Sei sulla pagina 1di 20
WORK ORDER ‘Work Order No: OOUAITRIKHD Date 16.0eu18 To © PY. PETRONESIA BENIMEL From Dring Location Const Supt. Subject DRILLING LOCATION CONSTRUCTION SERVICES - SOUTHERN & NORTHERN AREA Contact No. + 861800303, Job Location Muti #827 05 a 219043.3742 You are hee by authorized to commence the folowing workin the period of Stared :" October 18, 2018, Complete’ November 8, 2018 STANDARD TIME. No. DESCRIPTION om Vouume OT Saney Suppan aug conan TX) ayer Ra Toot 02 Cleorng work (XK) get sHa TERIST- Sam 03 Earth Work () a oaetet 23.Cut Type () tS Har Day cum B.Cut and Fin type (KE) eMsDay Z30EDE Cum 04 Selected Back wih (—) soo uibey 11 Sand Fil (and Type) (2) tar Day 232 Sand Fil (Crossing Rive) (>t Hasedays Bt Gay Fi (Lane Type) (7) 20 Nsay 12 clay Fil (Crossing Riven (40 NB MDay ©. Greshed Rock Fil Maurin (=) 150.Ns:0ay 4 Ciushes Rock Fil Pals (2) t50nss0ay e.Latorte Fa (=) too MasDay 05 Earth ran & crainage sytem (—) too nasDay 2 Perimeter erainage (3X) 100 NaVDay Storm water drainage (3) 100.NBzDBy «Drainage provement & Sie dtch (—) too nssbay 06 Bund Wall as per soecteation: (2) 100 m3,Day at Type A (Land Type) (KE) ao wsiday a2Type A (Gossing Riker) (<2) 160. ws/03y 2.1 Type B (Land Type) (FE) twoaystor 2 Type B (Crossing River) (2) Tbayetet 2 Type C (Land Type) (HE) 7 dayetot 2 Type © (Grossing River) () eoumbay 07 Constucten of Fare Pt (3K) 2otMmey (08 Gonstructon of Trash Pt () 4oumpay (09 Underground Pipe Protecion =) ima a. Types (=) sotmpay b. Type 8 (Bima © Typec (=) 8 tMdey 10 Road improvement & Project (=) toLwoay a. Grading & compacing Maintain of Existing Road (=) stMpay B: Diesel nand compactor incl erator (=) 100 tw: 6 Paving Slock instalation (P8 21x 10.5x6 cm, K-400) (=) sotmpsy 4. Paving Block cismarile (2) sotmpay Tefors Pavement (=) seo naay 11 Wood Work a per seciteation: (=) S00 nobay 8, Woeden Catarne Lader (Type A) (3) seo MasDay Cont! bax Type 8) (eC) 500 May €. Caton pit? Contol Box Type A (2) S00 LwuDay 18 Wood Constnton (nel. material supply woes cass 1) (=) soo unmay +2 Supply and Installation of Geotxtie ayer (=) S00 Nanay 3. Non woven Geotexile Polyester MXO25 or equivalent (=) 500 Waray ', Woven Geoletle Popropnelens URWS00 or equivalent (""} $00 Ma/Day €:Non Woven Geabag Polypropholon or equivaton(ncluse — (—) 500 M2Day 48 nstaling Rig pad torial (=) ‘oLway 1. Concrete Sib (=) toLwwey .Durabase Mats (=) 7 Deysttet 14 Dismanting Rig pad materia (=) bayer é 1. Concrete Slab (=) 19 Dayettot sqm 5. Ourabase Mate (=) 19 Daye sam 46 Construction of Walk Way (=) to ayant With hand il (=) 7 Dayettot cum 5, Without and rail (=) 5 Daysttot. cum 46 Construction of Retaining Wall (=) Daystar cum 17 Flexble Gabion Box complote with crushed stone minsize 10: (—) 5 DayssLat cum 18 Demolish ZincFence (=) 10LMPsy ow 20 Location ean up! ready fer regreening (=) 10 LmiDsy La 24 Construction of Stone Masonry (=) soo weiday cum £22 Conerete works (=) “4 Daystot {Concrete K-27 (nol na reinforcement bars) (=) to Daystar cum 5, Concrete K-175 (nol nal reinforcement bars) (3 uaiDey cum 4. Supply and Fabrication and instalation Concrete Reinforce © (_) 10 M2/Day cum ©, Demaish Concrete (=) Tayo 9 23 Insta Drain pipe "oF 6 (chiding mteril) (=) raysitot. uw 24 Provide On Call Basis Light Vehicle (=) TManDays 7 2 Siation Wagon, 4 Whee Drive (7-Seaters), Year Made 201, () 7 Days Unitday ». Double Cabin, é Whee! Drive (4- Seaters). Year Made 201 (_) 7 Days Unitday Contactor Contactor