ISI KANDUNGAN DOKUMEN UNTUK KAEDAH PELAKSANAAN IBS LAMPIRAN A

PART ALTERNATIF 1 ALTERNATIF 2 ALTERNATIF 3


D&B - REKABENTUK KONVENSIONAL DITUKAR D&B - REKABENTUK OLEH KONTRAKTOR KONVENSIONAL - REKABENTUK IBS OLEH JKR
KEPADA IBS

VOLUME 1 CONTRACTUAL AND GENERAL REQUIREMENTS CONTRACTUAL AND GENERAL REQUIREMENTS Section I - CONTRACTUAL REQUIREMENT
1. Instructions to tenderer 1. Instructions to tenderer 1. Instructions to tenderer
2. Form of Tender 2. Form of Tender 2. Form of Tender
3. Letter of Acceptance of Tender (7/2008) 3. Letter of Acceptance of Tender (7/2008) 3. Letter of Acceptance of Tender (7/2008)
4. General Conditions of Contract 4. General Conditions of Contract 4. Conditions of Contract :

i) Articles of Agreement i) Articles of Agreement i) Borang JKR 203A (Rev. 2007)


ii) Conditions of Contract (PWD FORM DB Rev. 2007) ii) Conditions of Contract (PWD FORM DB Rev. 2007) ii) Special provisions to the Conditions of Contract
iii) Addendum to Conditions of Contract iiI) Special provisions to the Conditions of Contract
iv) Special provisions to the Conditions of Contract
5. Appendices: 5. Appendices:
Appendix 1 - Appendix to Conditions of Contract Appendix 1 - Appendix to Conditions of Contract

Appendix 2 - Schedule of payments Appendix 2 - Schedule of payments

Appendix 3 - Contractual and General requirements Appendix 3 - Contractual and General Requirements Section II - Bills Of Quantities
Appendix 4 - Contractor's proposal Appendix 4 - Contractor's proposal 1. Main Summary of Tender

Appendix 5 - Contract Sum Analysis Appendix 5 - Contract Sum Analysis 2. Preliminaries

Appendix 6 - Contract Schedule of Rates Appendix 6 - Contract Schedule of Rates 3. Appendices to preliminaries

Appendix 7 - Bank Guarantee Form for Performance Bond Appendix 7 - Bank Guarantee Form for Performance Bond 4. Building works
and Advance payment and Advance payment

Appendix 8 - List of Government Multimodal Transport Appendix 8 - List of Government Multimodal Transport 5. External Works
Operators Operators

Appendix 9 - List of Imported Goods Approved By The Appendix 9 - List of Imported Goods Approved By The 6. Prime Cost Sums and Provisional Sums
Government for Incorporation Into The Works or Supplied Government for Incorporation Into The Works or Supplied
Under the Contract Under the Contract

Appendix 10 - List of work supply and services to be sublet Appendix 10 - List of work supply and services to be sublet 7. List of drawings used in the preparation of BQ
to Bumiputera Organisation and Professional. to Bumiputera Organisation and Professional.

Page 1 of 5
ISI KANDUNGAN DOKUMEN UNTUK KAEDAH PELAKSANAAN IBS LAMPIRAN A

PART ALTERNATIF 1 ALTERNATIF 2 ALTERNATIF 3


D&B - REKABENTUK KONVENSIONAL DITUKAR D&B - REKABENTUK OLEH KONTRAKTOR KONVENSIONAL - REKABENTUK IBS OLEH JKR
KEPADA IBS

VOLUME 2 GOVERNMENT TECHNICAL REQUIREMENTS GOVERNMENT TECHNICAL REQUIREMENTS Section I


(Architectural Works, Civil, Structural and Geotechnical Part 1 - Need Statement for Architectural works A.Specifications :
Works, Mechanical and Electrical Works and Other
Services)
Part 2 - Need Statement for Civil, Structural and 1. Standard specification for building works (2005)
Geotechnical works
A. Drawings Part 3 - Need Statement for Mechanical works 2. Addendum specifications:
Part 4 - Need Statement for Electrical works i) JKR Standard Specification for precast concrete
piles in building works (JKR 20709-0182-91)
B.Specifications : Other services ( If Any) ii) JKR Standard specification for prefabricated cold
formed steel roof trusses ( JKR 20600-0022-2001)
1. Standard specification for building works (2005) iii) JKR Standard specification for prefabricated timber
roof trusses (JKR 20600-0020-99)
2. Addendum specifications: iv) JKR Standard Specification for Structural Steel
Works (JKR no. 20600-0019-99)
i) JKR Standard Specification for precast concrete piles v) JKR Specification for Quality Assurance Plan
in building works (JKR 20709-0182-91)
ii) JKR Standard specification for prefabricated cold vi) Specification for Precast Concrete Component
formed steel roof trusses (JKR 20600-0022-2001)
iii) JKR Standard specification for prefabricated timber vii) Architectural Works for IBS Component
roof trusses (JKR 20600-0020-99)
iv) JKR Standard Specification for Structural Steel Works
(JKR no. 20600-0019-99)
v) JKR Specification for Quality Assurance Plan B. Measurement Amplification and Pricing Factor

vi) Specification for Precast Concrete Component


vii) Architectural Works for IBS Component

C. Tender Brief/Need Statement


(If any or applicable when drawings and specification not
provided)

Page 2 of 5
ISI KANDUNGAN DOKUMEN UNTUK KAEDAH PELAKSANAAN IBS LAMPIRAN A

PART ALTERNATIF 1 ALTERNATIF 2 ALTERNATIF 3


D&B - REKABENTUK KONVENSIONAL DITUKAR D&B - REKABENTUK OLEH KONTRAKTOR KONVENSIONAL - REKABENTUK IBS OLEH JKR
KEPADA IBS
VOLUME 3 GOVERNMENT TECHNICAL REQUIREMENTS
(CONVENTIONAL DESIGN)

A.BILLS OF QUANTITIES
1. Main Summary of Tender
2. Preliminaries

3. Appendices to preliminaries _ _
4. Building works

5. External Works

6. Prime Cost Sums and Provisional Sums

B. SUMMARY OF TENDER (DRAWINGS AND


SPECIFICATION)

Page 3 of 5
PERBANDINGAN ISI KANDUNGAN TTD/TD UNTUK KAEDAH PEL

PART ALTERNATIF 1
D&B - REKABENTUK KONVENSIONAL DITUKAR
KEPADA IBS

CONTRACTUAL AND GENERAL REQUIREMENTS


SI KANDUNGAN TTD/TD UNTUK KAEDAH PELAKSANAAN IBS

ALTERNATIF 2 ALTERNATIF 3
D&B - REKABENTUK OLEH KONTRAKTOR KONVENSIONAL - REKABENTUK IBS OLEH JKR