ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
Introduction ISO/TS16949 and this document define the fundamental quality system requirements of Volvo
0.1 General 3P and Volvo Powertrain (Hereafter referred to in this document as “Volvo 3P/VPT”)
0.2 Process Approach
0.3 Relationship with ISO This document contains the customer-specific requirements supplemental to ISO/TS16949.
9004 These supplemental requirements shall be included in the scope of the registration/certification to
0.3.1 IATF Guidance ISO/TS16949 in order for the ISO/TS16949 certificate to be recognized as satisfying the Volvo
0.4 Compatibility with other 3P/VPT organization’s criteria for third-party certification by an IATF recognized and contracted
management systems certification body.
0.5 Goal of this Technical
Specification ISO/TS 16949: 2002 is applicable to manufacturing sites of organizations supplying to Volvo
3P/VPT (production and service parts and materials), and to assemblers of production parts or
materials purchased by Volvo 3P/VPT.
Service parts and materials applicability does not include aftermarket or remanufactured parts.
Volvo 3P/VPT Group Customer Specific Quality Requirements are referenced in:
- Purchasing Quality Procedures (PQP)
- Volvo Purchase Order
- Volvo Corporate Standards
1 Scope This International Standard specifies requirements Regulatory requirements are conveyed in the Volvo Technical Regulations, on the Volvo 3P/VPT
1.1 General for a quality management system where an drawing and or Part Version Report
organization: Needs to demonstrate its ability to
consistently provide product that meets customer
and applicable regulatory requirements, and aims
to enhance customer satisfaction through the
effective application of the system, including
processes for continual improvement of the system
and the assurance of conformity to customer and
applicable regulatory requirements.
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 1 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
Supplier Scorecard
Located within Volvo’s Supplier Portal, the Supplier Scorecard is a secured website that contains
commercial, financial and quality information and performance data.
QPM = PPM points + NCp points + IR Raised points + Vol Val points
The RTS checklist is signed by Volvo and the organization to ensure that all the Technical
Regulations & General Specifications applicable to the part have been received, reviewed and
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 2 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
4.2.2 Quality manual The organization shall establish and maintain a For Volvo 3P/VPT, the organization must have the Volvo product line included into the scope of
quality manual that includes the ISO/TS 16949 certification.
4.2.3.1 Engineering The organization shall have a process to assure Organizations are encouraged to utilize the Volvo Review of Technical Specification (RTS) when
specifications the timely review, distribution, and implementation developing a quote for Volvo 3P/VPT.
of all customer engineering standards and/or
specifications and changes based on customer- An equivalent and effective Organization Contract Review process that includes the elements
required schedule. Timely review should be as within the RTS is acceptable in lieu of the Volvo RTS.
soon as possible, and shall not exceed two working
weeks.
Quality performance records (e.g. control charts, inspection and test results) shall be retained for
one calendar year after the year in which they were created.
Records of internal quality system audits, product audits, layout inspection, functional testing and
management review shall be kept for three years.
The above time periods shall be regarded as minimum. Retention periods longer than those
specified above may be specified by an organization in its procedures.
requirements are determined and are met with the the form of our Purchasing Quality Procedures (PQP). The PQP can be obtained in the
aim of enhancing customer satisfaction (see 7.2.1 Volvo Supplier Portal at http://www.volvo.com/suppliers
and 8.2.1)
5.4.1.1 Quality objectives - Top management shall define quality objectives Volvo 3P/VPT Supplier & Quality Development Departments will determine customer
supplemental and measurements that shall be included in the expectations with respect to quality objectives.
business plan and used to deploy the quality
policy. Organizations are encouraged to sign a PPM Target Agreement in order to secure commitment
towards continual improvement.
Note Quality objectives should address customer
expectations and be achievable within a defined time
period.
5.5.2 Customer Top management shall designate personnel with The organization shall notify Volvo 3P/VPT within 10 working days of any changes to senior
representative responsibility and authority to ensure that customer management (i.e. Quality, Product Development, company ownership etc).
requirements are addressed.
The organization shall notify the respective Volvo 3P/VPT Purchasing Buyer and Volvo Receiving
facility within 24 hours of organization production interruption. The nature of the problem shall be
communicated to Volvo 3P/VPT and immediate actions taken to assure supply of product to
Volvo 3P/VPT.
Note: Production interruption is defined as an inability to meet the Volvo 3P/VPT specified
production capacity volume.
