form of sewerage system is the individual septic tank (IST).
There are an estimated 1.2 million premises with individual septic tanks in the country.
9
Premises with a proper individual septic tank (Malaysian Standards - MS 1228) has 3 to 4
rectangular metal covers and is usually located outside the premises compound either at the
side, rear or front. The septic tank only provides partial treatment of the sewage that flows
into it and needs to be desludged on a regular basis, approximately once in two years, to
ensure that it functions efficiently. IWK provides this important and mandatory scheduled
desludging service to government premises.
2.4 Refurbishment
Refurbishment work involves the tidying up of treatment plants and pump stations
with improved aesthetics and security; the repairing, replacing and testing of pumps, float
switches and associated valves and pipeworks; the repairing, replacing and testing of
treatment process equipment; the desludging of plants including holding tanks; the repairing,
replacing and testing of High Voltage and Low Voltage electrical services including electrical
wiring, control panels, lightning protection, etc; the sampling of effluents to ensure applicable
environmental standards are met; and the inspection, repairing and/or replacement of critical
sewer pipework.
10
It takes anywhere between three to 24 months to refurbish a plant.
Assuming one plant is fully refurbished in a day, it would take over 14 years to refurbish all
of Malaysia's public sewage treatment plants. However, Indah Water aims to complete all
refurbishment on a priority basis within six years.
Indah Water Konsortium Sdn. Bhd. Is comitted to safeguarding and improving its
health and safety performance by coducting its undertaking in an organized and responsible
manner through the adoption of a certifiable health and safety management system. We will
endeavor to see that our activities, service and products do not harm employees, customers
and member of the public who may be affected by our undertaking. We believe it is
necessary to adopt sound management practices of which the integration of health and safety
principle are of the highest priority.
• Provide and maintain facilities, plant, equipment and system so as to ensure we operate a
safe place of work with adequate welfare and first aid facilities;
• Establish effective communiation that enable employees and their representatives to
participate in developing and promoting effective measures to ensure the highest
standards of health and safety at work are maintained;
• Undertake to train and educate employees of the risk to which they may be exposed;
• To make avalaible to each and every employee appropriate safety and protective
equipment;
• To prepare and review annual health and safety plans;
• To comply with all relevent occupational safety and health national law and regulation as
a minimum, promoting performance standards that reflect best international practice;
• To develop, maintain and review emergency procedures in accordance with the
requirement of law and the needs of relevent external egencies and local communities;
11
• To ensure health and safety will be significant factor in the selection process of external
suppliers or contractors;
• To continually improve the performance of the health and safety management system
The overall responsibility for executing the policy rests with the director of Indah
Water Konsortium Sdn Bhd.
Each head of department or line manager will implement the policy and will allocate
sufficient resources within their areas of responsibility.
Each line manager in the company is responsible for ensuring that the activities and
places of work under their control are safe and without risk to health. In so doing, they are
expected to make regular reviews of the health and safety standards within their areas of
responsibility.
All employees are responsible for their own health and safety and that of fellow
workers, customers and members of the public.
They must co-operate with their superiors in all aspects of health and safety and
maintain their place of work and all equipment in a safe and tidy condition. Employees must
not interfere with or misuse anything provided in the interest of health and safety. Every
employee will be given the opportunity to make their views known on health and safety
matters.
12
3.0 Green Technologies
Global environmental issues, such as climate change and deforestation, have emerged
as new challenges to people throughtout the world. Many countries with aims to become a
low-carbon society through green growth achieved via green technologies and green
industries which enhance eco-efficiency while minimizing adverse environmental impacts.
National Energy Balance (NEB) is design to illustrate the energy supply and demand
balance reflecting the Reference Energy System of the country. The energy balance is a
presentation of the basic supply and demand data for all fuels in a manner, which shows the
main fuels being separately distinguished and expressed in a common energy unit. Both of
these characteristics will allow the comparison of contribution each fuel makes to the
economy and their interrelationships through the conversion from one fuel to another. NEB
was carried out to cover a broad area in energy disciplines such as supply and demand sector
in this country based on the standard format recommended by the United Nations. NEB will
present time series statistical data on the supply, transformation and demand of commercial
energy sources as well as providing a comprehensive support for integrated energy planning.
Data providers for the compilation of NEB consists of relevant government agencies, power
utilities, independent power producers (IPPs), private oil companies, as well as the cement
and iron and steel manufacturers.
13
3.3 Waste Water Treatment
Industrial wastewater treatment covers the mechanisms and processes used to treat
waters that have been contaminated in some way by anthropogenic industrial or commercial
activities prior to its release into the environment or its re-use. Most industries produce some
wet waste although recent trends in the developed world have been to minimize such
production or recycle such waste within the production process. However, many industries
remain dependent on processes that produce wastewaters.
4.1.1. Determination Of Per Capita Load & Water Consumption In Sewage Design
14
Determine the actual loading of various parameters in raw sewage e.g. BOD5, SS,
COD, TKN, P, NH3 and oil and grease as well as determine the per capita loading and water
consumption in sewerage systems by per capita organic loading, sewage generation quantity
and study the strength of untreated sewage.
Investigate the causes and associated relationship between the quantity of in flow and
infiltration in the sewer system. The study shall also derive the relation of inflow and
infiltration to the design peak flow. Verify infiltration rate and peak flow factor and
determine whether they are acceptable for local conditions and to evaluate the flow
characteristics.
15
Investigate and identify cost effective methods of oxidation ponds upgrading. The
study proposed to install baffles to improve hydrodynamic flow in the oxidation pond. See
below figure.
5.0 Conclusion
16
For development of iwk as an engineering industry in Malaysia, iwk had build one
stop centre for sewage solution our niche technical capabilities and expertise for the domestic
waste water sector include:
6.0 REFERENCE
17
1. http://www.kettha.gov.my/en/category/category/green-technology
2. http://www.iwk.com.my/
18