356804.173
356804.CD3
Documentation Chart
Flatpack2, PS System
DC Power Supply System Outdoor Cab Cabinetized
Integrated 2U
PowerSuite Õ 402207.003
PC program for system configuration
with description of system functionality
General Precautions
CAUTION: Even though the product incorporates protection circuitry and other safeguards,
Device
it can be damaged, perform poorly or have a reduced lifecycle if it is exposed to
hazard incorrect treatment during transport, installation or service.
CAUTION: For safety reasons, the commissioning and configuration of the equipment is
only to be performed by Eltek’s personnel or by authorized and qualified persons;
otherwise the warranty may be invalidated.
Qualified
personnel Please, read the user documentation carefully before installing and using the equipment,
as installation and operation is to be performed as described in it.
WARNING: Opening the equipment may cause terminal injury — even if the mains
AC supply is disconnected. Hazardous voltages may be present inside, as large
Electric
shock capacitors may still be charged.
CAUTION: The installer is responsible for ensuring that the EMC properties of this
product/ system do not deteriorate during installation, and that it is performed in accordance
EMC, NEC/CEC
with applying regulations.
regard Installations in USA and Canada must comply with NEC/CEC requirements.
CAUTION: Before you start the electrical installation, you must always disconnect all
Device
external AC supply fuses, as well as internal battery and load fuses/ breakers.
hazard
WARNING: For safety reasons (high leakage current and high touch current) you
must always connect the AC earth wire (PE) to the terminals, before you connect the
Electric
shock AC input cable(s).
Head Office
Eltek Energy AS Copyright © Eltek Energy AS, Norway 2005
PO Box 2340 Strømsø; N-3003 Drammen; Norway This document may be changed without notice
Tel:+47 32 20 32 00 — Fax:+47 32 20 32 10 Art. No. 356804.173, Issue 5, 2006 Nov
E-mail: eltek@eltekenergy.com Internet: www.eltekenergy.com Published 2006-11-25
DOCUMENTING YOUR TASKS
Check off, fill in and sign the check lists and forms shown below.
This is the easiest way of documenting your work during installation, commissioning and maintenance of
Flatpack2 PS systems, avoiding reading thick manuals.
You find all the check lists and forms in the quick start guide, in the pullout section in the middle. You can also
print them out directly from the CD-ROM.
System
Installation
Check off 1
Refer to system
specific documents
More
information
Installation Check List
Form
Fill in 2
CD-ROM User
Documentation, FP2
Manuals for rectifier and
controller, check lists, prod-
uct catalogue & presenta-
tions, software and more…
Commissioning and
Maintenance
DOCUMENTING YOUR TASKS
Check off, fill in and sign the check lists and forms shown below.
This is the easiest way of documenting your work during installation, commissioning and maintenance of
Flatpack2 PS systems, avoiding reading thick manuals.
You find all the check lists and forms in the quick start guide, in the pullout section in the middle. You can also
print them out directly from the CD-ROM.
System
Commissioning
Fill in and
sign 1
System
Maintenance
Fill in and
sign 1
Commissioning Procedure
Form
More
information
Maintenance Procedure
Form
More
information
CD-ROM User
Documentation, FP2
Manuals for rectifier and
controller, check lists, prod-
uct catalogue & presenta-
tions, software and more…
CD-ROM User
Documentation, FP2
Manuals for rectifier and
controller, check lists, prod-
uct catalogue & presenta-
Installation tions, software and more…