Migration Documentation

Purpose

New general ledger accounting combines a variety of existing methods for representing ledgers and also
delivers new methods. Customers wanting to use all these options face two challenges:

 Which functions are required from the business point of view?


 Which ledgers are required besides the leading ledger?
 Is document splitting required?
 Should segment reporting be possible?
 Setting out from the customer's current situation (such as classic general ledger accounting,
account approach, no document splitting), what steps must the customer undertake to be in a
position to use the new functions? This question has a business aspect (such as the implementation
of account assignments that did not exist before) and a technical aspect (what needs to be
migrated).

The migration monitor assumes that you want to perform the transition from classic general ledger
accounting (installed operationally with R/3 Enterprise or an earlier release) to new general ledger
accounting in mySAP ERP 2004 (ECC5.0) or SAP ERP 6.0 (ECC6.0).

However, the following limitations apply in SAP ERP 2004:

 The functions for "Validation of Document Splitting" are not available (Migration package 3, 5
and 6).

Note:

If you have not previously used any active installation and you are in the evaluation or project stage, you
need to decide (depending on your concrete situation) whether you first want to use classic general
ledger accounting or whether you want to implement new general ledger accounting straight away and
thus avoid the need for any subsequent migration.

Making changes or enhancements to the range of functions available in an active installation of new
general ledger accounting does not fall under the type of migration scenario described in this guide.
Instead, such changes or enhancements need to be conducted in a separate consulting project. The
migration tools described in the following chapters are not meant to be used for this purpose.

If you migrate from a third-party system to new general ledger accounting, this migration guide is not
relevant to you. For tips on performing the migration from a third-party system, see SAP Note 890237.

Prerequisites

In order for the migration to new general ledger to succeed, it is essential that you follow the migration

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 2 of 386

phase model. The phase model consists of the following three phases:

Phase 0

 Conception of new general ledger accounting


 Customizing of new general ledger accounting (already possible in this phase)
 Planning and conception of migration
 Analysis of the production system, in particular when document splitting is applied
 Where applicable, customizing of document splitting

Phase 1

 Closing the old fiscal year


 Customizing of new general ledger accounting
 Customizing of migration
 Use of validation to check document splitting
 Performing the actual migration at the end of phase 1
 Activation of new general ledger accounting after successful migration

Phase 2

 Use of new general ledger accounting


 Deactivation of update of classic general ledger accounting (GLT0) after transition period

There are two dates of particular significance:

 Migration date (start of the fiscal year for which the migration is performed)
 The migration date is the start of phase 1
 Activation date (date on which new general ledger accounting is activated)
 The activation date is the start of phase 2

Note that the previous fiscal year (that is, the fiscal year before the migration date) definitely must be closed before the
migration starts. It is technically not possible to reopen the previous fiscal year after the migration.

Additional Information

For a detailed description of the migration process, please refer to the migration guide on SAP Service
Marketplace.

https://service.sap.com/glmig

1.1. 2. NGL00_MIGRATION_QUANTITIES_BASE_UNIT (Document Link -


/NGL/NGLM_MIG_QUAN_BASE_UNIT )

Prerequisites to Migrate Quantities and Base Unit of Measures

Use

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 3 of 386

To be able to migrate quantities and base unit of measures, certain corrections already need to be
implemented in the system during Phase 0 itself. Both the below mentioned notes and the related notes
are relevant to ensure that quantities fields will be migrated.

SAP Note ERP2004 ERP2005

1477286 X -

1477363 - X

1.1. 3. NGL00_CUSTOMIZING_VIA_TRANSPORT (Document Link -


/NGL/NGLM_CSTMZ_VIA_TRANSPRT )

Customizing of Package via Transport Request

Use

If you use the recommended three-system-landscape (typically consisting of a development system, a


quality assurance system, and a live system), you have to do all relevant customizing settings and
developments for BAdIs in the development system. In this case, you confirm in this activity that
customizing and BAdI development take place in another system and that the results will be imported
into the current system. Once you have confirmed this, another activity called Customizing via
Transport Request Confirmed is automatically inserted in the process tree and set to status green.

If you do the customizing directly in the current system, do not execute this step.

Remark: If you execute this activity before the migration plan has been transported from a development
system to the current system, you will get an error message saying that the migration plan does not exist.

1.1. 4. NGL00_CALC_DATA_VOLUME_IN_TOTALS_TABLE (Document Link -


/NGL/NGLM_CALC_DATA_VOL_TOTS )

Calculate Expected Data Volume in Totals Table

Use

Independent of the migration, SAP recommends calculating the expected data volume in the new totals
table FAGLFLEXT or in your customer-specific totals table (if applicable).

See also SAP Note 820495.

Using report RGUIST01, you can estimate the number of future totals records based on currently
existing data (SAP Note 1045430).

Please note that the actual number of entries in the table will most likely differ from these calculated
figures.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 4 of 386

1.1. 5. NGL00_CHECK_SYSTEM_MODIFICATIONS (Document Link -


/NGL/NGLM_CHECK_SYSTEM_MODS )

Check System Modifications or Enhancements

Use

We recommend that you check whether there are modifications in your system that have an impact on
the new general ledger or on the migration and decide whether these modifications are also required for
new general ledger accounting, considering that modifications can often be replaced by SAP standard
functionality or enhancements within the SAP standard.

If you decide to keep modifications in ERP, make sure they are tested thoroughly in connection with the
new general ledger.

Note that this check is independent of the technical modification clearing (using transaction SPAU) that
you did in connection with the technical upgrade to mySAP ERP.

1.1. 6. NGL00_CUSTOMIZING_SETUP_FOR_NEWGL (Document Link -


/NGL/NGLM_CUST_SETUP_4_NEWGL )

Confirm Customizing Setup for New GL

Use

In this activity, you confirm that customizing for new General Ledger Accounting is finished and ready
for go-live.

Note that it is currently not possible in SAP standard to activate additional non-leading ledgers.
Information about the risk of subsequent changes in document splitting, ledgers, and scenarios is
provided in SAP Note 891144.

Prerequisites

The business blueprint for new General Ledger Accounting is completed and technically implemented in
the system.

1.1. 7. NGL00_CREATE_MIGRATION_PLAN (Document Link - /NGL/NGLM_CREATE_MIG_PLAN )

Create Migration Plan

Use

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 5 of 386

In this activity, the Migration Plan is created. The migration plan contains all company code and ledger
objects that are to be migrated together for those company codes and ledgers assigned to the migration
plan. Company codes that have the same fiscal year limits can be migrated together in one migration
plan. For very large volumes of data, you may have to define multiple migration plans to conduct the
migration company code by company code. To do this you have to define another migration package in
the migration server overview.

The migration plans are internally generated with the keys 'A01', 'A02' to 'Z99'.

Standard settings

SAP does not deliver standard migration plans. You can create at least one migration plan according to
your migration package.

Activities

To set up the migration plan, proceed as follows.

1. The migration plan is created automatically when you execute the function for this activity. The
migration plan applies to your migration package.
2. In the next activity, you set the migration date, which must coincide with the start date of a fiscal
year.

Please note the following:

 The last day of the fiscal year variant of the company code or ledger must agree with the
migration date minus one. For more information and an example, see Migration Date.
 You can assign company codes and ledgers to more than one migration plan. However you cannot
assign the same combination of company code and ledger to more than one migration plan. There
must be no more than one migration running for each combination of company code and ledger.
 Once you have assigned company codes and a ledger to a migration plan and started the
migration, you cannot change the migration type and the migration date and assignments
anymore.

1. Having set the Migration Date, you assign company codes and ledgers to the migration plan.

1.1. 8. NGL00_SET MIGRATION DATE (Document Link - /NGL/NGLM_SET_MIGRATION_DATE )

Set Migration Date

Use

Having created the Migration Plan, you need to choose the migration date. The activity suggests
all possible combinations of migration dates for your company codes and fiscal year variants.

It is not possible to set the migration date to a start date prior to the current fiscal year.

Prerequisites

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 6 of 386

The migration plan has been created.

The migration date is always the start of the fiscal year. The migration usually takes place directly
after the previous fiscal year has been closed. After the migration, postings to previous fiscal year
are no longer possible. Furthermore it is not possible to reset clearing of clearing documents
posted in the previous years.

For migration package 6 only (Subsequent activation of document splitting):

Please ensure that the initial migration from classic G/L to new G/L has been executed at least one
fiscal year prior to the migration date of the current migration.

Dependencies

Only relevant for SAP ERP 6.0:

If you use a migration scenario with document splitting (migration package 3, 5 or 6), the
migration date should also be set as Validation Date. Migration to an environment with document
splitting is more complex than the scenario without document splitting. For a migration with
document splitting, line items must be supplied with account assignment information in order to
guarantee that the processing and results of subsequent processes are correct. For more
information, see Validation Document Splitting in the preparation phase of the migration cockpit.

Additional information

The migration date cannot be changed once the migration plan has been started.

Package specific information

For migration package 6 (Subsequent activation of document splitting):

Please ensure that in case of an initial migration from classic G/L to new G/L this migration has
been executed at least one fiscal year prior to the migration date of the current migration.

For migration package 7 (Subsequent implementation of a further ledger):

Please ensure that in case of an initial migration from classic G/L to new G/L this migration has
been executed completely before you start the current implementation of a new ledger.

For migration package 8 (Subsequent change from account solution to ledger solution):

You can only choose a migration date in future. Please ensure that in case of an initial migration
from classic G/L to new G/L this migration has been executed at least one fiscal year prior to the
migration date of the current migration.

1.1. 9. NGL00_ASSIGN_CC_AND_LEDGERS_TO_MIG_PLAN (Document Link -


/NGL/NGLM_ASSIGN_CC_LEDGERS )

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 7 of 386

Assign Company Codes and Ledgers to Migration Plan

Use

Having created the Migration Plan and set the migration date, you assign the company codes and
target ledgers to the migration plan. Generally, you can assign all combinations to one migration
plan if you use the same fiscal year and migration scenario for all company codes.

The following cases require separate migration plans. (A migration plan relates 1:1 to a migration
package):

 The fiscal year limits are different between company codes or ledgers.
 You use different migration scenarios regarding document splitting within one client.

If you have multiple migration plans, you can assign company codes and ledgers to one migration
plan only. It is not allowed to assign the same combination to more than one migration plan.

Recommendation

If you want to introduce new General Ledger Accounting for a number of company codes, we
recommend that you use separate migration plans for company codes with very large volumes of
data. Smaller company codes, on the other hand, can be migrated together in one migration plan.
In this way, if an error were to occur in a large company code, causing you to reset the data
completely, any smaller company codes that had already been successfully migrated would not be
affected.

Note that you have to perform all activities within the migration cockpit for all migration
packages.

Prerequisites

The migration plan has been created successfully.

Dependencies

The assignment of company codes and ledgers cannot be changed after the migration plan has
been started.

Once you have assigned company codes and ledgers to the migration plan you can change the
migration date that applies to the fiscal year definition of the assigned company codes as long as
the migration plan has not yet been started.

Once you have assigned a company code with a non-leading ledger to the migration plan you
cannot delete this in the new G/L customizing (Define and Activate Non-Leading Ledgers).

Package specific information

For migration package 7 and 8:

It is not allowed to assign the leading ledger.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 8 of 386

Once you have assigned the company codes and ledgers to the migration plan the new G/L
customizing activity Define and Activate Non-Leading Ledgers automatically starts the migration
plan.

1.1.10. NGL00_SHOW_MGPLN_CUSTOMIZING (Document Link -


/NGL/NGLM_SHOW_MGPLN_CUSTMZG )

Display Migration Plan

Use

Once you have created the migration plan, you can use this display function to see the
customizing settings and status of the migration plan.

The following data is shown:

 Migration date
 Migration with document splitting
 Migration status (started, ended)
 Company codes, target (new G/L) ledger and fiscal year variant

1.1.11. NGL00_ASSIGN_SRC_AND_TRG_LEDGERS (Document Link -


/NGL/NGLM_ASSIGN_SRC_TAR_LED )

Assign Source Ledgers

Use

Having assigned the company codes and target ledgers to migration plan, you assign the
source ledgers at the level of G/L account intervals or individual accounts and currency
types. This allows you to define (in particular for the balance carryforward) which G/L
Accounts are uploaded from which source ledgers and consequently tables, for instance
GLT0, GLPCT.

Especially for migration package 4 and 5, you are able to allocate account ranges for several
accounting principles to different target ledgers; the source ledger is typically ledger '00' in
table GLT0 but also other ledgers with same account balance as ledger '00' are possible.

Since the configuration made in Assign Source Ledgers controls the upload carryforward it
is not possible to assign G/L accounts with open-item management or customer and vendor
reconciliation accounts.

Currency type '10' (company code currency) and '00' (transaction currency) are always
linked to the same ledger.

Example

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 9 of 386

You currently use the accounts approach with two accounting principles - one for local
valuation and the other one for IFRS. To switch to the ledger solution in new G/L, you
might use the following logic:

 All accounts starting with 1xxxxxxxxx are common accounts and will be assigned to
all target ledgers
 All accounts starting with 2xxxxxxxxx are IFRS accounts only and will be assigned
to leading ledger '0L' only"
 All accounts starting with 3xxxxxxxxx are local accounts only and will be assigned to
non-leading ledger 'L1' only.

Features

In activity Assign Source Ledgers, you have several options that can be chosen on the entry
screen. The assignment is done for every company code / target ledger combination.

Maintain (Scenario 1-5)

Maintain (Scenario 6)

Display

Propose entries

Check Entries

Copy from another company code

Copy from another migration plan

Transport entries

For migration package 6 only (subsequent activation of document splitting):

When you choose the Maintain function, the system automatically creates the proposal
entries. For this specific migration package, the source ledger is always equal to the target
ledger. This applies to all target ledgers of the company code and all determined currency
types.

Prerequisites

The migration plan has been created successfully. Company codes and ledgers have been
assigned to the migration plan.

Dependencies

Deletion or editing of existing intervals is possible as long as no account within the edited
or deleted interval has been processed (uploaded). If an account is already processed, you
must first RESET the upload of the corresponding interval.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 10 of 386

Package specific information

For migration package 6 (subsequent activation of document splitting):

When you choose the Maintain function, the system automatically creates the proposal
entries. For this specific migration package, the source ledger is always equal to the target
ledger. This applies to all target ledgers of the company code and all determined currency
types.

For migration package 7 (Subsequent implementation of a further ledger) and 8 (Subsequent


change from account solution to ledger solution):

It is only possible to assign a new G/L ledger (leading ledger or non-leading ledger) as
source ledger. Additionally you can use a FI-FL ledger as a source ledger in case you want
to replace a FI-SL ledger by using new G/L ledger. Please note that in case of FI-SL ledger
the ledger should provide a balance carryforward function. Otherwise you will get a
warning message when checking the entries.

If you assign a FI-SL rollup ledger as a source ledger you will get a warning message.

The function copy from another migration plan can only be used for the same migration
plan type. The migration packages 7 and 8 use the same migration plan type.

1.1.12. NGL00_PREPARE_SEGMENTATION

1.1.12.1. NGL00_ACTIVATE_SEGMENT_MAINTENANCE (Document Link -


/NGL/NGLM_ALW_SGMNT_MAINTNCE )

Allow Maintenance of Segments

Use

New General Ledger Accounting contains a new characteristic called segment. The segment
is meant to be used in particular for segment reporting as required by IAS/IFRS and US-
GAAP. This activity is only relevant if you want to use the new characteristic in new
General Ledger Accounting.

SAP strongly recommends using the segment derivation before activation of new General
Ledger. This function ensures that all necessary documents are filled with segment
information during the original posting of these documents. Therefore you need to prepare
the postings that take place after the migration date and before the activation date in phase
1.

Activities

The following settings are required for segment derivation:

 You have defined at least one segment in new General Ledger customizing.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 11 of 386

 You define the segment as ready for input in this activity of the migration cockpit.
 You have defined profit centers and assigned segments to them. If you already use
profit centers, all you have to do is assign the segment to them. If you do not use
profit centers within classic Profit Center Accounting (EC-PCA), you need to set up
the profit center master as well. But usually you do not need to activate EC-PCA
itself and to use the full functionality of EC-PCA.

1.1.12. 2. NGL00_ACTIVATE_SEGMENT_DERIVATION (Document Link -


/NGL/NGLM_ACTIVT_SGMNT_DERIV )

Activate Segment Derivation

Use

In this activity, you activate the standard process of segment derivation by profit centers.

Integration

To use the segment derivation you need to allow the maintenance of segments before new
General Ledger is active (in activity Allow Maintenance of Segments).

Prerequisites

To use the segment derivation, you defined all necessary segments in new General Ledger
customizing and assigned the segments to profit centers.

Make sure to test your posting processes carefully - including posting processes that involve
profit centers.

Example

Your migration date is 01.01.2007 (fiscal year start). The migration to new General Ledger
Accounting will take place after the closing of the previous fiscal year on 15.03.2007. All
documents that are posted between 01.01.2007 and 15.03.2007 are then assigned to at least
one segment based on the profit center contained in the document.

1.1.13. NGL03_CREATE_BADI_FOR_DOCSPLIT_INFO_OPIT (Document Link -


/NGL/NGL03_CRT_BADI_DOCSPLIT )

Create BAdI for Document Splitting Information Open Items

Use

With this activity, all open items to be processed receive a correct account assignment,
which is the basis for building the document-splitting tables. You have to implement the
logic for supplementing the account assignments in the form of a Business Add-In (BAdI).

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 12 of 386

In this way, you can include individual derivation rules in a standard migration process.

Ensure that, from the perspective of the total document, an account assignment is found for
each individual open item.

The account assignment is supplemented in the form of a singular account assignment,


which means that an open item can take one value for each account assignment object and
cannot itself be split. If, for example, you introduce a new account assignment (such as a
profit center or segment) and are able to assign the open item uniquely to a specific account
assignment value or object using the BAdI intended for this purpose, then this is not critical.

Features

The BAdI FAGL_MIGR_SUBST comprises the following functions:

 Transfer of the following information that you can use to implement the derivation:
 The complete document within which the open item is located (IT_BSEG)
 The open item that is currently being processed (IS_ACCIT)
 The document header (IS_ACCHD)
 You can change the account assignments contained in structure CS_MIG_ASGMT.
 With the exception of the characteristic Profit center, only initial fields can take an
account assignment. You cannot change fields that are already filled; you can only
delete a dummy profit center or overwrite it with another profit center.
 You may overwrite a specified profit center with the profit center in a CO account
assignment if this assignment is also set.
 In structure CS_MIG_ASGMT, you can also set additional account assignments for
CO that are used to post follow-up costs (such as cash discount, exchange rate
differences, or penalty interests) once new general ledger accounting has been
activated.
 The fields must be filled with the correct values, which means that the corresponding
account assignments must exist.
 If a document contains more than one open item, each open item is processed
individually.
 The original items (tables BSEG, BSIS, BSID, and BSIK) are not changed;
only the entries in the tables for document splitting are generated. The general
ledger line items are transferred in a separate step. Before the general ledger
line items are built, all open items must have the status Without errors.
Otherwise, the migration cannot be performed completely and correctly. In
cases where no correct account assignment can be derived, you may need to
make a dummy account assignment.
 You need to ensure that all account assignments that you require for the
document splitting are set in the open items. This is particularly important if
you use several ledgers in new general ledger accounting with different update
characteristics, such as segment or profit center in the leading ledger and cost
center in another ledger.

The following BAdI is an example based on a simple case. In this example, the profit center
is derived from the business area of the original document if the business area is distinct.
Otherwise profit center '9999' is set.

METHOD if_ex_fagl_migr_subst~subst_item.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 13 of 386

types: begin of l_gsb,

gsber type bseg-gsber,

end of l_gsb.

data: lt_gsb type table of l_gsb.

data: ls_gsb type l_gsb.

data: ls_bseg type bseg.

if is_accit-bukrs = '0001'.

loop at it_bseg into ls_bseg where gsber <> space.

clear ls_gsb.

ls_gsb-gsber = ls_bseg-gsber.

collect ls_gsb into lt_gsb.

endloop.

describe table lt_gsb lines sy-tfill.

if sy-tfill = 1.

read table lt_gsb index 1 into ls_gsb.

case ls_gsb-gsber.

when '0001'.

cs_mig_asgmt-prctr = '1100'.

when '3000'.

cs_mig_asgmt-prctr = '1300'.

when '4000'.

cs_mig_asgmt-prctr = '1400'.

when others.

cs_mig_asgmt-prctr = '9999'.

endcase.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 14 of 386

else.

cs_mig_asgmt-prctr = '9999'.

endif.

CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'

EXPORTING

INPUT = cs_mig_asgmt-prctr

IMPORTING

OUTPUT = cs_mig_asgmt-prctr.

endif.

ENDMETHOD.

The query for the company code is only used as an example; it may generally be the case
that the same derivation logic can apply independently of the company code, but it is also
conceivable that the logic differs from company code to company code. Conducting the
implementation on the basis of tables is also feasible; that is to say, the account assignments
are not set as fixed, but instead are defined and read in customer-specific tables.

If you use the characteristic Segment and derive it from the profit center, it is not necessary
to fill the segment because it is filled using standard derivation, which is performed after
processing the BAdI. For this purpose, segment derivation must be activated. You find this
activity in the migration cockpit under Setup phase -> Prepare segmentation -> Activate
segment derivation. You can use method GET_SPLITFIELDS (class
CL_FAGL_SPLIT_SERVICES) to find out which active document splitting fields can be
changed. Open items in customer and vendor accounts and G/L accounts managed on an
open item basis do not usually have a profit center account assignment at the item level. An
exception to this could be downpayments or other special sales or purchases. These could
indeed have a profit center, which would result in a message being output when this profit
center is overwritten by another profit center as a result of the BAdI.

Note: If necessary, you can use the BAdI FAGL_DERIVE_SEGMENT to store an


alternative logic for segment derivation that differs from the standard logic.

Within the BAdI, you can perform any checks and have any error messages issued in
structure ES_MESSAGE. The error messages then appear in the log. The current open item
may not be processed further, regardless of the type of message involved (warning message
or error message).

1.1.14. NGL03_VALIDATION_DOCUMENT_SPLITTING

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 15 of 386

1.1.14.1. NGL03_WHT_VALIDATION_OF_DOCSPLIT_MEAN (Document Link -


/NGL/NGL03_VLD_DOCSPLIT_MEAN )

What Does Validation of Document Splitting Mean?

Use

You use validation during migration phase 1 to check the documents in the production
system before activating new General Ledger Accounting (for migration packages 3 and 5)
or document splitting (only for migration package 6). By conducting this check, you ensure
that error-free documents are available for document splitting when you activate new
General Ledger Accounting. During validation, no data is updated to the general ledger
tables or the information files for document splitting.

The aim of validation is to test as early as possible and in a live system the business
processes modeled in document splitting. Validation enables you to perform the following
quality assurance measures:

 Extend the scope and improve the quality of modeling In an iterative procedure
 Identify early on any problem areas in the operational posting transactions and
undertake any necessary measures
 Ensure that the posting rules specified in document splitting are adhered to
 Prevent the accumulation of documents containing errors in the current production
system that are relevant for subsequent posting during migration.

During the migration, you can log error statuses in the production system and post-process
them in the test system (preparation system). In this way, you prepare the post-processing of
these documents in the test system (if they need to be posted subsequently) or you identify
and close any gaps in the modeling of document splitting and in the business processes.

If a document to be posted does not fulfill the requirements of document splitting, you can
set up the production system so that messages are issued and grant the user appropriate
ways of intervening. In the case of third-party processes (such as MM or SD) and automatic
processes in FI (such as payment runs or recurring entries), you can only have entries
generated in the log, for example.

You can set up dependencies for the error messages on other constraints (such as account
assignment determination or master data processing) that need to be fulfilled coupled with
the attainment of a certain project status. You can activate validation of document splitting
using time dependency and in stages.

SAP recommends using the validation of document splitting. Note that if you skip this
validation the number of errors during the migration is likely to be significantly higher, and
the quality of the data would not be as expected. This may endanger the whole migration.
Therefore the migration packages with document splitting include a check for activation of
the validation. If you use document splitting, it is not allowed to set the migration date
retroactively.

to safeguarda successful migration, you must finalize your document splitting customizing
including all processes already in phase 0 and transport the settings for document splitting

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 16 of 386

to your productive system. Before this takes place, you must carefully test all posting
processes in a test or quality insurance system.

Prerequisites

The validation of document splitting occurs in the production system. To be able to perform
validation in a useful manner and thereby avoid redundant error logs, the following
prerequisites need to be fulfilled:

 You have defined and customized the leading ledger of new General Ledger
Accounting.
 You have assigned the document splitting method in the customizing of new
General Ledger.
 You have made or checked all other required settings in Customizing for document
splitting.
 You activate the validation at migration plan level in the activity Activate
Validation of Document Splitting in the process tree. For this reason, you need to
transport the migration plan to the production system.

1.1.14. 2. NGL03_ACTIVATE_VALIDATION_OF_DOC_SPLIT (Document Link -


/NGL/NGLM_ACT_VALID_DOCSPLIT )

Activate Validation of Document Splitting

Use

If you want to introduce document splitting with the migration to new General Ledger
Accounting, or if you want to introduce document splitting subsequently, we
recommend that you activate the validation of document splitting for phase 1 of the
migration.

Validating document splitting is important for the following reasons:

 You can test as early on as possible the business processes modeled in


document splitting under live system conditions
 You can extend the scope and improve the quality of modeling in an iterative
procedure
 You can identify problem areas of the operational posting transactions early on
and take any necessary measures
 You can check whether the posting rules specified in document splitting are
adhered to and, where necessary, implement measures to enforce adherence to
them.

You can decide on the form validation should take:

 No validation
 Log only
 Warning message and log
 Error message

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 17 of 386

You make the setting directly in the migration plan. To this purpose, you enter the
validation date from which the documents need to be validated. The validation date
relates to the posting date; that is to say, the system validates all documents with a
posting date falling on or after the validation date.

Prerequisites

To conduct the validation optimally, the following prerequisites need to be fulfilled:

 The migration plans and the leading ledger are defined


 The document splitting method has been specified
 The G/L accounts used must be assigned to item categories
 The document types used are assigned to business transaction variants
 The assignment of item categories to the business transaction variants has been
checked and adjusted where necessary
 The document splitting characteristics are defined: It must be possible either to
derive the account assignment characteristics used (from CO objects, segment
from profit center, or via substitution), or to enter data for these characteristics
directly during document entry.
 For migration packages 1 to 5: Document splitting is active for the company
codes to be validated.
 For migration package 6: Document splitting is active at client level but
inactivated for the relevant company codes.

Features

The documents can be posted using external interfaces (such as ALE and direct
input). These interfaces must provide sufficient account assignment information so
that it is possible to represent the general ledger document in a way reflecting the
processes. If this is not the case at the time of the validation, these lines must be
assigned subsequently. You can also set up different levels of validation for
individual business transactions down to the transaction level (in activity Adjust
Validation for Specific Processes). This is necessary if you cannot validate specific
processes sufficiently yet or modeling has not yet been performed completely.

If this is still not sufficient, you also have the option of using a Business Add-In
(BadI FAGL_SPLVAL_ADJUST) to specify the level of validation in each case.
Using the changeable BadI parameter CD_VAL_MOD, you can set the following
fixed values in the modifiable parameters:

Validation Level

Value Meaning

Blank No validation

1 Log only

2 Warning messages and log

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 18 of 386

3 Error message

Document splitting generally requires certain document splitting characteristics to be


mandatory in line items. If account assignment information is not available or,
depending on the project status, not yet available, you can use a Business Add-In
(BAdI FAGL_SPLVAL_ASSGNMT) to simulate the necessary base account
assignments for document splitting and to activate the validation thereafter. You find
the settings for the above-mentioned BAdIs in the migration cockpit below.

Example

You are currently using business areas in classic General Ledger Accounting. In new
General Ledger Accounting, you want to introduce a complete financial statement
using profit centers. If you have not yet defined the profit center structure completely,
you can still derive a profit center from the business areas currently available. It is
important that you only simulate this. This means that you have to supplement the
documents subsequently with the account assignment Profit Center for the migration.

1.1.14. 3. NGL03_ADJUST_VALIDATION_FOR_SPECIFIC_PRO (Document Link -


/NGL/NGLM_ADJUST_VALIDATION )

Adjust Validation for Specific Processes

Use

If you are not able to validate certain processes sufficiently because account
assignments have not yet been derived completely or conversion has not yet occurred,
you can adjust the validation for those particular processes.

Requirements

 You have fulfilled the prerequisites for the validation of document splitting.
 You have activated validation in the migration cockpit activity before.

Activities

For each reference transaction, business transaction, transaction, and batch input
marker, specify a validation level.

The validation level is adjusted to the level defined if the general activation of
validation has a higher level.

Choose one of the following validation levels:

Value Meaning

Blank No validation

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 19 of 386

1 Only log

2 Warning messages and log

3 Error message

Example

In the general activation of validation, you have defined the validation level Error.
However, you only want to have a log written for background processes. To this
purpose, enter the validation level Only Log for the batch input marker.

1.1.14. 4. NGL03_CREATE_BADI_FOR_VALIDATION_ADJUSTM (Document Link -


/NGL/NGLM_BADI_FOR_VALID_ADJ )

Create/Change BAdI for Validation Adjustment

Use

If you use validation for document splitting, this BAdI allows you to adjust the degree
of validation to your specific requirements.

Requirements

You have fulfilled the prerequisites described in the documentation on how to


activate validation for document splitting.

Activities

Implement the method VALIDATION_ADJUST of the BAdI interface.

The method has the following parameters:

 IS_ACCHD: Import Parameter


The structure describes the header information of a document to be posted.
 IS_ACCIT: Import Parameter
The table describes the lines of a document to be posted.
 CD_VAL_MODE: Modifiable Parameter
In this parameter, you can adjust the level of validation. It contains the level of
validation determined thus far.

Note: You can override validation by initializing the level setting.

1.1.14. 5. NGL03_CREATE_BADI_FOR_SIMULATE_BASE_ACCO (Document Link -


/NGL/NGLM_BADI_SIM_BASE_ACCT )

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 20 of 386

Create BAdI for Simulating Base Account Assignments

Use

If account assignment information is not yet available due to the status of a project,
you can use this BAdI to simulate account assignments for specific lines. The
document splitting characteristics can be defined as a mandatory account assignment
for document splitting. The account assignment information in the line items can have
different origins.

Requirements

You have met the prerequisites described in the document on validation of document
splitting.

Activities

Implement method COMPLETE_ASSGNMT of the BAdI interface.

The method has the following parameters:

 IS_ACCHD: Import Parameter


The structure describes the header information of a document to be posted
together with the information from document splitting.
 IS_ACCHD: Import Parameter
The table describes the lines of a document to be posted together with the
information from document splitting.
 CT_ACCIT_B: Modifiable Table
The lines used as the basis for splitting in rule-based document splitting are
transferred in this table. You can only change the document splitting
characteristics in these lines.

Note: Specific process-determined account assignments are simulated automatically


in document splitting. Account assignments are already simulated in clearing lines,
lines of a reversal document, and lines with invoice references.

Example

You activate validation of document splitting for profit centers, but you have not yet
made the assignment of cost centers to profit centers in the production system. Since
no cost center is assigned, error messages relating to account assignments are issued
in the validation of document splitting. You can use this BAdI implementation to
simulate the missing derivation and avoid unnecessary log entries.

1.1.14. 6. NGL03_CHECK_VALIDATION_DOC_SPLITTING (Document Link -


/NGL/NGLM_CHECK_VAL_DOCSPLIT )

Check Validation for Document Splitting

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 21 of 386

Use

If you chose a migration scenario with document splitting, the program for this
activity checks if you have activated the validation at least with level 1 (Only log).
You receive a warning message if validation of document splitting is not activated.

1.1.15. NGL00_ADDITIONAL_BADI_IMPLEMENTATION

1.1.15.1. NGL03_CRE_BADI_4_PROC_ACNT_AGNMT_OF_DOCS (Document Link -


/NGL/NGL03_CRT_BADI_PRC_ASMT )

Process Account Assignments of Documents

Use

If, in new general ledger accounting, you introduce new account assignment
characteristics (such as segments) that do not form part of the documents, you can use
a Business Add-In (BAdI) to supplement the account assignment information during
runtime. In particular, you can use the BAdI FAGL_MIG_ADJ_ACCIT with the
method ADJUST_ACCIT. The documents entered in table BSEG remain unchanged,
that is to say, the account assignment is not updated in the document. The enriched
account assignment information is added to the document splitting information and
applied in building the documents in the general ledger view.

You can use the following inbound parameters:

 Header information of a document in the AC interface (IS_ACCHD)


 Line information for a document in the AC interface (IT_ACCIT_EX, enhanced
by document splitting information and by additional ACCIT_EXTENSION
information)
 Clearing information at item level (IT_AUSZ_CLR)

Within the BAdI, you can change the account assignment fields of structure
CT_ACCIT_ASGMT. To change parts of ACCIT_EXTENSION, set the export
parameter EB_ACCIT_EXT_SUPPL. This BAdI enables you to create invoice
references subsequently, without writing them to the database. When using this
function, ensure that you fill all necessary fields for the invoice reference (REBZG,
REBZJ, and REBZZ).

By changing the invoice reference, you can influence the behavior of document
splitting. Document splitting splits up the lines for the following invoice reference
types, on the basis of the how the relevant item is split:

 A: Down Payment Clearing


 P: Price Reduction
 U: Payment for / Down Payment Clearing
 U: Invoice Supplement

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 22 of 386

You cannot change the account assignments for clearing lines. They are always
overwritten by document splitting. Lines changed by the BAdI are no longer split in
document splitting.

You may change base account assignments that are relevant for the splitting of items
that have to be edited. But you should not change open item line items (XOPVW =
'X') because these items will not longer be split in document splitting.

Example: Vendor invoice

Account Profit Center Segment Amount in EUR

Expense A 001 500 Changed line

Expense B 002 500 Changed line

Tax - 160 Unchanged

Vendor - 1160- Unchanged

1.1.15. 2. NGL03_CREBADI4_CHANGEDOCSPLIT_INFOOF_DOC (Document Link -


/NGL/NGL03_CRT_BADI_CHNG_DOC )

Change Document Splitting Information of Documents

Use

The documents that you would like to post to new general ledger accounting using
migration may in some cases be split during document splitting in a way that makes
little business sense.

This BAdI allows you to specify an alternative splitting result to that produced using
the standard process.

You can choose one of the following options for this:

 Line items are split on the basis of a relationship defined in the BAdI (export
parameter ET_RELTAB)
 Line items are split on the basis of the lines to be specified in the BAdI (export
parameter ET_SPLITITEM)

Requirements

This BAdI is used exclusively for migration with document splitting when the
document splitting tables are built for the documents to be posted subsequently.

Activities

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 23 of 386

Implement the method SPLIT_ITEMS.

The method has the following parameters:

 IS_ACCHD: Import parameter that describes the header information of the


interface, enhanced by the document splitting information
 IT_ACCIT: Import parameter that describes the line information of the
interface, enhanced by document splitting information
 ET_RELTAB: Export parameter
This table describes the relationship used to split a line.The line type of the
internal table consists of the following parts:
 The substructure S_POS describes the item to be split. It consists of
company code, document number, fiscal year, and the number of the
posting item in the accounting document. The fields Company Code,
Document Number, and Fiscal Year are only filled in cross-company
code documents.
 The substructure FAGL_S_MIG_ASGMT describes the possible account
assignments for the distribution. However, the system only transfers
fields that are also defined as a document splitting characteristic in
document splitting.

Field WRBTR describes an amount that itself describes the relationship of the
account assignment records. The total of the amounts do not have to agree with the
amount of the item to be split. The amount must not be zero.

Splitting on the basis of the relationship occurs before distribution using the base
rows.

 ET_SPLITITEM: Export parameter


This table describes which lines are to be split on the basis of other lines. The
line type consists of the following parts:
 The substructure S_POS describes the line to be split. It consists of
company code, document number, fiscal year, and the number of the
posting item in the accounting document. The fields Company Code,
Document Number, and Fiscal Year are only filled in cross-company
code documents.
 The substructure B_POS describes the lines that form the basis for
splitting the line described in S_POS.

When this approach is used, internal dependencies do not apply. If the system
identifies a recursion, an error message is issued.

Notes

 You can only use one approach for a given line.


 Clearing lines cannot be split using these approaches.
 The standard rule-based document splitting no longer processes the split
results. However, you can use the result to split other lines.

Example

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 24 of 386

The following document in your system needs to be posted subsequently:

Vendor1 -1000

Vendor2 -2000

Expense PC01 -1200

Expense PC02 800

Expense PC03 1000

In terms of content, Vendor1 and the expenses in lines 3 and 4 belong together, and
Vendor2 corresponds to the expense in line 5. Rule-based document splitting cannot
recognize this connection and would perform the distribution for vendors on the basis
of expense items so that a share in all profit centers results for each vendor. In this
way, Vendor1 would be distributed on the basis of expense items 3, 4, and 5.

 First method: Line items are split on the basis of a relationship defined in the
BAdI. In table ET_RELTAB, you enter a relation for the distribution to line 1
(Vendor1) and line 2 (Vendor2) for the profit centers.

You fill table ET_RELTAB as follows:

Structure S_POS FAGL_S_MIG_ASGMT

Field BUZEI PRCTR .... WRBTR

01 PC01 120

01 PC02 80

02 PC03 100

 Second method: Line items are split on the basis of the lines to be specified in
the BAdI. In table ET_SLITITEM, you describe which lines should be used to
distribute Vendor1 (line 1) and Vendor2.

For this purpose, you enter the following in table ET_SPLITITEM:

Structure S_POS B_POS

Field BUZEI BUZEI

01 03

01 04

02 05

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 25 of 386

1.1.15. 3. NGL00_CREATE_BADI_FOR_UPLOAD_CARRYFORWRD (Document Link -


/NGL/NGLM_UPLOAD_CARRY_FRWD )

BAdI for Uploading Carryforward

Use

With this BAdI, you can control how the fields of the source ledger are transferred to
the target ledger when the balance carryforward is uploaded.

To control the transfer, you can use method MOVE_FIELDS. The generated structure
GLU1 contains all fields of all possible source and target ledgers. The records are
transferred to the method record by record in GLU1 format:

The source record in the importing parameter IS_GLU1_SOURCE.

The changing target record in the changing parameter CS_GLU1_TARGET.

The record CS_GLU1_TARGET has the values of the fields from


IS_GLU1_SOURCE with the same name as preassigned values, including the known
name inequalities BUKRS/RBUKRS (if the company code field in the source ledger
is BUKRS) and PRCTR/RPRCTR (if the profit center field in the source ledger is
PRCTR).

You should therefore implement this BAdI particularly if you want to cover
additional name inequalities - for example, if you have added a customer field called
RZZFIELD1 to the source ledger and want to transfer it to customer field ZZFIELD1
of the target ledger.

The value fields TSL, HSL, KSL, OSL of the target structure CS_GLU1_TARGET
already have the correct values (that is, the values corresponding to the currency types
of the target ledger).

Prerequisites

The account assignment that you want to allocate to the target structure must be
available in your current totals table (e.g. GLT0, GLT3).

Example

The following example illustrates the segment and profit center derivation based on
business areas in FI totals records.

method IF_EX_FAGL_UPLOAD_CF~MOVE_FIELDS.

case IS_GLU1_SOURCE-RBUSA.

when '1000

CS_GLU1_TARGET-SEGMENT = 'S001'.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 26 of 386

CS_GLU1_TARGET-PRCTR = 'P001'.

when '2000

CS_GLU1_TARGET-SEGMENT = 'S002'.

CS_GLU1_TARGET-PRCTR = 'P002'.

when '3000

CS_GLU1_TARGET-SEGMENT = 'S003'.

CS_GLU1_TARGET-PRCTR = 'P003'.

when others.

CS_GLU1_TARGET-SEGMENT = 'S999'.

CS_GLU1_TARGET-PRCTR = 'P999'.

endcase.

endmethod.

Additional information

For the source and target account assignment, you can have a 1:1 relationship or an
n:1 relationship. It is not possible to split up a source account assignment into
multiple target account assignments.

