Migration Documentation
Purpose
New general ledger accounting combines a variety of existing methods for representing ledgers and also
delivers new methods. Customers wanting to use all these options face two challenges:
The migration monitor assumes that you want to perform the transition from classic general ledger
accounting (installed operationally with R/3 Enterprise or an earlier release) to new general ledger
accounting in mySAP ERP 2004 (ECC5.0) or SAP ERP 6.0 (ECC6.0).
The functions for "Validation of Document Splitting" are not available (Migration package 3, 5
and 6).
Note:
If you have not previously used any active installation and you are in the evaluation or project stage, you
need to decide (depending on your concrete situation) whether you first want to use classic general
ledger accounting or whether you want to implement new general ledger accounting straight away and
thus avoid the need for any subsequent migration.
Making changes or enhancements to the range of functions available in an active installation of new
general ledger accounting does not fall under the type of migration scenario described in this guide.
Instead, such changes or enhancements need to be conducted in a separate consulting project. The
migration tools described in the following chapters are not meant to be used for this purpose.
If you migrate from a third-party system to new general ledger accounting, this migration guide is not
relevant to you. For tips on performing the migration from a third-party system, see SAP Note 890237.
Prerequisites
In order for the migration to new general ledger to succeed, it is essential that you follow the migration
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 2 of 386
phase model. The phase model consists of the following three phases:
Phase 0
Phase 1
Phase 2
Migration date (start of the fiscal year for which the migration is performed)
The migration date is the start of phase 1
Activation date (date on which new general ledger accounting is activated)
The activation date is the start of phase 2
Note that the previous fiscal year (that is, the fiscal year before the migration date) definitely must be closed before the
migration starts. It is technically not possible to reopen the previous fiscal year after the migration.
Additional Information
For a detailed description of the migration process, please refer to the migration guide on SAP Service
Marketplace.
https://service.sap.com/glmig
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 3 of 386
To be able to migrate quantities and base unit of measures, certain corrections already need to be
implemented in the system during Phase 0 itself. Both the below mentioned notes and the related notes
are relevant to ensure that quantities fields will be migrated.
1477286 X -
1477363 - X
Use
If you do the customizing directly in the current system, do not execute this step.
Remark: If you execute this activity before the migration plan has been transported from a development
system to the current system, you will get an error message saying that the migration plan does not exist.
Use
Independent of the migration, SAP recommends calculating the expected data volume in the new totals
table FAGLFLEXT or in your customer-specific totals table (if applicable).
Using report RGUIST01, you can estimate the number of future totals records based on currently
existing data (SAP Note 1045430).
Please note that the actual number of entries in the table will most likely differ from these calculated
figures.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 4 of 386
Use
We recommend that you check whether there are modifications in your system that have an impact on
the new general ledger or on the migration and decide whether these modifications are also required for
new general ledger accounting, considering that modifications can often be replaced by SAP standard
functionality or enhancements within the SAP standard.
If you decide to keep modifications in ERP, make sure they are tested thoroughly in connection with the
new general ledger.
Note that this check is independent of the technical modification clearing (using transaction SPAU) that
you did in connection with the technical upgrade to mySAP ERP.
Use
In this activity, you confirm that customizing for new General Ledger Accounting is finished and ready
for go-live.
Note that it is currently not possible in SAP standard to activate additional non-leading ledgers.
Information about the risk of subsequent changes in document splitting, ledgers, and scenarios is
provided in SAP Note 891144.
Prerequisites
The business blueprint for new General Ledger Accounting is completed and technically implemented in
the system.
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 5 of 386
In this activity, the Migration Plan is created. The migration plan contains all company code and ledger
objects that are to be migrated together for those company codes and ledgers assigned to the migration
plan. Company codes that have the same fiscal year limits can be migrated together in one migration
plan. For very large volumes of data, you may have to define multiple migration plans to conduct the
migration company code by company code. To do this you have to define another migration package in
the migration server overview.
The migration plans are internally generated with the keys 'A01', 'A02' to 'Z99'.
Standard settings
SAP does not deliver standard migration plans. You can create at least one migration plan according to
your migration package.
Activities
1. The migration plan is created automatically when you execute the function for this activity. The
migration plan applies to your migration package.
2. In the next activity, you set the migration date, which must coincide with the start date of a fiscal
year.
The last day of the fiscal year variant of the company code or ledger must agree with the
migration date minus one. For more information and an example, see Migration Date.
You can assign company codes and ledgers to more than one migration plan. However you cannot
assign the same combination of company code and ledger to more than one migration plan. There
must be no more than one migration running for each combination of company code and ledger.
Once you have assigned company codes and a ledger to a migration plan and started the
migration, you cannot change the migration type and the migration date and assignments
anymore.
1. Having set the Migration Date, you assign company codes and ledgers to the migration plan.
Use
Having created the Migration Plan, you need to choose the migration date. The activity suggests
all possible combinations of migration dates for your company codes and fiscal year variants.
It is not possible to set the migration date to a start date prior to the current fiscal year.
Prerequisites
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 6 of 386
The migration date is always the start of the fiscal year. The migration usually takes place directly
after the previous fiscal year has been closed. After the migration, postings to previous fiscal year
are no longer possible. Furthermore it is not possible to reset clearing of clearing documents
posted in the previous years.
Please ensure that the initial migration from classic G/L to new G/L has been executed at least one
fiscal year prior to the migration date of the current migration.
Dependencies
If you use a migration scenario with document splitting (migration package 3, 5 or 6), the
migration date should also be set as Validation Date. Migration to an environment with document
splitting is more complex than the scenario without document splitting. For a migration with
document splitting, line items must be supplied with account assignment information in order to
guarantee that the processing and results of subsequent processes are correct. For more
information, see Validation Document Splitting in the preparation phase of the migration cockpit.
Additional information
The migration date cannot be changed once the migration plan has been started.
Please ensure that in case of an initial migration from classic G/L to new G/L this migration has
been executed at least one fiscal year prior to the migration date of the current migration.
Please ensure that in case of an initial migration from classic G/L to new G/L this migration has
been executed completely before you start the current implementation of a new ledger.
For migration package 8 (Subsequent change from account solution to ledger solution):
You can only choose a migration date in future. Please ensure that in case of an initial migration
from classic G/L to new G/L this migration has been executed at least one fiscal year prior to the
migration date of the current migration.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 7 of 386
Use
Having created the Migration Plan and set the migration date, you assign the company codes and
target ledgers to the migration plan. Generally, you can assign all combinations to one migration
plan if you use the same fiscal year and migration scenario for all company codes.
The following cases require separate migration plans. (A migration plan relates 1:1 to a migration
package):
The fiscal year limits are different between company codes or ledgers.
You use different migration scenarios regarding document splitting within one client.
If you have multiple migration plans, you can assign company codes and ledgers to one migration
plan only. It is not allowed to assign the same combination to more than one migration plan.
Recommendation
If you want to introduce new General Ledger Accounting for a number of company codes, we
recommend that you use separate migration plans for company codes with very large volumes of
data. Smaller company codes, on the other hand, can be migrated together in one migration plan.
In this way, if an error were to occur in a large company code, causing you to reset the data
completely, any smaller company codes that had already been successfully migrated would not be
affected.
Note that you have to perform all activities within the migration cockpit for all migration
packages.
Prerequisites
Dependencies
The assignment of company codes and ledgers cannot be changed after the migration plan has
been started.
Once you have assigned company codes and ledgers to the migration plan you can change the
migration date that applies to the fiscal year definition of the assigned company codes as long as
the migration plan has not yet been started.
Once you have assigned a company code with a non-leading ledger to the migration plan you
cannot delete this in the new G/L customizing (Define and Activate Non-Leading Ledgers).
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 8 of 386
Once you have assigned the company codes and ledgers to the migration plan the new G/L
customizing activity Define and Activate Non-Leading Ledgers automatically starts the migration
plan.
Use
Once you have created the migration plan, you can use this display function to see the
customizing settings and status of the migration plan.
Migration date
Migration with document splitting
Migration status (started, ended)
Company codes, target (new G/L) ledger and fiscal year variant
Use
Having assigned the company codes and target ledgers to migration plan, you assign the
source ledgers at the level of G/L account intervals or individual accounts and currency
types. This allows you to define (in particular for the balance carryforward) which G/L
Accounts are uploaded from which source ledgers and consequently tables, for instance
GLT0, GLPCT.
Especially for migration package 4 and 5, you are able to allocate account ranges for several
accounting principles to different target ledgers; the source ledger is typically ledger '00' in
table GLT0 but also other ledgers with same account balance as ledger '00' are possible.
Since the configuration made in Assign Source Ledgers controls the upload carryforward it
is not possible to assign G/L accounts with open-item management or customer and vendor
reconciliation accounts.
Currency type '10' (company code currency) and '00' (transaction currency) are always
linked to the same ledger.
Example
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 9 of 386
You currently use the accounts approach with two accounting principles - one for local
valuation and the other one for IFRS. To switch to the ledger solution in new G/L, you
might use the following logic:
All accounts starting with 1xxxxxxxxx are common accounts and will be assigned to
all target ledgers
All accounts starting with 2xxxxxxxxx are IFRS accounts only and will be assigned
to leading ledger '0L' only"
All accounts starting with 3xxxxxxxxx are local accounts only and will be assigned to
non-leading ledger 'L1' only.