7.1 Planning of product The organization shall plan and develop the Volvo 3P/VPT organizations shall utilize the AiAG - Advanced Product Quality Planning Process
realization processes needed for product realization. Planning (APQP) .
of product realization shall be consistent with the
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 5 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 6 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
characteristics documentation and control of special fit/form/function of the part or process, must be controlled in a manner that variation is minimized.
characteristics
Volvo Product Development will determine which characteristics are design consequence class
and will identify them on the drawing with a designation of class 1,2 or 3. Critical Characteristic
features are applied when minimizing the variation and centering the distribution close to the
mean of the tolerance optimize the part function or reliability. Specific Critical Characteristics
instructions for identification and grading can be found in the Volvo Standard 105-0001 which
can be located at the Volvo Standards Website: http://www.tech.volvo.se/standard/eng/
The Volvo Group also uses the term "Key Control of Characteristics" (KCC) for the Mack Truck
product. This designation identifies product characteristics or process parameters that, due to
their impact on the fit/form/function of the part or process, must be controlled in a manner that
variation is minimized
7.2.2 Review of The organization shall review the requirements Organizations to Volvo are encouraged to complete a Review of Technical Specification and
requirements related to related to the product. This review shall be submit to Volvo Purchasing 3P/VPT. An effective and equivalent contract review process can be
the product conducted prior to the organization’s commitment used in place of the Review of Technical Specification.
to supply a product to the customer (e.g.
submission of tenders, acceptance of contracts or
orders, acceptance of changes to contracts or
orders) and shall ensure that
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 7 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
7.2.2.1 Review of Waiving the requirement stated in 7.2.2 for a formal Any request for waiver of formal review shall be directed to the respective Volvo Purchasing
requirements related to review (see note) shall require customer Buyer.
the product - authorization
supplemental
7.2.3.1 Customer The organization shall have the ability to It is preferred that organizations have CAD/CAE system interface capability with Volvo
communication - communicate necessary information, including Engineering. Catia, Pro-E and IGES are acceptable. It is not mandatory at the present time. The
supplemental data, in a customer-specified language and format appropriate Volvo personnel shall notify organizations that are required to obtain interface with
(e.g. computer-aided design data, electronic data Volvo systems.
exchange).
When there is a Volvo prescribed format for communication, it is specified in the appropriate
section or other Volvo documents.
7.3.1.1 Multidisciplinary The organization shall use a multidisciplinary Volvo requires all organizations to follow a formal advanced product quality planning process for
approach approach to prepare for product realization, new product programs and product/process changes (APQP).
including:
FMEA, as these are “Living Documents”, are designed to aid and document improvement. Volvo
- Development and finalization of special does not have review and approval requirements prior to production part approval, but does
characteristics review FMEAs during the PPAP submission process and at other times as appropriate.
- Development and review of FMEA’s,
including actions to reduce potential risks,
and
- Development and review of control plans.
7.3.2.2 Manufacturing The organization shall identify, document and Organizations are encouraged to complete a Review of Technical Specification and submit to
process design input review the manufacturing design input Volvo Purchasing 3P or demonstrate existence of an effective and equivalent contract review
requirements, including: process
- Product design output data
- Targets for productivity, process capability and
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 8 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
cost
- Customers requirements if any, and
- Experience from previous developments
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 9 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
The use of customer designated sources, including In these cases, the organization has the full responsibility for quality assurance.
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 10 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
Additional sub-contractors may be considered at the request of the organization. These requests
shall be directed to the Volvo Purchasing Buyer and Product Development Engineer. The new
sub-contractor is subject to all Volvo requirements and must undergo the appropriate sub-
contractor and material component PPAP approval process.
7.4.3.2 Supplier Supplier performance shall be monitored through Included in the organization’s monitoring of 2nd tier supplier performance, the following additional
monitoring the following indicators: parameters should be measured:
- Delivered product quality - Quality/Environmental Management System status
- Delivery schedule performance (including
incidents of premium freight)
- Special status customer notifications relating
to quality or delivery issues.
process control
- include methods for monitoring of control
exercised over special characteristics (see
7.3.2.3) defined by both the customer and the
organization
- include the customer required information, if
any, and
- initiate the specified reaction plan (see 8.2.3.1)
when the process becomes unstable or not
statistically capable.