1.1.16. NGL03_CHECK_MIGRATION_CUSTOMIZING (Document Link -


/NGL/NGLM_CHECK_MIG_CUSTMZNG )

Check Migration Customizing

Use

In this activity, the migration plan is checked against the customizing of new General
Ledger Accounting:

 The program checks if the migration type of the migration plan fits the
document splitting activation status in new General Ledger. You get a warning
message if there are company codes with document splitting assigned to a
migration plan without document splitting and vice versa.
 Remark: For migration package 6, it is necessary that the document splitting
indicator is set at client level and that the relevant company codes are inactive
for document splitting. In ERP 6.0 this is set automatically for the first time
during activation of the validation of document splitting.
 The program checks if each company code is at least assigned to the migration
plan for the leading ledger (not for migration package 7 and 8). You will

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 27 of 386

receive a warning message if there are company code and ledger combinations
not assigned to at least one migration plan.
 The program checks if there are company codes assigned to the migration plan.
 The program checks if the leading ledger is assigned to the migration plan (not
for migration package 7 and 8). If the leading ledger is not assigned to the
current migration plan, you will receive a warning message.
 The program checks if non-leading ledgers are assigned to the migration plan.
 Additionally, the program checks if clearing reset of cleared items before the
migration date is possible. If yes, you receive a warning message.
 The program checks if all relevant accounts have been assigned for source and
target ledgers. All balance sheet accounts that are not managed on an open item
basis and that are no reconciliation accounts for customers and vendors are
relevant here. Additionally, the currency types in use are also considered.
 Based on the assignment of source and target ledger, the program checks if the
source and target ledgers use the same fiscal year start date.
 Especially for migration package 4 and 5, at least two target ledgers must have
been assigned.

Remark: Different migration plans could be handled with separate migration


packages. If you have multiple migration packages respectively migration plans due
to multiple source and target ledgers with different fiscal years, you might ignore the
warning message that the leading ledger is not assigned to the migration plan (not
relevant for migration package 7 and 8).

The program for this activity also checks if you implemented the BAdI for document
splitting information of open items. If you use a migration scenario with document
splitting, the BAdI is required for cases with one or more required document splitting
criteria in new G/L. Otherwise you will have no subsequent information in new G/L
for clearing of the open items.

Prerequisites

The migration plan has been defined and the company code(s) and ledger(s) have
been assigned to the migration plan. The assignment of source and target ledger has
been done.

1.1.17. NGL00_CREATE_TRANSPORT_FOR_MGPLN_CUST (Document Link -


/NGL/NGLM_CRT_TRANS_4_MGPLN )

Create Transport for Migration Plan Customizing

Use

With this activity you can create a transport request which includes the migration plan
customizing of the current migration package.

The activity execution is independent from the status of the migration plan or
migration package. So it is always possible to either create a new transport with the

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 28 of 386

current settings or add the current settings to an existing transport.

Example

If you will do the migration customizing in a separate system and need to transport
the settings to all other systems (e.g. test system, production system etc.) you can use
the current migration plan settings of this package and

1. Include them into a transport


2. Import the transport into another system
3. Create a migration package in the other system
4. Execute activity "Customizing of Package via Transport Request"

With this activity you will be able to use the prior imported migration plan
customizing within the newly created package. (Please read also the activity
documentation of this step)

Features

The following migration customizing settings will be included in the transport

 Migration Plan

o Automatically included in transport

 Migration Date

o Automatically included in transport

 Company Code and Ledger Assignment of the Migration Plan

o Automatically included in transport

 Status of Migration Plan (e.g. "Migration Started")

o Automatically included in transport

 Activation of Validation of Document Splitting (Migration Plan dependent)

o Only in Release ERP6.0

o Automatically included in transport

 Assignment of Source and Target Ledger for Balance Sheet Accounts

o Only included if selected

Prerequisites

The corresponding customizing settings will only be included in the transport if the

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 29 of 386

settings already exist in the system (table entries exist).

Example

The status of the migration plan ("Migration Started") will only be included in the
transport if the status is already set while executing this activity.

Package specific information

For migration package 7 (Subsequent implementation of a further ledger) and 8


(Subsequent change from account solution to ledger solution):

You have to ensure that the migration plan customizing is transported together with
the new G/L customizing of the new ledger. This is necessary because the updates to
the new ledger will be controlled by the migration plan and migration date. If there is
no migration plan but the new ledger already exists in the system the updates are done
without any control of the fiscal year. In case the migration plan with migration date
exists the updates into the new ledger will only take place in the fiscal year of
activation of the new ledger.

1. 2. NGL00_ANALYZE_PHASE

1. 2.1. NGL00_CHECK_NEWGL_INACTIVE (Document Link -


/NGL/NGLM_CHECK_NEWGL_INACTV )

Check if New G/L Is Inactive

Use

The program for this activity checks if the new general ledger is inactive in the
current client. The new general ledger can be activated only after successful
migration of all company codes within the client.

The migration takes place into initial new general ledger tables. These tables are
created during the migration process. A merge with existing data during the migration
is not possible. Note that data must be reconciled after migration and before
activation of new general ledger accounting.

Additional information

After upgrading to mySAP ERP, the classic general ledger is still the appropriate
application before the migration to new general ledger accounting takes place.

Important Note

Make sure that the relevant transport to the current test or productive system
does not contain an activation flag for New G/L. New G/L must not be activated
until the migration has been completed successfully.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 30 of 386

1. 2. 2. NGL03_CHECK_SPLIT_CHARACTERISTICS (Document Link -


/NGL/NGLM_CHK_SPLIT_CHARCTER )

Check Document Splitting Characteristics and Scenarios

Use

In this activity, the migration plan is checked against the customizing of for new
General Ledger Accounting:

 The program checks if document splitting characteristics are defined in new


G/L customizing.
 Based on the document splitting fields, the relevant new G/L scenarios are
determined. First, the program checks if the found scenarios are assigned to the
leading ledger. If this is not the case, you get a warning message. Second, the
program checks if the scenarios are assigned to non-leading ledgers. For
scenarios that are not assigned to any ledger, you get an error message.
 The program checks if the relevant ledgers for document splitting are assigned
to the current migration plan or any other migration plan.
 Additionally, the system checks if the document splitting fields are included in
the new G/L totals table. For the fields that are not included in the totals table,
you get a warning message.

1. 2. 3. NGL00_CHECK_ORGANIZATIONAL_STRUCTURES

1. 2. 3.1. NGL00_CHECK_COMPANY (Document Link -


/NGL/NGLM_CHECK_COMPANY )

Check Company

Use

The program for this activity checks if the company setup fits the scenario
Preparations for Consolidation for new general ledger accounting:

 If you use the scenario Preparations for Consolidation for new general
ledger accounting, the program checks if there are companies defined in
the enterprise structure. If this is the case, the company code assignment
and master data for customer, vendor, and G/L accounts are also
checked.
 If you defined companies, but do not use the scenario Preparations for
Consolidation for new general ledger accounting, you will receive a
warning message.

Prerequisites

Make sure that all relevant company codes are assigned to the migration plan.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 31 of 386

1. 2. 3. 2. NGL00_CHECK_COMPANY_CODE_PARAMETERS (Document Link -


/NGL/NGLM_CHECK_CCODE_PARAMS )

Check Company Codes

Use

The program for this activity checks if all company codes that are assigned to a
migration plan have a valid fiscal year variant assigned. Furthermore it is
checked if totals exist for the current and previous fiscal year for the company
codes of the current migration plan.

Prerequisites

Make sure that all active company codes are assigned to the migration plan.

Note that SAP standard company codes that you do not use in your live system
might be available in customizing but do not have to be considered here.

If there are company codes that are not used actively, but have data, you have
to decide if these company codes must be migrated to new General Ledger or if
these company codes are no longer valid for any posting and thus will stay in
the classic General Ledger tables only. To reactivate an inactive company code
you have to perform the migration for this company code as well before any
other posting related to that company code takes place.

1. 2. 3. 3. NGL00_CHECK_FUNCTIONAL_AREA (Document Link -


/NGL/NGLM_CHECK_FUNC_AREA )

Check Functional Areas

Use

The program for this activity checks for the following:

 If you use the scenario Cost of Sales Accounting for new general ledger
accounting, functional areas must exist. Additionally the status of Cost of
Sales Accounting must be 'active' or at least 'in preparation'.
 If the Cost of Sales Accounting scenario is not active, but functional areas
exist or cost of sales accounting is active, you will receive a warning
message.
 You will get information about the new features for determination of
functional areas. Additionally, the active substitution call-up points for
derivation of functional areas are checked.

Remark: The substitution rules themselves or even user exits are not checked!

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 32 of 386

Prerequisites

Make sure that all active company codes are assigned to the migration plan.

1. 2. 3. 4. NGL00_CHECK_CONTROLLING_AREA (Document Link -


/NGL/NGLM_CHECK_CNTRLNG_AREA )

Check Controlling Areas

Use

The program for this activity checks if all company codes assigned to a
controlling area use the same fiscal year variant in accordance with the SAP
standard. In some cases, there might be a modification as described in SAP
Note 107211.

If Profit Center Accounting (EC-PCA) is activated in the controlling areas, the


program checks if the scenario Profit Center Update is activated for the leading
ledger in new general ledger accounting in your system. If you have different
fiscal year variant names in FI and CO, the program checks if the start dates
and end dates of the fiscal year for FI and CO coincide.

If reconciliation ledger is active, the program checks if you have assigned a


CO-FI real-time integration variant to the company code. If cross-profit center
postings are activated, you get a warning message because the CO postings in
phase 1 have to be posted retrospectively to FI.

Integration

If you did not activate the profit center update and thus do not intend to use
Profit Center Accounting in new general ledger accounting, consider the
restrictions described in SAP Note 826357.

Prerequisites

Make sure that all relevant company codes are assigned to the appropriate
controlling area.

1. 2. 3. 5. NGL00_CHECK_BUSINESS_AREAS (Document Link -


/NGL/NGLM_CHECK_BUSINES_AREA )

Check Business Areas

Use

Business areas can be used in different ways in the classic general ledger

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 33 of 386

accounting. If you currently use business areas, the system checks for scenario
Business Area in customizing for new general ledger accounting. Note that for
a complete balance sheet on business area level, the document splitting for
business areas is needed (requires migration package 3 or 5).

If you enabled the business area balance sheet in the classic general ledger or if
there are totals records in GLT0 on business area level, the program for this
activity checks if the scenario Business Area for new general ledger accounting
is activated for the leading ledger or at least one ledger that is assigned to the
relevant company codes. If the scenario is missing, you will get a warning
message.

If you use the business area as a document splitting criteria, the program checks
if you also use the scenario Business Area for the leading ledger in new general
ledger accounting. Depending on the zero balance option within the document
splitting, you will get an error message if the scenario is missing and zero
balance is active. Otherwise the system outputs a warning message.

1. 2. 3. 6. NGL00_CHECK_CONSOLIDATION (Document Link -


/NGL/NGLM_CHECK_CONSOLID )

Check Consolidation

Use

The pogram for this activity checks the consolidation integration.

There are the following checks:

 You use the integration with EC-CS for


 Company consolidation
The scenario Preparations for Consolidation (FIN_CONS) must
be active for at least one ledger in new general ledger accounting.
If it is not active for the leading ledger, you will get a warning
message.
 Business area consolidation:
The scenario Business Area (FIN_GSBER) must be active for at
least one ledger in new general ledger accounting. If it is not active
for the leading ledger, you will get a warning message.
 Profit center consolidation
The scenario Profit Center Update (FIN_PCA) must be active for
at least one ledger in new general ledger accounting. If it is not
active for the leading ledger, you will get a warning message.
 You use the integration with classic FI-LC for
 Company consolidation
The scenario Preparations for Consolidation (FIN_CONS) must
be active for at least one ledger in new general ledger accounting.
If it is not active for the leading ledger you will get a warning

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 34 of 386

message.
 Business area consolidation
The scenario Business Area (FIN_GSBER) must be active for at
least one ledger in new general ledger accounting. If it is not active
for the leading ledger you will get a warning message.

Important note: Consider also the information provided in SAP Note 918675.

Integration with EC-CS

It is not possible to use report RFBILA00 to set up periodic data extraction


from new general ledger accounting to consolidation. To make it possible to
convert processes step-by-step as part of the introduction of new general ledger
accounting, you have the option of updating the consolidation preparation
ledger alongside new general ledger accounting during an interim phase and to
use report RFBILA00 to transfer the data from there to consolidation. Note,
however, that this is an interim solution because the extract can only be created
using the format of the standard totals table GLT3. In principle, you can
perform a rollup from the new totals table FAGLFLEXT to the receiver table
ECMCT using transfer rules and exits. You can also perform a rollup from new
general ledger accounting using the standard exits for the conversion of the data
from Profit Center Accounting to EC-CS if the relevant fields in new general
ledger accounting use the same data elements as in the profit center totals table
GLPCT.

Integration with Consolidation (SEM-BCS)

The financial data in new general ledger accounting can be transferred in an


integrated data transfer to SEM-BCS together with all the additional account
assignments necessary for consolidation. This is possible because, in the
standard setup, the structure of new general ledger accounting contains all the
fields required for company consolidation or profit center consolidation. These
are the fields Partner Company, Partner Profit Center, and Consolidation
Transaction Type. Using an integrated data transfer (extractor), you can extract
the data from new general ledger accounting to SAP Business Information
Warehouse (BW). The data is then imported into SEM-BCS.

More information referring to the integration SEM-BCS and new general


ledger accounting is provided in SAP Note 852971.

1. 2. 3. 7. NGL00_CHECK_SEGMENTATION (Document Link -


/NGL/NGLM_CHECK_SEGMENTATION )

Check Segmentation

Use

The program for this activity checks the customizing in new G/L for

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 35 of 386

segmentation:

 If you defined segments in the customizing IMG Enterprise Structure ->


Definition -> Financial Accounting -> Define Segment, the program
checks if the new G/L scenario Segmentation is assigned for at least one
ledger. Otherwise, you get a warning message.
 If you assigned the new G/L scenario Segmentation, the program checks
if segments exist in the related customizing table as before. If no
segments are defined, you get an error message. In this case, you have to
create the segments first before proceeding with the migration.
 If you use the new G/L scenario Segmentation, the program also checks
if you activated the profit center update. In SAP standard, the segment is
derived from the profit center. If you do not intend to use new G/L profit
center update, you get a warning message.
 If the scenario Profit Center Update is active, the program also checks if
document splitting for profit center or segment is active.

SAP recommends activating Profit Center Accounting in combination with


segments. Otherwise you should not activate document splitting for profit
centers and for segments (according to SAP Note 826357).

Only for migration packages with document splitting:

Note that segments are correctly assigned to open items from previous fiscal
years (migration phase 0) during the migration by means of a BAdI for
document splitting information of open items (Setup phase -> Create/Change
BAdI for document split information open items).

You may also derive the account assignment for documents in the fiscal year of
the migration during the migration using a BAdI. You will find this BAdI in the
Setup phase -> Additional BAdI implementation -> Create BAdI for process
account assignments of documents.

You can add the segment information in the balance carryforward by using a
BAdI for uploading the carryforward. You will find this BAdI in the Setup
phase -> Additional BAdI implementation -> Create BAdI for upload carry
forward.

Prerequisites

The customizing of new G/L and document splitting is finished and transported
to the current system.

Important Note for package 6:

Make sure that the relevant transport to the current test or productive
system does not contain an activation of document splitting at company
code level. Document splitting for company codes must not be activated
until the migration has been completed successfully.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 36 of 386

1. 2. 3. 8. NGL00_CHECK_PROFIT_CENTER (Document Link -


/NGL/NGLM_CHECK_PROFIT_CENTR )

Check Profit Center

Use

The program for this activity checks the customizing in new general ledger
accounting for profit center update:

 If you defined profit center master data, the program checks if the
scenario Profit center update (FIN_PCA) is assigned for at least one
ledger in new general ledger accounting. Otherwise you will get a
warning message.
If the scenario is assigned to a non-leading ledger, the program also
checks if the company code is assigned to that ledger.
 If you assigned the scenario Profit center update, the program checks if
any master data exists. If no profit center master data has been defined,
you will get an error message. In this case, you should create the profit
center first before proceeding the migration.

Only for document split (Package 3 or 5)

Note that profit centers are correctly assigned to open items from previous
fiscal years (migration phase 0) during the migration by means of the BAdI for
document split information of open items. (Setup phase -> Additional BAdI
implementation -> Create BAdI for process account assignments of
documents.)

Profit center account assignments for documents in the fiscal year of the
migration can also be derived during the migration by means of a BAdI. You
will find this BAdI in the Setup phase Additional BAdI implementation -->
Create BAdI for process account assignments of documents.

You can add the segment information in the balance carry-forward by using a
BAdI for uploading the carry-forward. You will find this BAdI in the Setup
phase -> Additional BAdI implementation -> Create BAdI for upload carry
forward.

Prerequisites

The customizing for new general ledger accounting is finished and transported
to the current system.

1. 2. 3. 9. NGL00_CHECK_ASGMNT_PRO-CENTER_AND_SEGMNT (Document
Link - /NGL/NGLM_CHCK_ASMT_PRFT_SGT )

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 37 of 386

Check Assignments of Segments to Profit Centers

Use

If you use the scenarios Segmentation (FIN_SEGM) and Profit center update
(FIN_PCA) in new general ledger accounting, the program for this activity
checks if segment information is available in all profit center master records. If
the program finds missing assignments, you will receive a warning message.
The program also checks if you use the segment as required field for document
splitting. If so, you will get an error message if any assignments are missing
and if the BAdI implementation for BAdI FAGL_DERIVE_SEGMENT is
missing.

Prerequisites

The customizing for new general ledger accounting is finished and transported
to the current system. The profit center master data has been created
completely.

Dependencies

Note that you cannot change the segment assignment to profit center using
transaction KE52 if transaction data exists for the profit center (SAP Note
940721).

Activities

If applicable, fill in the segment in all profit center master data records.

1. 2. 4. NGL00_CONFIRM_PROFITCENTER_ASSIGNMENT (Document Link -


/NGL/NGLM_CHECK_PRFT_CNT_ASG )

Confirm Profit Center Assignment

Definition

The profit center is assigned to various data objects, such as cost center,
internal order, or material master. The assignment of profit centers to the
appropriate data objects must be finalized before the migration takes place.
After the migration, the assignment cannot be changed if you create a profit
center or segment balance sheet. You will find a list of assignments in
customizing under Financial Accounting (New) -> General Ledger Accounting
(New) -> Master data -> Profit Center -> Assignments of Account Assignment
Objects to Profit Centers.

If you do not use the Profit Center Accounting in new general ledger
accounting, you can simply confirm this activity without further action.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 38 of 386

Dependencies

Note that the assignment of profit centers to account assignment objects cannot
be changed once the account assignment object holds transaction data.

1. 2. 5. NGL00_CHECK_CURRENCIES_AND_LEDGERS

1. 2. 5.1. NGL00_CHECK_CURRENCIES (Document Link -


/NGL/NGLM_CHECK_CURRENCIES )

Check Currencies

Use

The program for this activity checks the currency settings if you use parallel
currencies in FI.

If you use a second and third local currency in FI, the program checks if you
use another currency within classic EC-PCA, FI-SL, or classic consolidation
preparation in GLT3. In new general ledger accounting, it is possible to assign
a second and third local currency to the leading ledger. If you have more
currencies for the mentioned components than the three local currencies that
are available for the company code, this cannot be reflected in new general
ledger accounting.

1. 2. 5. 2. NGL00_CHECK_SOURCE_LEDGERS (Document Link -


/NGL/NGLM_CHECK_SOURCE_LDGRS )

Check Source Ledgers

Use

The program for this activity makes the following checks:

 For all company codes with transaction data in FI-GL (table GLT0), the
program checks if these company codes are assigned to a migration plan
for the leading ledger.
 If GLFUNCT contains data, the program checks if the scenario Cost of
Sales Accounting (FIN_UKV) is active for the leading ledger or for non-
leading ledgers in new general ledger accounting.
 If you use GLT3 or GLT1 with trading partner or movement type
information, the program checks if the scenario Preparations for
Consolidation (FIN_CONS) is active for the leading ledger or for non-
leading ledgers in new general ledger accounting.
 If you use GLT1 with cost center information, the scenario Cost Center
Update (FIN_CCA) in new general ledger accounting is checked.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 39 of 386

 If EC-PCA is active or data exists in GLPCT, the program checks if the


scenario Profit Center Accounting (FIN_PCA) is active for the leading
ledger or for non-leading ledgers in new general ledger accounting.
Additionally, it checks for document splitting for profit centers.