Features
In activity Assign Source Ledgers, you have several options that can be chosen on the entry
screen. The assignment is done for every company code / target ledger combination.
Maintain (Scenario 6)
Display
Propose entries
Check Entries
Transport entries
When you choose the Maintain function, the system automatically creates the proposal
entries. For this specific migration package, the source ledger is always equal to the target
ledger. This applies to all target ledgers of the company code and all determined currency
types.
Prerequisites
The migration plan has been created successfully. Company codes and ledgers have been
assigned to the migration plan.
Dependencies
Deletion or editing of existing intervals is possible as long as no account within the edited
or deleted interval has been processed (uploaded). If an account is already processed, you
must first RESET the upload of the corresponding interval.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 10 of 386
When you choose the Maintain function, the system automatically creates the proposal
entries. For this specific migration package, the source ledger is always equal to the target
ledger. This applies to all target ledgers of the company code and all determined currency
types.
It is only possible to assign a new G/L ledger (leading ledger or non-leading ledger) as
source ledger. Additionally you can use a FI-FL ledger as a source ledger in case you want
to replace a FI-SL ledger by using new G/L ledger. Please note that in case of FI-SL ledger
the ledger should provide a balance carryforward function. Otherwise you will get a
warning message when checking the entries.
If you assign a FI-SL rollup ledger as a source ledger you will get a warning message.
The function copy from another migration plan can only be used for the same migration
plan type. The migration packages 7 and 8 use the same migration plan type.
1.1.12. NGL00_PREPARE_SEGMENTATION
Use
New General Ledger Accounting contains a new characteristic called segment. The segment
is meant to be used in particular for segment reporting as required by IAS/IFRS and US-
GAAP. This activity is only relevant if you want to use the new characteristic in new
General Ledger Accounting.
SAP strongly recommends using the segment derivation before activation of new General
Ledger. This function ensures that all necessary documents are filled with segment
information during the original posting of these documents. Therefore you need to prepare
the postings that take place after the migration date and before the activation date in phase
1.
Activities
You have defined at least one segment in new General Ledger customizing.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 11 of 386
You define the segment as ready for input in this activity of the migration cockpit.
You have defined profit centers and assigned segments to them. If you already use
profit centers, all you have to do is assign the segment to them. If you do not use
profit centers within classic Profit Center Accounting (EC-PCA), you need to set up
the profit center master as well. But usually you do not need to activate EC-PCA
itself and to use the full functionality of EC-PCA.
Use
In this activity, you activate the standard process of segment derivation by profit centers.
Integration
To use the segment derivation you need to allow the maintenance of segments before new
General Ledger is active (in activity Allow Maintenance of Segments).
Prerequisites
To use the segment derivation, you defined all necessary segments in new General Ledger
customizing and assigned the segments to profit centers.
Make sure to test your posting processes carefully - including posting processes that involve
profit centers.
Example
Your migration date is 01.01.2007 (fiscal year start). The migration to new General Ledger
Accounting will take place after the closing of the previous fiscal year on 15.03.2007. All
documents that are posted between 01.01.2007 and 15.03.2007 are then assigned to at least
one segment based on the profit center contained in the document.
Use
With this activity, all open items to be processed receive a correct account assignment,
which is the basis for building the document-splitting tables. You have to implement the
logic for supplementing the account assignments in the form of a Business Add-In (BAdI).
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 12 of 386
In this way, you can include individual derivation rules in a standard migration process.
Ensure that, from the perspective of the total document, an account assignment is found for
each individual open item.
Features
Transfer of the following information that you can use to implement the derivation:
The complete document within which the open item is located (IT_BSEG)
The open item that is currently being processed (IS_ACCIT)
The document header (IS_ACCHD)
You can change the account assignments contained in structure CS_MIG_ASGMT.
With the exception of the characteristic Profit center, only initial fields can take an
account assignment. You cannot change fields that are already filled; you can only
delete a dummy profit center or overwrite it with another profit center.
You may overwrite a specified profit center with the profit center in a CO account
assignment if this assignment is also set.
In structure CS_MIG_ASGMT, you can also set additional account assignments for
CO that are used to post follow-up costs (such as cash discount, exchange rate
differences, or penalty interests) once new general ledger accounting has been
activated.
The fields must be filled with the correct values, which means that the corresponding
account assignments must exist.
If a document contains more than one open item, each open item is processed
individually.
The original items (tables BSEG, BSIS, BSID, and BSIK) are not changed;
only the entries in the tables for document splitting are generated. The general
ledger line items are transferred in a separate step. Before the general ledger
line items are built, all open items must have the status Without errors.
Otherwise, the migration cannot be performed completely and correctly. In
cases where no correct account assignment can be derived, you may need to
make a dummy account assignment.
You need to ensure that all account assignments that you require for the
document splitting are set in the open items. This is particularly important if
you use several ledgers in new general ledger accounting with different update
characteristics, such as segment or profit center in the leading ledger and cost
center in another ledger.
The following BAdI is an example based on a simple case. In this example, the profit center
is derived from the business area of the original document if the business area is distinct.
Otherwise profit center '9999' is set.
METHOD if_ex_fagl_migr_subst~subst_item.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 13 of 386
end of l_gsb.
if is_accit-bukrs = '0001'.
clear ls_gsb.
ls_gsb-gsber = ls_bseg-gsber.
endloop.
if sy-tfill = 1.
case ls_gsb-gsber.
when '0001'.
cs_mig_asgmt-prctr = '1100'.
when '3000'.
cs_mig_asgmt-prctr = '1300'.
when '4000'.
cs_mig_asgmt-prctr = '1400'.
when others.
cs_mig_asgmt-prctr = '9999'.
endcase.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 14 of 386
else.
cs_mig_asgmt-prctr = '9999'.
endif.
EXPORTING
INPUT = cs_mig_asgmt-prctr
IMPORTING
OUTPUT = cs_mig_asgmt-prctr.
endif.
ENDMETHOD.
The query for the company code is only used as an example; it may generally be the case
that the same derivation logic can apply independently of the company code, but it is also
conceivable that the logic differs from company code to company code. Conducting the
implementation on the basis of tables is also feasible; that is to say, the account assignments
are not set as fixed, but instead are defined and read in customer-specific tables.
If you use the characteristic Segment and derive it from the profit center, it is not necessary
to fill the segment because it is filled using standard derivation, which is performed after
processing the BAdI. For this purpose, segment derivation must be activated. You find this
activity in the migration cockpit under Setup phase -> Prepare segmentation -> Activate
segment derivation. You can use method GET_SPLITFIELDS (class
CL_FAGL_SPLIT_SERVICES) to find out which active document splitting fields can be
changed. Open items in customer and vendor accounts and G/L accounts managed on an
open item basis do not usually have a profit center account assignment at the item level. An
exception to this could be downpayments or other special sales or purchases. These could
indeed have a profit center, which would result in a message being output when this profit
center is overwritten by another profit center as a result of the BAdI.
Within the BAdI, you can perform any checks and have any error messages issued in
structure ES_MESSAGE. The error messages then appear in the log. The current open item
may not be processed further, regardless of the type of message involved (warning message
or error message).
1.1.14. NGL03_VALIDATION_DOCUMENT_SPLITTING
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 15 of 386
Use
You use validation during migration phase 1 to check the documents in the production
system before activating new General Ledger Accounting (for migration packages 3 and 5)
or document splitting (only for migration package 6). By conducting this check, you ensure
that error-free documents are available for document splitting when you activate new
General Ledger Accounting. During validation, no data is updated to the general ledger
tables or the information files for document splitting.
The aim of validation is to test as early as possible and in a live system the business
processes modeled in document splitting. Validation enables you to perform the following
quality assurance measures:
Extend the scope and improve the quality of modeling In an iterative procedure
Identify early on any problem areas in the operational posting transactions and
undertake any necessary measures
Ensure that the posting rules specified in document splitting are adhered to
Prevent the accumulation of documents containing errors in the current production
system that are relevant for subsequent posting during migration.
During the migration, you can log error statuses in the production system and post-process
them in the test system (preparation system). In this way, you prepare the post-processing of
these documents in the test system (if they need to be posted subsequently) or you identify
and close any gaps in the modeling of document splitting and in the business processes.
If a document to be posted does not fulfill the requirements of document splitting, you can
set up the production system so that messages are issued and grant the user appropriate
ways of intervening. In the case of third-party processes (such as MM or SD) and automatic
processes in FI (such as payment runs or recurring entries), you can only have entries
generated in the log, for example.
You can set up dependencies for the error messages on other constraints (such as account
assignment determination or master data processing) that need to be fulfilled coupled with
the attainment of a certain project status. You can activate validation of document splitting
using time dependency and in stages.
SAP recommends using the validation of document splitting. Note that if you skip this
validation the number of errors during the migration is likely to be significantly higher, and
the quality of the data would not be as expected. This may endanger the whole migration.
Therefore the migration packages with document splitting include a check for activation of
the validation. If you use document splitting, it is not allowed to set the migration date
retroactively.
to safeguarda successful migration, you must finalize your document splitting customizing
including all processes already in phase 0 and transport the settings for document splitting
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 16 of 386
to your productive system. Before this takes place, you must carefully test all posting
processes in a test or quality insurance system.