Representaive CONMENT ON COMPLETION ‘A Actual completion date Total Devaton Days Reason of Deviation (delay on time ) B. Total quantity of wok item Contractor. Reviewed by, Fpproved By, icky RinaldofRiat Kushardant sohan_Calyapuira Pr Patronasia Bonnet Panning & Logisie SA Superintendent Manager SCM & Services WORK ORDER Work OreerNo ooZMTRIXNO Date 46-00-19 To PT. PETRONESIA BENIMEL From Dring Location Const Supt. Subject DDRILLING LOCATION CONSTRUCTION SERVICES - SOUTHERN & NORTHERN AREA Contact No.» 801800303, Job Location: _Mutiara #20 08, AFE: 219091.9742 You ate here by autnorzed o commence te folowing workin he period of Stared "October 16,2019 ‘Completed November 11, 2018 STANDARO TIME No. DESCRIPTION ranparoi vouume ‘OF Suvey Suppor dating consvucion TAK) Dayelh Ha Too Tot (02 Clearing work (HK) 1 Daysit He TEBE 72 SoM (03 Earth Work (2) 14 Daysitot a.Cut Type (>) 15 Hal Day cum Cut and Fil Type (BE) “taasoay RTT Cum (4 Selected Back with (=) 800 LMbay 81 Sand Fil Land Type) (ll) thasbay cum 812 Sang Fl (Crossing Riven) (ot Havavays cum 1 Glay Fil cLand Type) (=) 240 way cum b2.Giay Fil Crossing River). (=) 20 m3/0ay cum 6. Crushed Rock Fil Meunain (=) 160 ms/0ay cum Crushed Rock Fill alu (=) 150. ms/ay cum Later Fill (=) 00m ay cum (05 Earth drain &cranage system (=) tw0ms/oay a Pevimeter drainage (HE) 100 m3/0ay iT ww © Storm water drainage (C) 100 m3,0ay 36381. iM © Drainage mproverent & Sie dich (=) twos say uw (6 Bund Wall as per speceation (=) 100m3/0ay a1 Type A (Land Type) (3) moms /oay Se ww 2 Type A Crossing River) (<2) 150m3/0ay 7 st Type 8 (Land Type) (BL) to Daystar TeasT iM 2 Type B (Crossing River) (2) 7Dayatet uw £2 Type C (Land Type) (BE) 7 Dayartat ar 62 Type C (Grossing River) (—) 40 Ley uw 07 Construction of Fle it (HE) zoey TOO Lot (08 Construction of Trash Pit (=) doumpay tot (09 Undergroune Pipe Protection (=) 2otmpay a. Type A (=) otmey uw Type 8 (=) et mpay uw eTypec (=) 16 Umpey uw 10 Road improvement & Project (=) totmpay 2. Grading & compacing/fantain of Existing Road (=) sumoay sam 8. Desel hang compar incl operator (=) 10 umDay Day 6. Paving Block instalation (PB 21x10 8x8 em, K-400) (=) ‘soimpay sam «Paving Block dismantle (=) s0imay sam «Telford Pavement (=) soo namay cum 11 Wee Werk a8 per specication (>) 500 mzray 2 Wooden Cela inl Ladder Type A) (3) 500 N2IDay Lot Control box ype 8) (22) 500 NzIDay Lot -Calch pt Contol Box (Type A) (RE) 500 LMOay tot { Weod Construction (nc. material supply wood cass 1) (=~) 500 LM/Oay cum 12 Supply and inllaon of Gotetie ayer (=) 500 Narbey «a. Non woven Geotele Polyester MX025 or equiaient () 500m2IDoy sam Woven Geotextle Polyprophelere MKV/300 or equvelent © (—}__500 M2/Day Sam €:Non Weven Geobag Peyprophelene or equvalon(incude —(——) 500 M2/Day Bag 18 Insaing Rg pad material (=) “touMrey 2. Conerete Siob (=) lms sam > , Durabase Mats 7 Daysit = Sam +4 Diemanting Rig pad material 7 Days at a Concrete Slab () woaysnot sau 2 Darabase Wats (=) todarsnat sau 18 Consinction of Wake Way (ZS) oapanst 5 2 Wt panda (=) Tarot cum witout nan a (ZS) sbapstot com 16 Consicion of Retain Wall (=) Toapanst cum 17 Flexble Gabon Sox compete wih crushed stenemin size 10: (—] 5 Days cum 19 Demolsh Zine Fence (=) wutioay tw 20 Location cleanup ead for egreening (=) ours lot 21 Consnuton a Stone Masonry (=) so wapay com 22 Conaete works (=) “te daystot : 2: Concrete 1275 (ot ne reinforcement bas) (=) 19 bayatet com 8. Concrete K-78 (ot ns esoresment