1. 2. 6. NGL00_CHECK_DOCUMENTS

1. 2. 6.1. NGL03_CHECK_DOCUMENTS_AND_LINE_ITEMS (Document Link


- /NGL/NGLM_CHCK_DOC_LINE_ITMS )

Check Documents and Line Items

Use

The FI documents for the fiscal year of the migration are subsequently
posted to the new G/L. It is not possible to transfer FI archives to the new
G/L. This is why the program for this activity checks if there are archive
runs for FI_DOCUMNT after the migration date in the current system.

Only for migration packages 1 - 5 : In addition, the program checks if


all clearing documents (clearing date equal or higher than migration date)
in phase 1 are updated to the table BSE_CLR, which is needed for
technical purposes. As BSE_CLR was not updated in SAP releases lower
than 4.5, it could happen that entries in BSE_CLR are missing if the
technical upgrade took place in phase 1.

Activities

If you run archiving for FI_DOCUMNT, you will get an error message.
In that case, you have to check if FI documents have been deleted and, if
so, create a message for component FI-GL-MIG. Otherwise you can set
the status of this activity to green.

Note that restore programs for FI_DOCUMNT have been deleted from
SAP standard with support package SAPKH50007 (SAP Note 877439).

For migration package 7 and 8:

For building-up the new ledger it is also necessary that all documents in
phase 1 are available. Furthermore several documents, for instance
periodic postings from FI-AA, have to be reversed during the migration
process.

1. 2. 6. 2. NGL00_CHECK_CROSS-COMPANY_DOCUMENTS (Document
Link - /NGL/NGLM_CHCK_CROS_COMP_DOC )

Check Cross-Company Documents

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 40 of 386

Use

The program for this activity checks if you use cross-company postings
in FI. To this purpose, the customizing settings (IMG Financial
Accounting -> General Ledger Accounting -> Business transactions ->
Prepare Cross-Company Code Transactions) are read for the relevant
company codes within a migration plan. The program checks if the
related company codes have the same fiscal year start and end date. If the
fiscal year start differs, the program also checks if FI cross-company
documents exist in the fiscal year of the migration (migration phase 1). If
so, you will receive an error message. If this is the case, contact SAP by
creating a message for component FI-GL-MIG.

Related company codes with same fiscal year definition must be assigned
to the same migration plan if cross-company documents exist in phase 1.

Only relevant for migration package 3 , 5 and 6

For all combinations in customizing of cross-company code transactions,


the program checks if the relevant company codes use document
splitting. It is not allowed to deactivate the document split partly for
individual company codes. If this is the case in your project, you will
receive an error message.

Prerequisites

All relevant company codes and ledgers are assigned to the migration
plan.

1. 2. 6. 3. NGL00_ZERO_CLEARING_CHECK (Document Link -


/NGL/NGLM_CHECK_BSTAT_A )

Use

The program for this activity checks if there are clearing documents
without line items in the system for phase 1 of the migration. Clearing
documents without line items only have an entry in table BKPF with
status BSTAT = 'A'. There are no line items in BSEG for these
documents. Since the migration with document splitting cannot process
these documents correctly, implement SAP Note 1054674 to ensure that
no such documents are created in phase 1. To this purpose, you must
transport the migration plan into your production system.

If clearing documents without line items in phase 1 already exist, you


must reverse (reset clearing) and repost these documents. A report you
can use for this purpose is provided in the migration cockpit.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 41 of 386

1. 2. 6. 4. NGL03_CHECK_PAYMENT_REQ_FOR_PRE_POSTINGS
(Document Link - /NGL/NGLM_CHECK_REF_DOCS )

Check Reference Documents

Use

For the migration of documents in phase 1, the program for this activity
checks if there are actual FI documents that refer to preliminary postings
or noted items. This may occur in case of advance payments for
preliminary documents.

Dependencies

If document references are found, you must post these documents during
the next phase.

1. 2. 7. NGL03_CHECK_DOCUMENT_SPLITTING

1. 2. 7.1. NGL03_CHECK_VALIDATION_DOC_SPLITTING (Document Link -


/NGL/NGLM_CHECK_VAL_DOCSPLIT )

Check Validation for Document Splitting

Use

If you chose a migration scenario with document splitting, the program


for this activity checks if you have activated the validation at least with
level 1 (Only log). You receive a warning message if validation of
document splitting is not activated.

1. 2. 7. 2. NGL03_CHECK_GLACCOUNTS_FOR_DOC_SPLITTING
(Document Link - /NGL/NGL03_CHK_G/L_4_DOCSPLT )

Check General Ledger Accounts for Document Splitting

Use

Using the settings made in the general ledger account master record as
well as a given general ledger account in customizing, the program
determines an assignment proposal for the item category that is to be
used to classify that particular general ledger account (see also in
Customizing under Financial Accounting -> General Ledger Accounting
-> Business Transactions -> Document Splitting -> Classify G/L
Accounts for Document Splitting).

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 42 of 386

Features

The proposal is compared against the classification of general ledger


accounts for document splitting. If needed, you can also restrict the
selection to individual company codes and general ledger accounts.

 @08@ Proposal fits classification


 @09@ Proposal differs from classification
 @0A@ Classification is missing

The system displays the output data as an interactive list. You can
execute the following functions for an item in the list:

 Double-clicking a general ledger account: allows you to edit the


general ledger account master data
 Double-clicking an item category: takes you to the classification of
general ledger accounts for document splitting

1. 2. 7. 3. NGL03_CHECK_DOC_TYPES_FOR_DOC_SPLITTING
(Document Link - /NGL/NGL03_CHK_DOCTY_4_DOCSP )

Check Document Types for Document Splitting

Use

This program checks the classification of the document types for


document splitting.

Prerequisites

You have defined the classification of document types for


document splitting (IMG Financial Accounting (New) -> General
Ledger Accounting (New) -> Business Transactions -> Document
Splitting -> Classify Document Types for Document Splitting).

Features

The program counts the number of accounting documents before


and after the migration date for all company codes in the migration
plan. For document types that have documents after the migration
date, the system checks whether a business transaction and a
business transaction variant are assigned in the classification of
document types for document splitting.

The system displays the output data as an interactive list. You can
navigate to the function with which you define the business
transaction variant for a selected item in the list. A dialog box
appears in which the permitted item categories and indicators are
displayed. The dialog box also tells you whether the item category

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 43 of 386

for this business transaction variant is mandatory or just defined


once.

1. 2. 7. 4. NGL03_CHECK_BUSI_TRANS_ASSGMNT_FOR_DOCS
(Document Link - /NGL/NGL03_CHK_BUSI_TRAN_ASG )

Check Business Transaction Assignment for Documents

Purpose

The program checks whether each of the selected documents


posted in migration phase 1 applies the rules stored in the business
transaction variant assigned to that document.

Prerequisites

The customizing for document splitting in new general ledger


accounting has been created.

Features

The program checks the selected document types to determine


whether the documents posted since the migration date fulfill the
definition of the assigned business transaction variant. You check
the assignment of the business transactions to document types in
activity Check Document Types for Document Splitting.

If you have already assigned a document-specific business


transaction and activated it in customizing for the migration, this
assignment is applied for the check. For all other documents, the
system derives the business transaction from the document type
used.

Documents that do not fit the assigned business transaction variant


are listed as containing errors. You can use the Save Docs
Containing Errors indicator to include these documents with the
checked business transaction variant and status Inactive in the table
for alternative business transaction assignments. Here, you can
assign to these documents a suitable business transaction variant
for use in migration.

If required, you can specify a posting period or document number


for which you want the system to display the documents to be
checked.

1. 2. 7. 5. NGL03_LIST_LOG_FOR_VALIDATION (Document Link -


/NGL/NGLM_LIST_LOG_FOR_VALID )

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 44 of 386

List Log for Validation of Document Splitting

Use

In this activity, you can analyze the log entries for validation.You
can delete any entries that are no longer required from the log.
However note that deleted log entries cannot be recreated.

Requirements

You have activated the validation.

1. 2. 7. 6. NGL03_ALTERNATI_SETTINGS_4_DOC_SPLITTING

1. 2. 7. 6.1. NGL03_DEF_ALTERNATIVE_DOC_SPLIT_METHOD
(Document Link - /NGL/NGL03_DEF_ALT_SPLT_METH )

Define Alternative Document Splitting Method

Use

In this activity, you enter a separate document splitting method that


is to be used exclusively for the migration of documents that have
already been posted.

Requirements

 In the customizing for document splitting in new general


ledger accounting, you have defined the alternative method
in the activity Define Document Splitting Method.

To prevent inconsistencies between the migrated documents and


the documents posted after activating new general ledger
accounting, you need to copy the standard method (stored under
Assign Document Splitting Method and make adjustments
accordingly.

 In the alternative document splitting method for the


migration, all Document Splitting Rules used for the
migration must be defined completely. To this purpose, copy
all the document splitting rules of the document splitting
method stored as standard to the alternative document
splitting method for the migration, and then make the
migration-specific changes to the document splitting rules.
 If necessary, you can define more business transaction
variants. You can then define alternative rules for these
business transaction variants or change the assignment to the
item category (see also the activity Define alternative

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 45 of 386

business transaction assignment in the migration cockpit).

Activities

Specify the alternative document splitting method for the


migration.

Note that this method is only used for the documents to be


migrated. The alternative document splitting method is not
applied to documents posted after the migration!

Example

Customer invoices in the current year need to be handled with an


alternative document splitting rule.

The standard method cannot split this document in a way that


makes business sense because the document contains posting items
with item category Balance Sheet Account (01000).

To define an alternative document splitting method, you copy the


document splitting rules from the standard method and change the
rules to meet your requirements. In this example, you add a new
rule for the business transaction variant Customer Invoices that
splits item category 01000 on the basis of the revenue item.

In this way, the change takes effect for migration documents, but it
is not applied to new documents to be posted after new general
ledger accounting has been activated.

1. 2. 7. 6. 2. NGL03_DEF_ALTERNATIVE_BUSI_TRANSACTION
(Document Link - /NGL/NGL03_DEF_ALT_BUSI_TRAN )

Define Alternative Business Transaction Assignment

Use

In this activity, you can assign an alternative business transaction


variant to selected documents. In the migration, this assignment
overrides the standard derivation of the business transaction
variant, such as derivation from the document type.

Prerequisites

Either you have assigned a document splitting method in


customizing for document splitting, or you have specified an
alternative document splitting method in the related activity.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 46 of 386

Note: Here you only assign existing business transaction variants.


You may also need to define a document splitting method for the
migration only.

Activities

For documents that cannot be migrated using the business


transaction variant derived by the standard method, assign an
alternative business transaction variant.

For cross-company code documents, single documents from other


company codes are automatically assigned to the same business
transaction variant. For this reason, the internal key of the entire
document is displayed in the fields Reference Key and Reference
Transaction. You cannot assign different business transaction
variants to documents with the same reference fields. Check your
assignments and how they are derived by saving your settings.

For the migration of the documents contained in the table, the


business transaction variant assigned explicitly is used instead of
the business transaction variant derived from the document type or
transaction used to interpret the document. This is logged in the
status management of the migration objects in the Adjustment
field. You can display the status management in the migration
cockpit under Migration phase -> Evaluation -> Analyze
Migration Status and in the -> log for document adjustment.

Example

You have entered a customer invoice with document type DZ. In


customizing for document splitting, however, document type DZ
has the business transaction Payment assigned in a variant that
requires a bank account line in the document.

Migration of the invoice is rejected with the error message that the
document does not contain the required bank account line.

You assign business transaction Customer Invoice with an


appropriate business transaction variant to the document in this
activity and then repeat the migration for this document.

Document splitting now interprets the document as a customer


invoice and no longer applies the business transaction Payment to
this document.

1. 2. 7. 6. 3. NGL03_DEF_ALTERNATIVE_ITEM_CATG_ASSGNMT
(Document Link - /NGL/NGL03_DEF_ALT_ITEM_CATG )

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 47 of 386

Define Alternative Item Category Assignment

Use

In this activity, you assign an alternative Item category to the


posting item of a document. During migration, this assignment
overrides the standard item category assignment for document
splitting.

Prerequisites

Either you have Assigned a document splitting method in


customizing for document splitting, or you have entered a
migration-specific document splitting method in the related
migration cockpit activity.

Activities

Assign the item category to the line items that cannot be classified
uniquely or correctly for document splitting.

When the line items in the table are migrated, the item category
that has been assigned explicitly is used (instead of the item
category derived internally or from the G/L account) to interpret
the line item. This is logged in the status management of the
migration objects in the Adjustment field. You can display the
status management in the migration cockpit under Migration phase
-> Evaluation -> Analyze Migration Status and in the -> log for
document adjustment.

Example

You have posted items with different types, such as bank clearing
and other accruals. These items should be handled differently in
document splitting.

You have classified the G/L account in customizing for document


splitting using the item category that is applied most frequently.
Here, however, you assign this alternative item category explicitly
to the items that are to be interpreted using an alternative item
category.

Document splitting then applies these explicitly assigned


alternative item categories during the migration.

1. 2. 7. 6. 4. NGL03_ALTERNATIVE_CLEARING_RELATIONSHIP
(Document Link - /NGL/NGL03_DEF_ALT_CLRNG_REL )

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 48 of 386

Alternative Clearing Relationship

Use

You can influence the behavior of document splitting by changing


the clearing relationship of a clearing line. This is necessary in the
following cases:

 If you have created the clearing relationships of documents


subsequently
 If the clearing relationships of documents are incomplete
 If the clearing process is to be excluded from document
splitting

The document splitting programs always process clearings and


expect to find document splitting information for the items to be
cleared. If the document splitting information is missing or
incomplete, the document cannot be posted subsequently.

Prerequisites

In the customizing for document splitting, you can assign a


document splitting method or an alternative document splitting
method specific to the migration cockpit activity above.

Activities

The change of the clearing relationship is not part of the standard


migration procedure. If you need to change the clearing
relationship, create a message under component XX-RC-FI-MIG.

If you want to influence clearing lines, please note the following:

 You change a clearing relationship for a document line by


entering the corresponding data in the fields of the document
line to be processed.
 In the following fields, you assign the document line to be
cleared by entering the corresponding data for the cleared
item.
 You assign one of the following actions to the line:
 Add
If you want to add the clearing relationship, select the
action Add. If you want to represent multiple clearing
relationships with the same clearing line, give the
entries a unique number (which can be a randomly
chosen number) in field Seq. No. Clearing.
 Ignore Individual Clearing Relationships
If you want to delete the clearing relationship, select
the action Ignore Individual Clearing Relationships. If
you want to delete multiple clearing relationships with

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 49 of 386

the same clearing line, give the entries a unique


number (which can be a randomly chosen number) in
field Seq. No. Clearing.
 Ignore Entire Clearing
If you want to delete all clearing relationships, select
the action Ignore Entire Clearing. In this way, all
clearing relationships for this clearing item are not
used internally and no clearing is processed in
document splitting. The fields of the cleared item are
not used.

Ensure that the account and the amounts in the clearing


relationships agree.

If you create additional clearing relationships for document lines


that were posted before the migration date, you need to ensure that
the assigned cleared items are already in the work list of open
items to be migrated or that they are included explicitly in that
work list.

In the migration of document line items contained in the table, the


explicitly assigned clearing relationship is used in addition to the
clearing relationships represented in posting table BSE_CLR to
build the document splitting information, or any such clearing
relationship is ignored. This is logged in the status management of
the migration objects in the Adjustment field. You can display the
status management in the process tree under Migration phase ->
Evaluation -> Analyze Migration Status and in the -> log for
document adjustment.

1. 2. 8. NGL00_CHECK_FOR_SAPNOTES (Document Link -


/NGL/NGLM_CHECK_FOR_SAPNOTES )

Check Implementation of SAP Notes

Use

For the technical migration process it might be necessary to


implement some SAP notes into the SAP system. This activity
checks if the system has the needed technical prerequisites.

The activity does not check if application relevant SAP notes are
installed.

Prerequisites

The program can only check the implementation of a note if the


implementation was done via the standard procedure (transaction

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 50 of 386

SNOTE).

Activities

Execute the activity.

You will receive a list of SAP notes. A status will indicate if the
SAP note is installed or not. If the program could not determine the
correct implementation you will have two options to proceed.

1. Check the implementation manually. If the SAP note is


already implemented, change the status of the note manually
to yellow.
2. Implement the required SAP note with help of transaction
SNOTE. Execute the check again.

1. 2. 9. NGL00_CONF_RPLCMNT_OF_MOD_OR_ENHNCMNT
(Document Link - /NGL/NGLM_CONF_RPL_MOD_ENHMT )

Confirm Replacement of Modifications and


Enhancements

Use

If you use modifications or enhancements that could affect


the migration and are no longer applicable for the new
general ledger accounting, confirm that these have been
replaced by SAP standard or deactivated.

1. 3. NGL00_PRE-MIGRATION_PHASE

1. 3.1. NGL00_CONF_RECON_AND_CLOS_OF_PREV_FIYEAR
(Document Link - /NGL/NGLM_CONF_RECON_CLOSEFY )

Confirm Reconciliation and Closing of Previous Fiscal


Year

Use

A basic requirement for the migration is that the previous


fiscal year is definitely closed and must not be re-opened
under any circumstances.

The reason why re-opening the previous fiscal year is


forbidden is that, if you did so, the balance carry-forward
would be changed and become incorrect.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 51 of 386

It is not possible to re-run the normal FI balance carry-


forward to update the balance carry-forward in new general
ledger accounting. The migration is a one-time activity
where it is not possible to repeat the balance carry-forward
program in order to refresh the figures.

Activities

 Close posting periods in FI


 Close posting periods in FI-SL
 Close periods in CO
 Close previous fiscal year in Asset Accounting (FI-
AA)
 Close previous fiscal year in other SAP components
like Material Management, Sales and Distribution, and
so on

Prerequisites

The previous fiscal year has been closed and audited by your
auditor.

Consider also that all sending applications to FI must not be


opened again for back-dated postings. Otherwise the
corresponding FI documents for previous years can not be
processed.

Package specific information

For migration package 7 and 8:

You are able to start updating the new ledger(s) at beginning


of the fiscal year. Therefore the customizing of the new
ledger(s) as well as the migration plan must be imported into
your production system. At this point in time you post into
the new ledger and the previous fiscal year is still open. In
the meantime there is no complete reporting on the new
ledger(s) possible. Once you have closed the previous year
you can takeover the balance carry forward and open items
into the new ledger(s) and completely use these ledger(s).

1. 3. 2. NGL00_REGISTER_USERS (Document Link -


/NGL/NGLM_REGISTER_USERS )

Register SAP Users for Migration Project

Use

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 52 of 386

In this activity, you register the SAP users for the migration
project. These users are authorized to access the system
during the following migration timeframe. All other users
that were not registered here will be locked for logon in the
next step (not for migration package 7 and 8).

Make sure to register users for representatives of the relevant


business departments as well as technical users and IT users
for performing the technical activities.

Before you register and lock users, inform all users in your
organization that the SAP system will not be available for a
certain period of time due to the migration.

Package specific information

For migration package 7 and 8:

In contrast to other migration packages the users are not


blocked in migration package 7 and 8. You have to make
sure that all existing documents are posted into the new
ledger(s) subsequently until all documents are posted. In this
manner you do not have any downtime for creating the new
ledger(s).

1. 3. 3. NGL00_LOCK_SAP_USERS (Document Link -


/NGL/NGLM_LOCK_USERS )

Lock SAP Users

Use

In this activity, all SAP users that have not been registered in
the activity before are locked. This is necessary to ensure
that no unauthorized user activities that might endanger data
consistency take place during the migration.

Before you register and lock users, inform all users in your
organization that the SAP system will not be available for a
certain period of time due to the migration.