Prerequisites
The validation of document splitting occurs in the production system. To be able to perform
validation in a useful manner and thereby avoid redundant error logs, the following
prerequisites need to be fulfilled:
You have defined and customized the leading ledger of new General Ledger
Accounting.
You have assigned the document splitting method in the customizing of new
General Ledger.
You have made or checked all other required settings in Customizing for document
splitting.
You activate the validation at migration plan level in the activity Activate
Validation of Document Splitting in the process tree. For this reason, you need to
transport the migration plan to the production system.
Use
If you want to introduce document splitting with the migration to new General Ledger
Accounting, or if you want to introduce document splitting subsequently, we
recommend that you activate the validation of document splitting for phase 1 of the
migration.
No validation
Log only
Warning message and log
Error message
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 17 of 386
You make the setting directly in the migration plan. To this purpose, you enter the
validation date from which the documents need to be validated. The validation date
relates to the posting date; that is to say, the system validates all documents with a
posting date falling on or after the validation date.
Prerequisites
Features
The documents can be posted using external interfaces (such as ALE and direct
input). These interfaces must provide sufficient account assignment information so
that it is possible to represent the general ledger document in a way reflecting the
processes. If this is not the case at the time of the validation, these lines must be
assigned subsequently. You can also set up different levels of validation for
individual business transactions down to the transaction level (in activity Adjust
Validation for Specific Processes). This is necessary if you cannot validate specific
processes sufficiently yet or modeling has not yet been performed completely.
If this is still not sufficient, you also have the option of using a Business Add-In
(BadI FAGL_SPLVAL_ADJUST) to specify the level of validation in each case.
Using the changeable BadI parameter CD_VAL_MOD, you can set the following
fixed values in the modifiable parameters:
Validation Level
Value Meaning
Blank No validation
1 Log only
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 18 of 386
3 Error message
Example
You are currently using business areas in classic General Ledger Accounting. In new
General Ledger Accounting, you want to introduce a complete financial statement
using profit centers. If you have not yet defined the profit center structure completely,
you can still derive a profit center from the business areas currently available. It is
important that you only simulate this. This means that you have to supplement the
documents subsequently with the account assignment Profit Center for the migration.
Use
If you are not able to validate certain processes sufficiently because account
assignments have not yet been derived completely or conversion has not yet occurred,
you can adjust the validation for those particular processes.
Requirements
You have fulfilled the prerequisites for the validation of document splitting.
You have activated validation in the migration cockpit activity before.
Activities
For each reference transaction, business transaction, transaction, and batch input
marker, specify a validation level.
The validation level is adjusted to the level defined if the general activation of
validation has a higher level.
Value Meaning
Blank No validation
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 19 of 386
1 Only log
3 Error message
Example
In the general activation of validation, you have defined the validation level Error.
However, you only want to have a log written for background processes. To this
purpose, enter the validation level Only Log for the batch input marker.
Use
If you use validation for document splitting, this BAdI allows you to adjust the degree
of validation to your specific requirements.
Requirements
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 20 of 386
Use
If account assignment information is not yet available due to the status of a project,
you can use this BAdI to simulate account assignments for specific lines. The
document splitting characteristics can be defined as a mandatory account assignment
for document splitting. The account assignment information in the line items can have
different origins.
Requirements
You have met the prerequisites described in the document on validation of document
splitting.
Activities
Example
You activate validation of document splitting for profit centers, but you have not yet
made the assignment of cost centers to profit centers in the production system. Since
no cost center is assigned, error messages relating to account assignments are issued
in the validation of document splitting. You can use this BAdI implementation to
simulate the missing derivation and avoid unnecessary log entries.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 21 of 386
Use
If you chose a migration scenario with document splitting, the program for this
activity checks if you have activated the validation at least with level 1 (Only log).
You receive a warning message if validation of document splitting is not activated.
1.1.15. NGL00_ADDITIONAL_BADI_IMPLEMENTATION
Use
If, in new general ledger accounting, you introduce new account assignment
characteristics (such as segments) that do not form part of the documents, you can use
a Business Add-In (BAdI) to supplement the account assignment information during
runtime. In particular, you can use the BAdI FAGL_MIG_ADJ_ACCIT with the
method ADJUST_ACCIT. The documents entered in table BSEG remain unchanged,
that is to say, the account assignment is not updated in the document. The enriched
account assignment information is added to the document splitting information and
applied in building the documents in the general ledger view.
Within the BAdI, you can change the account assignment fields of structure
CT_ACCIT_ASGMT. To change parts of ACCIT_EXTENSION, set the export
parameter EB_ACCIT_EXT_SUPPL. This BAdI enables you to create invoice
references subsequently, without writing them to the database. When using this
function, ensure that you fill all necessary fields for the invoice reference (REBZG,
REBZJ, and REBZZ).
By changing the invoice reference, you can influence the behavior of document
splitting. Document splitting splits up the lines for the following invoice reference
types, on the basis of the how the relevant item is split:
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 22 of 386
You cannot change the account assignments for clearing lines. They are always
overwritten by document splitting. Lines changed by the BAdI are no longer split in
document splitting.
You may change base account assignments that are relevant for the splitting of items
that have to be edited. But you should not change open item line items (XOPVW =
'X') because these items will not longer be split in document splitting.
Use
The documents that you would like to post to new general ledger accounting using
migration may in some cases be split during document splitting in a way that makes
little business sense.
This BAdI allows you to specify an alternative splitting result to that produced using
the standard process.
Line items are split on the basis of a relationship defined in the BAdI (export
parameter ET_RELTAB)
Line items are split on the basis of the lines to be specified in the BAdI (export
parameter ET_SPLITITEM)
Requirements
This BAdI is used exclusively for migration with document splitting when the
document splitting tables are built for the documents to be posted subsequently.
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 23 of 386
Field WRBTR describes an amount that itself describes the relationship of the
account assignment records. The total of the amounts do not have to agree with the
amount of the item to be split. The amount must not be zero.
Splitting on the basis of the relationship occurs before distribution using the base
rows.
When this approach is used, internal dependencies do not apply. If the system
identifies a recursion, an error message is issued.
Notes
Example
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 24 of 386
Vendor1 -1000
Vendor2 -2000
In terms of content, Vendor1 and the expenses in lines 3 and 4 belong together, and
Vendor2 corresponds to the expense in line 5. Rule-based document splitting cannot
recognize this connection and would perform the distribution for vendors on the basis
of expense items so that a share in all profit centers results for each vendor. In this
way, Vendor1 would be distributed on the basis of expense items 3, 4, and 5.
First method: Line items are split on the basis of a relationship defined in the
BAdI. In table ET_RELTAB, you enter a relation for the distribution to line 1
(Vendor1) and line 2 (Vendor2) for the profit centers.
01 PC01 120
01 PC02 80
02 PC03 100
Second method: Line items are split on the basis of the lines to be specified in
the BAdI. In table ET_SLITITEM, you describe which lines should be used to
distribute Vendor1 (line 1) and Vendor2.
01 03
01 04
02 05
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 25 of 386
Use
With this BAdI, you can control how the fields of the source ledger are transferred to
the target ledger when the balance carryforward is uploaded.
To control the transfer, you can use method MOVE_FIELDS. The generated structure
GLU1 contains all fields of all possible source and target ledgers. The records are
transferred to the method record by record in GLU1 format:
You should therefore implement this BAdI particularly if you want to cover
additional name inequalities - for example, if you have added a customer field called
RZZFIELD1 to the source ledger and want to transfer it to customer field ZZFIELD1
of the target ledger.
The value fields TSL, HSL, KSL, OSL of the target structure CS_GLU1_TARGET
already have the correct values (that is, the values corresponding to the currency types
of the target ledger).
Prerequisites
The account assignment that you want to allocate to the target structure must be
available in your current totals table (e.g. GLT0, GLT3).
Example
The following example illustrates the segment and profit center derivation based on
business areas in FI totals records.
method IF_EX_FAGL_UPLOAD_CF~MOVE_FIELDS.
case IS_GLU1_SOURCE-RBUSA.
when '1000
CS_GLU1_TARGET-SEGMENT = 'S001'.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 26 of 386
CS_GLU1_TARGET-PRCTR = 'P001'.
when '2000
CS_GLU1_TARGET-SEGMENT = 'S002'.
CS_GLU1_TARGET-PRCTR = 'P002'.
when '3000
CS_GLU1_TARGET-SEGMENT = 'S003'.
CS_GLU1_TARGET-PRCTR = 'P003'.
when others.
CS_GLU1_TARGET-SEGMENT = 'S999'.
CS_GLU1_TARGET-PRCTR = 'P999'.
endcase.
endmethod.
Additional information
For the source and target account assignment, you can have a 1:1 relationship or an
n:1 relationship. It is not possible to split up a source account assignment into
multiple target account assignments.
Use
In this activity, the migration plan is checked against the customizing of new General
Ledger Accounting:
The program checks if the migration type of the migration plan fits the
document splitting activation status in new General Ledger. You get a warning
message if there are company codes with document splitting assigned to a
migration plan without document splitting and vice versa.
Remark: For migration package 6, it is necessary that the document splitting
indicator is set at client level and that the relevant company codes are inactive
for document splitting. In ERP 6.0 this is set automatically for the first time
during activation of the validation of document splitting.
The program checks if each company code is at least assigned to the migration
plan for the leading ledger (not for migration package 7 and 8). You will
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 27 of 386
receive a warning message if there are company code and ledger combinations
not assigned to at least one migration plan.