Bas) (=) 3 unlibey cum 4. Supply ane Fadneation and instalaton Concrete Reinfrca —() 10 M2Day cum {© Bamoleh Conerete () Taya ‘s 25 Intl Dra pipe 4” or" (ectuing mato (=) 7 Dayatot uw 24 Provide On Gall Bass Light Vercle (=) 7 Man days ‘ 2 Staton Wagon, 4 Wheel Dive 7-Seators), Year Made 201 (7 Daye Uniday ® Double Cabin 4 Wheel Dive (4 Sates), Year Made 201¢ {——} 7 Daye Uni-say ‘COMMENT ON COMPLETION ‘A Actual completion date Total Deviation Days Reason of Deviation (delay on time ) 8 Total quantiy of work tem ira Contract, Reviewed By ‘ApBTONea By. ehan_Catvapuira ST Peironesia Baninal — Planning & Logistic SA Superintendent ‘Manager SCM & Services WORK ORDER Work Order No > ooa/SDKIKUIa Date 2Noe1 To PT PETRONESIA BENIMEL From Diting Location Const Sup Subject DDRILLING LOCATION CONSTRUCTION SERVICES - SOUTHERN & NORTHERN AREA ContactNo, | SC1800303 ob acaton Neuter aren are: E1s400.5716 ‘You ae nae by authorize to commence ha folowing werkin ho part of Stated ©» Novenbor 8, 2019 ‘coma Novomber 30, 2018, STANDARD TME Ne. DESCRIPTION ii vou ‘Di Suney Supear dure constuction Ty) t Oayert sa at €2 Geaing work (tba he Sa eS etn Wor (=) adopter sci Type () 18 Haybay com 2. Catand Fi Tyee (>) taupe cum 04 Solectos Sack ih: (=) seo buoy 25 Sane Fil Cand Type} (>) 1 HarDay com 482 Sand Fil (Crossing Riven (St HasaDays cum 8:1 Gey Fl Land Type) (=) mo wabay cum 52.0097 Fil Grossing ive) () wo waney cam © Crusted Rock Fil, Mouniain (=) toMy cu Crushed Rock FH Pal (=) sone com Latte Fil (=) 100 wesDey cam 5 Ean drain &dranage system (=) 100 wavy 2 Perimeter cramage () teowssoay un Stor atersainoge (wo webay ua Drainage improvement & Sie ten (=) wows rosy ut 6 Bund Wal a per spectcaton {wows 2:1 Type A Cand Type) (=) zo so2y us 42.2 Type A Cressng Riven) (to wamay uu Type B Cand Type) () “to Days ua B2Type 8 (resing Re) (ZT oayenot ta £2 Type C and Type) (ST oayant tt £2 Type c (Cresng River) = etme =u 7 Consrvton of fisre Pt. (=) 2Dwoay Lot 08 Constucton of Tash Pit (> wows tot 09 Undesroune Pipe Protcten (=) 20 LWoay e-typeA (x0 Bway byes (1s Lwoay etypec (18 uwoay 410 Road Imerovenent & Project i) wuwDey 2.Grading & compacing Mania of Exsthg Road () ‘sume ®.Diesl hand compactor inc operator (=) 100 Gwoay Paving elk station (P8 27x10 5x8 em, K-00) =) ‘soLmpay 6 Paving tock dsmantie (=) s0uWoay €. TellordPavernert (=) 0 wapay 11 Woee Werk as pe spectator: (=) 260 wapay 2 Weaaan Ceterine Usdser (Type 8) (=) so waney 2 Contelbax ype6) (7) 500 waay €.Catenpt/ Con! Bex Type A) (so Lay 4 Weed Constucon (re material suppy wood cess 1) {—} $00 LaLDay 12 Supptyand slataon of Geatte ayer (=) 0 waay 2 Non woven Geoterle Polyester A025 or quent (=) seo waey 3 Woven GeosatiePeyprophelone MAN 300 0 eauvaient —(—) 500 Madey E-Nor Woven Geobag Pohprophelene cr equate pause (—~) $00 MadDay 18 instating Rig pas maria (=) “touwoay ‘Conerte Slab (> toLmosy > © Durabase Mats 7 Dayilot SH 14 Diamanting Rig pa materi () 7 ayant Concrete Sino (=) to Dayenor Durabase Mi (=) to dayenet 416 Construction of Wale Way (=) to dayeet 3. With hand ait () 7 Dayenot 1 Without hand eal (=) sayenet 16 Construction of Retaining Wa (=) 7 ayattet 17 Flexibin Gabion Box complae with crushed stone min size WC (——) 5 Dayaltet. 