Sei sulla pagina 1di 7

From:

S. Kannan,B.E

Tisaiyanvillai – 627 657,Tirunelveli Dt, Tamilnadu,india

To : Personnel Manager(HRD),

Dear Sir,

Sub : Application for suitable placement in your Organization

(Electrical Engineer)

I have passed B.E. Electrical and Electronics Engineering and have secured (First
Class) . From J.J. College of Engineering & Tech, Bharathidasan University,
Tiruchirappalli. Tamilnadu. I had 8 Years Experience in my relevant field.

I have enclosed herewith a copy of resume, which will help you to apprise me as per
your requirement. . In case my qualification meets your requirements. I may please be
given a chance to proven my skill and knowledge.If I am appointed in your concern. I
assure you full Co-operation and I would discharge my duties to the entire
satisfaction of my superiors.

Thanking you& Looking forward to a positive reply.


S.KANNAN
9/31, Ittamozhi Road,
Tisaiyanvillai-
627657,Tirunelveli
(Dt)TamilNadu, India.

E-mail:kanlntuae@gmail.com
91-9442468326,
Objective:

To secure a challenging position in the field of Electrical and Electronic


Design and Application.

. Attain a Responsible position in an organization where I will get an


opportunity to fully utilize my rich technical experience as well as
managerial skills for achieving my personal and organizational goals.
Professional Experience Summary
• 8 Years of Experience in Substation& Transmission line
infrastructure Development, Power Projects and execution of
Electrical equipments & All installations has been completed,inspectedand
tested with the DEWA/IEE WIRING REGULATIONS the commissioning of the
SUB STATION using Method statements and other contract Documents

• Experience in Project Planning and Management of the Project

• Co-ordination with clients and consultants,subcontractors.


Certifying the Contractor’s bills for Erection and Supply of
materials

Safety Precaution :

 Workmens are wearing Double harness when work at height.


 Don’t Walk under a Suspended Load.
 No materials shoud be dropped from height

Client : MSEB ELECTRICITY BOARD

Main Contractor: GET POWER PVT LTD,CHENNAI Sub contractor: RS SENTHUR


PANDIAN PVT LTD, Designation : Sr.Engineer- Date of Join : Dec 10
to Feb11

Project MSEB PROJECT –nandurbar

1. Plan the
work execution and monitor daily construction activity
2. Supervise all construction activities of the whole site
4. Help in resource mobilization and resource sharing among var
ious teams at site
5. Handle allocation of tasks within teams based on skills profile
.
6. Prepare bills for payments and collects payment in ti
me from client
7. Estimate quantities & orders of materials for constr
uction.
8. Coordinate with site representative of client/consult
ant
10. Handle material management for site and coordinates with stor
e keeper
11. Implement the health and safety measures
12. Responsible for quality assurance and documentation

Professional Experience:

 Name & Address of the organization : NEPC INDIA LTD, TIRUNELVELI


TAMILNADU

Post Held : PROJECT EXECUTIVE;Period of service: July 03 to Nov 2007

Nature Of Work:
 Erection of DP, Transformers , Cabling, , Lighting, Earthing,Lightning
Arrestors, Yard lighting Safety Equipment and other allied works.
Responsible for Electrical safety&Inspection&Manpower Management.

 Organization : M/s. Larsen&Toubro Ltd (www.lntecc.com)


 Client : M/s. TRANSCO – ABUDHABI WATER ELECTRICITY AND
AUTHORITY

 Consultant : M/s. FITCHNER ENGINEERS CONSULTANTS DUBAI

 Main Contractor: M/s. L & T ECC. DIVISION. ABUDHABI-UAE

 Designation : Sr.Engineer -Electrical

 Date of Join : Jan08 To SEP 09 HV&LV Cable laying and


Termination Work
 Erection of DP, Transformers , Cabling, , Lighting,
Earthing,Lightning Arrestors, Yard lighting Safety
Equipment and other allied works
 Installtion of total substation structures, equipments, BUS
Formation, Panels, as per Approved Construction
Drawings.cables termination as per Cable schedule. PANELS
Installation of Sub station equipments POWER
TRANSFORMER, CIRCUIT BREAKER, CT ,PT, CVT, ISOLATORS &
CONTROL RELAY.
 Coordinating with Supervisors, Contractors and other sub-
contractors in execution of work and taking necessary
decisions whenever required condition any Site clearance