1. 3. 4. NGL00_DATA_BACKUP_BEFORE_MIGRATION
(Document Link - /NGL/NGLM_DATA_BACKUP_BEFORE )

Data Backup Before Migration

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 53 of 386

Use

Before you start the migration, you need to create a full data
backup. This data backup is needed for rebuilding the
system if irreparable errors occur during the migration.

Activities

Contact your system or database administrator.

1. 3. 5. NGL00_DATABASE_ACTIVITIES (Document Link -


/NGL/NGLM_DBASE_ACTIVITIES )

Database and System Activities

Use

Before the migration starts, it is necessary to back up the


SAP system in order to ensure the data integrity in the event
of errors. We recommend you use a classic, full data backup.

Additionally you should deactivate database logging by


using the appropriate system parameters for performance
reasons. The detailed activities concerning your database
need to be decided by your system administrator. Please note
that in case of deactivated database logging a point-in-time-
recovery is not possible.

Consider also related activities like

 Cancellation of periodic and occasional jobs


 Stopping connections for RFC, EDI, ALE, and so on
 System operation mode (work processes for
background, update, and so on)

Activities

Please contact your system or database administrator.

Prerequisites

Before you proceed with database and system activities,


please make sure that all users who are not registered for
the migration are logged off. The functions for
registration and locking users do not log off the users
automatically.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 54 of 386

1. 3. 6. NGL03_REVERSE_BALANCE_SHEET_ADJUSTMENT
(Document Link - /NGL/NGL03_REV_BALSHEET_ADJS )

Reverse Balance Sheet Adjustment

Use

If you use business areas and also use adjustments for the
creation of business area financial statements, you need to
consider a special feature that applies to the migration to
new General Ledger Accounting: Adjustments are no longer
used in new General Ledger Accounting because these
functions have been replaced by document splitting. If you
continue to use the business area as a financial statement
characteristic, you need to perform document splitting using
the characteristic Business Area with option Zero Balance
(requires migration package 3 , 5 or 6). In this case, you
have to consider the following.

Adjustments are performed for financial statements.


Summary postings are made to subsequently assign any
items not assigned to a business area and to enable the
creation of a complete financial statement with a zero
balance at business area level. In general, you perform the
adjustment for mid-year closing at the same time as the
migration (that is, in migration phase 1). In this way, you
can assume at the time of the migration that there are
adjustment documents that are also included in the migration
with document splitting.

We recommend using a mass reversal to reverse those


documents from the financial statement adjustments
(SAPF180) that were posted in migration phase 1 (by
period). Please note that the SAPF180S reversal function
resets only the tables for the balance sheet adjustments, but
not the FI documents created by SAPF180. For reversal of
FI documents, you have to use transaction F.80 with a
suitable condition to select the relevant documents. The
reference number (XBLNR) of the adjustment documents
always starts with "SAPF180", so we recommend using the
string "SAPF180*" as selection criteria for the mass
reversal.

During the time interval after you performed the report for
the last time and before you start the migration, you must not
perform any clearing.

Example

You have previously posted a vendor invoice as follows:

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 55 of 386

Vendor Invoice

Account Business Area Amount in EUR

Expense 0001 500

Expense 0002 500

Tax - 160

Vendor - 1160-

Adjustment Posting

Account Business Area Amount in EUR

Tax adjustment 0001 80

Tax adjustment - 80-

Tax adjustment 0002 80

Tax adjustment - 80-

Adjustment posted - 580

Adjustment posted 0001 580-

Adjustment posted - 580

Adjustment posted 0002 580-

After the migration (with document splitting), the General


Ledger view looks as follows:

a) Original document

Account Business Area Amount in EUR

Payables 0001 580-

Payables 0002 580-

Expense 0001 500

Expense 0002 500

Tax 0001 80

Tax 0002 80

b) Adjustment document

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 56 of 386

Account Business Area Amount in EUR

Adjustment posted - 580

Adjustment posted 0001 580-

Adjustment posted - 500

Adjustment posted 0002 580-

Tax adjustment 0001 80

Tax adjustment - 80-

Tax adjustment 0002 80

Tax adjustment - 80-

Clearing account 0001 580

Clearing account - 580-

Clearing account 0002 580

Clearing account - 580-

Clearing account - 80

Clearing account 0001 80-

Clearing account - 80-

Clearing account 0002 80-

The clearing account is the zero balance clearing account


from the customizing for document splitting.

Since document splitting treats the adjustment documents in


the way illustrated above, the financial statement would
reflect all business areas, whereas considering just one
business area produces an incorrect representation in the line
items.

Financial Statement for Business Area 0001


Business Area Amount in EUR

Payables 0001 1160-

Clearing 0001 580

Expense 0001 500

Tax 0001 160

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 57 of 386

Clearing 0001 80-

The correct financial statement for business area 0001 would


look as follows:

Account Business Area Amount in EUR

Payables 0001 580-

Expense 0001 500

Tax 0001 80

1. 3. 7. NGL03_REVERSE_P/L_ADJUSTMENT (Document Link -


/NGL/NGL05_REVERSE_PL_ADJUST )

Handling of SAPF181 Documents in the Context of new


G/L Migration With Document Splitting

Unlike the SAPF180 documents for splitting of balance


sheet accounts by business areas, the documents created by
report SAPF181 (profit and loss adjustment) should not be
reversed during a general ledger migration. In the classic
general ledger, this report covers several areas:

1. Splitting of cash discount paid and cash discount


received (or lost cash discount and exchange rate
differences respectively) by business areas and profit
centers
2. Subsequent activation of cash discount paid and cash
discount received (or lost cash discount respectively)
for fixed assets
3. If the accounts for cash discounts or exchange rate
differences were created as cost elements, the report
also makes an adjustment to cost centers
4. Splitting of backdated tax calculation due to deducted
cash discount

In new G/L, the functions described above are implemented


directly during the original posting of a document using the
document splitting function. For postings during phase 1 of
the migration, not all information that is required to
completely replace the SAPF181 documents is available in
the original documents. The reason for this is that in new
G/L the adjustment for CO account assignments and fixed
assets does not take place in the general ledger view, but in
the entry view for a document (see example 3). During the
migration to new G/L, only the general ledger views are
rebuilt by subsequent processing of document splitting,

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 58 of 386

whereas the entry screen for already posted documents


remains unchanged (see examples 1 and 2). This is why the
SAPF181 documents from phase 1 must be migrated.

Procedure for the Migration:

If the accounts for cash discounts or exchange rate


differences were created as cost elements, all these lines
should have a default account assignment (profit center /
business area), for example from the cost center. If these
lines do not contain all account assignments that are relevant
for document splitting, for example because not all accounts
were created as cost elements or because a new account
assignment is introduced, you should add the missing default
account assignments in the documents using BAdI
FAGL_MIG_ADJ_ACCIT. This description also includes
sample programming for the BadI (see below). The example
given below assumes that the SAPF181 documents were
posted with document type "SU" and that document splitting
by profit centers and by business areas is used.

As you can see in examples 1 and 2 below, there are two


possible ways of splitting the tax line from the backdated tax
calculation. With variant 1, splitting of the tax line is based
on the cash discount line in the payment and consequently
gets the default account assignment during the migration. In
this case, the splitting takes place based on the default
splitting method (0000000012 - splitting: like 0000000002
(follow-up costs online)) and the business transaction
(variant) 1000/0001 for payment documents. As you can see
in the example, the drawback of this method is that the
balance sheet for the business area for phase 1 does not have
a zero balance and that you must adapt the balance of the tax
account for each account assignment using transaction FB41
after the migration.

With variant 2, a customer-specific modification of


document splitting for business transaction variant 1000 is
required for payments. You can define an alternative
splitting method for the migration in the migration
customizing. In this alternative splitting method, you can
make the required customer-specific modifications. To do
so, copy the complete splitting method you want to use for
document splitting (normally, this will be approach
0000000012) to the customer namespace and define the new
splitting method as a deviating method in migration
customizing. After that, you define the basis positions 02000
(customer) and 03000 (vendor) as references for item
category 05100 (value added tax) and set the indicator for
automatic splitting for the added items. Next, deleted item
category 40100 (cash discount) in Customizing (Financial

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 59 of 386

Accounting (New) -> General Ledger Accounting (New) ->


Business Transactions -> Document Splitting -> Extended
Document Splitting -> Define Document Splitting Rule).

Caution:
If you used report SAPF181 to post documents for splitting
of backdated tax calculation, you should reverse these
documents. (They are documents of their own.) You identify
these documents by means of the reference number
(XBLNR) in the document header and then reverse them
using a mass reversal (TA F.80). To find the relevant
documents, enter the following search string for the
reference number: SAPF181/*/4 (The asterisk is a wildcard
for the middle part of the number.)

Sample Coding for BAdI FAGL_MIG_ADJ_ACCIT

METHOD IF_EX_FAGL_MIG_ADJ_ACCIT~ADJUST_ACCIT.

* In the example, the profit center as well as


the business area are

* supplied with a default value if one of these


two fields is initial.

* The coding must be modified in accordance with


your new G/L configuration.

FIELD-SYMBOLS: <LS_ACCIT> LIKE LINE OF


CT_ACCIT_ASGMT.

* Subsequent posting of the SAPF181 lines using


a default value for lines

* that were posted without an account assignment


because the original line

* itself did not have an account assignment

* In the standard setup, SAPF181 documents are


posted with document type'SU'.

* If necessary, this must be changed in


accordance with the actual system

* configuration.

READ TABLE IT_ACCIT_EX WITH KEY ACCIT-BLART =


'SU' TRANSPORTING NO FIELDS.

IF SY-SUBRC = 0.

LOOP AT CT_ACCIT_ASGMT ASSIGNING <LS_ACCIT>

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 60 of 386

WHERE PRCTR EQ SPACE

OR GSBER EQ SPACE.

* Copy default account assignment for profit


center

IF <LS_ACCIT>-PRCTR IS INITIAL.

"Sample value for a default profit center

<LS_ACCIT>-PRCTR = '0000009999'.

ENDIF.

* Copy default account assignment for business


area

IF <LS_ACCIT>-GSBER IS INITIAL.

" Sample value for a default business area

<LS_ACCIT>-GSBER = '9999'.

ENDIF.

ENDLOOP.

ELSE.

* Subsequent posting of cash discount and


exchange rate difference lines in

* FI cocuments with a default value

LOOP AT IT_ACCIT_EX TRANSPORTING NO FIELDS

WHERE ( ACCIT-KTOSL EQ 'SKE'

OR ACCIT-KTOSL EQ 'SKT'

OR ACCIT-KTOSL EQ 'VSK'

OR ACCIT-KTOSL EQ 'KDF' )

AND ( ACCIT-PRCTR EQ SPACE

OR ACCIT-GSBER EQ SPACE ).

READ TABLE CT_ACCIT_ASGMT ASSIGNING <LS_ACCIT>


INDEX SY-TABIX.

* Copy default account assignment for profit


centers

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 61 of 386

IF <LS_ACCIT>-PRCTR IS INITIAL.

" Sample value for a default profit center

<LS_ACCIT>-PRCTR = '0000009999'.

ENDIF.

* Copy default account assignment for business


area

IF <LS_ACCIT>-GSBER IS INITIAL.

" Sample value for a default business area

<LS_ACCIT>-GSBER = '9999'.

ENDIF.

ENDLOOP.

ENDIF.

ENDMETHOD.

Example 1:

 Vendor invoice with 2% cash discount


 Accounts for cash discounts are also created as cost
elements, and the default account assignment is die
cost center CS99 with business area BA99
 Balance sheets by business areas are activated

Documents before the migration

Vendor invoice (entry view):

G/L account Business area Cost center Amount

Vendor -1,100.00

Expense account 1 BA01 CS01 500.00

Expense account 2 BA02 CS02 500.00

Tax 100.00

Vendor payment (entry view):

G/L account Business area Cost center Amount

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 62 of 386

Vendor 1,100.00

Bank -1,078.00

Cash discount received BA99 CS99 -20.00

Tax -2.00

Adjustment by SAPF181 (entry view):

G/L account Business area Trading partner business


area Cost center Amount

Cash discount received BA99 CS99 10.00

Cash discount received BA01 CS01 -10.00

Cash discount received BA99 CS99 10.00

Cash discount received BA02 CS02 -10.00

Offsetting account BA99 BA01 -10.00

Offsetting account BA01 BA99 10.00

Offsetting account BA99 BA02 -10.00

Offsetting account BA02 BA99 10.00

Documents after the Migration

 Document splitting for business areas including zero


balance is active

Vendor invoice (general ledger view):

G/L account Business area Cost center Amount

Vendor BA01 -550.00

Vendor BA02 -550.00

Expense account 1 BA01 500.00

Expense account 2 BA02 500.00

Tax BA01 50.00

Tax BA02 50.00

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 63 of 386

Vendor payment (general ledger view - variant 1):

G/L account Business area Cost center Amount

Kreditor BA01 550.00

Vendor BA02 550.00

Bank BA01 -550.00

Bank BA02 -550.00

Bank BA99 22.00

Cash discount received BA99 -20.00

Tax BA99 -2.00

Vendor payment (general ledger view - variant 2):

G/L account Business area Cost center Amount

Vendor BA01 550.00

Vendor BA02 550.00

Bank BA01 -549.00

Bank BA02 -549.00

Bank BA99 20.00

Cash discount received BA99 -20.00

Tax BA01 -1.00

Tax BA02 -1.00

Adjustment by SAPF181 (general ledger view):

The SAPF181 document in the general ledger view is not


changed by the document splitting.

G/L account Business area Trading partner business


area Cost center Amount

Cash discount received BA99 10.00

Cash discount received BA01 -10.00

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 64 of 386

Cash discount received BA99 10.00

Cash discount received BA02 -10.00

Offsetting account BA99 BA01 -10.00

Offsetting account BA01 BA99 10.00

Offsetting account BA99 BA02 -10.00

Offsetting account BA02 BA99 10.00

Example 2:

 Customer invoice with 2% cash discount


 The account for cash discount paid has not been
created as a cost element
 Balance sheets by business areas are activated

Documents before the migration

Customer invoice (entry view):

G/L account Business area Cost center Amount

Customer 1,100.00

Revenue account BA01 -500.00

Revenue account BA02 -500.00

Tax -100.00

Customer payment (entry view):

G/L account Business area Cost center Amount

Customer -1,100.00

Bank 1,078.00

Cash discount paid 20.00

Tax 2.00

Adjustment by SAPF181 (entry view):

G/L account Business area Trading partner business


area Cost center Amount

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 65 of 386

Cash discount paid -10.00

Cash discount paid BA01 10.00

Cash discount paid -10.00

Cash discount paid BA02 10.00

Offsetting account BA01 10.00

Offsetting account BA01 -10.00

Offsetting account BA02 10.00

Offsetting account BA02 -10.00

Documents after the migration

 Document splitting for business areas including zero


balance is active and the business area field is a
required entry field

Customer invoice (general ledger view):

G/L account Business area Cost center Amount

Customer BA01 550.00

Customer BA02 550.00

Revenue account BA01 -500.00

Revenue account BA02 -500.00

Tax BA01 -50.00

Tax BA02 -50.00

Customer payment (general ledger view - variant 1):

G/L account Business area Cost center Amount

Customer BA01 -550.00

Customer BA02 -550.00

Bank BA01 550.00

Bank BA02 550.00

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 66 of 386

Bank BA99 22.00

Cash discount received BA99 20.00

Tax BA99 2.00

Customer payment (general ledger view - variant 2):

G/L account Business area Cost center Amount

Customer BA01 -550.00

Customer BA02 -550.00

Bank BA01 549.00

Bank BA02 549.00

Bank BA99 20.00

Cash discount received BA99 20.00

Tax BA01 1.00

Tax BA02 1.00

Adjustment by SAPF181 (general ledger view):

In the general ledger view, the SAPF181 document is


enriched by the stored default value.

G/L account Business area Trading partner business


area Cost center Amount

Cash discount received BA99 -10.00

Cash discount received BA01 10.00

Cash discount received BA99 -10.00

Cash discount received BA02 10.00

Offsetting account BA99 BA01 10.00

Offsetting account BA01 BA99 -10.00

Offsetting account BA99 BA02 10.00

Offsetting account BA02 BA99 -10.00

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 67 of 386

Example 3:

 Vendor invoice with 2% cash discount


 Document splitting for business areas including zero
balance

Posting in new G/L with active document splitting

Vendor invoice (entry view):

G/L account Business area Cost center Amount

Vendor -1,100.00

Expense account 1 BA01 CS01 500.00

Expense account 2 BA02 CS02 500.00

Tax 100.00

Vendor invoice (general ledger view):

G/L account Business area Cost center Amount

Vendor BA01 -550.00

Vendor BA02 -550.00

Expense account 1 BA01 500.00

Expense account 2 BA02 500.00

Tax BA01 50.00

Tax BA02 50.00

Vendor payment (entry view):

G/L account Business area Cost center Amount

Vendor 1,100.00

Bank -1,078.00

Cash discount received BA01 CS01 -10.00

Cash discount received BA02 CS02 -10.00

Tax -2.00

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 68 of 386

Vendor payment (general ledger view):

G/L account Business area Cost center Amount

Vendor BA01 550.00

Vendor BA02 550.00

Bank BA01 -539.00

Bank BA02 -539.00

Cash discount received BA99 -10.00

Cash discount received BA02 -10.00

Tax BA01 -1.00

Tax BA02 -1.00

1. 3. 8. NGL03_REVERSE_TAX_ADJUSTMENT_POSTINGS
(Document Link - /NGL/NGLM_REV_TAX_ADJUST_POS )

Reverse Tax Adjustment Postings

Use

In one of the preceding activities, you reversed the balance


sheet adjustment (if applicable). Generally, the same may
happen for the tax adjustments created by SAPF181. The
reference number (XBLNR) in SAPF181 for tax adjustment
documents always follow the naming convention
"SAPF181/*/4", so we recommend using this string as
selection criteria for the mass reversal.

Please note that the other functions of SAPF181 must be


treated in a specific manner as described in the
documentation for preceding activities.

Example

You have previously posted a vendor invoice and payment


as follows:

Account Business Area Amount in EUR

Expense 0001 500

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 69 of 386

Tax Account - 100

Vendor 0001 600-

Vendor Payment with 5% cash discount, 20% tax rate

Account Business Area Amount in EUR

Cash Discount 0001 25-

Tax Account - 5-

Bank 0001 570-

Vendor 0001 600

Adjustment Posting

Account Business Area Amount in EUR

Tax Adjustment Account 0001 5-

Tax Adjustment Account - 5

After the migration (with document splitting), the General


Ledger view looks as follows:

a) Original document

Vendor Invoice

Account Business Area Amount in EUR

Expense 0001 500

Tax Account 0001 100

Vendor 0001 600-

Vendor Payment

Account Business Area Amount in EUR

Cash Discount 0001 25-

Tax Account 0001 5-

Bank 0001 570-

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 70 of 386

Vendor 0001 600

b) Adjustment document

Account Business Area Amount in EUR

Tax Adjustment Account 0001 5-

Tax Adjustment Account - 5

Clearing Account 0001 5

Clearing Account - 5-

The clearing account is the zero balance clearing account


from the customizing for document splitting.

Since document splitting treats the adjustment documents in


the way illustrated above, the financial statement would
reflect all business areas, whereas considering just one
business area produces an incorrect representation in the line
items.

Financial Statement for Business Area 0001 Business


Area Amount in EUR

Payables 0001 0

Bank 0001 570-

Tax 0001 90

Clearing 0001 5

Cash Discount 0001 25-

Expense 0001 500

The correct financial statement for business area 0001


considering these documents only would look as follows:

Financial Statement for Business Area 0001 Business


Area Amount in EUR

Payables 0001 0

Bank 0001 570-

Tax 0001 95

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 71 of 386

Cash Discount 0001 25-

Expense 0001 500

1. 3. 9. NGL03_CONF_REVERSAL_OF_P/L_B/S_ADJUSTMNT
(Document Link - /NGL/NGL05_CONF_REVERSAL_ADJ )

Confirm Reversal of Balance Sheet / P&L Adjustment

Use

In this activity, you confirm that reversal of balance sheet


and P&L adjustment in phase 1 has been carried out
completely, if applicable.

