Design Loads
• Introduction.
The bridge engineer must first list all the possible loads on the superstructure; to wit,
– A) Permanent Loads:
• 01. Dead Loads
• 02. Superimposed Dead Loads
• 03. Pressures (earth, water, ice, etc.)
– B) Temporary Loads:
• 04. Vehicle Live Loads
• 05. Earthquake Forces
• 06. Wind Forces
• 07. Channel Forces
• 08. Longitudinal Forces
• 09. Centrifugal Forces
• 10. Impact Forces
• 11. Construction Loads
The primary design parameter for highways are truck loadings. The American Association
of State and Highway Transportation Officials (AASHTO), founded in 1914 as AASHO,
developed the concept of a train of trucks in the 1935 that imitated the railroad industry’s
standards. However, as the weight of the trucks grew, the bridges were overstressed.
In 1944, AASHTO developed a new concept: hypothetical trucks, called the H (with two-
axles) and the HS (with three-axles) classes of trucks. These were fictitious trucks, used
only for design and they did not resemble any real truck on the road.
In 1975, the federal DOT upgraded the allowable gross weight for trucks from 73,280 lb to
80,000 lb (although some states increased them to 90,000 lb).
A similar standard exists for Canada (the Ontario Highway Bridge Design Code, OHBDC),
or the United Kingdom, the BS5400 code. Europe has higher bridge loads, because they are
designed to carry heavier loads than the US, primarily military loads.
Permanent Loads.
1. Dead Loads (DL). The dead loads of a bridge are all the loads from the superstructure,
such as, the wearing surface, the deck, the stay-in-place forms, parapets, sidewalks,
railings, bracing, connection plates, stiffeners, signing and utilities. The table below shows
some of the dead load unit weights that are used to calculate the superstructure.
2. Superimposed Dead Loads (SDL).
In a typical composite superstructure, the deck is formed by an 8 inch thick slab of reinforced concrete,
placed upon steel stringers or box girders. The top chord of this composite is in compression, which is
ideal for concrete, and the bottom chord is in tension, which is ideal for steel. The superimposed dead
loads are those loads placed on the superstructure after the deck has cured, and thus has begun to work
with the primary members. These are sidewalks, railings, parapets, signing, utilities and the wearing
surface.
3. Pressures.
In general, earth pressures upon the back-wall of the abutment is part of the substructure. The same is
true of the water pressure (and ice) upon the pier. However, part of the earth pressure can end up
affecting the superstructure, and this must be checked in all designs.
Temporary Loads.
One is the AASHTO 3.7.4, which was developed in 1975 by the FHA (Federal Highway Administration),
and is known as the Alternative Military Loading. It is represented by two axles separated by only 4 feet,
and each carry 24,000 lb. All bridges on the United States Interstate system are required to compare the
HS20-44 loading with the Alternative Military Loading, with the configuration that produces the greatest
stress being chosen as the design criterion.
The second is the P Load class. States like California, that experience a large number of over-loaded
trucks, use the P loads (from permit design). The P load design vehicle has a single steering axle in front,
and between two to six pairs of loaded axles in tandem.
5. Earthquake Forces (EQ).
Earthquake forces are a natural force, that depends on the geographical location of the bridge. These
forces are temporary, and act for a short duration of time. The application of these forces to the bridge
is usually studied with their effect upon piles, pile caps and abutments, via the Mononobe-Okabe
analysis method. These will be studied later.
There are four factors that are taken into consideration to determine the magnitude of the seismic
forces: 1) The dead weight of the entire bridge;
2) The ground acceleration (all three axes);
3) The period of vibration, and
4) The type of soils or rocks serving as bearing for the bridge.
The sum of these factors are reduced to an equivalent static force, which is applied to the structure in
order to calculate the forces and the displacements of each bridge element.
The first step is to ascertain what is the seismic performance category (SPC), via AASHTO I-A, 3.3
(next two slides). The next step is to determine the type of analysis required, via AASHTO, I-A, 4.2,
which are either Method 1 (Single-Mode Spectral Analysis) or Method 2 (Multi-mode Spectral
Analysis). Method 1 is the simpler of the two, and can be done by hand-calculations. Method 2 is
complex, and requires specialized software. The single-mode spectral analysis uses the same procedure
for calculating the longitudinal as the transverse loading. This is done via the principle of virtual
displacements, in order to develop a mode shape model for the bridge. An arbitrary uniform static force
po = 1, is applied to the length of the structure in order to produce an initial displacement vs. This
displacement, combined with the dead load weight of the superstructure, and part of the substructure, is
used to determine the earthquake force.