419 Demoith Zine Fence () imiay 20 Location sean up ready for regreening (=) toimaay 21 Consttucton of Stone Masonry (=) soo maay 22 Conerote works (2) 14 Daysttor 2. Concrete 1-27 (nol inc reinforcement bars) () todays. B Concrete K-175 (no inc reinforcement bars} (=) sumay 4. Supply and Fabrication and instaiaion Concrete Reinforce, ()——10.2Day © Demolsh Concrete (=) Toaystter 23 install rain pipe or 6” (ncuding material) (=) Tbayatet 24 Prove On Call Basis Light Vehicle Co - a Slaton Wagan, 4 Whee! rive (7-Seaters) Year Mace 201, ( SE) Unittay Double Cabin, 4 Whee! Drive 4- Sealers), Year Mage 2ote | (—) Unitday Contractor —ConiraciorReprecentaive — ‘COMMENT ON COMPLETION ‘A Actual completion date “otal Deviation bare eaton of Devaton an (delay /ontine 8 Total quantity of work em Contracter, Renewed oy, epee oy, Bony Daion omni Benuwat) Planning & Logie NA Superintendent PT Petvenesia Benimel — Manager SCM & Services WORK ORDER Work Order: OO4BDKMINE Date 2Now-19 To + PT. PETRONESIA BENDEL From Driting Location Const Supt Subject DRILLING LOCATION CONSTRUCTION SERVICES - SOUTHERN & NORTHERN AREA Contract No scxe00a03 Job Lecation —>_Nouther Ara AE: us4003716 You are hereby authorize to commence the following wark in tho period of Stared © November 8, 2018 ‘Completed Novernbor 30,2019 ‘STANDARD TIME, No. DESCRIPTION Seopa voLuMe ‘OF Survey Support aang construction To) tba Sia =e (02 Clearing werk (1 bays He sam 03 Earth Wor (te Daystar a.cuTyee (>) 15Haloay cum .Cutand Fi Type (2 iKwoay cum (04 Selected Backi wi: (=) 000 LitDay 13.1 Sand Fil (Lend Type) ()tHasDay cum ‘22 Sand Fil (Cressing River) (2) i ravanays cum ‘i Clay Fal Land Type) (22) m0 NB/bay cum Clay Fal (Grossing River (2) ao Ns.o8y com ¢ Grished Rock Fil Mouriain (2) 150 MaDay cum 6. Crushed Rock Fi Pal (2) 0 ma.0ay cum fe Laterte Fl (2) 100 NavDay cum 05 Earth drain & crainage system (=) 100 ws.ay 2. Pecimeter dainage (=) 100 ms.03y w ©, Storm water érinage (=) too ms.0ay w «Drainage Improvement & Side ch (=) 0 ms.0ay 05 Bund Wall as per speciation: (=) 10 ms09y ‘24 Type A (Land Type) (=) x0 ma.0ay ‘22 Type (Greeting Rives) (=) 150 mss0ay 1b Type (Land Type) (=) to Daysitat ba Type B (Grossing Rivet) (=) TDayettet (62 Type C (Land Type) (=) 7 ayenet {62 Type C (Grossing River) (=) soumtay 07 Construction of Flare Fit () 2 Lwey (08 Construction of Tash Pit (=) toLnbay 08 Underground Pipe Protection (2) wuwey a.Typea (2) x0uMway b Type 8 (=) suey eTypeC (=) 1sumoay 10 Read improvemant& Prjoct (=) 1oLwosy 2 Grading &compacinghsintan of Exiting Road (=) sumay 1: Diesethand compactor incLoperator =) ours © Paveg Block instalation (PB 21110 5x8 em, K-40) (=) souwoay 16. Paving Bleck dismante (2) soumay €. Tellors Pavement (=) 500 Marbay 11 Weod Wer as pr specification (=) 500 maDay 18. Wooden Coll inci Ladder (Type A) (<2) 500 maay b Cortrelbox (ype 8} (<=) 500 may € Cale pit Conta Box Type A) (=) 500 Day {6 Wood Construction inl. material supely wood cass 1) (=) 500 Lasioay 12 Supply and instalation of Geotete layer (=) 500 mavay 8. Nen woven Geolentie Polyester MXO25 or equivalent (2) 00 mabey ©: Woven Gaotetie Polyproghelene HOCWS00 or equivalent © (—} 500 MasDay € Non Woven Geobag Polyprophetene er equivalent (neues (—} 500 MaDay 13 Instaling Rig pad material () “t0uway 2. Conerata Sao () toumay Dorabase ats (Toate 14 Dismanting Rig pad materi | ‘8 Concrete Sis (=) roast, sam ' Durebase Mats (7) 10 days sam 15 Construction of Wak Woy (=) to Daye 2. With hand rail (=) payee coun 1 Without mand al (=) Saat cum, 16 Construction of Retaining Wall (=) 7g com 17 Flexible Gabion Box complete wih crushed sone minsize 1: (}__ Daye/Lat cum 419 Demolish Zine Fence (=) oumpay uM 20 Location clean