ACKNOWLEDGEMENT
The making of any report calls for contribution and cooperation from many
others, besides the individual alone. It is the result of meticulous efforts put in the
by many minds that contribute to the final report formation. Several eminent
people at DELHI METRO RAIL CORPORATION LIMITED. (DMRC) have made
valuable contributions to this report through their inputs. I duly acknowledge my
gratitude to each one of them.
I would also like to thank Ms. Charu (placement cell officer) who helped in
getting me internship and gave me an opportunity to accomplish individual live
project.
At last, I would like to acknowledge all those who helped, directly or indirectly,
at various areas in completing my project and related study and made my training a
wonderful experience.
MANISHA ARORA.
2
PREFACE
Training is a planned program designed to improve performance and bring about
measurable changes in knowledge, skills, attitude and social behavior of employees.
It makes the employees versatile, mobile, flexible and useful to the organization.
Training needs analysis addresses immediate requirements & generally long term
strategic goal for each staff member to build their skills gradually. Successful training
implementation is the key factor for staff productivity & positive morale. Participants
learn appropriately depending on their preference of style and approach and this is
crucial when considering the ever changing work environment.
The topic in this project throws light on every important aspect i.e. training needs and
analysis. TNA occupies an important place in industrial progress for its
organizational effectiveness and for development of employees.
3
PROCESS OF TNA :
DIAGRAMATICAL REPRESENTATION:
4
SOURCES OF TRAINING NEEDS
5
BASIC CONTENTS OF THIS PROJECT INCLUDES:
Chapter 11 includes the various sources from where the data was collected
(bibliography).
6
OBJECTIVE OF THE STUDY
The main and specific objectives of Training Needs &analysis study are as follows:
Main objective
To study the existing Training Needs &analysis system in Delhi Metro Rail
Corporation (DMRC) vis-à-vis other organizations.
Specific objectives
1) To find out the problems that exist in the current TNA system
2) To give suggestions for further improvements in the existing TNA
system of DMRC
3) To get an idea of how to make TNA system more effective so that it can
suite to the emerging business environment.
7
INTRODUCTION TO DMRC
The history of planning a Metro Project for Delhi dates back to 70's. The
Central Road Research Institute (CRRI) undertook the first exhaustive
study on traffic and travel characteristics of Delhi in 1969-70. While
bringing out extensive data describing the traffic and travel
characteristics, it developed mathematical models to project travel
demand. By examining several alternatives, it recommended for a Mass
Rapid Transit Network for Delhi. Metropolitan Transport Team (MTT),
Indian Railways, has reviewed the above schemes. MTT sought for some
modifications to recommendations of CRRI and planned for a well knit
Mass Rapid Transit System for the capital city of India. The system
comprised of 36 Km of underground corridors aligned two axes North-
South and East-West Corridors and 96 Kms of surface rail corridors.
Metropolitan Transport Project (MTP-R, set up by the Ministry of
Railways, Government of India) prepared an engineering plan to
construct the MTR system. As a part of the techno-economic feasibility
study, subsoil exploration were conducted on four specific trunk routes
and by the side of existing railway tracks and recommended for taking up
pilot projects.
Feasibility Report on Integrated Multi Modal Mass Rapid Transport
System of Delhi (IMMRTS) prepared by RITES recommended for three-
component system comprising of Rail corridors, Metro corridors and
dedicated bus way totaling to 184.5 Km and further addition of 14 km
increased to 198.5 km. The total network contains 16 sections to be
implemented in a sequence based on passenger kilometer carried per
kilometer length of each section.
DELHI METRO
8
road based .With the result the city roads have become highly congested
and the pollution levels and the road accidents have gone beyond
acceptable limits. Ideally, Delhi should have had a Mass Rapid Transit
Network of at least 250 K m s.
To solve the transportation problem of the city a Master Plan for
providing a Metro System has been drawn up to be completed in four
phases by the year 2021.The work on the first phase of the project
commenced on 1st October, 1998 and is slated for completion by
September 2005.The dream of Delhi citizens to have a modern metro
system is fast becoming a reality.