The program checks if there are company codes assigned to the migration plan.
The program checks if the leading ledger is assigned to the migration plan (not
for migration package 7 and 8). If the leading ledger is not assigned to the
current migration plan, you will receive a warning message.
The program checks if non-leading ledgers are assigned to the migration plan.
Additionally, the program checks if clearing reset of cleared items before the
migration date is possible. If yes, you receive a warning message.
The program checks if all relevant accounts have been assigned for source and
target ledgers. All balance sheet accounts that are not managed on an open item
basis and that are no reconciliation accounts for customers and vendors are
relevant here. Additionally, the currency types in use are also considered.
Based on the assignment of source and target ledger, the program checks if the
source and target ledgers use the same fiscal year start date.
Especially for migration package 4 and 5, at least two target ledgers must have
been assigned.
The program for this activity also checks if you implemented the BAdI for document
splitting information of open items. If you use a migration scenario with document
splitting, the BAdI is required for cases with one or more required document splitting
criteria in new G/L. Otherwise you will have no subsequent information in new G/L
for clearing of the open items.
Prerequisites
The migration plan has been defined and the company code(s) and ledger(s) have
been assigned to the migration plan. The assignment of source and target ledger has
been done.
Use
With this activity you can create a transport request which includes the migration plan
customizing of the current migration package.
The activity execution is independent from the status of the migration plan or
migration package. So it is always possible to either create a new transport with the
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 28 of 386
Example
If you will do the migration customizing in a separate system and need to transport
the settings to all other systems (e.g. test system, production system etc.) you can use
the current migration plan settings of this package and
With this activity you will be able to use the prior imported migration plan
customizing within the newly created package. (Please read also the activity
documentation of this step)
Features
Migration Plan
Migration Date
Prerequisites
The corresponding customizing settings will only be included in the transport if the
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 29 of 386
Example
The status of the migration plan ("Migration Started") will only be included in the
transport if the status is already set while executing this activity.
You have to ensure that the migration plan customizing is transported together with
the new G/L customizing of the new ledger. This is necessary because the updates to
the new ledger will be controlled by the migration plan and migration date. If there is
no migration plan but the new ledger already exists in the system the updates are done
without any control of the fiscal year. In case the migration plan with migration date
exists the updates into the new ledger will only take place in the fiscal year of
activation of the new ledger.
1. 2. NGL00_ANALYZE_PHASE
Use
The program for this activity checks if the new general ledger is inactive in the
current client. The new general ledger can be activated only after successful
migration of all company codes within the client.
The migration takes place into initial new general ledger tables. These tables are
created during the migration process. A merge with existing data during the migration
is not possible. Note that data must be reconciled after migration and before
activation of new general ledger accounting.
Additional information
After upgrading to mySAP ERP, the classic general ledger is still the appropriate
application before the migration to new general ledger accounting takes place.
Important Note
Make sure that the relevant transport to the current test or productive system
does not contain an activation flag for New G/L. New G/L must not be activated
until the migration has been completed successfully.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 30 of 386
Use
In this activity, the migration plan is checked against the customizing of for new
General Ledger Accounting:
1. 2. 3. NGL00_CHECK_ORGANIZATIONAL_STRUCTURES
Check Company
Use
The program for this activity checks if the company setup fits the scenario
Preparations for Consolidation for new general ledger accounting:
If you use the scenario Preparations for Consolidation for new general
ledger accounting, the program checks if there are companies defined in
the enterprise structure. If this is the case, the company code assignment
and master data for customer, vendor, and G/L accounts are also
checked.
If you defined companies, but do not use the scenario Preparations for
Consolidation for new general ledger accounting, you will receive a
warning message.
Prerequisites
Make sure that all relevant company codes are assigned to the migration plan.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 31 of 386
Use
The program for this activity checks if all company codes that are assigned to a
migration plan have a valid fiscal year variant assigned. Furthermore it is
checked if totals exist for the current and previous fiscal year for the company
codes of the current migration plan.
Prerequisites
Make sure that all active company codes are assigned to the migration plan.
Note that SAP standard company codes that you do not use in your live system
might be available in customizing but do not have to be considered here.
If there are company codes that are not used actively, but have data, you have
to decide if these company codes must be migrated to new General Ledger or if
these company codes are no longer valid for any posting and thus will stay in
the classic General Ledger tables only. To reactivate an inactive company code
you have to perform the migration for this company code as well before any
other posting related to that company code takes place.
Use
If you use the scenario Cost of Sales Accounting for new general ledger
accounting, functional areas must exist. Additionally the status of Cost of
Sales Accounting must be 'active' or at least 'in preparation'.
If the Cost of Sales Accounting scenario is not active, but functional areas
exist or cost of sales accounting is active, you will receive a warning
message.
You will get information about the new features for determination of
functional areas. Additionally, the active substitution call-up points for
derivation of functional areas are checked.
Remark: The substitution rules themselves or even user exits are not checked!
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 32 of 386
Prerequisites
Make sure that all active company codes are assigned to the migration plan.
Use
The program for this activity checks if all company codes assigned to a
controlling area use the same fiscal year variant in accordance with the SAP
standard. In some cases, there might be a modification as described in SAP
Note 107211.
Integration
If you did not activate the profit center update and thus do not intend to use
Profit Center Accounting in new general ledger accounting, consider the
restrictions described in SAP Note 826357.
Prerequisites
Make sure that all relevant company codes are assigned to the appropriate
controlling area.
Use
Business areas can be used in different ways in the classic general ledger
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 33 of 386
accounting. If you currently use business areas, the system checks for scenario
Business Area in customizing for new general ledger accounting. Note that for
a complete balance sheet on business area level, the document splitting for
business areas is needed (requires migration package 3 or 5).
If you enabled the business area balance sheet in the classic general ledger or if
there are totals records in GLT0 on business area level, the program for this
activity checks if the scenario Business Area for new general ledger accounting
is activated for the leading ledger or at least one ledger that is assigned to the
relevant company codes. If the scenario is missing, you will get a warning
message.
If you use the business area as a document splitting criteria, the program checks
if you also use the scenario Business Area for the leading ledger in new general
ledger accounting. Depending on the zero balance option within the document
splitting, you will get an error message if the scenario is missing and zero
balance is active. Otherwise the system outputs a warning message.
Check Consolidation
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 34 of 386
message.
Business area consolidation
The scenario Business Area (FIN_GSBER) must be active for at
least one ledger in new general ledger accounting. If it is not active
for the leading ledger you will get a warning message.
Important note: Consider also the information provided in SAP Note 918675.
Check Segmentation
Use
The program for this activity checks the customizing in new G/L for
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 35 of 386
segmentation:
Note that segments are correctly assigned to open items from previous fiscal
years (migration phase 0) during the migration by means of a BAdI for
document splitting information of open items (Setup phase -> Create/Change
BAdI for document split information open items).
You may also derive the account assignment for documents in the fiscal year of
the migration during the migration using a BAdI. You will find this BAdI in the
Setup phase -> Additional BAdI implementation -> Create BAdI for process
account assignments of documents.
You can add the segment information in the balance carryforward by using a
BAdI for uploading the carryforward. You will find this BAdI in the Setup
phase -> Additional BAdI implementation -> Create BAdI for upload carry
forward.
Prerequisites
The customizing of new G/L and document splitting is finished and transported
to the current system.
Make sure that the relevant transport to the current test or productive
system does not contain an activation of document splitting at company
code level. Document splitting for company codes must not be activated
until the migration has been completed successfully.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 36 of 386
Use
The program for this activity checks the customizing in new general ledger
accounting for profit center update:
If you defined profit center master data, the program checks if the
scenario Profit center update (FIN_PCA) is assigned for at least one
ledger in new general ledger accounting. Otherwise you will get a
warning message.
If the scenario is assigned to a non-leading ledger, the program also
checks if the company code is assigned to that ledger.
If you assigned the scenario Profit center update, the program checks if
any master data exists. If no profit center master data has been defined,
you will get an error message. In this case, you should create the profit
center first before proceeding the migration.
Note that profit centers are correctly assigned to open items from previous
fiscal years (migration phase 0) during the migration by means of the BAdI for
document split information of open items. (Setup phase -> Additional BAdI
implementation -> Create BAdI for process account assignments of
documents.)
Profit center account assignments for documents in the fiscal year of the
migration can also be derived during the migration by means of a BAdI. You
will find this BAdI in the Setup phase Additional BAdI implementation -->
Create BAdI for process account assignments of documents.
You can add the segment information in the balance carry-forward by using a
BAdI for uploading the carry-forward. You will find this BAdI in the Setup
phase -> Additional BAdI implementation -> Create BAdI for upload carry
forward.
Prerequisites
The customizing for new general ledger accounting is finished and transported
to the current system.
1. 2. 3. 9. NGL00_CHECK_ASGMNT_PRO-CENTER_AND_SEGMNT (Document
Link - /NGL/NGLM_CHCK_ASMT_PRFT_SGT )
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 37 of 386
Use
If you use the scenarios Segmentation (FIN_SEGM) and Profit center update
(FIN_PCA) in new general ledger accounting, the program for this activity
checks if segment information is available in all profit center master records. If
the program finds missing assignments, you will receive a warning message.