 Ensuring of quality, time, and cost, certifying the bills &


Reporting the Daily Progress status of the Project to the
reporting to the Construction Manager

 Post held&address : worked as Electrical Engineer in

ETA ltd DUBAI on Nov2009 to Nov 2010

 Nature Of Work:
 LV Distribution system ie(MDBS,SMDBS&DBs),fixed wiring Installations
lighting,power circuits,ELCB protection provided,Cable tray 50mm ht and fittings
coupler,Riser,reducer,Tee,Bend,ECCsand Divider,coverand fixing details
 ,50.100mm Cable Trunkingwith joints roofing bolt,nutand washerand accessories
for installations,Continuity of each earth continuity conductors is
satisfactory,polaraity of throughout installations is correct and switchingare in
the phase conductor only,

 CT operated ELCBs operations ischeckedand effective,DEWA competency


wireman wiring work supervisedand tested,after supply is releasedand rectify any
defects if found reported by the DEWA,

 All installations has been completed,inspectedand tested with the DEWA/IEE


WIRING REGULATIONS

1. Resposible on executing the activities as per Approved


drawings
2. Responsible on Daily work accomplishmentand coordination
to the contractor
3. Assit the Construction Manager in implementing the
approved drawings activities
Coordinate the QC engineer for internal Audit before
inviting contractor inspection

4.Checking all the working drawings and materials conforming to


the approved Specification&Project Requirements

6.Reporting Daily completion activities to planning engineer


7.Responsible for Electrical safety&Inspection&Manpower Management.

8. Key link between the subcontractors and the consultant/client.

9. The works carried out are in line with specifications and design.
10. Monitoring of mobilization activities.

11. Review, monitor and control Standardization to the maximum extent and
centralizing of services to monitor and ensure consistent quality.

Current salary : 7000 AED per monthWith Accoomodation

Expected salary:Salary wiil be negotiable with my


experience
Class / Board of Year of Class Secured
Name of Institution
Course Study Passing Obtained (%)
Holy Redeemer’s Hr. Sec.
School, State Board of
X 1995 – 1996 First Class 88.60
S.S.L.C Education
Tirunelveli (Tamilnadu)

Holy Redeemer’s Hr. Sec.


XII School, State Board of
1997 – 1998 First Class 82.16
Education
HSC Tirunelveli (Tamilnadu)

J.J College of Bharathidas


B.E Engineering and an 1998 – First
Technology, University, 75.00
(EEE) 2002 Class

projecthandled

• PC Based Centralized Substation Automation.


• Advantage of our project is that it reduces human involvement
and ensures a reliable operation in the substation. Application of this
project is that it can be installed in substation of protection &
monitoring the voltage, current and frequency.

Computer Skills

Operating System : Windows 98, Windows NT,

Office Packages : MS - Office 2000, 2D drafting, PC Schematic EL Automation. (E-


CAD)

Co – Curricular Activities

• Member of Institute of Electrical and Electronics Engineers

• Using CAD ,Drawing Panel Diagram of Electrical projects.

Personal Details

Father’s Name : T. Sivan Arumugam B.A


Date of Birth : 5th June 1981

Nationality : Indian

Languages known : English & Tamil. Malayalam,hindi

Passport no : E3123691,Expirary:07/10/2012

I hereby declare that all the information mentioned above is true to the
best of my knowledge and belief.

Yours Truly,

(S.KANNAN)

Potrebbero piacerti anche