The financial year 2002 has been an eventful year for the history of entire
nation. With the flagging off, of the inaugural train by the Hon’ able
Prime Minister on the Shahdara - Tis Hazari section, a new era in urban
transport has begun. For the capital city of Delhi, an alternate mode of
modern transport system is now available.
Delhi Metro is being constructed as a world class Metro. To ensure
reliability and safety in train operations, it is being equipped with the
most modern communication and train control system. Unique feature of
Delhi Metro is its integration with other modes of public transport,
enabling the commuters to conveniently interchange from one mode to
another. To increase rider ship of Delhi Metro, feeder buses for metro
stations have been planned. In short, Delhi Metro has turned out to be a
trendsetter for such systems in other cities of the country. Perhaps,
because of this reason alone, many State governments have already
evinced interest to get technical help from Delhi Metro to set up metro
systems in their major cities.
The company is hopeful that with the extension of route length in the
near future, the position will improve substantially.
Delhi became the capital of India in 1912. In those days, it was a clean,
beautiful city where every one loved to live. Even when India got
independence in 1947, the population of Delhi was a mere 0.6 million. Of
all the cities of the country, the process of urbanization was the fastest in
Delhi and as a result, the population today stands at 13.8 million. As of
9
now, the city witnesses about 11.7 million transit trips per day of which
no less than 62% are by public transport. Among public transport
options, 99% are road-based and only 1% is rail-based, despite the fact
that Delhi has 144 route kilometers of rail tracks converging into the city
from five different directions.
10
Total 65.10 13.17 47.43 4.5 59
11
WORLD METRO SCENARIO
In developed countries, the planning for a Mass Rapid Transit System
generally starts when the city population crosses the 1million mark. The
system is in position by the time the city population is 2-3 million & when
the population exceeds 4 million or so, planned extensions to the Mass
Rapid Transit System are vigorously initiated. Prior to the launch of the
Delhi metro, India had a Metro Rail facility in one city i.e. Kolkata, with
a length of 16.5Km.
GENERAL CONSULTANTS
12
FUNDING PLAN
28% of the project cost is to be financed through Equity Contributions
subscribed equally by the Central Government and the State
Government. The two Governments have also agreed to give an interest-
free subordinate loan to cover the cost of land acquisition, which roughly
works out to 5% of the project cost.
13
between Kashmere Gate and central Secretariat was inaugurated by
Mrs. Sonia Gandhi , Chairperson , National Advisory Council on 2nd
july ,2005. with this DMRC successfully completed Line-2 (underground
corridor) between Viswavidyalya and Central secretariat covering a
distance of 11kms .Kashmere gate and Rajiv Chowk are interchange
stations where the passengers can change from Line-1- Line -2 and vice
versa.. Phase 1 of Delhi Metro was completed with the commissioning of
Line-3. The prime Minister of India, Dr. Manmohan Singh, inaugurated
this line from Barakhamba Road- Dwaka on 30th December 2005. On
31st
March, 2006, another 6.5 kms and 6stations were added to Line-3 with
an extension of the Line into dwarka sub-city and on11th November,2006
the 2.81 km extension linking Barakhamba road with Indraprastha was
completed and opened for the passenger traffic.
Rolling stock: 3.2 mtrs . Wide light weight modern state-of- the-art
coaches with 8 cars (4 cars in the initial years) train formation are being
used. The Rolling Stock has stainless steel shells, which are equipped with
3-phase AC motors, VVVF control, chevron rubber/air bag suspension
system and regenerative system.
14
platforms in Line No.1, master clock, centralized Public Address System
and Public Information Display system.
Track Structure: The Delhi Metro has been built on broad guage (5’.6”)
with UIC 60kg Head Har4dened rails and Vossloh fastenings without
ballast.
Fare Collection the 21st century way: The Ticketing system is fully
automatic. Metro passengers face the option of using contact-less smart
cards and contact-less tokens. The token can be used for a single journey
whereas smart cards are for multiple journeys. A ten percent bonus will
be available to passengers whenever they buy or recharge their Smart
Cards, There are two types of cards – one is Stored Value Card and
another Tourist Card. Stored value Cards are available in the
denomination of Rs.100/- , Rs.200/- and Rs.500/- and are valid for 1 year
fro, the date of purchase or the date of recharge whichever is later.