The next step is to calculate the dead weight value w(x) from the superstructure and part of the sub-
structure. It can also include some live load if the bridge is in a heavily traveled urban area. From these
two values, vs and w(x), we can find the fundamental period T of the bridge and the seismic force pe(x).
6. Wind Forces (W and WL).
Similar to the earthquake forces, wind forces are extremely complicated, but through a series of
simplifications are reduced to an equivalent static force applied uniformly over the exposed faces of the
bridge (both super and sub-structures) that are perpendicular to the longitudinal axis.
AASHTO specifies that the assumed wind velocity should be 100 mph. For a common slab-on-stringer
bridge this is usually a pressure of 50 psf, and a minimum of 300 p/lf. Truss and arch bridges require a
pressure of 75 psf, and a minimum of 300 p/lf on the windward and 150 p/lf on the leeward sides.
These forces are applied at the center of gravity of the exposed regions of the structure.
AASHTO also requires an additional 20 psf of overturning force, to be applied at quarter points on the
windward chord.
The design wind pressure PD can also be calculated from,
For this equation, in S.I. units, VDZ is the design wind velocity at the designated elevation Z in km/h.
VDZ is a function of the friction velocity Vo, also in km/h, multiplied by the ratio of the actual wind
velocity to the base wind velocity both at 10 m above grade, and the natural logarithm of the ratio of
height to a meteorological constant length for given surface conditions.
7. Channel Forces (SF and ICE).
Channel forces come from the stream flow, floating ice and bouyancy. These forces affect primarily the
sub-structure.
The force Pavg of the stream flow upon the pier, is half the maximum stream flow pressure Pmax
measured by a hydrologic study.
Longitudinal forces result from the transfer of momentum from the truck braking or accelerating on a
bridge. AASHTO 3.9 specifies that 5% of the appropriate lane load along with the concentrated force
for moment be used as the resulting longitudinal force. This force is applied 6 feet above the top of the
deck surface. The stiffer or rigid the structure, the greater the effect of the longitudinal force.
A truck turning on a bridge, because of a horizontal curve exerts a centrifugal force, as calculated
below, and located 6 feet above the top of the deck surface, using truck loading.
10. Live Load Impact (I).
Trucks at high speeds may hit the deck with a large vertical force (impact) because of several causes,
such as a pot hole, or a large vertical step between the approach slab and the rigid deck, etc. AASHTO
3.8.2 defines the impact factor as follows:
During the erection of the bridge, some members may be subjected to larger loads than those
calculated for normal use. The experienced designer usually consults with the (likely) contractors to
obtain information on the method of construction, the heavy equipment that may mount the bridge,
staging materials, and other problems in order to add these loads to the bridge analysis.
12. Creep.
Creep is the deformation of a concrete mass caused by carrying a load over a period of time. When the
load is applied, the concrete experiences an instant strain (linearly related to the stress), and an instant
deformation. Over time however, an additional strain (creep strain) occurs, which may be from 150% to
300% larger than the instant linear strain. Creep strain is a function of its moisture during curing. If the
concrete is left to dry out, creep will be very large. On the other hand, a protected fresh concrete surface
that is kept moist, will experience minimal creep strain. Excessive concrete in the deck may deform the
length of the members and lead to warping or misalignments.
13. Shrinkage.
Shrinkage is also, like creep, a deformation due to material properties. It is a consequence of the natural
change in volume of concrete, and not related to load. The shrinking is due to the los of moisture during
its drying. Steel reinforcing is usually added to absorb some of the tensile stresses induced by the
shrinking. The best way to diminish shrinkage is to keep the concrete moist during curing, and using
plasticizer to provide workability in lieu of extra water which increase shrinkage (and creep).
14. Settlement.
Settlement of the foundations will produce sizable moments in the superstructure, especially differential
settlement. Settlement can have one or several causes, including (1) exceeding the bearing capacity of the
soils, (2) lowering of the phreatic surface, (3) vibrations, (4) loading the embankments, and (5) changes
in the soil properties (for example, shrinkage and swelling).
15. Uplift.
Some bridge configurations may produce the lifting of a span with respect to its adjacent elements. For
example, high loading a long span, next to a short span. This is called uplift, and its discussed in
AASHTO 3.17.
Bridges experience a combination of the previously discussed forces. Experience has generated ten load
groups. These are described by the equation below.