1. 3.10.
NGL00_REVERSE_FOREIGN_CURRENCY_VALUATION
(Document Link - /NGL/NGLM_REV_FOR_CURR_VAL )

Reverse Foreign Currency Valuation

Use

In classic General Ledger Accounting, it was possible to use


a function called BDIFF update (in SAPF100). With this
function, the valuation difference of an open item was
updated into the corresponding line item in BSEG. This
function is no longer supported in new General Ledger
Accounting.

In the new foreign currency valuation


(FAGL_FC_VALUATION), BDIFF is not read. The new
foreign currency of evaluated items causes incorrect results
if the BDIFF update is not reset.

Recommendation

SAP recommends using the function for resetting foreign


currencies, which sets the BDIFF to zero and reverses the
valuation.

Note

Please refer SAP Note 960661 and 1006684 for more


information.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 72 of 386

Package specific information

For migration package 8 (Subsequent change from account


solution to ledger solution):

Please use the Reset Valuation function in the new foreign


currency valuation program (FAGL_FC_VALUATION) for
reversal of the valuation for all periods in current fiscal year
by selecting all valuations from migration date until now.

Please note:

Valuations are only reset if a valuation has taken place for


the same key date with the same valuation area. If an item is
not valuated for the key date, the valuation for the item
cannot be reset and nothing happens to the item.

1. 3.11. NGL00_REVERSE_FOREIGN_CURR_VAL_CONFIRM
(Document Link - /NGL/NGLM_REV_FOR_CURR_CONF )

Confirm Reversal of Foreign Currency Valuation

Use

In this activity you confirm that the valuation run(s) starting


from migration date have been reversed completely.

Dependencies

After reversal of the original valutation run(s) and the


transport of the new account assignments you are able to
rerun the foreign currency valuation.

1. 3.12. NGL03_POST_PARKED_DOCUMENTS (Document Link


- /NGL/NGL05_POST_PARKED_DOCS )

Post Parked Documents

Use

As a rule, parked documents are not relevant for the


migration. There is one exception, however, that makes it
necessary to differentiate between two categories of parked
or preliminary documents:

 Preliminary documents, such as invoices, that have not

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 73 of 386

been posted yet and that do not refer to follow-up


documents
 Preliminary documents that are used as reference
documents in follow-up processes; currently this can
be prepayments on preliminary postings

If there are actual documents in FI that refer to parked or


preliminary documents, these parked documents must be
posted before the migration (because of document splitting).
If there is no reference to the parked document, the
document can be enriched by all necessary account
assignments and finally posted when new general ledger
accounting is active. As an option, these parked documents
can also be posted before the migration.

1. 3.13. NGL03_PERF_OTH_OPEN_BTCH_IP_SSINS_N_POST
(Document Link - /NGL/NGLM_PERF_OPN_BTCH_SESS )

Check Open Batch Input Sessions and Postings

Use

In this manual step, you confirm that all open batch-input


sessions and postings have been performed successfully.
Open batch-input sessions are those with status

 New
 Incorrect
 In Process
 In Background
 Being Created

Note: Customer-specific programs that create batch-input


sessions must be adapted if you use additional account
assignments in the new general ledger accounting.
Especially if you use document splitting (requires migration
package 3 or 5), you should analyze the impact of the
created documents regarding the document splitting in new
general ledger accounting. Make sure that these processes
are tested adequately.

Activities

Process all relevant sessions and confirm the status in this


migration cockpit activity.

1. 3.14. NGL03_COMPLETE_PAYMENT_RUNS (Document Link

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 74 of 386

- /NGL/NGL05_COMPL_PAYMNT_RUNS )

Check Payment Runs

Use

In general, payment runs should be processed before any


migration activities are started. If there are open payment
runs at this point in time, this might have an impact on the
follow-up process in new general ledger accounting. With
document splitting (requires migration package 3 , 5 or 6), it
could happen that the payment proposal does not contain
account assignments that are required for the postings under
new G/L later on, for instance, if you introduce document
splitting by profit centers. If there are downpayment requests
without a profit center within the payment proposal, you
receive an error. In this case there are two options:

 Complete the payment run under classic G/L and


make sure that all necessary account assignments are
available or derived by a BAdI.
 If you do not complete the payment run, you can
delete it in new general ledger accounting. Note that
changes in payment proposal will possibly be lost
then.

1. 3.15.
NGL00_STOP_POSTINGS_DURING_MIG_PROCESS
(Document Link -
/NGL/NGLM_STOP_POST_DURG_MIG )

Stop Postings During Migration Process

Use

In order to be able to migrate a constant set of data to


the new general ledger accounting, you must stop all
postings in the system. We recommend that you
specify a system downtime for the migration during
which no operational activity takes place.

Prerequisites

You have finished all necessary postings. After the


migration, posting in the previous fiscal year is no
longer possible. Reopening the previous fiscal year is
forbidden.

Depreciation and periodic postings from FI-AA were


completed for the previous fiscal year. Also other

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 75 of 386

sending applications that create FI documents have


been processed completely.

1. 3.16. NGL00_CHECK_RESET_CLEARING_CONTROL
(Document Link -
/NGL/NGLM_CHK_RESET_CLR_CTRL )

Check Clearing Reset Control

Use

The program for this activity checks if your system


allows a clearing reset for clearing dates before the
migration date. If so, you will receive a warning
message. When you proceed with the migration, you
are no longer allowed to reset clearing for entries from
before the migration date. Re-posting to the previous
year is forbidden as well. (More information about this
is provided in the documentation for activity Confirm
Reconciliation and Closing of Previous Fiscal Year).

Activities

Delete the message control for area FAGL_MIG and


message number 066 or set this message to type
"E" (error message).

1. 3.17. NGL03_CHECK_DOCUMENT_SPLITTING

1. 3.17.1.
NGL03_CHECK_BUSI_TRANS_ASSGMNT_FOR_DOC1
(Document Link -
/NGL/NGL03_CHK_BUSI_TRAN_ASG )

Check Business Transaction Assignment for


Documents

Purpose

The program checks whether each of the selected


documents posted in migration phase 1 applies the
rules stored in the business transaction variant
assigned to that document.

Prerequisites

The customizing for document splitting in new general

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 76 of 386

ledger accounting has been created.

Features

The program checks the selected document types to


determine whether the documents posted since the
migration date fulfill the definition of the assigned
business transaction variant. You check the
assignment of the business transactions to document
types in activity Check Document Types for Document
Splitting.

If you have already assigned a document-specific


business transaction and activated it in customizing for
the migration, this assignment is applied for the check.
For all other documents, the system derives the
business transaction from the document type used.

Documents that do not fit the assigned business


transaction variant are listed as containing errors. You
can use the Save Docs Containing Errors indicator to
include these documents with the checked business
transaction variant and status Inactive in the table for
alternative business transaction assignments. Here,
you can assign to these documents a suitable business
transaction variant for use in migration.

If required, you can specify a posting period or


document number for which you want the system to
display the documents to be checked.

1. 3.17. 2. NGL03_LIST_LOG_FOR_VALIDATION
(Document Link -
/NGL/NGLM_LIST_LOG_FOR_VALID )

List Log for Validation of Document Splitting

Use

In this activity, you can analyze the log entries for


validation.You can delete any entries that are no
longer required from the log. However note that
deleted log entries cannot be recreated.

Requirements

You have activated the validation.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 77 of 386

1. 3.17. 3.
NGL03_ALTERNATI_SETTINGS_4_DOC_SPLITTING

1. 3.17. 3.1.
NGL03_DEF_ALTERNATIVE_DOC_SPLIT_METHOD
(Document Link -
/NGL/NGL03_DEF_ALT_SPLT_METH )

Define Alternative Document Splitting Method

Use

In this activity, you enter a separate document splitting


method that is to be used exclusively for the migration
of documents that have already been posted.

Requirements

 In the customizing for document splitting in


new general ledger accounting, you have
defined the alternative method in the activity
Define Document Splitting Method.

To prevent inconsistencies between the migrated


documents and the documents posted after activating
new general ledger accounting, you need to copy the
standard method (stored under Assign Document
Splitting Method and make adjustments accordingly.

 In the alternative document splitting method for


the migration, all Document Splitting Rules
used for the migration must be defined
completely. To this purpose, copy all the
document splitting rules of the document
splitting method stored as standard to the
alternative document splitting method for the
migration, and then make the migration-specific
changes to the document splitting rules.
 If necessary, you can define more business
transaction variants. You can then define
alternative rules for these business transaction
variants or change the assignment to the item
category (see also the activity Define alternative
business transaction assignment in the
migration cockpit).

Activities

Specify the alternative document splitting method for

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 78 of 386

the migration.

Note that this method is only used for the documents


to be migrated. The alternative document splitting
method is not applied to documents posted after the
migration!

Example

Customer invoices in the current year need to be


handled with an alternative document splitting rule.

The standard method cannot split this document in a


way that makes business sense because the document
contains posting items with item category Balance
Sheet Account (01000).

To define an alternative document splitting method,


you copy the document splitting rules from the
standard method and change the rules to meet your
requirements. In this example, you add a new rule for
the business transaction variant Customer Invoices that
splits item category 01000 on the basis of the revenue
item.

In this way, the change takes effect for migration


documents, but it is not applied to new documents to
be posted after new general ledger accounting has
been activated.

1. 3.17. 3. 2.
NGL03_DEF_ALTERNATIVE_BUSI_TRANSACTION
(Document Link -
/NGL/NGL03_DEF_ALT_BUSI_TRAN )

Define Alternative Business Transaction


Assignment

Use

In this activity, you can assign an alternative business


transaction variant to selected documents. In the
migration, this assignment overrides the standard
derivation of the business transaction variant, such as
derivation from the document type.

Prerequisites

Either you have assigned a document splitting method

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 79 of 386

in customizing for document splitting, or you have


specified an alternative document splitting method in
the related activity.

Note: Here you only assign existing business


transaction variants. You may also need to define a
document splitting method for the migration only.

Activities

For documents that cannot be migrated using the


business transaction variant derived by the standard
method, assign an alternative business transaction
variant.

For cross-company code documents, single documents


from other company codes are automatically assigned
to the same business transaction variant. For this
reason, the internal key of the entire document is
displayed in the fields Reference Key and Reference
Transaction. You cannot assign different business
transaction variants to documents with the same
reference fields. Check your assignments and how
they are derived by saving your settings.

For the migration of the documents contained in the


table, the business transaction variant assigned
explicitly is used instead of the business transaction
variant derived from the document type or transaction
used to interpret the document. This is logged in the
status management of the migration objects in the
Adjustment field. You can display the status
management in the migration cockpit under Migration
phase -> Evaluation -> Analyze Migration Status and
in the -> log for document adjustment.

Example

You have entered a customer invoice with document


type DZ. In customizing for document splitting,
however, document type DZ has the business
transaction Payment assigned in a variant that requires
a bank account line in the document.

Migration of the invoice is rejected with the error


message that the document does not contain the
required bank account line.

You assign business transaction Customer Invoice


with an appropriate business transaction variant to the

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 80 of 386

document in this activity and then repeat the migration


for this document.

Document splitting now interprets the document as a


customer invoice and no longer applies the business
transaction Payment to this document.

1. 3.17. 3. 3.
NGL03_DEF_ALTERNATIVE_ITEM_CATG_ASSGNMT
(Document Link -
/NGL/NGL03_DEF_ALT_ITEM_CATG )

Define Alternative Item Category Assignment

Use

In this activity, you assign an alternative Item


category to the posting item of a document. During
migration, this assignment overrides the standard item
category assignment for document splitting.

Prerequisites

Either you have Assigned a document splitting


method in customizing for document splitting, or you
have entered a migration-specific document splitting
method in the related migration cockpit activity.

Activities

Assign the item category to the line items that cannot


be classified uniquely or correctly for document
splitting.

When the line items in the table are migrated, the item
category that has been assigned explicitly is used
(instead of the item category derived internally or
from the G/L account) to interpret the line item. This
is logged in the status management of the migration
objects in the Adjustment field. You can display the
status management in the migration cockpit under
Migration phase -> Evaluation -> Analyze Migration
Status and in the -> log for document adjustment.

Example

You have posted items with different types, such as


bank clearing and other accruals. These items should
be handled differently in document splitting.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 81 of 386

You have classified the G/L account in customizing


for document splitting using the item category that is
applied most frequently. Here, however, you assign
this alternative item category explicitly to the items
that are to be interpreted using an alternative item
category.

Document splitting then applies these explicitly


assigned alternative item categories during the
migration.

1. 3.18. NGL00_CHECK_ACCT_CONTROL_SETTINGS
(Document Link -
/NGL/NGLM_CHK_ACT_CTRL_STNGS )

Check Account Control Settings

Use

A prerequisite for a consistent migration of the open


items is that the current account control settings are
correct. If in the past the account control settings have
been switched from "open item managed" to "non-
open item managed" or vice versa without adjusting
the corresponding line items, there is an inconsistency
that will cause problems during/after the migration
process.

Example

If you post an open item, the corresponding line item


will be technically posted with the account control
settings that are valid while the posting happens. If
afterwards the account control settings will be
changed (switch from "open item managed" to "non-
open item managed") without adjusting the existing
line items it would look like that the line item is an
open item although the corresponding account is no
longer open item managed.

Activities

Execute the activity.

The program will check for all assigned company


codes of the current migration plan if the existing line
items are consistent with the current account control
settings.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 82 of 386

The check will be done for all line items of the G/L
accounts in the system (technically: tables BSIS and
BSAS will be checked).

If inconsistent line items exist you will find the


corresponding G/L account in the protocol
(reconciliation accounts will not be checked).
Inconsistent line items must be corrected before the
migration starts. Check SAP Note 175960 for further
information. If you need assistance for the correction,
open a customer message on component XX-RC (XX-
RC = remote consulting).

Remark

In a huge database the runtime of the program can be


very long as all existing line items and all existing
accounts for each assigned company code will be
checked.

Relevant for Enhancement Package 3 (EhP3) or


higher

With EhP3 (and the activation of the corresponding


business function for new G/L) it is possible to do
clearings specific to ledger groups. This new feature
can be activated for G/L accounts in the corresponding
account master data with flag "Clearing Specific to
Ledger Groups" (further information can be found in
the F1 help of this flag).

If at least EhP3 is installed in your system, the


program will do some further consistency checks
related to this new feature. The program will check
that the account master data as well as the existing
open and cleared items of the G/L accounts are
fulfilling the basic requirements for the new feature.

1. 3.19. NGL00_RECONCILE_CLASSIC_GL (Document


Link - /NGL/NGLM_RECNCILE_CLASK_LEG )

Reconcile Classic G/L for Current Fiscal Year

Use

SAP recommends reconciling the system by using the


Financial Accounting Comparative Analysis
(SAPF190) at period end, for example monthly. In

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 83 of 386

particular, this program should be performed before


the migration takes place to ensure the consistency of
the transaction figures.

Remark
Within scenarios 4 and 5 transaction FAGLF03
(program TFC_COMPARE_VZ) will be used.

Activities

In the event of differences, the incorrectness must be


clarified and repaired. If necessary, contact SAP
Support (by creating a message).

1. 3.20. NGL00_RECONCILE_SOURCE_LEDGERS
(Document Link -
/NGL/NGLM_RECNCILE_SRC_LEGS )

Reconcile Source Ledgers

Use

Depending on the source ledgers that you actually use


and the account assignments that you would like to
transfer within the balance carry-forward, you may use
either standard GLT0 or the appropriate ledger in the
other SAP totals tables GLFUNCT, GLT3, GLPCT, or
other FI-SL ledgers in your own totals table.

Normally, GLT0 is the table to be used for uploading


the balance carry-forward. If you want to migrate the
balance carry-forward for additional characteristics
such as Profit Center or Trading Partner, you can
upload the balance carry-forward for instance from the
ledgers in GLT3, GLFUNCT, or GLPCT.

Note that GLFUNCT is only relevant if you have


trading partner information in GLFUNCT that requires
balance sheet accounts (and not only P&L accounts in
combination with functional area) to be posted to
GLFUNCT as well. The P&L accounts whose balance
is zero are not relevant for the upload balance carry-
forward.

If you use tables other than GLT0 for the upload


carry-forward, you have to reconcile the ledger that
you want to use with GLT0 on company code and
account level.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 84 of 386

For a migration from GLT0 ledger '0' only, you can set
this activity to status green, and no further action is
required in this activity.

1. 3.21.
NGL00_CONFIRM_EXEC_OF_BALCF_OF_SRC_LEDGS
(Document Link -
/NGL/NGLM_CONF_EXEC_CF_SRCLD )

Confirm Balance Carry-Forward of Source


Ledgers

Use

The transfer of the balance carry-forward to new


general ledger accounting cannot take place until the
balance carry-forward program for the source ledger
has been performed completely.

In this activity, you confirm that balance carry-


forward in the source ledgers up to the current fiscal
year (of the migration) has been done.

In the case of G/L accounts that are not managed on


an open-item basis and that do not represent
reconciliation accounts for customers or vendors,
balances are transferred in totals, not by document line
item.

Make sure that you create the balance carryforward for


these accounts within the relevant source ledger in
classic G/L. Activity 'Transfer Balance Carry-
Forward' in 'Migration phase' transfers the balance
carryforward values from an appropriate source ledger
(such as GLT0, GLT3, or GLFUNCT) that has been
assigned in the setup phase into a ledger in New
General Ledger Accounting.

Balance carryforward in the source ledgers up to the


current fiscal year (of the migration) is required to
build the totals table in New General Ledger
Accounting correctly using the 'Transfer Balance
Carry-Forward' activity.

1. 3.22.
NGL00_CRE_OPEN_BALANCE_SHEET_4_CC_IN_CLA
(Document Link -

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 85 of 386

/NGL/NGLM_CRT_OPN_BAL_SHT_CL )

Create Opening Balance Sheet in Classic General


Ledger

Use

We recommend creating an opening balance sheet in


classic general ledger accounting for the current fiscal
year for all company codes and uploading it in the
migration cockpit for documentation purposes. You
can use the report you normally use for this purpose,
for example RFBILA00.

Activities

Create the balance sheet. We recommend that you


upload the list output as attachments in the migration
cockpit to have it available for documentation
purposes.

1. 3.23.
NGL00_CRE_OPEN_BAL_SHEET_4_CC_IN_CLA_PDF
(Document Link -
/NGL/NGLM_CRE_OPN_BSHT_CLPDF )

PDF Conversion of Balance Sheet

Use

Once you have created the balance sheet (in the


preceding activity), you convert it to a PDF file and
attach this file to the activity.

1. 3.24.
NGL00_CRE_YTD_BALANCE_SHEET_4_CC_IN_CLAS
(Document Link -
/NGL/NGLM_CRT_YTD_BAL_SHT_CL )

Create Balance Sheet in Classic General Ledger

Use

We recommend creating a balance sheet and P&L in


classic general ledger accounting for the current fiscal
year (with the migration date as the key date) for all
company codes and uploading it to the migration

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 86 of 386

cockpit for documentation purposes. You can use the


report you normally use for this purpose, for example
RFBILA00.

Activities

Create the balance sheet. We recommend that you


upload the list output as attachments in the migration
cockpit to have it available for documentation
purposes.

1. 3.25.
NGL00_CRE_YTD_BAL_SHEET_4_CC_IN_CLAS_PDF
(Document Link -
/NGL/NGLM_CRE_YTD_BSHT_CLPDF )

PDF Conversion of Balance Sheet

Use

Once you have created the balance sheet (in the


preceding activity), you can convert it to a PDF file
and attach this file to the activity.

1. 4. NGL00_MIGRATION_PHASE

1. 4.1. NGL00_REBUILD_DATABASE_STATISTICS_DOC
(Document Link -
/NGL/NGLM_REBLD_DB_STAT_DOC )

Rebuild Database Statistics

Use

To determine an optimum access path for search


queries in the database and to avoid long runtimes for
individual database accesses or generally bad
performance of the database it is always better to
'Update Database Statistics'. If this statistical data is
obsolete or does not exist, this can cause performance
problems because the optimizer may then use an
unfavorable access path.