Tourist Cards are for unlimited travel over a short period of time.
Available with one day and three day validity periods for Rs.70/- and
Rs.200/- respectively.rs.100/- refundable deposit is to be made at the time
of buying a
Smart Card. Travel on the Metro will cost the commuter Rs.6/- as the
minimum fare and Rs.22/- as the maximum fare depending upon the
distance traveled by the passenger. Automatic flap type ticket gates
(entry, exit, and reversible) have been installed to help people enter and
exit the stations quickly.
The convenience of Park & Ride: Parking facilities are available at Metro
Stations for private vehicle owners who can park and ride on the Metro,
Special feeder buses are also provided for the benefit of the commuters.
15
ventilated. The ventilation and air-conditioning arrangements in the
tunnel and underground stations are so designed that emergency
ventilation, when required, will continue to be maintained from the
standby generators.
16
The Yamuna Bridge- new heights of achievement: The building of the two
track – Metro Rail Bridge across Yamuna exemplifies the expertise,
planning and attitudinal excellence that has gone into making of the
Shahadra – Tis Hazari Section if the Delhi Metro Rail Network.
The State-of –the-art, 553 meters long continuous, singles pre-stressed
box girder, for two tracks across the river Yamuna, was completed on 2nd
February,2001 in a period of just 30months by using a special technique
called “Incremental Launching”. This construction technique is ideal for
busy cities because it allows construction without any major disruption of
traffic. Since the bridge is advanced by sections, unlikely conventionally
built bridges, there are no joints and this has also ensured a smoother
journey for commuters.
17
Technological extra-dose!
DMRC has built India’s first extra dosed bridge near Pragati Maidan.
At present, there are only 26extradosed bridges in the world. The main
span of this bridge is 93 meters long and does not have any piers to
support it. The total length of the bridge is196.3 meters an it has a 302
meters radius curvature as required by the alignment.
PHASE II
After completing Phase I of the Delhi Metro nearly three years ahead of
schedule, DMRC has now started construction of the second phase of the
project, which is scheduled to be completed before the Common wealth
Games in 2010.The detailed project report of Phase II has finalized
routes with a total length of 121.11 kilometers with 79 stations.
Section Length*
(Km)
Shahdara-Dilshad Garden 3.10
Indraprastha-New Ashok Nagar-Noida 15.10
Sec 32, City Centre
Yamuna Bank-Anand Vihar 6.20
Vishwavidyalaya- Jahangir Puri 6.90
Inderlok- Kirti Nagar-Mundka 18.50
Central Secretariat-Sushant Lok 20.16
Dwarka Sec 9-Dwarka Sec21 2.30
New Delhi-Airport 19.50
Anand Vihar-KB Vaishali 2.55
Central Secretariat-Badarpur 20.16
Total 121.11
Future plans
Airport link: Delhi Metro is planning to link New Delhi to the Airport
through a 19.50 km long corridor. The total journey in this high-speed
corridor would take jus t 16 minutes wit h trains running up to 135kmph
and will have just two stations between at Shivaji Stadium and Moti
bagh. As the route connects the Airport, check –in-facility will be
available at New Delhi and with the bus station at Connaught Place.
18
Metro in NCR
Delhi Metro is connecting areas like Noida, Gurgaon, Ghaziabad,
Bahadurgarh, Faridabad etc to the main city. Gurgaon and Noida
corridors have already been approved, whereas routes connecting
Faridabad & Bahadurgarh are yet to be sanctioned.
Consultancy
19
ROUTE MAP- PHASE-I &PHASE-II
20
IT’S JUST WHAT DELHI NEEDED: - BENEFITS OF THE PROJECT
==========================================================
21
Saving Space:
Metro will reduce journey time by 50 to 75 percent.