The program also checks if you use the segment as required field for document
splitting. If so, you will get an error message if any assignments are missing
and if the BAdI implementation for BAdI FAGL_DERIVE_SEGMENT is
missing.
Prerequisites
The customizing for new general ledger accounting is finished and transported
to the current system. The profit center master data has been created
completely.
Dependencies
Note that you cannot change the segment assignment to profit center using
transaction KE52 if transaction data exists for the profit center (SAP Note
940721).
Activities
If applicable, fill in the segment in all profit center master data records.
Definition
The profit center is assigned to various data objects, such as cost center,
internal order, or material master. The assignment of profit centers to the
appropriate data objects must be finalized before the migration takes place.
After the migration, the assignment cannot be changed if you create a profit
center or segment balance sheet. You will find a list of assignments in
customizing under Financial Accounting (New) -> General Ledger Accounting
(New) -> Master data -> Profit Center -> Assignments of Account Assignment
Objects to Profit Centers.
If you do not use the Profit Center Accounting in new general ledger
accounting, you can simply confirm this activity without further action.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 38 of 386
Dependencies
Note that the assignment of profit centers to account assignment objects cannot
be changed once the account assignment object holds transaction data.
1. 2. 5. NGL00_CHECK_CURRENCIES_AND_LEDGERS
Check Currencies
Use
The program for this activity checks the currency settings if you use parallel
currencies in FI.
If you use a second and third local currency in FI, the program checks if you
use another currency within classic EC-PCA, FI-SL, or classic consolidation
preparation in GLT3. In new general ledger accounting, it is possible to assign
a second and third local currency to the leading ledger. If you have more
currencies for the mentioned components than the three local currencies that
are available for the company code, this cannot be reflected in new general
ledger accounting.
Use
For all company codes with transaction data in FI-GL (table GLT0), the
program checks if these company codes are assigned to a migration plan
for the leading ledger.
If GLFUNCT contains data, the program checks if the scenario Cost of
Sales Accounting (FIN_UKV) is active for the leading ledger or for non-
leading ledgers in new general ledger accounting.
If you use GLT3 or GLT1 with trading partner or movement type
information, the program checks if the scenario Preparations for
Consolidation (FIN_CONS) is active for the leading ledger or for non-
leading ledgers in new general ledger accounting.
If you use GLT1 with cost center information, the scenario Cost Center
Update (FIN_CCA) in new general ledger accounting is checked.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 39 of 386
1. 2. 6. NGL00_CHECK_DOCUMENTS
Use
The FI documents for the fiscal year of the migration are subsequently
posted to the new G/L. It is not possible to transfer FI archives to the new
G/L. This is why the program for this activity checks if there are archive
runs for FI_DOCUMNT after the migration date in the current system.
Activities
If you run archiving for FI_DOCUMNT, you will get an error message.
In that case, you have to check if FI documents have been deleted and, if
so, create a message for component FI-GL-MIG. Otherwise you can set
the status of this activity to green.
Note that restore programs for FI_DOCUMNT have been deleted from
SAP standard with support package SAPKH50007 (SAP Note 877439).
For building-up the new ledger it is also necessary that all documents in
phase 1 are available. Furthermore several documents, for instance
periodic postings from FI-AA, have to be reversed during the migration
process.
1. 2. 6. 2. NGL00_CHECK_CROSS-COMPANY_DOCUMENTS (Document
Link - /NGL/NGLM_CHCK_CROS_COMP_DOC )
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 40 of 386
Use
The program for this activity checks if you use cross-company postings
in FI. To this purpose, the customizing settings (IMG Financial
Accounting -> General Ledger Accounting -> Business transactions ->
Prepare Cross-Company Code Transactions) are read for the relevant
company codes within a migration plan. The program checks if the
related company codes have the same fiscal year start and end date. If the
fiscal year start differs, the program also checks if FI cross-company
documents exist in the fiscal year of the migration (migration phase 1). If
so, you will receive an error message. If this is the case, contact SAP by
creating a message for component FI-GL-MIG.
Related company codes with same fiscal year definition must be assigned
to the same migration plan if cross-company documents exist in phase 1.
Prerequisites
All relevant company codes and ledgers are assigned to the migration
plan.
Use
The program for this activity checks if there are clearing documents
without line items in the system for phase 1 of the migration. Clearing
documents without line items only have an entry in table BKPF with
status BSTAT = 'A'. There are no line items in BSEG for these
documents. Since the migration with document splitting cannot process
these documents correctly, implement SAP Note 1054674 to ensure that
no such documents are created in phase 1. To this purpose, you must
transport the migration plan into your production system.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 41 of 386
1. 2. 6. 4. NGL03_CHECK_PAYMENT_REQ_FOR_PRE_POSTINGS
(Document Link - /NGL/NGLM_CHECK_REF_DOCS )
Use
For the migration of documents in phase 1, the program for this activity
checks if there are actual FI documents that refer to preliminary postings
or noted items. This may occur in case of advance payments for
preliminary documents.
Dependencies
If document references are found, you must post these documents during
the next phase.
1. 2. 7. NGL03_CHECK_DOCUMENT_SPLITTING
Use
1. 2. 7. 2. NGL03_CHECK_GLACCOUNTS_FOR_DOC_SPLITTING
(Document Link - /NGL/NGL03_CHK_G/L_4_DOCSPLT )
Use
Using the settings made in the general ledger account master record as
well as a given general ledger account in customizing, the program
determines an assignment proposal for the item category that is to be
used to classify that particular general ledger account (see also in
Customizing under Financial Accounting -> General Ledger Accounting
-> Business Transactions -> Document Splitting -> Classify G/L
Accounts for Document Splitting).
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 42 of 386
Features
The system displays the output data as an interactive list. You can
execute the following functions for an item in the list:
1. 2. 7. 3. NGL03_CHECK_DOC_TYPES_FOR_DOC_SPLITTING
(Document Link - /NGL/NGL03_CHK_DOCTY_4_DOCSP )
Use
Prerequisites
Features
The system displays the output data as an interactive list. You can
navigate to the function with which you define the business
transaction variant for a selected item in the list. A dialog box
appears in which the permitted item categories and indicators are
displayed. The dialog box also tells you whether the item category
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 43 of 386
1. 2. 7. 4. NGL03_CHECK_BUSI_TRANS_ASSGMNT_FOR_DOCS
(Document Link - /NGL/NGL03_CHK_BUSI_TRAN_ASG )
Purpose
Prerequisites
Features
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 44 of 386
Use
In this activity, you can analyze the log entries for validation.You
can delete any entries that are no longer required from the log.
However note that deleted log entries cannot be recreated.
Requirements
1. 2. 7. 6. NGL03_ALTERNATI_SETTINGS_4_DOC_SPLITTING
1. 2. 7. 6.1. NGL03_DEF_ALTERNATIVE_DOC_SPLIT_METHOD
(Document Link - /NGL/NGL03_DEF_ALT_SPLT_METH )
Use
Requirements
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 45 of 386
Activities
Example
In this way, the change takes effect for migration documents, but it
is not applied to new documents to be posted after new general
ledger accounting has been activated.
1. 2. 7. 6. 2. NGL03_DEF_ALTERNATIVE_BUSI_TRANSACTION
(Document Link - /NGL/NGL03_DEF_ALT_BUSI_TRAN )
Use
Prerequisites
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 46 of 386
Activities
Example
Migration of the invoice is rejected with the error message that the
document does not contain the required bank account line.
1. 2. 7. 6. 3. NGL03_DEF_ALTERNATIVE_ITEM_CATG_ASSGNMT
(Document Link - /NGL/NGL03_DEF_ALT_ITEM_CATG )
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 47 of 386
Use
Prerequisites
Activities
Assign the item category to the line items that cannot be classified
uniquely or correctly for document splitting.
When the line items in the table are migrated, the item category
that has been assigned explicitly is used (instead of the item
category derived internally or from the G/L account) to interpret
the line item. This is logged in the status management of the
migration objects in the Adjustment field. You can display the
status management in the migration cockpit under Migration phase
-> Evaluation -> Analyze Migration Status and in the -> log for
document adjustment.
Example
You have posted items with different types, such as bank clearing
and other accruals. These items should be handled differently in
document splitting.
1. 2. 7. 6. 4. NGL03_ALTERNATIVE_CLEARING_RELATIONSHIP
(Document Link - /NGL/NGL03_DEF_ALT_CLRNG_REL )
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 48 of 386
Use
Prerequisites
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 49 of 386
Use
The activity does not check if application relevant SAP notes are
installed.
Prerequisites
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 50 of 386
SNOTE).
Activities
You will receive a list of SAP notes. A status will indicate if the
SAP note is installed or not. If the program could not determine the
correct implementation you will have two options to proceed.
1. 2. 9. NGL00_CONF_RPLCMNT_OF_MOD_OR_ENHNCMNT
(Document Link - /NGL/NGLM_CONF_RPL_MOD_ENHMT )
Use
1. 3. NGL00_PRE-MIGRATION_PHASE
1. 3.1. NGL00_CONF_RECON_AND_CLOS_OF_PREV_FIYEAR
(Document Link - /NGL/NGLM_CONF_RECON_CLOSEFY )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 51 of 386
Activities
Prerequisites
The previous fiscal year has been closed and audited by your
auditor.
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 52 of 386
In this activity, you register the SAP users for the migration
project. These users are authorized to access the system
during the following migration timeframe. All other users
that were not registered here will be locked for logon in the
next step (not for migration package 7 and 8).