up ready for regieening (=) to umbay re 21 Construction of Stone Masonry (=) so manay cum 22 Coneree works (=) “ta Dayenn 2. Concrete K-275 (00 ne reinforcement bars) (=) to dayenot cum Concrete K-175 (ot inc reinforcement bars) (=) 3mbay cum 4. Supply and Fabrication and neaision Concrete Reinforces (——] 10 M2IDay com ‘e.Dematsn Concrete (=) Toayston 9 23 Instat Bran pps 4" or 6" (nckadng mater) (=) aysttot uM 24 Provide On Call Basis Light Vehicle (SS) 7 han Daye ‘i Station Wagan, 4 Whee! Orve (7Sesers), Year Mace 201. (3K) 7 Days EO Uni-say ‘Double Cabin, 4 Wheel Drive (4-Seaters) Year Made 201 ©) 7 Daye Unitaay Contactor ~ Convair Represeniaive ‘COMMENT ON COMPLETION 'A.Aetual completion dato Tots! Deviation ays Reason of Deviation (olay fon tine ) 8. Totalquantty of wor een Contactr, Reviewed by, Aoprevea by, Daten ern Benue Johan _Cebyacut Panning & Logistic NA Superintons Manager SC & Senicae WORK ORDER Work Ordero : OOSIBDKIKUIS Date 2aNov-19 To PT. PETRONESIA BENIMEL From Diling Location Const Supt Subject DRILLING LOCATION CONSTRUCTION SERVICES - SOUTHERN & NORTHERN AREA Contacte. : SC1B00903 Job Location > _Noutharn Ava APE: e1se00.3715 You ae her by authorized to commence the ellosing werk inthe paviod of Stead : November 8, 2019, Competed November 30,2019 STANDARD TME No. DESCRIPTION oe vouume ‘i Survey Suppor dua consirtion Too) Dayeli Ste a 02 Gleaing work (i bayesHe sat (03 Ean Work (=) 14 Daysnot 3. Cut Type () 15 Heyday cum b.Cutand Fit Type () “tKwyDey cum (04 Selecta Back wih: (=) e00 Ley 3.1 Sard Fil Lard Type) (1 Hay Day = cum 8.2 Sand Fi Grossing River) (thane —— com 1 lay Et (and Type) (2) 200 m3.09y oom 22 Gay Fil (Crossing Riven (=) wma. cum «. Crushed Rock Ft, Mountain (—) 15063202 cum 4 Crushed Rock Fil, Pala (=) tao masmay ous fe Laterte Fl (=) 00 m3.0ay — com (05 Eon an &erinage system (=) 100 M3.0ay 2 Permeter drainage (2) to mss0ay =u Sam water drainage (2) 100 ms003y tat «. Drange Improvement & Sido dich (7) too ma.oay ir 08 Burd Wal ee er specication: (=) 100 m3009y 11 Type (Land Type) () 20 m3.02y Iroc ea 2.2 Type A (Grossing Riven () s0ms.09 jooeeci eo 11 Type (Land Type) (Zl) ta dayne tt 2 Type B (Crossing River) (=) ayrtot uw €2 Type ¢ (Lord Type) (7 Dayenot uw 62 Type © (Grossing Rivet (2) a LMibey wt 07 Constuction of Flare Pit (=) aumnsy bot 08 Constuction of Trash PR (=) ao Ley bet 09 Undersrourd Pipe Protection (2) 2umey a.Typea (2) 2onMibey b Type 8 (=) tsumpay Type () 18 Lanay 10 Reas improvement & Project (=) toumesy 2 Grading & eompacingNantain of Esting Rood (=) Sima ». Diesel hand compactor incloperaior (=) too anay € Paving Bost instalation (21370 58 om, 400) () “soumney 1 Paving Slack aismante (=) umes «Telford Pavement (=) soma 11 Wood Work 38 per specication (=) soo mapa 2, Wooden Celine Ladder ype A) (so mavay 1. Conttol box (Type 8) (=) sony ©. Calehpit/ Cantal Box (Type A) (=) so umoay 4 Wood Construction incl material supplywood cass 1) (——}_ $00 LM/Day une 12 Supply and nstaiaton of Geoteie ayer (=) so meioay 2 Non woven Goole PajestarNDXO25 of eauiralnt (=) 0 mpay Som 2 Woven Geotestie Poyprophalene MAW300 or equtaien! =) 800 MOMDay sam ‘e.NonWoven Geobog Pobpropnelene or equialen (retide — {——} 500 M2Day Beg 13 Instaling Rig pa material (=) “to uMtoay 4 Concrete Slab (=) oumey sam 1 Durabaso Mas ()_ Toaystan 5am 14 Dismanting Rig pad material (=) 7 eye 2. Concite Sab (=) toaster sa .Durabate tats (2) topayeter sam 15 Censtncton of Walk Way (=) topayete. S 