Socio-Economic Benefit:
The Delhi Metro has been awarded OHSAS 18001 (Occupational Health
Pvt. Ltd. (RINA), Genova. DMRC may be the only operational metro to
The Delhi Metro Rail Corporation (DMRC) has also received the ISO
14001 certificate for establishing an environmental management system
making it the First Metro in the World to receive this certification at the
construction stage of the Metro.
The United States-Asia Environment Programme (US-AEP), the New
York Mass Rapid Transit System and the Confederation India Industry
assisted the DMRC in achieving this certification within 15 months.
The DMRC Corporate Culture already specifies that the Metro
construction should not lead to ecological or environmental degradation
22
and for every tree cut during the construction ten trees have been planted
in advance by DMRC as compensatory a forestation. In addition
environmental impact assessments are done for every section of the
Metro to ensure that the ecological balance is not disturbed by Metro
construction activities.
23
DMRC's CORPORATE MISSION
• To make the first phase of the MRTS fully operational by March
2005.
• To complete the project within the estimated cost (except for
inflation).
• To make it a world class Metro - A vehicle to promote dignity and
discipline in the city.
24
Organizational chart of DELHI METRO RAIL CORPORATION.
Managing director
GM
Exc. Director Exc. (O&RS)
(AP)
All GM (F)
Director
GM (M)
All CPMs All CEEs CPO
GM (F)
Company
CA DY. COS
Secretary
CPRO Training
school
25
CPM-Chief Project Manager GM (O&RS)-General Manager
CA-Chief Architect (Operation & Rolling stock)
CUP-Chief Urban Planner GM (M)-General Manager
GM (Legal)-General Manager (Legal) (Maintenance)
CPRO-Chief Public Relation Officer JGM (R & T)-Joint General Manager
CEE-Chief Electrical Engineer (Recruitment and Training)
Dy. COS-Dy. Controller of Stores AGM (O)-Assistant General Manager
GM (F)-General Manager (Finance) (Operation)
CPO-Chief Personnel Officer
Company
Profile of other
participating
organizations.
26
=============================================================
27
and Post-graduate Medical Education in all its branches so as to
demonstrate a high standard of Medical Education in India; to
bring together in one place educational facilities of the highest
order for the training of personnel in all important branches of
health activity; and to attain self-sufficiency in Post-graduate
Medical Education.
Objectives of AIIMS
28
Functions of AIIMS
INSTITUTE BODY
29
Dr. Karan Singh Yadav, MP
Member
(LS)
Prof. Deepak Pental, VC,
Member
Delhi University
Shri Naresh Dayal, Health
Member
Secretary
Dr. R.K. Srivastava, DGHS Member
Dr. Shyam Prasad, Vice
Member
President, NBE
Dr. S.S. Agarwal, CDRI ,
Lucknow
Member
Dr. S.S. Agarwal, Former
Director, SGPCI
Prof. B.P. Chaterjee, IACS,
Member
Kolkatta
Shri. R.P.Agrawal, Secretary,
Member
HRD
Prof. K.K. Talwar, Director,
Member
PGI, Chandigarh
Prof. Kartar Singh, Director,
Member
SGPGI, Lucknow
Prof. R. Surendran, HOD,
Member
Chennai
Dr. (Mrs.) Nilima Arun
Kshirsagar, Dean, HOD, SGS
Member
Med. College
KEM Hospital, Mumbai
Shri Raughbir Singh, Addl.
Member
Secretary & FA, MHFW
Prof. P. Venugopal, Director, Member-
AIIMS Secretary
Smt. Bhavani Thyagarajan, Jt.