Before you register and lock users, inform all users in your
organization that the SAP system will not be available for a
certain period of time due to the migration.
Use
In this activity, all SAP users that have not been registered in
the activity before are locked. This is necessary to ensure
that no unauthorized user activities that might endanger data
consistency take place during the migration.
Before you register and lock users, inform all users in your
organization that the SAP system will not be available for a
certain period of time due to the migration.
1. 3. 4. NGL00_DATA_BACKUP_BEFORE_MIGRATION
(Document Link - /NGL/NGLM_DATA_BACKUP_BEFORE )
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 53 of 386
Use
Before you start the migration, you need to create a full data
backup. This data backup is needed for rebuilding the
system if irreparable errors occur during the migration.
Activities
Use
Activities
Prerequisites
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 54 of 386
1. 3. 6. NGL03_REVERSE_BALANCE_SHEET_ADJUSTMENT
(Document Link - /NGL/NGL03_REV_BALSHEET_ADJS )
Use
If you use business areas and also use adjustments for the
creation of business area financial statements, you need to
consider a special feature that applies to the migration to
new General Ledger Accounting: Adjustments are no longer
used in new General Ledger Accounting because these
functions have been replaced by document splitting. If you
continue to use the business area as a financial statement
characteristic, you need to perform document splitting using
the characteristic Business Area with option Zero Balance
(requires migration package 3 , 5 or 6). In this case, you
have to consider the following.
During the time interval after you performed the report for
the last time and before you start the migration, you must not
perform any clearing.
Example
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 55 of 386
Vendor Invoice
Tax - 160
Vendor - 1160-
Adjustment Posting
a) Original document
Tax 0001 80
Tax 0002 80
b) Adjustment document
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 56 of 386
Clearing account - 80
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 57 of 386
Tax 0001 80
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 58 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 59 of 386
Caution:
If you used report SAPF181 to post documents for splitting
of backdated tax calculation, you should reverse these
documents. (They are documents of their own.) You identify
these documents by means of the reference number
(XBLNR) in the document header and then reverse them
using a mass reversal (TA F.80). To find the relevant
documents, enter the following search string for the
reference number: SAPF181/*/4 (The asterisk is a wildcard
for the middle part of the number.)
METHOD IF_EX_FAGL_MIG_ADJ_ACCIT~ADJUST_ACCIT.
* configuration.
IF SY-SUBRC = 0.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 60 of 386
OR GSBER EQ SPACE.
IF <LS_ACCIT>-PRCTR IS INITIAL.
<LS_ACCIT>-PRCTR = '0000009999'.
ENDIF.
IF <LS_ACCIT>-GSBER IS INITIAL.
<LS_ACCIT>-GSBER = '9999'.
ENDIF.
ENDLOOP.
ELSE.
OR ACCIT-KTOSL EQ 'SKT'
OR ACCIT-KTOSL EQ 'VSK'
OR ACCIT-KTOSL EQ 'KDF' )
OR ACCIT-GSBER EQ SPACE ).
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 61 of 386
IF <LS_ACCIT>-PRCTR IS INITIAL.
<LS_ACCIT>-PRCTR = '0000009999'.
ENDIF.
IF <LS_ACCIT>-GSBER IS INITIAL.
<LS_ACCIT>-GSBER = '9999'.
ENDIF.
ENDLOOP.
ENDIF.
ENDMETHOD.
Example 1:
Vendor -1,100.00
Tax 100.00
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 62 of 386
Vendor 1,100.00
Bank -1,078.00
Tax -2.00
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 63 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 64 of 386
Example 2:
Customer 1,100.00
Tax -100.00
Customer -1,100.00
Bank 1,078.00
Tax 2.00
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 65 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 66 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 67 of 386
Example 3:
Vendor -1,100.00
Tax 100.00
Vendor 1,100.00
Bank -1,078.00
Tax -2.00
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 68 of 386
1. 3. 8. NGL03_REVERSE_TAX_ADJUSTMENT_POSTINGS
(Document Link - /NGL/NGLM_REV_TAX_ADJUST_POS )
Use
Example
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 69 of 386
Tax Account - 5-
Adjustment Posting
a) Original document
Vendor Invoice
Vendor Payment
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 70 of 386
b) Adjustment document
Clearing Account - 5-
Payables 0001 0
Tax 0001 90
Clearing 0001 5
Payables 0001 0
Tax 0001 95
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 71 of 386
1. 3. 9. NGL03_CONF_REVERSAL_OF_P/L_B/S_ADJUSTMNT
(Document Link - /NGL/NGL05_CONF_REVERSAL_ADJ )
Use
1. 3.10.
NGL00_REVERSE_FOREIGN_CURRENCY_VALUATION
(Document Link - /NGL/NGLM_REV_FOR_CURR_VAL )
Use
Recommendation
Note
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 72 of 386
Please note:
1. 3.11. NGL00_REVERSE_FOREIGN_CURR_VAL_CONFIRM
(Document Link - /NGL/NGLM_REV_FOR_CURR_CONF )
Use
Dependencies
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 73 of 386
1. 3.13. NGL03_PERF_OTH_OPEN_BTCH_IP_SSINS_N_POST
(Document Link - /NGL/NGLM_PERF_OPN_BTCH_SESS )
Use
New
Incorrect
In Process
In Background
Being Created
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 74 of 386
- /NGL/NGL05_COMPL_PAYMNT_RUNS )
Use
1. 3.15.
NGL00_STOP_POSTINGS_DURING_MIG_PROCESS
(Document Link -
/NGL/NGLM_STOP_POST_DURG_MIG )
Use
Prerequisites
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 75 of 386
1. 3.16. NGL00_CHECK_RESET_CLEARING_CONTROL
(Document Link -
/NGL/NGLM_CHK_RESET_CLR_CTRL )
Use
Activities
1. 3.17. NGL03_CHECK_DOCUMENT_SPLITTING
1. 3.17.1.
NGL03_CHECK_BUSI_TRANS_ASSGMNT_FOR_DOC1
(Document Link -
/NGL/NGL03_CHK_BUSI_TRAN_ASG )
Purpose
Prerequisites
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 76 of 386
Features
1. 3.17. 2. NGL03_LIST_LOG_FOR_VALIDATION
(Document Link -
/NGL/NGLM_LIST_LOG_FOR_VALID )
Use
Requirements
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 77 of 386
1. 3.17. 3.
NGL03_ALTERNATI_SETTINGS_4_DOC_SPLITTING
1. 3.17. 3.1.
NGL03_DEF_ALTERNATIVE_DOC_SPLIT_METHOD
(Document Link -
/NGL/NGL03_DEF_ALT_SPLT_METH )
Use
Requirements
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 78 of 386
the migration.
Example
1. 3.17. 3. 2.
NGL03_DEF_ALTERNATIVE_BUSI_TRANSACTION
(Document Link -
/NGL/NGL03_DEF_ALT_BUSI_TRAN )
Use
Prerequisites
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 79 of 386
Activities
Example
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 80 of 386
1. 3.17. 3. 3.
NGL03_DEF_ALTERNATIVE_ITEM_CATG_ASSGNMT
(Document Link -
/NGL/NGL03_DEF_ALT_ITEM_CATG )
Use
Prerequisites
Activities
When the line items in the table are migrated, the item
category that has been assigned explicitly is used
(instead of the item category derived internally or
from the G/L account) to interpret the line item. This
is logged in the status management of the migration
objects in the Adjustment field. You can display the
status management in the migration cockpit under
Migration phase -> Evaluation -> Analyze Migration
Status and in the -> log for document adjustment.
Example
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 81 of 386
1. 3.18. NGL00_CHECK_ACCT_CONTROL_SETTINGS
(Document Link -
/NGL/NGLM_CHK_ACT_CTRL_STNGS )
Use
Example
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 82 of 386
The check will be done for all line items of the G/L
accounts in the system (technically: tables BSIS and
BSAS will be checked).
Remark
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 83 of 386
Remark
Within scenarios 4 and 5 transaction FAGLF03
(program TFC_COMPARE_VZ) will be used.
Activities
1. 3.20. NGL00_RECONCILE_SOURCE_LEDGERS
(Document Link -
/NGL/NGLM_RECNCILE_SRC_LEGS )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 84 of 386
For a migration from GLT0 ledger '0' only, you can set
this activity to status green, and no further action is
required in this activity.
1. 3.21.
NGL00_CONFIRM_EXEC_OF_BALCF_OF_SRC_LEDGS
(Document Link -
/NGL/NGLM_CONF_EXEC_CF_SRCLD )
Use
1. 3.22.
NGL00_CRE_OPEN_BALANCE_SHEET_4_CC_IN_CLA
(Document Link -
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 85 of 386
/NGL/NGLM_CRT_OPN_BAL_SHT_CL )
Use
Activities
1. 3.23.
NGL00_CRE_OPEN_BAL_SHEET_4_CC_IN_CLA_PDF
(Document Link -
/NGL/NGLM_CRE_OPN_BSHT_CLPDF )
Use
1. 3.24.
NGL00_CRE_YTD_BALANCE_SHEET_4_CC_IN_CLAS
(Document Link -
/NGL/NGLM_CRT_YTD_BAL_SHT_CL )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 86 of 386
Activities
1. 3.25.