This activity needs to run in a repetitive fashion i.e.


before triggering the activities in 'Migration from Prior
Years' and 'Migration from Current Year'.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 87 of 386

The tables FAGLFLEXA and FAGL_SPLINFO will


be updated first by the creation of G/L line items and
balance carry-forward.

The tables FAGLFLEXA, FAGLFLEXT and


FAGL_SPLINFO will be updated by the execution of
Transfer Documents to New General Ledger.

The tables FAGL_MIG_RPITEMS and


FAGL_MIG_OPITEMS will be updated by the
execution of Build Work List for Open Items and
Build Work List for Documents respectively.

We recommend that you rebuild the database statistics


before you start the update programs. To know more
about database statistics refer SAP Note : 588668.

Activities

Contact your system or database administrator.

1. 4. 2. NGL00_BUILD_WORK_LIST (Document Link -


/NGL/NGLM_BUILD_WORK_LIST )

Build Work List

Use

Before the migration programs update the new general


ledger tables, you have to build the work lists that
contain all relevant data for open items (from
migration phase 0) and documents in the current fiscal
year of migration (migration phase 1). The open items
and documents are selected by these programs and
saved into separate tables.

Therefore there are two work lists:

 Work list for open items


 Work list for documents

You use this activity to start the relevant selection


programs to generate the work lists for both open
items and documents. The migration plan will
automatically receive the status Started.

Note

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 88 of 386

For scenario NGL04 and NGL05 migration plan will


be already started using activity Start Migration Plan.

1. 4. 2.1.
NGL00_RECONCILE_WORK_LIST_OPEN_ITEMS
(Document Link -
/NGL/NGLM_BLDWRK_LST_OPNITMS )

Build Work List for Open Items

Use

In this activity, the system generates the worklist of


open items to be migrated. In this process, all G/L
account lines that are managed on an accounts
payable, accounts receivable, or open item basis and
that were not cleared on the date of the migration are
selected for the specified migration plan.

Once the worklist for open items has been created, you
may not perform the following postings:

 Postings with a posting date earlier than the


migration date
 Clearings with a clearing date earlier than the
migration date
 Clearing reset with a clearing date earlier than
the migration date.

The worklist is stored in table FAGL_MIG_OPITEMS


for open items.

Features

The indicator "Reconcile work list and dataset" on the


selection-screen is no longer supported (see SAP note
1115351 for further details).

A reconciliation of the worklist can be relevant:

 If you execute the program for determining the


worklist of open items to be migrated more
than once
 If the periods of the old fiscal year (prior to the
migration date) are not yet closed or were
reopened temporarily
 If you have performed clearing postings.

Activities

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 89 of 386

To still be able to reconcile the worklist, refer to SAP


note 1115351 and use program
FAGL_MIG_CHECK_WORKLIST_OP (check also
to the report documentation for further details).

The output list of the program will show you all open
items that are no longer necessary which means they
have been cleared in the meantime after building the
first worklist. Additionally, if you have changed the
account control settings in the meantime, you will also
find those open items in the output list, because the
program does not know how to check these accounts.

Open items that are no longer relevant for the


migration have to be removed from the worklist. Use
activity "Reset Open Items Only" within subphase
Evaluation of phase Migration Phase to remove the
open item from the worklist.

Remark

Note, however, that we strongly recommend closing


the periods of the fiscal year for the migration
before you generate the worklist. In this case, you do
not have to reconcile the worklist because the status of
the open items (with regard to the migration date) can
no longer be changed.

Example

You have already generated the worklist of open


items. The worklist contains open item A, which was
open on the migration date. You have successfully
performed the migration for the open items.

However, for closing operations, item A still has to be


reconciled in the old fiscal year (before the migration
date). Reconciliation is performed using item B in the
old fiscal year.

If you were now to regenerate the worklist of open


items for migration, neither item A nor item B would
be relevant for the migration because both items had
been reconciled before the migration date.
Furthermore, the opening balance of the account for
item A has been determined incorrectly in the update
of open items to new general ledger accounting
because item A is contained in the balance, which is
no longer justified.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 90 of 386

Output

The system determines the migration objects and


specifies the number of migration objects transferred
to the worklist or the number of migration objects
already contained in the worklist.

New migration objects that have been included in the


worklist receive the status Not Processed (00).

Furthermore, if the migration plan has not been


processed previously, the corresponding migration
plan receives the status Started.

1. 4. 2. 2. NGL00_CHECK_WORKLIST_OP (Document
Link - /NGL/NGLM_CHECK_WORKLIST_OP )

Check Worklist of Open Items

Use

With SAP note 1115351 the program


(FAGL_MIG_OPITEMS_FILL) for building the
worklist for the open items was modified, so that the
option Reconcile Worklist is no longer available.

There are several reasons for deactivating this feature.


With SAP note 1014617 the program was enhanced to
be able to handle mass data in huge customer systems.
Due to technical and performance reasons it was
decided to exclude the reconciliation of the worklist
within the same program.

To be able to check the worklist regarding validity,


you have the chance to start the reconciliation of the
worklist manually in a separate step.

When is it relevant to perform this reconciliation?

 You have executed activity "Build Work List for


Open Items" more than once
 The periods of the old fiscal year (prior to the
migration date) are not yet closed
 You have performed clearing postings

Prerequisites

You have implemented SAP note 1115351 (or the

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 91 of 386

corresponding support package) in your system but


you still want to check if all open items that are in the
worklist are still relevant for the migration.

Note, however, that we strongly recommend closing


the periods of the fiscal year for the migration
before you generate the worklist. In this case, you do
not have to set this indicator because the status of the
open items (with regard to the migration date) can no
longer be changed.

Example

You have already generated the worklist of open


items. The worklist contains open item A, which was
open on the migration date. You have successfully
performed the migration for the open items.

However, for closing operations, item A still has to be


reconciled in the old fiscal year (before the migration
date). Reconciliation is performed using item B in the
old fiscal year.

If you were now to regenerate the worklist of open


items for migration, neither item A nor item B would
be relevant for the migration because both items are
reconciled before the migration date. Furthermore, the
opening balance of the account for item A has been
determined incorrectly in the update of open items to
New General Ledger Accounting because item A is
contained in the balance, which is no longer justified.

Activities

Execute program
FAGL_MIG_CHECK_WORKLIST_OP (see SAP
note 1115351) manually. Enter the migration plan of
the package that you would like to check.

The output list of the program will show you all open
items that are no longer necessary which means they
have been cleared in the meantime after building the
first worklist. Additionally, if you have changed the
account control settings in the meantime, you will also
find those open items in the output list, because the
program does not know how to check these accounts.

Open items that are no longer relevant for the


migration have to be removed from the worklist. Use
activity "Reset Open Items Only" within subphase

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 92 of 386

Evaluation of phase Migration Phase to remove the


open item from the worklist.

Attention

If the items are not removed, they could cause


differences in the balance carryforward of the
corresponding reconciliation account / account
managed on an open item basis.

Remark
The program can have a very long runtime. It will
check all existing open items within the worklist table
of the corresponding migration package (= migration
plan) if it is still open.
Background execution is recommended in huge
databases.

1. 4. 2. 3.
NGL00_RECONCILE_WORK_LIST_DOCUMENTS
(Document Link -
/NGL/NGLM_BLDWRK_LST_DOCS )

Build Work List for Documents

Use

In this activity, the system determines the work list for


the documents to be migrated. All documents that
were posted in the period starting with the migration
date are determined for the specified migration plan. If
the program is executed more than once, the system
only considers additional documents that have been
posted since the last time the program was run.

Features

Use the Read completely indicator to specify whether


the complete dataset should be read when the work list
is regenerated or whether the system should only
select the documents created since the last time the
program was run.

 Indicator is set ('X')


The complete dataset is read. In some cases, this
can cause the program to have very long
runtimes.
 Indicator is not set (' ')
The system only determines the migration

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 93 of 386

objects that have been added since the last time


the program was run. The decision regarding
whether a document is considered or not
depends on the system time at which a
document was posted, not on the posting date of
a document. (This is the recommended setting.)

Output

The system determines the migration objects and


specifies the number of migration objects transferred
to the work list or the number of migration objects
already contained in the work list.

New migration objects that have been included in the


work list receive the status Not Processed (00).

Furthermore, if the migration plan has not been


processed previously, the corresponding migration
plan receives the status Started.

1. 4. 2. 4. NGL00_CONFIRM_BUILD_WORKLIST
(Document Link -
/NGL/NGLM_CONF_CREATN_WRKLST )

Confirm Completion of Work List Creation

Use

The programs for creation of work lists can be


repeated. In this activity, you confirm that creation of
work lists for open items and documents is completed.
After that, no further postings may be added to or
deleted from the work list.

1. 4. 3. NGL00_GENERATE_CODING_FOR_NEWGL
(Document Link -
/NGL/NGLM_GENERATE_CODE_NGL )

Use

To ensure that the migration process will be executed


with the most current coding of the posting interface
for new G/L, you can execute program RGZZGLUX.

If you use several migration packages within one and


the same system you have to perform the activity only

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 94 of 386

once. For all other migration packages you can set the
status of the activity manually.

Prerequisites

Make sure that no other postings will be done during


the runtime (less than 15 minutes) of the generation.
The generation affects the whole system (client-
independent).

Features

Executing this activity while postings will happen in


parallel (also in different clients in the system), a
shortdump of the posting transaction might occur
(error LOAD_PROGRAM_LOST).

1. 4. 4. NGL00_MIGRATION_FROM_PRIOR_YEARS

1. 4. 4.1.
NGL00_TRANSFER_BALANCE_CARRY_FORWARD
(Document Link -
/NGL/NGLM_TRANSF_BALCARY_FWD )

Transfer Balance Carryforward

Use

In this activity, you can generate an opening balance


(balance carryforward period) for new General Ledger
Accounting for the current fiscal year by transferring
the balance carryforward from an existing ledger into
a ledger in new General Ledger Accounting. The
balance carryforward is transferred from the source
ledgers that have been assigned in the setup phase.

You can restrict the selection to individual company


codes and accounts or account intervals. The program
updates the status for the selected accounts or account
intervals.

A check will be carried out in this activity at the end


of execution to make sure whether balance
carryforward is over successfully for all the assigned
account intervals or not. As long as not all intervals
are processed, this check will end with error.

Preconditions

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 95 of 386

 You have made the settings in activity Assign


source ledgers for those accounts or account
intervals that have to be transferred.
 If FBCB documents have been posted, these
documents have to be reversed before upload
carryforward takes place to the affected
accounts.

Dependencies

If you want to correct the balance carryforward once


you have performed the transfer, you must first reset
the balance carryforward period in the target ledger.
To do this, choose activity Reset Balance Carry
Forward. Having reset the balance carryforward, you
can change the settings in activity Assign source
ledgers.

To get an overview about the balance carryforward,


execute the function for activity Display Status for
Balance Carryforward.

Note

The fields of the source ledger are transferred to the


fields of the target ledger on the basis of name
equality. Some known name inequalities are corrected
in this process, such as BUKRS and RBUKRS
(company code) or PRCTR and RPRCTR (profit
center). If, however, you want to transfer a customer
field to a customer field in a ledger (such as the field
RZZAUFNR for the order number to the customer
field ZZAUFNR of the FI-SL target ledger in new
General Ledger Accounting), you must implement the
BAdI FAGL_UPLOAD_CF, in which you define the
relation between these fields. (More information is
provided in the documentation for activity Additional
BAdI Implementation in the setup phase.)

1. 4. 4. 2.
NGL00_DISPLAY_LOG_FOR_BALANCE_CARRY_FOR2
(Document Link -
/NGL/NGLM_DISP_LOG_4_BCFWD )

Display Log for Balance Carryforward

Use

Use the program for this activity to analyze the origin

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 96 of 386

of the transfer of balance carryforward.

Prerequisites

You have uploaded the balance carryforward


(Migration Phase -> Migration from Prior Years ->
Transfer Balance Carryforward).

Features

The system displays the accounts for which the


balance was carried forward. You can see how the
balance carryforward was created. For the amount of
the balance carryforward itself, you can use activity
Compare Source and Target Ledger for Balance
Carryforward to reconcile the figures.

The status of the balance carryforward can be


displayed in activity Display Status for Balance
Carryforward.

1. 4. 4. 3.
NGL00_DISPLAY_STATUS_FOR_BAL_CARRY_FORWA
(Document Link -
/NGL/NGLM_DISP_STS_4_BCARFWD )

Display Status for Balance Carryforward

Use

Within this activity, you can display and analyze the


status of each account respectively account interval
that you assigned to source ledgers in the Setup Phase.

Features

For every company code / target ledger combination,


the defined accounts are shown with the status:

 Upload has been performed successfully


 Upload has been performed with errors
 Upload has not yet been performed.

If you select a single line, you see the processing


status for this line including information about the
user, timestamp and "upload or reset (delete)" action.
This allows you to find out about the reasons for any
incorrect or incomplete balance carryforward figures

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 97 of 386

that may occur.

Recommendation

SAP recommends printing out the results of this report


and attaching this information to the activity for
documentation purposes.

1. 4. 4. 4.
NGL00_CONFIRM_COMPLETE_EXEC_OF_TRAN_BCF
(Document Link -
/NGL/NGLM_CONF_BALCARY_FWD )

Check Completeness of Transfer Balance


Carryforward

Use

The program for this activity checks if the balance


carryforward has been transferred for all accounts that
have been set up in Assign Source Ledgers.

Activities

If any account or interval of accounts are missing,


complete the transfer of balance carryforward.

1. 4. 4. 5.
NGL03_PROCESS_DOCSPLIT_INFO_FOR_OPENITEM
(Document Link -
/NGL/NGL03_PROC_DOCSPLT_OPIT )

Process Document Splitting Information for Open


Items

Use

Use this program to generate entries in the document


splitting tables for open items that were posted before
the migration date (migration phase 0). This step is
only relevant for migration packages with document
splitting.

Note:

This program only collects the relevant documents,


but does not do the document splitting as such. You

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 98 of 386

can use a BAdI to add an account assignment for each


individual open item. (This does not change the open
item itself in the original tables BSIS or BSIK or
BSID, BSEG.)

Prerequisites

 Implementation of BAdI
FAGL_MIGR_SUBST.
You have implemented this BAdI, which allows
you to enhance the open items with account
assignments posted without document splitting.
 If you derive the segment from the profit
center, you need to have set the Segment
derivation is active indicator in the activity
Prepare segmentation -> Activate segment
derivation (Setup Phase). If you have
implemented the BAdI
FAGL_DERIVE_SEGMENT, it overrides
each segment derivation. Please note that the
BAdI FAGL_DERIVE_SEGMENT is not part
of the migration cockpit; rather, it is a
functionality provided by new General Ledger
Accounting in general.

Features

The open items are selected from the worklist. If an


error occurs for an open item (for example during
validation), an error message is issued, and the open
item is not saved in the tables for document splitting.

Status Management

If an open item has a status other than 10, the program


displays the item as not processed or as containing an
error. The following statuses are possible:

 00: Open items with this status have not yet


been processed with this program in an update
run.
 01: Open items with this status have been
processed with this program in an update run.
However, an error has occurred.
 10: Open items with this status have been
successfully processed with this program in an
update run. Entries have been generated in the
document splitting tables. Open items with
status 10 cannot be processed by this program
again. You first need to change the status to 00.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 99 of 386

 XX: This status is not considered in this


program. This status is set once all open items
have been posted subsequently to new General
Ledger Accounting.

Note:

Since open items can also be assigned to more than


one migration package respectively migration plan (in
cases involving a non-calendar fiscal year variant), the
status of an open item is adjusted independently of
the migration plan selected.

Example

The open item 100000090 exists in the worklist for


migration plan MP1 as well as in the worklist for
MP2. When you execute the program for migration
plan MP1, the status of this open item is updated in
migration plan MP1 as well as in migration plan MP2.
Previously, you had determined the worklists for both
migration plans. However, the program does not
display the documents of migration plan MP2.

1. 4. 4. 6.
NGL00_CREATE_GL_LINEITEMS_N_BALCARRYFORW
(Document Link -
/NGL/NGLM_CRT_G/L_LITM_BCFWD )

Create G/L Open Items and Balance Carry-


Forward

Use

This activity allows you to transfer open items from


the previous year to new general ledger accounting
and, simultaneously, to adjust the balance carry-
forward (period 0) of the migration year.

The items are selected from the work list of open


items to be transferred.

For migration plans without document splitting, the


following statuses apply:

 Status 00: Items with this status have not yet


been processed.
 Status 01: Items with this status have been
processed with errors.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 100 of 386

The following status is available for migration plans


using document splitting:

 Status 10: Items with this status have already


been successfully processed in an update run.
Entries have been generated in the document
splitting tables.

Items that have already been transferred to new


general ledger accounting without errors are not
selected again for processing.

Under Output Control, you can select the type of


output:

 Display Overview Only

The system displays the number of items processed


with errors, the number of items that were successfully
updated but with messages, and the number of items
that were updated correctly.

 Overview + Incomplete Objects

Besides the overview of processed items, the system


issues a list of all items for which messages were
issued.

 Overview + All Objects


Besides the overview of processed items, the
system issues a list of all items.

Under Parallel Processing, you can make the settings


for executing the program using parallel processing.
You only have to make all settings in this area if you
want to use the program for mass processing and
parallel processing.

 In the Package Size field, specify how many


documents should be processed in a single
process. If you specify a package size of 1000,
the system always processes 1000 documents in
a process.
 If you want to use specific application servers
for processing, specify a server group. Making
an entry here is optional. If you do not make an
entry, all application servers that are currently
available in the current SAP system are used as
a server group.
 Specify the maximum number of processes to

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 101 of 386

be run in parallel. If you leave this field empty,


the program is not performed in parallel.
 Please be aware that the number of parallel
processes you enter here need to be available as
UPDATE work processes in the current system.
It helps to prevent deadlock situation.

Notes on system performance

 To improve system performance, you can


reduce the package size and thus use the
available processes more effectively. Note,
however, that this increases the overall
workload on the network
 Furthermore, you can execute the program in
multiple jobs, or by company code or fiscal
year, or by a combination of both.

1. 4. 4. 7.
NGL00_ANALYZE_MIGRATION_STATUS1
(Document Link -
/NGL/NGLM_ANALYZE_MIG_STATUS )

Analyze Migration Status

Use

You can use this program to analyze the


processing status of the migration objects.

The program produces statistics on the


processing statuses for the work lists of open
items to be processed and documents to be
transferred. The system displays the total
number of migration objects for each status
value and the percentage of the migration
objects in the work list that have a given status.

Furthermore, the system generates a list of the


error messages for the work list objects,
showing the total number and the percentage
share of the amount of occurrences for each
error message.

You also have the option of displaying the


analyzed migration objects as a list.

Selection

 To analyze the processing status of the

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 102 of 386

open items in the work list, select the


Open Items To Be Prepared indicator.
 To analyze the processing status of the
documents in the work list, select the
Documents To Be Transferred indicator.
 In the Selections for the Document area,
you can select individual documents or
ranges of documents from the work list of
the specified migration plan.
 In the Selections for Processing Status
area, you can select migration documents
by status or error message from the work
list of the specified migration plan.
 Select the level of detail you require:
 Statistics Only
Set this indicator to display just a
summary of the analysis results for
the selected objects.
 Statistics + Incomplete Objects
Set this indicator to display a list of
the migration objects that have not
yet received the migration status
Complete (XX) in addition to the
summarized analysis results for the
selected objects.
 Statistics + All Objects
Set this indicator to display a list of
all migration objects in addition to
the summarized analysis results for
the selected objects.

Output

 If you have started the program directly,


the system displays the data as an
interactive list in the ALV grid format.
You can use pushbuttons to switch
between the evaluation views (statistics,
error statistics, or document list).
 If you have executed the program in the
background, the system prints out a series
of sublists for each selected work list,
depending on the selected level of detail.

Activities

Depending on the level of detail you select, you


can use the following display and navigation
options for each work list (open items to be
processed or documents to be transferred):

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 103 of 386

 Display Complete Statistics


 Display Error Statistics
 Display Object List
 You can switch to the analysis results for
the other work list.
 From the object list, you can display other
details:
 For transferred documents, you can
display the document splitting
results independent of the ledgers.
 Document display using the
Document Number field.
 Log display for migration-specific
document adjustment using the
Adjustment field.
 Message documentation display
using the Message Text field.