Special Invitee
Secretary, MHFW
Dean (Acad.) AIIMS Special Invitee
Dr. T.D. Dogra, Dean (Exam.),
Special Invitee
AIIMS
30
GOVERNING BODY
FINANCE COMMITTEE
31
Prof. Vijay Kumar Malhotra,
Member
MP (LS)
Shri. R.K. Dhawan, MP (RS) Member
Dr. R.K. Srivastava, DGHS Member
Shri Raghubir Singh, AS & FA Member
Dr. Shyam Prasad Member
Shri. R.P.Agrawal, Secretary,
Member
HRD
Prof. S.S. Agarwal Member
Prof. P. Venugopal, Director, Member-
AIIMS Secretary
ESTATE COMMITTEE
ACADEMIC COMMITTEE
32
Prof. K.K. Talwar Member
Dr. R.K. Srivastava Member
Dr. Shyam Prasad Member
Prof. B.P. Chaterjee Member
Shri. R.P.Agrawal Member
Prof. P. Venugopal, Director, Member-
AIIMS Secretary
SELECTION COMMITTEE
33
Dr. Shyam Prasad Member
Specialty Centers
Departments
34
• Anaesthesiology • Nephrology
• Anatomy • Nuclear Medicine
• Biochemistry • Nuclear Magnetic
• Biomedical Engineering Resonance Imaging
• Biophysics • Obstetrics and
• Biostatistics Gynaecology
• Biotechnology • Orthopaedics
• Cardiology • Otorhinolaryngology
• Centre for Community • Paediatrics
Medicine • Paediatric Surgery
• College of Nursing • Pathology
• Dermatology & • Pharmacology
Venereology • Physiology
• Endocrinology, • Physical Medicine &
Metabolism & Diabetes Rehabilitation
• Forensic Medicine • Psychiatry
• Gastroenterology and • Radio Diagnosis
Human Nutrition • Reproductive Biology
• Gastrointestinal Surgery • Surgical Disciplines
• Haematology • Transplant Immunology
• Hospital Administration & Immunogenetics
• Laboratory Medicine • Transfusion Medicine
• Medicine (Blood Bank)
• Microbiology • Urology
35
DENA BANK
Dena Bank was founded on 26th May, 1938 by the family of Devkaran
Ltd.It became a Public Ltd. Company in December 1939 and later the
In July 1969 Dena Bank Ltd. along with 13 other major banks was
current financial year the total deposits were up 18.19% and gross
increased by 23.59% to Rs 6,979 crore and forms 41.5% of the net bank
credit.
36
Milestones
1. One among six Public Sector Banks selected by the World Bank for
sanctioning a loan of Rs.72.3 crores for augmentation of Tier-II
Capital under Financial Sector Developmental project in the year
1995.
2. One among the few Banks to receive the World Bank loan for
technological upgradation and training.
3. Launched a Bond Issue of Rs.92.13 crores in November 1996.
4. Maiden Public Issue of Rs.180 Crores in November 1996.
5. Introduced Tele banking facility of selected metropolitan centers.
6. Dena Bank has been the first bank to introduce:
• Minor Savings Scheme
• Credit card in rural India known as "DENA KRISHI SAKH
PATRA" (DKSP).
• Drive-in ATM counter of Juhu, Mumbai.
• Smart card at selected branches in Mumbai.
• Customer rating system for rating the Bank Services.
37
GAIL India limited:
Subsequent to giant gas finds in the late 1970's to develop the localized
natural gas markets, the Government of India set up the Gas Authority of
India Limited on August 16, 1984 with the following objectives:
38
Today GAIL has expanded into Gas Processing, Petrochemicals,
Liquefied Petroleum Gas Transmission and Telecommunications. The
company has also extended its presence in Power, Liquefied Natural Gas
re-gasification, City Gas Distribution and Exploration & Production
through equity and joint ventures participations.
GAIL is rated among the top 10 Indian companies in terms of profits and
revenue according to October 2003 ET 500, a list of top 500 companies in
India compiled by the Economic Times daily. The company's turnover in
the financial year 2002-03 was Rs. 11,775 crore (US$2.5 billion) and its
net profit Rs. 1,639 crore (US$343 million).
GAIL is:
39
• A JV partner in a gas-based 156 MW Gujarat State Energy
Generation (GSEG) Ltd's Power Plant
The company has attained a leading status in the Indian business through
its all-round contribution to the nation's gas-based economy with a
countrywide presence of Pipelines, Plants, Marketing network, including
60 work centres, which is efficiently operated by a young team of less
than 3,500 employees, whose average age is 36 years.
Research methodology
40
Research Design: - a conclusive research using survey method
with the help of structured questionnaire was used, as it best
conforms to the objectives of the survey.