NGL00_CRE_YTD_BAL_SHEET_4_CC_IN_CLAS_PDF
(Document Link -
/NGL/NGLM_CRE_YTD_BSHT_CLPDF )
Use
1. 4. NGL00_MIGRATION_PHASE
1. 4.1. NGL00_REBUILD_DATABASE_STATISTICS_DOC
(Document Link -
/NGL/NGLM_REBLD_DB_STAT_DOC )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 87 of 386
Activities
Use
Note
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 88 of 386
1. 4. 2.1.
NGL00_RECONCILE_WORK_LIST_OPEN_ITEMS
(Document Link -
/NGL/NGLM_BLDWRK_LST_OPNITMS )
Use
Once the worklist for open items has been created, you
may not perform the following postings:
Features
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 89 of 386
The output list of the program will show you all open
items that are no longer necessary which means they
have been cleared in the meantime after building the
first worklist. Additionally, if you have changed the
account control settings in the meantime, you will also
find those open items in the output list, because the
program does not know how to check these accounts.
Remark
Example
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 90 of 386
Output
1. 4. 2. 2. NGL00_CHECK_WORKLIST_OP (Document
Link - /NGL/NGLM_CHECK_WORKLIST_OP )
Use
Prerequisites
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 91 of 386
Example
Activities
Execute program
FAGL_MIG_CHECK_WORKLIST_OP (see SAP
note 1115351) manually. Enter the migration plan of
the package that you would like to check.
The output list of the program will show you all open
items that are no longer necessary which means they
have been cleared in the meantime after building the
first worklist. Additionally, if you have changed the
account control settings in the meantime, you will also
find those open items in the output list, because the
program does not know how to check these accounts.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 92 of 386
Attention
Remark
The program can have a very long runtime. It will
check all existing open items within the worklist table
of the corresponding migration package (= migration
plan) if it is still open.
Background execution is recommended in huge
databases.
1. 4. 2. 3.
NGL00_RECONCILE_WORK_LIST_DOCUMENTS
(Document Link -
/NGL/NGLM_BLDWRK_LST_DOCS )
Use
Features
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 93 of 386
Output
1. 4. 2. 4. NGL00_CONFIRM_BUILD_WORKLIST
(Document Link -
/NGL/NGLM_CONF_CREATN_WRKLST )
Use
1. 4. 3. NGL00_GENERATE_CODING_FOR_NEWGL
(Document Link -
/NGL/NGLM_GENERATE_CODE_NGL )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 94 of 386
once. For all other migration packages you can set the
status of the activity manually.
Prerequisites
Features
1. 4. 4. NGL00_MIGRATION_FROM_PRIOR_YEARS
1. 4. 4.1.
NGL00_TRANSFER_BALANCE_CARRY_FORWARD
(Document Link -
/NGL/NGLM_TRANSF_BALCARY_FWD )
Use
Preconditions
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 95 of 386
Dependencies
Note
1. 4. 4. 2.
NGL00_DISPLAY_LOG_FOR_BALANCE_CARRY_FOR2
(Document Link -
/NGL/NGLM_DISP_LOG_4_BCFWD )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 96 of 386
Prerequisites
Features
1. 4. 4. 3.
NGL00_DISPLAY_STATUS_FOR_BAL_CARRY_FORWA
(Document Link -
/NGL/NGLM_DISP_STS_4_BCARFWD )
Use
Features
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 97 of 386
Recommendation
1. 4. 4. 4.
NGL00_CONFIRM_COMPLETE_EXEC_OF_TRAN_BCF
(Document Link -
/NGL/NGLM_CONF_BALCARY_FWD )
Use
Activities
1. 4. 4. 5.
NGL03_PROCESS_DOCSPLIT_INFO_FOR_OPENITEM
(Document Link -
/NGL/NGL03_PROC_DOCSPLT_OPIT )
Use
Note:
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 98 of 386
Prerequisites
Implementation of BAdI
FAGL_MIGR_SUBST.
You have implemented this BAdI, which allows
you to enhance the open items with account
assignments posted without document splitting.
If you derive the segment from the profit
center, you need to have set the Segment
derivation is active indicator in the activity
Prepare segmentation -> Activate segment
derivation (Setup Phase). If you have
implemented the BAdI
FAGL_DERIVE_SEGMENT, it overrides
each segment derivation. Please note that the
BAdI FAGL_DERIVE_SEGMENT is not part
of the migration cockpit; rather, it is a
functionality provided by new General Ledger
Accounting in general.
Features
Status Management
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 99 of 386
Note:
Example
1. 4. 4. 6.
NGL00_CREATE_GL_LINEITEMS_N_BALCARRYFORW
(Document Link -
/NGL/NGLM_CRT_G/L_LITM_BCFWD )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 100 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 101 of 386
1. 4. 4. 7.
NGL00_ANALYZE_MIGRATION_STATUS1
(Document Link -
/NGL/NGLM_ANALYZE_MIG_STATUS )
Use
Selection
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 102 of 386
Output
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 103 of 386
1. 4. 4. 8.
NGL00_CONFIRM_G/L_LINEITEMS_BALCARRY
(Document Link -
/NGL/NGLM_CONF_GL_LITM_BCFWD )
Use
Prerequisites
Activities
1. 4. 4. 9.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 104 of 386
NGL00_COMP_SRC_N_TRGT_LEDGERS_TECHN
(Document Link -
/NGL/NGLM_COMP_SRC_TRGT_LEG )
Use
Features
Activities
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 105 of 386
Additional information
1. 4. 4.10.
NGL00_REPOST_BAL_CARRY_FORWARD
(Document Link -
/NGL/NGLM_REPOSIT_BCFWD_MANU )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 106 of 386
Prerequisites
Features
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 107 of 386
transaction currency
into the local currency.
This means that you
can post explicit
currency amounts with
the foreign currency
posting (F-05).
Only relevant for
migration package 1 -
5: Besides the standard
totals table in new
General Ledger
Accounting
(FAGLFLEXT), table
GLT0 in classic
General Ledger
Accounting is also
updated in period 0 for
postings made to the
leading ledger. In this
way, when a ledger
comparison is
performed, the
balances in classic
General Ledger
Accounting match the
balances of the leading
ledger in new General
Ledger Accounting.
Only relevant for
migration package 1 -
5: If you carry out
FBCB postings to non-
leading ledgers, table
GLT0 in classic
General Ledger
Accounting is not
updated in parallel.
Therefore the opening
balance sheet in new
G/L differs from the
opening balance sheet
in classic G/L at
account level. We
recommend creating
opening balance sheets
in classic G/L and new
G/L for documentation
and certification
purposes.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 108 of 386
Activities
Dependencies
1. 4. 5.
NGL00_MIGRATION_FROM_CURRENT_Y
1. 4. 5.1.
NGL03_PROCESS_SPLIT_INFO_FOR_DOC
(Document Link -
/NGL/NGL03_PROC_DOCSPLT_DOCU )
Use
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 109 of 386
Features
Document splitting is
performed for each found
document. The system first
checks for the alternative
document splitting settings
(as made in activity
Additional settings for
document splitting in the
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 110 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 111 of 386
1. 4. 5. 2.
NGL03_SIMULATE_DOCUMENT_SPLITTI
(Document Link -
/NGL/NGLM_SIMULATE_DOC_SPLIT )
Simulate Document
Splitting
Use
Prerequisites
Features
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 112 of 386
related customizing
settings
The settings relating to
business transactions in
customizing for
document splitting
The log of the error or
warning messages that
occurred during
document splitting
1. 4. 5. 3.
NGL00_TRANSFER_DOCUMENTS_T
(Document Link -
/NGL/NGLM_TRANSF_DOCU_NEW
Transfer Documents
to New General
Ledger
Use
Features
Display
Overview Only:
The system
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 113 of 386
displays the
number of
documents
processed with
errors, the
number of
documents that
were
successfully
updated but with
messages, and
the number of
documents that
were updated
correctly.
Overview +
Incomplete
Objects:
Besides the
overview of
processed
documents, the
system issues a
list of all
documents for
which messages
were issued.
Overview + All
Objects:
Besides the
overview of
processed
documents, the
system issues a
list of all
documents.
Under Parallel
Processing, you can
make settings for
executing the program
using parallel
processing. You only
have to make all
settings in this area if
you want to use the
program for mass
processing and parallel
processing.
In the Package
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 114 of 386
Size field,
specify how
many documents
should be
processed in a
single process. If
you specify a
package size of
1000, the system
always processes
1000 documents
in a process.
Specify a server
group if you
want to use a
certain
application
server for
processing.
Making an entry
here is optional.
If you do not
make an entry,
all application
servers that are
currently
available in the
current SAP
system are used
as a server
group.
Specify the
maximum
number of
processes to be
run in parallel. If
you leave this
field empty, the
program is not
performed in
parallel.
Please be aware
that the number
of parallel
processes you
enter here need
to be available as
UPDATE work
processes in the
current system. It
helps to prevent
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 115 of 386
deadlock
situation.
Notes on
performance:
To improve system
performance, you can
reduce the package size
and thus utilize the
available processes
more effectively. Note,
however, that this
increases the overall
workload on the
network.
Furthermore, you can
execute the program in
multiple jobs, or by
company code or fiscal
year, or by a
combination of both.
Status 00:
Documents with
this status have
not yet been
processed.