2 With mand al (Toate cum 1. without hare ell (=) Sayetee cum 16 Consinucion of Retaining Wal (> Toayatee cum 17 Flexible Gabion Box complete with crushed store min size 10. (——) 5 Daysltet. cum 18 Demolish zinc Fence (=) wointipay ow 20 Location cleanup! ready fr regresning (=) toumay Lot 21 Construction of Stone Masonry (=) 00 mabey cum 22 Concrete works (> ta bayster 2. Concrete 1-275 (no inl reinforcement bars) (> todays. cum Bb Concrete K-178 (not inl. reinforcement bars) (=) 3uttibay cum {Supply and Fabrication and nsalaion Concrete Reinforce () 10 M/Day cum Demolish Conerete, (=) Toayete. ko 23 Inca Orin pipe 4” ot 8 ncuding materia (=) zDayete. on 24 Provide On Cal Basis Light Vehicle (7 Manoays = : 2 Slaton Wagon, 4 Whee! Drive (7-Seaters), Year Made 201, (3) 7 Days ZEGD Unitday bb Double Cabin, 4 Wheel Drive (f-Secters), YearMade 20e (~) 7 Days Uni-day Contactor ‘GaniadierRepreseriaive ‘COMMENT ON COMPLETION ‘A Actual completion date ‘Total Deviation Days Reason of Deviation 2. Tola quantity of work tem (delay on time ) contractor, Reviewed by ‘Approved by, Pee eee ‘Beny Daton ern! Bent slohan_Cahyaputra BT Betronania Baril Planning & Logie NA Superintendent Manager SCM & Services WORK ORDER Work OrderNe : S0BmBDKRRII9 Date 2Nov Te PT. PETRONESIA BENIMEL From Dring Location Const Supt. Subject DDRILLING LOCATION CONSTRUCTION SERVICES - SOUTHERN & NORTHERN AREA Contract No 01800303 Jeb Lecation + _Noutnar Aros APE: ELS4003716 ‘You ae here by authorized to commence the folowing work inthe pried of Stared: November 8,201 ‘Completed November 30,2019, STANDARD TIME No. DESCRIPTION Soeoaritrel VOLUME Ti Savey Suppor Gana eonsTasion {yt Days SHa Toe 12 Cheating work (lo) 1 bayer He sam 03 Earn Work (2) date : a. caTyne. (22) 15 HayDay cum Cut and Fit Type (a) kMsoay cum 06 Selected Backtit wits (2) 00 LNiDay 2.1 Sand Fil (Land Type) () 1 Has Day cunt 12.2 Sand Fil (Creasing Rive) (2) 1 Haladaye cum 1B Clay Fal (Land Type) () 240 ma.0ay cum b2.Clay Fl (Grossing River) (=) 40 Mo.0ay cum Crushed Rock Fil, Mourn (=) 150 MB.00y cunt 6. Crushed Rock Fi, Pals (2) 150 MB.Day cum .Laterie Fl (=) 100 m3.0ay cum 0s Each drain & drainage system (=) 0 ms.0ay 7 2, Perimeter drainage (=) 10 ms.0ay uw Storm water drainage (=) 0 ms.0ay uw Drainage Improverrert & Sic atch (=) to msi0ay uM 06 Gund Well at per spectiaton: (2) wo msi0ay : 2. Type A (Land Type) (2) xo masoay ut ‘22 Type A (Cronsing River (=) 150 mBiDay ow bt Type B (Land Typs) (=) todaysnct uM b2 Type (Croesing Rive) (=) bayer uo 22 Type C (Land Typo) (=) 7 oaysitet nt 122 Type C (Crossing Rive) (a uatay Lt 07 Consinicton of Fire Pa (=) 2uwsy Le (08 Construction of Trash Pa (=) @uWsy (08 Underground Pipe Protection (>) 2 uwey aTypea (sp uitey bTypee () 15umay Typec (> sumey 10 Road improvement & Prject (—) tony 7 2. Grading & compacingMaintain of Existing Road (=) sumay b. Diesethand compactor IncLoperator (=) woLmay {Paving Bact Inetalaton (PE 2X0 5x6 em, K-00) (>) s2uNDey 1. Peving Bleck cismante (—) soLway «2. Tellord Pavernont (=) 500 manay 11 Wood Work as par specication: (—) 500 mapay . 