7.5.4.1 Customer owned Customer owned tools, manufacturing, test, The organization shall have a documented system for preventive maintenance. This shall include
production tooling inspection tooling and equipment shall be a timely review of planned maintenance activities and a documented action plan to address any
permanently marked so that the ownership of each backlog. Action plans are to be included in the Management Review process.
item is visible and can be determined.
Records of maintenance are to be maintained for 1 year.
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 12 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
All Volvo 3P/VPT owned tooling shall be permanently identified and shall include the Volvo tool
number and Volvo part number. This shall be performed on all pattern equipment and dies.
Other tooling shall be similarly identified in a practical manner. The organization can recommend
practical or alternate identification.
Organizations shall store and maintain all tooling and equipment used to produce product for
Volvo in a manner to ensure conforming parts are produced. Volvo 3P/VPT reserves the right to
review tooling and equipment at the organization’s location for condition and identification. Volvo
3P/VPT requires organizations to conduct an inventory of all Volvo owned tooling on an annual
basis.
Volvo 3P/VPT owned returnable packaging that is lost, damaged or otherwise unsuitable for use
shall be reported to the appropriate Volvo Corporate Materials organization location. The
organization is responsible for safekeeping and cleanliness of the returnable packaging in their
care and use
7.6.1 Measurement Statistical studies shall be conducted to analyze Gage R&R studies are required for each unique variable gage used to measure Critical
system analysis the variation present in the results of each type of Characteristics.
measuring and test equipment system. This
requirement shall apply to measurement systems Volvo does not accept the use of Gage R&R studies on families of gages or equipment for these
referenced in the control plan. Critical Characteristics. Analytical methods and acceptance criteria shall be determined on a
case-by-case basis during the advanced quality planning process.
The analytical methods and acceptance criteria
used shall conform to those in customer reference Organizations shall use the most current AIAG Measurement System Analysis publication for this
manuals on measurement systems analysis. Other purpose.
analytical methods and acceptance criteria may be
used if approved by the customer.
7.6.2 Records of the calibration/ verification activity for all Volvo requires notification of the shipment of any suspected nonconforming material resulting
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 13 of 66
Revision: 9, November 2005
ISO/TS 16949:2002 Volvo 3P & Volvo Powertrain Customer Specific Requirements
ISO/TS 16949:2002
Requirement Volvo 3P & Volvo Powertrain
Element
Calibration/verification gauges, measuring and test equipment, needed to from out of calibration gages, measuring, and test equipment. When the measured characteristic
records provide evidence of conformity of product to is a Critical Characteristic, Volvo must be notified if the resulting products would not meet special
determined requirements, including employee and requirements as listed in 8.2.3.1.
customer owned equipment shall include
- equipment identification, including the The receiving Volvo Assembly Operations Customer Satisfaction Department shall be notified.
measurement standard against which the
equipment is calibrated
- revisions following engineering changes
- any out of specification readings as received
for calibration
- an assessment of the impact of out of
specification condition
- statements of conformity to specification after
calibration/verification, and
- notification to the customer if suspect product
or material has been shipped.
7.6.3.2 External laboratory External/commercial/independent laboratory Laboratory facilities used by the organization to verify product conformance must use ASTM or
facilities used for inspection, test or calibration other recognized industry standards and the appropriate Volvo Group established test
services by the organization shall have a defined procedures, where available, as testing criteria.
laboratory scope that includes the capability to
perform the required inspection, test or calibration, The Volvo 3P/VPT will accept laboratory analysis from any independent accredited laboratory. In
and either the event of disputes between the Volvo Group and the organization's laboratory, the Volvo
- there shall be evidence that the external 3P/VPT reserves the right to specify an independent laboratory for arbitration.
laboratory is acceptable to the customer, or
- the laboratory shall be accredited to ISO/IEC
17025 or national equivalent.
Should the process not be under control and normally distributed, the organization shall contact
their respective Supplier & Quality Development Engineer.
The organization shall follow the AIAG PPAP manual for specific instructions.
8.2.1 Customer As one of the measurements of the performance of There is no prescribed Volvo 3P/VPT methodology to measure customer satisfaction.
satisfaction the quality management system, the organization
shall monitor information relating to customer Organizations shall determine their best method to determine and measure Volvo 3P/VPT’s
perception as to whether the organization has met satisfaction with their performance.
customer requirements. The methods for obtaining
and using this information shall be determined
Volvo 3P & Volvo Powertrain Purchasing Volvo Customer Specific Requirements Page 18 of 66
Revision: 9, November 2005