1. 4. 4. 8.
NGL00_CONFIRM_G/L_LINEITEMS_BALCARRY
(Document Link -
/NGL/NGLM_CONF_GL_LITM_BCFWD )

Check Completeness of G/L Line


Items and Balance Carryforward

Use

The program for this activity


checks if G/L line items from the
worklist have been created
completely for accounts managed
on an open item basis.

Prerequisites

The work list that has been created


at the beginning of the migration
phase is complete.

Activities

If open items are not yet processed,


run the function for creating G/L
line items and balance carryforward
once again.

1. 4. 4. 9.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 104 of 386

NGL00_COMP_SRC_N_TRGT_LEDGERS_TECHN
(Document Link -
/NGL/NGLM_COMP_SRC_TRGT_LEG )

Compare Source and Target


Ledgers for Balance
Carryforward

Use

To ensure and document the


correctness of the entire migration,
you have to compare classic
General Ledger Accounting against
new General Ledger Accounting by
means of a ledger comparison. The
ledger comparison provided by this
activity checks whether the values
for balance carryforward in the
specified source and target ledgers
agree. The comparison is made at
company code and account levels.

Features

Within the activity, you can select


the company code and target ledger
as well as the currency type. With
the option Display differences only,
you only get the accounts with
differences. The final status of the
report is set to green only if no
differences occur for any of the
company codes and target ledgers
assigned to the current migration
plan. If the comparison reveals
differences in company code
currency, the traffic light is red. For
all other currency types, you get a
warning message if the figures do
not match.

The activity always shows the


comparison status of all the
company code and target ledger
combinations assigned to the
current migration plan, regardless
of which combination has been
checked during the execution.

Activities

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 105 of 386

Perform a ledger comparison for all


relevant combinations, and upload
the lists to the migration cockpit for
documentation purposes.

Additional information

Since the comparison of the balance


carryforward also includes open-
item accounts, the G/L line items
and balances must be migrated
completely. This is also checked
within the activity.

It is not possible to compare the


balances of open item managed
accounts if the company code
(source ledger 0) and target (non-
leading) ledger have different fiscal
year variants. In this case, you have
the following options:

 Either skip the comparison of


open item managed accounts.
 Or Speciify the correct source
ledger with same fiscal year
variant.

1. 4. 4.10.
NGL00_REPOST_BAL_CARRY_FORWARD
(Document Link -
/NGL/NGLM_REPOSIT_BCFWD_MANU )

Repost Balance Carry-


Forward Manually

Use

This activity allows you to


repost balance carry-forward
manually.

When performing the


migration, you can expect to
frequently encounter
situations in which you have
to perform subsequent
postings manually to correct
the opening balance sheet
after transferring the balance

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 106 of 386

carry-forward from classic


general ledger accounting or
from another ledger (in FI-SL
or EC-PCA, for example).
This depends on the
dimensions (other than the
company code) that you want
to use for your future
financial statements in new
general ledger accounting.
Using the function Post
Balance Carryforward for
Ledger Groups (transaction
FBCB), you can make
postings to the balance carry-
forward of the current fiscal
year (Period 0).

Prerequisites

The transfer of balance carry


forward has been done, and
the migration plan containing
the leading ledger (only for
migration package 1-6) is
not completed. In migration
package 7 and 8 the
migration plan containing the
new ledger is not completed.

Features

When using this function,


consider the following:

 Postings can only be


made to accounts that
are not managed on an
open item basis.
Postings cannot be
made to reconciliation
accounts (customers or
vendors). For asset
accounts, consider SAP
Note 937940.
 In the posting, you
have to specify the
amounts explicitly in
all currencies. There is
no automatic
translation of the

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 107 of 386

transaction currency
into the local currency.
This means that you
can post explicit
currency amounts with
the foreign currency
posting (F-05).
 Only relevant for
migration package 1 -
5: Besides the standard
totals table in new
General Ledger
Accounting
(FAGLFLEXT), table
GLT0 in classic
General Ledger
Accounting is also
updated in period 0 for
postings made to the
leading ledger. In this
way, when a ledger
comparison is
performed, the
balances in classic
General Ledger
Accounting match the
balances of the leading
ledger in new General
Ledger Accounting.
 Only relevant for
migration package 1 -
5: If you carry out
FBCB postings to non-
leading ledgers, table
GLT0 in classic
General Ledger
Accounting is not
updated in parallel.
Therefore the opening
balance sheet in new
G/L differs from the
opening balance sheet
in classic G/L at
account level. We
recommend creating
opening balance sheets
in classic G/L and new
G/L for documentation
and certification
purposes.

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 108 of 386

Activities

Enter the amounts in all


currencies. The system does
not automatically convert the
amounts into the local
currencies. You also have to
enter the ledger group of the
subsequently introduced
ledger in which the posting
must happen.

If you do not need manual


postings to balance carry-
forward, set the status for this
activity manually.

Dependencies

If FBCB documents exist,


you can no longer reset the
migration. If it is essential to
reset the migration, you need
to reverse all FBCB
documents.

It is also no longer possible


to reset the balance
carryforward for accounts
that have been updated from
FBCB postings. Please be
careful about this because
there is no automatic function
for checking and repairing
this.

1. 4. 5.
NGL00_MIGRATION_FROM_CURRENT_Y

1. 4. 5.1.
NGL03_PROCESS_SPLIT_INFO_FOR_DOC
(Document Link -
/NGL/NGL03_PROC_DOCSPLT_DOCU )

Process Split Information


for Documents

Use

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 109 of 386

Use this program to generate


document splitting
information for the
documents to be migrated.

Features

Using the worklist of


documents to be migrated,
the program finds all
documents for which
document splitting
information can be built. This
is only the case if the
migration plans to be
processed have been defined
with document splitting.
Documents for which the
document splitting
information has already been
built and documents that
have already been written to
New General Ledger
Accounting are not processed
further.

The program only finds only


migration objects from the
worklist that have the
following status:

 Status 00: Documents


with this status have
not yet been processed
by this program in an
update run.
 Status 01: Documents
with this status have
already been processed
by this program in an
update run, but an error
occurred.

Document splitting is
performed for each found
document. The system first
checks for the alternative
document splitting settings
(as made in activity
Additional settings for
document splitting in the

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 110 of 386

setup phase) for this


document, and builds the
document splitting
information on the basis of
these settings. If no
alternative Customizing
settings are defined,
document splitting uses the
standard Customizing
settings for this document. If
the standard Customizing
settings lead to errors in
building the document
splitting information, you can
make alternative migration
settings for this document
(Setup phase -> Additional
settings for document
splitting). These migration-
specific assignments are only
determined and applied by
this program; they do not
have any effect on the
processing of new documents
to be posted.

The system uses the found


Customizing settings to build
the document splitting
information for the document
to be processed. The
documents are processed in
the correct chronological
order because for postings
with clearing or invoice
references the clearing
information is transferred
from the documents
referenced. If the system
processes the entire migration
plan without restrictive
selection criteria, the program
automatically applies a
corresponding sequence for
processing.

Each successfully processed


document is assigned
processing status 10 in the
work list for migration
documents. Documents for

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 111 of 386

which the document splitting


information could not be
built successfully are
assigned processing status 01
and logged in the work list
together with the
corresponding error message.

1. 4. 5. 2.
NGL03_SIMULATE_DOCUMENT_SPLITTI
(Document Link -
/NGL/NGLM_SIMULATE_DOC_SPLIT )

Simulate Document
Splitting

Use

With this activity, you obtain


detailed information for a
specific document about the
split document as well as
about the document splitting
rules applied. The document
splitting is simulated based
on the existing customizing
and the active BAdIs.

Prerequisites

You have activated document


splitting in customizing.
Optionally (as part of the
migration from classic
general ledger accounting to
new general ledger
accounting), you can make
any necessary settings in the
activities for Alternative
Settings for Document
Splitting below.

Features

You can display:

 The document after


document splitting as
well as the document-

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 112 of 386

related customizing
settings
 The settings relating to
business transactions in
customizing for
document splitting
 The log of the error or
warning messages that
occurred during
document splitting

1. 4. 5. 3.
NGL00_TRANSFER_DOCUMENTS_T
(Document Link -
/NGL/NGLM_TRANSF_DOCU_NEW

Transfer Documents
to New General
Ledger

Use

Use this program to


transfer documents
from the migration
year to new General
Ledger Accounting.
With the transfer, you
create entries in the
line item and totals
tables in new General
Ledger Accounting for
the documents to be
transferred (migration
phase 1).

Features

The documents are


selected from the
worklist of documents
to be transferred.

Under Output Control,


you can select the type
of output:

 Display
Overview Only:
The system

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 113 of 386

displays the
number of
documents
processed with
errors, the
number of
documents that
were
successfully
updated but with
messages, and
the number of
documents that
were updated
correctly.
 Overview +
Incomplete
Objects:
Besides the
overview of
processed
documents, the
system issues a
list of all
documents for
which messages
were issued.
 Overview + All
Objects:
Besides the
overview of
processed
documents, the
system issues a
list of all
documents.

Under Parallel
Processing, you can
make settings for
executing the program
using parallel
processing. You only
have to make all
settings in this area if
you want to use the
program for mass
processing and parallel
processing.

 In the Package

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 114 of 386

Size field,
specify how
many documents
should be
processed in a
single process. If
you specify a
package size of
1000, the system
always processes
1000 documents
in a process.
 Specify a server
group if you
want to use a
certain
application
server for
processing.
Making an entry
here is optional.
If you do not
make an entry,
all application
servers that are
currently
available in the
current SAP
system are used
as a server
group.
 Specify the
maximum
number of
processes to be
run in parallel. If
you leave this
field empty, the
program is not
performed in
parallel.
 Please be aware
that the number
of parallel
processes you
enter here need
to be available as
UPDATE work
processes in the
current system. It
helps to prevent

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 115 of 386

deadlock
situation.

Notes on
performance:
To improve system
performance, you can
reduce the package size
and thus utilize the
available processes
more effectively. Note,
however, that this
increases the overall
workload on the
network.
Furthermore, you can
execute the program in
multiple jobs, or by
company code or fiscal
year, or by a
combination of both.

From the work list of


documents to be
migrated, the program
determines all
documents that can be
transferred to new
General Ledger
Accounting.

For migration plans


without document
splitting, the following
statuses apply:

 Status 00:
Documents with
this status have
not yet been
processed.
 Status 01:
Documents with
this status have
been processed
with errors.

For migration plans


with document
splitting, the following
status applies:

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 116 of 386

 Status 10:
Documents with
this status have
already been
successfully
processed in an
update run.
Entries have
been generated
in the document
splitting tables.

Documents that have


already been
transferred to new
General Ledger
Accounting (status XX)
are not selected again
for processing.

For the documents to


be determined, the
program uses the data
from the original
document and any
document splitting
information to generate
general ledger line
items and totals
records. The data is
always written to all
ledgers that are
assigned to the
company code in the
migration plan.

Logging the
Processing Status:

 In the worklist of
the migration
documents, each
document that
has been
successfully
processed is
assigned
processing status
XX (completely
processed).
 Documents for

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 117 of 386

which the
document
splitting
information
could not be
built successfully
are assigned
processing status
01 (for migration
plans without
document
splitting) or
remain in
processing status
10 (for migration
plans with
document
splitting). The
documents are
logged in the
worklist together
with the
corresponding
error message.

1. 4. 5. 4.
NGL00_ANALYZE_MIGRATIO
(Document Link -
/NGL/NGLM_ANALYZE_MIG

Analyze
Migration
Status

Use

You can use this


program to
analyze the
processing status
of the migration
objects.

The program
produces
statistics on the
processing
statuses for the
work lists of
open items to be

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 118 of 386

processed and
documents to be
transferred. The
system displays
the total number
of migration
objects for each
status value and
the percentage of
the migration
objects in the
work list that
have a given
status.

Furthermore, the
system generates
a list of the error
messages for the
work list objects,
showing the total
number and the
percentage share
of the amount of
occurrences for
each error
message.

You also have


the option of
displaying the
analyzed
migration objects
as a list.

Selection

 To analyze
the
processing
status of
the open
items in
the work
list, select
the Open
Items To
Be
Prepared
indicator.
 To analyze

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 119 of 386

the
processing
status of
the
documents
in the
work list,
select the
Documents
To Be
Transferred
indicator.
 In the
Selections
for the
Document
area, you
can select
individual
documents
or ranges
of
documents
from the
work list
of the
specified
migration
plan.
 In the
Selections
for
Processing
Status
area, you
can select
migration
documents
by status
or error
message
from the
work list
of the
specified
migration
plan.
 Select the
level of
detail you
require:

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 120 of 386

 Statistics
Only
Set
this
indicator
to
display
just
a
summary
of
the
analysis
results
for
the
selected
objects.
 Statistics
+
Incomplete
Objects
Set
this
indicator
to
display
a list
of
the
migration
objects
that
have
not
yet
received
the
migration
status
Complete
(XX)
in
addition
to
the
summarized
analysis
results
for
the

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 121 of 386

selected
objects.
 Statistics
+
All
Objects
Set
this
indicator
to
display
a list
of
all
migration
objects
in
addition
to
the
summarized
analysis
results
for
the
selected
objects.

Output

 If you
have
started the
program
directly,
the system
displays
the data as
an
interactive
list in the
ALV grid
format.
You can
use
pushbuttons
to switch
between
the
evaluation
views

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 122 of 386

(statistics,
error
statistics,
or
document
list).
 If you
have
executed
the
program in
the
background,
the system
prints out
a series of
sublists for
each
selected
work list,
depending
on the
selected
level of
detail.

Activities

Depending on
the level of detail
you select, you
can use the
following
display and
navigation
options for each
work list (open
items to be
processed or
documents to be
transferred):

 Display
Complete
Statistics
 Display
Error
Statistics
 Display
Object List
 You can

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 123 of 386

switch to
the
analysis
results for
the other
work list.
 From the
object list,
you can
display
other
details:
 For
transferred
documents,
you
can
display
the
document
splitting
results
independent
of
the
ledgers.
 Document
display
using
the
Document
Number
field.
 Log
display
for
migration
-
specific
document
adjustment
using
the
Adjustment
field.
 Message
documentation
display
using
the
Message

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 124 of 386

Text
field.

1. 4.
5. 5.
NGL00_CONFIRM
(Document
Link
-
/NGL/NGLM_CO

Check
Completeness
of
Transfer
of
Documents
to
New
General
Ledger

Use

The
program
for
this
activity
checks
if all
documents
from
the
worklist
were
transferred
to
the
new
general
ledger.

Prerequisites

The
worklist
that
has
been
created

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 125 of 386

at
beginning
of
the
migration
phase
is
complete.

Activities

If
open
items
are
not
yet
processed,
run
the
function
for
activity
Transfer
Document
to
New
General
Ledger
once
again.

1. 4.
5. 6.
NGL00_COMP_SR
(Document
Link
-
/NGL/NGLM_CO

Compare
Source
and
Target
Ledgers
for
Documents
from
Current
Year

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 126 of 386

Use

To
ensure
and
document
the
correctness
of
the
entire
migration,
you
have
to
compare
classic
General
Ledger
Accounting
against
new
General
Ledger
Accounting
by
means
of a
ledger
comparison.
The
ledger
comparison
checks
whether
the
values
in
the
specified
source
and
comparison
ledgers
agree
for
the
current
fiscal
year.
The

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 127 of 386

comparison
is
made
at
company
code
and
account
levels.
You
can
also
include
additional
fields
(such
as
business
area)
in
the
comparison.

Since
you
can
transfer
data
selectively
from
multiple
source
ledgers,
you
need
to
take
this
into
account
during
the
ledger
comparison.

By
using
the
option
Other
key

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 128 of 386

figure,
you
can
switch
between
various
currencies.

Activities

Perform
a
ledger
comparison
for
all
relevant
combinations
and
upload
the
lists
to
the
migration
cockpit
for
documentation
purposes.

Additional
information

Use
this
report
if,
during
the
implementation
phase
of
new
General
Ledger
Accounting,
you
still
update
the
tables

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 129 of 386

of
classic
General
Ledger
Accounting
(GLT0)
in
parallel
for
non-
ledger
specific
postings
or
postings
to
the
leading
ledger.
This
report
allows
you
to
compare
the
totals
records
in
the
tables
for
new
General
Ledger
Accounting
against
the
totals
records
in
the
tables
for
classic
General
Ledger
Accounting
(GLT0).

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 130 of 386

1. 4.
6.
NGL00_EVALUA

1. 4.
6.1.
NGL00_ANALYZ
(Document
Link
-
/NGL/NGLM_AN

Analyze
Migration
Status

Use

You
can
use
this
program
to
analyze
the
processing
status
of
the
migration
objects.

The
program
produces
statistics
on
the
processing
statuses
for
the
work
lists
of
open
items
to be
processed
and
documents

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 131 of 386

to be
transferred.
The
system
displays
the
total
number
of
migration
objects
for
each
status
value
and
the
percentage
of
the
migration
objects
in
the
work
list
that
have
a
given
status.

Furthermore,
the
system
generates
a list
of
the
error
messages
for
the
work
list
objects,
showing
the
total
number
and

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 132 of 386

the
percentage
share
of
the
amount
of
occurrences
for
each
error
message.

You
also
have
the
option
of
displaying
the
analyzed
migration
objects
as a
list.

Selection

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 133 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 134 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 135 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 136 of 386

Output

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 137 of 386

Activities

Depending
on
the
level
of
detail
you
select,
you
can
use
the
following
display
and
navigation
options
for
each
work
list
(open
items
to be
processed
or
documents

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 138 of 386

to be
transferred):

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 139 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 140 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 141 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 142 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 143 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 144 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 145 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 146 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 147 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 148 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 149 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 150 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 151 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 152 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 153 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 154 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 155 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 156 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 157 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 158 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 159 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 160 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 161 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 162 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 163 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 164 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 165 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 166 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 167 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 168 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 169 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 170 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 171 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 172 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 173 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 174 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 175 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 176 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 177 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 178 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 179 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 180 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 181 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 182 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 183 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 184 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 185 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 186 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 187 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 188 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 189 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 190 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 191 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 192 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 193 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 194 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 195 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 196 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 197 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 198 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 199 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 200 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 201 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 202 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 203 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 204 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 205 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 206 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 207 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 208 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 209 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 210 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 211 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 212 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 213 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 214 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 215 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 216 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 217 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 218 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 219 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 220 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 221 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 222 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 223 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 224 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 225 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 226 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 227 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 228 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 229 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 230 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 231 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 232 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 233 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 234 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 235 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 236 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 237 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 238 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 239 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 240 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 241 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 242 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 243 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 244 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 245 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 246 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 247 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 248 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 249 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 250 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 251 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 252 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 253 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 254 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 255 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 256 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 257 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 258 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 259 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 260 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 261 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 262 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 263 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 264 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 265 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 266 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 267 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 268 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 269 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 270 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 271 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 272 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 273 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 274 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 275 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 276 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 277 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 278 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 279 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 280 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 281 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 282 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 283 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 284 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 285 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 286 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 287 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 288 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 289 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 290 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 291 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 292 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 293 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 294 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 295 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 296 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 297 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 298 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 299 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 300 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 301 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 302 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 303 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 304 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 305 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 306 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 307 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 308 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 309 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 310 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 311 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 312 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 313 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 314 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 315 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 316 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 317 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 318 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 319 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 320 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 321 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 322 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 323 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 324 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 325 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 326 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 327 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 328 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 329 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 330 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 331 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 332 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 333 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 334 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 335 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 336 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 337 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 338 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 339 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 340 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 341 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 342 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 343 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 344 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 345 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 346 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 347 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 348 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 349 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 350 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 351 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 352 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 353 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 354 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 355 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 356 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 357 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 358 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 359 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 360 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 361 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 362 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 363 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 364 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 365 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 366 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 367 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 368 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 369 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 370 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 371 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 372 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 373 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 374 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 375 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 376 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 377 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 378 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 379 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 380 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 381 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 382 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 383 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 384 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 385 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011
Page 386 of 386

saphtmlp://htmlviewer.sap.com/JMup8GDL3D3X0800mAWyaG/HTML000002.htm 02.03.2011

Potrebbero piacerti anche