8, Wooden Calla incl. Loder (Type A) (2) 500 mapay Contre bax (Type 8) (>) 500 mapay € Caleh pit Conta Box (Type A) (—) S00 uwoay 4. Wood Consttucton (nl materal supply woos cass t) (—) soo uwoay +2 Supply and naaltion of Goole ayer (2) 500 20a 2. Non woven Goctenle Polyester M025 or equivalont (—) soo mamey 5 Woven Geotetle Polyproghelene W300 or equivalent (") 50 aDay €.Non Woven Geobag Poyprophetne or equiatent(rclude —(——~) $00 MaDay 13 Istaling Rig pac materal (2) touway : 2: Concrete Stab (2) toLmosy bDorabase Wats (oy Toston 14 Dismanting Rig pas material (=) zoayatet = 3 Concrete Sat (=) 10 Dayna, sam ® Durabase Mat (=) todays, sam 15 Gonsiucion of Walk Way (=) to days E 3 vith mand a (=) Toayatet cum 3 Wout nan rat (=) 5 daystat cum 16 Gonsuclon of Rearing Wall (=) Toayatet cum 1 Fila Gabon Box complete wih crushed stone min size 0, (——) _ Daystat. cum 19 Oemlsh Zine Fence (—) we uelbey oh 26 Locston clatn up ready for egrening (=) jo tutbay Lot 21 Gonstcon of Stone Masonry (>) so weroay cum 22 Console works (=) “te Dayan < Concrete 1275 (ntinl enforcement bars) (=) 10 Dayana cum 5 nce <175 (net nel reforcement bars) (=) othe cum 4 Suppl and Fabrealon andinsiaaton Concrete Reinforce: (——) 10 M2VDay cum © Damolan Conerts (=) Toayetee ‘ 25 Ina ran pipe #08 (incuding materi (=) Daye, uh 24 Provide Or Cal Basa Light Vehise (=) Moneys : 2 Staton Wagon, {Viheel Orie (7-Seston), Your Made 201. {——) 7 Daye Uniteay Double Cabin 4 Wheel Dive i Seales) Year Made 20% (KE) 7 Daye BOT Unt onuecor Pertamina Huh Sanga Sanga —Coniacor Representative — anager cif Services ‘COMMENT ON COMPLETION ‘A. Aetal completion dete ‘ole Deviion oye Reason of Deviation (detay fon une 8. Total quantiyef wer tem ona, Reviewed Tera ‘ny Dato er Becuwat chan Catvasta a Parone Bommel — Planning & Logistic NA Superintendent Manager SCM & Services WORK ORDER Work Order No: OO7AITRIXIAD Date 1 2Now19 To PT. PETRONESIA BENIMEL From Driling Location Const Supt. ‘Subject + DRILLING LOCATION CONSTRUCTION SERVICES - SOUTHERN & NORTHERN AREA ‘Contact No, 01800308 Jeb Location Nouthorn Are ARE: ELsaous716 ‘You are hereby authorized to commence te folowing work nthe period of = Started : November €, 2018 ‘Completed Novernber 90, 2019 ‘STANDARD TIME No, DESRIPTION Sp ebeniare i Survey Suppor during constuction To) 1 Daysh 8 Ha (02 Clearing work (To) A Daysits He 03 Gerth Wore (2) te daysnet 2. CutType (18 Hes Day Cutard Fw Type (=) Troy 04 Selected Backfl vt: (2) s00 uwbay ‘21 Sand Fil (Land Typo) () tHas Day 2.2 Sand Fil (Crossing River) (2) thesabeys bt Gay Fill (Land Type) (>) 240 NBiDay 'b2 Clay Fill (Crossing River) (2) 40 MaiDay © Crushed Rock Fl, Mourrain (22) 150 MeiDay ©. Grushed Rock Fl, Pas (22) 180 M8Day «.Lateite Fil (2) 100 Mabey 05 Eerth drain & drainage syetom (22) 100 Mama 2. Perimater drainage (22) 100 Maubay ». Stormwater crainage (=) 100 9/Dey € Drainage improvement & Side dich (72) 100 Masay 1 Gune Wal as per specication (22) 100 MBuDay 2.4 Type A (Land Type) (77) mo say 12.2 Type A (Crossing River) (2) 150 nsupay bt Type B (Land Type) (=) to Daye. 12 Type B (Crossing River) (2) 7 Dayartet 62 Type C (Land Type) (=) 7 Daysitot £2 Type C (Grossing Riven ) souwpay 07 Construction of Fare Pit (=) 2umDay 98 Construction of Fath Pit (72) 40 tnwDay (09 Underground Pipe Protection () 20 uMDay 2. Typ (7) 30 tMDay b Type 8 (2) 1s uwpay © Type c (=) euwDey 10 Road Improvement & Project {) 10 LuwDay 2, Grading & corpacing/Maintain of Exising Read (2) stnwbay Diesel hana compactrincLoparator (2) 100 uwDay Paving Sieck instalation (PB 210.538 cm, K-00) (2) so Lay 1. Paving Block dismantle (2) so uMDay ©. Tellord Pavernent (2) $00 sarbay 11 Wad Work as por specification: (2) $00 Masbay £8, Woaden Cellar inl, Leder (Type A) (2) 500 Marbsy Control box (Type 5) (22) 500 MavDay Catch pit? Contol Box Type A) (2) S00 