Status 01:
Documents with
this status have
been processed
with errors.
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 116 of 386
Status 10:
Documents with
this status have
already been
successfully
processed in an
update run.
Entries have
been generated
in the document
splitting tables.
Logging the
Processing Status:
In the worklist of
the migration
documents, each
document that
has been
successfully
processed is
assigned
processing status
XX (completely
processed).
Documents for
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 117 of 386
which the
document
splitting
information
could not be
built successfully
are assigned
processing status
01 (for migration
plans without
document
splitting) or
remain in
processing status
10 (for migration
plans with
document
splitting). The
documents are
logged in the
worklist together
with the
corresponding
error message.
1. 4. 5. 4.
NGL00_ANALYZE_MIGRATIO
(Document Link -
/NGL/NGLM_ANALYZE_MIG
Analyze
Migration
Status
Use
The program
produces
statistics on the
processing
statuses for the
work lists of
open items to be
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 118 of 386
processed and
documents to be
transferred. The
system displays
the total number
of migration
objects for each
status value and
the percentage of
the migration
objects in the
work list that
have a given
status.
Furthermore, the
system generates
a list of the error
messages for the
work list objects,
showing the total
number and the
percentage share
of the amount of
occurrences for
each error
message.
Selection
To analyze
the
processing
status of
the open
items in
the work
list, select
the Open
Items To
Be
Prepared
indicator.
To analyze
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 119 of 386
the
processing
status of
the
documents
in the
work list,
select the
Documents
To Be
Transferred
indicator.
In the
Selections
for the
Document
area, you
can select
individual
documents
or ranges
of
documents
from the
work list
of the
specified
migration
plan.
In the
Selections
for
Processing
Status
area, you
can select
migration
documents
by status
or error
message
from the
work list
of the
specified
migration
plan.
Select the
level of
detail you
require:
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 120 of 386
Statistics
Only
Set
this
indicator
to
display
just
a
summary
of
the
analysis
results
for
the
selected
objects.
Statistics
+
Incomplete
Objects
Set
this
indicator
to
display
a list
of
the
migration
objects
that
have
not
yet
received
the
migration
status
Complete
(XX)
in
addition
to
the
summarized
analysis
results
for
the
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 121 of 386
selected
objects.
Statistics
+
All
Objects
Set
this
indicator
to
display
a list
of
all
migration
objects
in
addition
to
the
summarized
analysis
results
for
the
selected
objects.
Output
If you
have
started the
program
directly,
the system
displays
the data as
an
interactive
list in the
ALV grid
format.
You can
use
pushbuttons
to switch
between
the
evaluation
views
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 122 of 386
(statistics,
error
statistics,
or
document
list).
If you
have
executed
the
program in
the
background,
the system
prints out
a series of
sublists for
each
selected
work list,
depending
on the
selected
level of
detail.
Activities
Depending on
the level of detail
you select, you
can use the
following
display and
navigation
options for each
work list (open
items to be
processed or
documents to be
transferred):
Display
Complete
Statistics
Display
Error
Statistics
Display
Object List
You can
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 123 of 386
switch to
the
analysis
results for
the other
work list.
From the
object list,
you can
display
other
details:
For
transferred
documents,
you
can
display
the
document
splitting
results
independent
of
the
ledgers.
Document
display
using
the
Document
Number
field.
Log
display
for
migration
-
specific
document
adjustment
using
the
Adjustment
field.
Message
documentation
display
using
the
Message
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 124 of 386
Text
field.
1. 4.
5. 5.
NGL00_CONFIRM
(Document
Link
-
/NGL/NGLM_CO
Check
Completeness
of
Transfer
of
Documents
to
New
General
Ledger
Use
The
program
for
this
activity
checks
if all
documents
from
the
worklist
were
transferred
to
the
new
general
ledger.
Prerequisites
The
worklist
that
has
been
created
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 125 of 386
at
beginning
of
the
migration
phase
is
complete.
Activities
If
open
items
are
not
yet
processed,
run
the
function
for
activity
Transfer
Document
to
New
General
Ledger
once
again.
1. 4.
5. 6.
NGL00_COMP_SR
(Document
Link
-
/NGL/NGLM_CO
Compare
Source
and
Target
Ledgers
for
Documents
from
Current
Year
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 126 of 386
Use
To
ensure
and
document
the
correctness
of
the
entire
migration,
you
have
to
compare
classic
General
Ledger
Accounting
against
new
General
Ledger
Accounting
by
means
of a
ledger
comparison.
The
ledger
comparison
checks
whether
the
values
in
the
specified
source
and
comparison
ledgers
agree
for
the
current
fiscal
year.
The
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 127 of 386
comparison
is
made
at
company
code
and
account
levels.
You
can
also
include
additional
fields
(such
as
business
area)
in
the
comparison.
Since
you
can
transfer
data
selectively
from
multiple
source
ledgers,
you
need
to
take
this
into
account
during
the
ledger
comparison.
By
using
the
option
Other
key
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 128 of 386
figure,
you
can
switch
between
various
currencies.
Activities
Perform
a
ledger
comparison
for
all
relevant
combinations
and
upload
the
lists
to
the
migration
cockpit
for
documentation
purposes.
Additional
information
Use
this
report
if,
during
the
implementation
phase
of
new
General
Ledger
Accounting,
you
still
update
the
tables
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 129 of 386
of
classic
General
Ledger
Accounting
(GLT0)
in
parallel
for
non-
ledger
specific
postings
or
postings
to
the
leading
ledger.
This
report
allows
you
to
compare
the
totals
records
in
the
tables
for
new
General
Ledger
Accounting
against
the
totals
records
in
the
tables
for
classic
General
Ledger
Accounting
(GLT0).
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 130 of 386
1. 4.
6.
NGL00_EVALUA
1. 4.
6.1.
NGL00_ANALYZ
(Document
Link
-
/NGL/NGLM_AN
Analyze
Migration
Status
Use
You
can
use
this
program
to
analyze
the
processing
status
of
the
migration
objects.
The
program
produces
statistics
on
the
processing
statuses
for
the
work
lists
of
open
items
to be
processed
and
documents
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 131 of 386
to be
transferred.
The
system
displays
the
total
number
of
migration
objects
for
each
status
value
and
the
percentage
of
the
migration
objects
in
the
work
list
that
have
a
given
status.
Furthermore,
the
system
generates
a list
of
the
error
messages
for
the
work
list
objects,
showing
the
total
number
and
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 132 of 386
the
percentage
share
of
the
amount
of
occurrences
for
each
error
message.
You
also
have
the
option
of
displaying
the
analyzed
migration
objects
as a
list.
Selection
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 133 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 134 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 135 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 136 of 386
Output
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 137 of 386
Activities
Depending
on
the
level
of
detail
you
select,
you
can
use
the
following
display
and
navigation
options
for
each
work
list
(open
items
to be
processed
or
documents
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 138 of 386
to be
transferred):
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 139 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 140 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 141 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 142 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 143 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 144 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 145 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 146 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 147 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 148 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 149 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 150 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 151 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 152 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 153 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 154 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 155 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 156 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 157 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 158 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 159 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 160 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 161 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 162 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 163 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 164 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 165 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 166 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 167 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 168 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 169 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 170 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 171 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 172 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 173 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 174 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 175 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 176 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 177 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 178 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 179 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 180 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 181 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 182 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 183 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 184 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 185 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 186 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 187 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 188 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 189 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 190 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 191 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 192 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 193 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 194 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 195 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 196 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 197 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 198 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 199 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 200 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 201 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 202 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 203 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 204 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 205 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 206 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 207 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 208 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 209 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 210 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 211 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 212 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 213 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 214 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 215 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 216 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 217 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 218 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 219 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 220 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 221 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 222 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 223 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 224 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 225 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 226 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 227 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 228 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 229 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 230 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 231 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 232 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 233 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 234 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 235 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 236 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 237 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 238 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 239 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 240 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 241 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 242 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 243 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 244 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 245 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 246 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 247 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 248 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 249 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 250 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 251 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 252 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 253 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 254 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 255 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 256 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 257 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 258 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 259 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 260 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 261 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 262 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 263 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 264 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 265 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 266 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 267 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 268 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 269 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 270 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 271 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 272 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 273 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 274 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 275 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 276 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 277 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 278 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 279 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 280 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 281 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 282 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 283 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 284 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 285 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 286 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 287 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 288 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 289 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 290 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 291 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 292 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 293 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 294 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 295 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 296 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 297 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 298 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 299 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 300 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 301 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 302 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 303 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 304 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 305 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 306 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 307 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 308 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 309 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 310 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 311 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 312 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 313 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 314 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 315 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 316 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 317 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 318 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 319 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 320 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 321 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 322 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 323 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 324 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 325 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 326 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 327 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 328 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 329 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 330 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 331 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 332 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 333 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 334 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 335 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 336 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 337 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 338 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 339 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 340 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 341 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 342 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 343 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 344 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 345 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 346 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 347 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 348 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 349 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 350 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 351 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 352 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 353 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 354 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 355 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 356 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 357 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 358 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 359 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 360 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 361 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 362 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 363 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 364 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 365 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 366 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 367 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 368 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 369 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 370 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 371 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 372 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 373 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 374 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 375 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 376 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 377 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 378 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 379 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 380 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 381 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 382 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 383 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 384 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 385 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 386 of 386
saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011