Meaning of Research:
41
Identification of the
project.
Drawing up of
questionnaire
Identification of the
companies to be
surveyed
Approaching the
concerned HR head of
the companies
Collection of primary
data: data filled in the
questionnaire by the
HR heads
Collection of the
secondary data:
company literature,
different books
Analysis of data
42
2. Data Collection Method:
PRIMARY DATA
SECONDARY DATA
CENTRES TARGETTED
43
The corporate offices of the following organizations has been covered
where actual planning are being done for their companies:
4. DENA BANK
Parliament street,
New delhi-110001
Sampling:
44
• Sample design must be in systematic way so that bias can be control
in better way.
• Sample should be such that the result of the sample study can
applied in general for the universe with a reasonable level of
confidence.
Sample description
Method of communication:
45
Limitations
Every research study has certain limitations. These could be due to
sample size, sampling techniques, time available, money etc. this study
has also certain limitations. The following are worth mentioning:-
still every effort has been employed in order to reduce the impact of these
limitations.
46
RESEARCH FINDINGS
After the analysis and interpretation of the data, I made some
observations and findings, which facilitated to give some
recommendations to DMRC, for improvement in the TNA
BENCHMARKING
47
4) Determine the data collection method and compare the data.
5) Determine the current performance gap
6) Project the future performance level
7) Communicate Benchmark findings and gain acceptance
8) Establish functional goals
9) Develop action plans
10) Implement specific actions and monitor the progress
11) If necessary, recalibrate Benchmarks.
48
Graphical representation of data collected.
2.5
1.5
COACHINGANDMENTORING
1
0.5
0
DMRC GAIL DENA BANK AIIMS
EXPLANATION
49
3
2.5
2
1.5
ORGANIZATIONALAWARENESS
1
0.5
0
DMRC GAIL DENA BANK AIIMS
Explanation
3.5
3.4
3.3
3.2
3.1
EMPLOYEEMOTIVATION
3
2.9
2.8
2.7
DMRC GAIL DENA BANK AIIMS
Explanation
50
3
2.5
2
1.5
INTERPERSONNELSKILLS
1
0.5
0
DMRC GAIL DENA BANK AIIMS
Explanation
51
CONCLUSIONS:
52
Develop the mentor selection criteria.
• Mentors must guide teachers in the program through
demonstrations, observations and consultations to
promote instructional excellence.
• Mentors must have a possession of effective
interpersonal and collaborative skills.
Employee Motivation:
53
Communication:
It is a critical component. Employees must
understand expectations as informed employees tend to the
most motivated one.
• Define goals
• Listen I intently (Encourage input from all areas).
• Creating a sense of purpose helps in promoting team
work and instills a sense of pride.
Empowerment:
• Promote ownership
• Let the teams or departments to make their own
rules. It stimulates self motivation.
• Empower your employees by authorizing them to
take action. It will impart a sense of pride and
ownership in an organization.
Recognition:
Organizational Awareness:
54
production process, controlling environ mental pollution,
safety programs.
Both way quality circle programs.
Interpersonal skills:
Treat others with respect, fairness and consistency.
Interaction with others in ways that are friendly,
courteous, and tactful and that demonstrate respect for
individual cultural differences and for the attitudes and
feelings of others.
Demonstrate empathy and understanding when addressing
sensitive issues with others.
55
BIBLIOGRAPHY
DMRC brochures
56
APPENDICES
Please rate the relative value of the following questions/comments of the training
program as
(1=excellent, 2=very good, 3=good, 4=satisfactory, 5=not satisfactory at all or poor)
9. How would you rate your awareness of all the activities in the
organisation which may affect your area of work? …………..
10. How much motivated you feel during your work? ……………
57
13. When things go wrong, reasons for it happening are examined in a
constructive manner rather than seeking to place blame. ………
14. How would you rate your ability to work in a team? ………..
18. Job analysis carried out to identify the skill & knowledge required
for the tasks. ……….
19. How would you rate your encouragement to identify your own
development needs? ………….
Please use the following space to note down any further comments and suggestions
…………………………………………………………………………………………
58