LMUDay <6. Wood Construction (ii. material supply wood class 1) (22) $00 LNtibay 12 Supply and Instalaton of Geotextie layer (22) 500 MaiDay 2. Non woven Geotexl Polyestar MXO25 or equivatent (—) 500 matbay Woven Geotextla Polyprophelene BOXW300 or equivalent = (—} S00 NZ/Day Non Weven Goobag Polyprophalone or equivalent (nchides — ——} S00 NZ/Day 13 Inetating Rig pad materia! (> Lwoay ‘8. Concrete Siab ama Lwibay bo. Durabase Mats (=) 7 Daysiten a ner =) - gon Semmet ‘S sme ‘Sette ‘> sims oes ae =) Sime : mau (=) tea Ls =| iam ve Somme Rin at ee See em martunomasedson {|,_coue ee =) ites $B lnh ec raps =) ies 2 owen fa)" ees ; Feet es merch (=) yi oegeaucensanuamcrnne: =) gees ‘orci =) ee ashanti rai =| aa Breen ores =) a, ae enjnuruims HE) ten ieee: eR ec a ar tom oGueeenan ince reaTay 6. tel en a =a a; RinaldoRiki Kus PT Patronasia Benimel Planning & Logistic SA Superintendent ni Johan Cahyaputre Manager SCM & Services WORK ORDER ‘Work Order No: O0BTRIXIO Date 2Now-19 10 PT, PETRONESIA BENIVEL From Dring Location Const Supt Subject DRILLING LOCATION CONSTRUCTION SERVICES - SOUTHERN & NORTHERN AREA ConvactNe. -Sct800303 eb Lecation Noutheen Ava ARE ELs¢00.3716 ‘You are here by authorized to commence the folowing workin the period of = Started : November 8, 2018 Completed Novernber 30, 2018 STANDARD TIME No. DESCRIPTION beast voLume 7 Survey Suppor guna constuction To) Days a Te (2 Clearing work (=) 1 dayait'sHe sam (03 Eanh Work (Zo) 14 Daysitot a. cut Type (2) 15 Hes Day cum .Cutana Fil Type (a) “haar oay oun 4 Seloced Backilwen (=) 00 uwoey’ ‘2-1 Sond Fil (Land Type) () 1 Has pay con £22 Sard il (Grossing iver) CT) Hamas com bt Clay Fil Lard Type) (2) HONB.Day cunt $2.Ciay Fil (Crossing Riven) (7) mo nsibay cum «© Grushed Rock Fil, Mounizin (22) 80 MBMDay cunt «Crushed Rock Fal. Paly (=) 180 N320ay cunt f Later Fl (> 100 n8.0 cunt 05 Earth drain & crainage system (2) too msibay 1: Perimaer drainage (2) 00 Mabey um ‘Storm water drinage (=) 100 mB.Day uM «Drainage Improvement & Side dich (2) 100 Ma/Day uM (0 Bund Wal as pe specication: (22) 100 a/Day 3:1 Type A (Land Typo} (a) 0 msiDay ut 2.2 Type A (Crossing River) (22) ts0MB"bay ut ‘4 Typo B (Land Type) (2) to deystet, ut 2 Type B (Crossing River) (>) 7 bayaitot un 2 Type C (Land Type) (2) 7 Dayeitot uM 62 Type G (Grossing River) () ao umey um 07 Construction of Fare it () 20 tMbey bot 08 Construction of Tash Pit () @tMpsy bet 09 Underground Pipe Protection (twa a.Typea (2) wumney ut b.Type 8 (2) 18 LwDey 7 Type (77) 18 they uw 10 Road improvement & Project (=) 10 LMbey 2, Grading & compactngfaintin of Existing Road (=) suntoey satt Diesel hand compactor inc oerater (=) 10 upay Day Paving Block Insallaon (PB 21¥10.5x8 cm, K-400) (>) wins sat 4. Paving Bleck asmanite (2) soley sam €. Telford Pavement (=) 0 nay cum 11 Wood Werk a8 per specication: (2) 500 ne2iday 3, Wooden Celine, Ladder (Type A) (2) S00 n2r00y bot -Contel box (Type 6) (=) S00 Ma2ey lot Catch pit / Control Bax (Type A) (2) so Lay bot {Wood Construction nc material supoly wood class 1) (=) S00 Ltbay uM 42 Supply and Installation of Geotextl layer (=) so neDay £2. Non woven Geotexile Polyester MX025 or equivalent () soo wary saat ‘Woven Geotoxtia Povypropneiene WXW300 oreauvalent = (——}__ 500 NBIDay sam «Non Woven Geobag Polyrophelene or equivateni(ncudes (600 MDIDay Bag 18 Insaig Rig pac mate (=) te woay 2. Coneree Sab ) 10 Dwday sam '.Durabase Mats ) 7 Dayeitot Sa

Potrebbero piacerti anche