System’s Documentation

System Documentation Set 356804.003


SPECIFIC GENERAL
Documents Documents

General Arrangement (GA) Documentation Chart


Component layout, location of Complete user documentation overview
terminal blocks, fuses, etc. (this document)

356804.173

Circuitry and Connections Quick Start Guide


System’s circuit diagram and For system’s installation, commissioning
connection drawing(s) and operation.
Checklists, forms, etc.
356804.103

Other Drawings CD-ROM User Documentation


Miscellaneous site or system specific User documentation in electronic format,
documents or manuals (if required) PowerSuite (PC program for system con-
figuration), checklists, product cata-
logue, datasheets, presentations, etc.

356804.CD3

Documentation Chart

Flatpack2, PS System
DC Power Supply System Outdoor Cab Cabinetized

Integrated, Cabinetized and Outdoor Applications

Integrated 2U

Documentation Chart Õ 356804.173

Quick Start Guide Õ 356804.103


Integrated 6U

Flatpack2 Rectifier Õ 350002.013


User’s Guide

Smartpack Control Unit Õ 350003.013


User’s Guide with keypad operation, etc.

PowerSuite Õ 402207.003
PC program for system configuration
with description of system functionality

From the contents of


CD-ROM User Documentation, FP2 356804.173
356804.CD3
SAFETY PRECAUTIONS
For installation, commissioning and general handling of Flatpack2 PS systems

General Precautions

CAUTION: Even though the product incorporates protection circuitry and other safeguards,
Device
it can be damaged, perform poorly or have a reduced lifecycle if it is exposed to
hazard incorrect treatment during transport, installation or service.

CAUTION: For safety reasons, the commissioning and configuration of the equipment is
only to be performed by Eltek’s personnel or by authorized and qualified persons;
otherwise the warranty may be invalidated.
Qualified
personnel Please, read the user documentation carefully before installing and using the equipment,
as installation and operation is to be performed as described in it.

WARNING: Opening the equipment may cause terminal injury — even if the mains
AC supply is disconnected. Hazardous voltages may be present inside, as large
Electric
shock capacitors may still be charged.

CAUTION: The installer is responsible for ensuring that the EMC properties of this
product/ system do not deteriorate during installation, and that it is performed in accordance
EMC, NEC/CEC
with applying regulations.
regard Installations in USA and Canada must comply with NEC/CEC requirements.

Precautions during installation

CAUTION: Before you start the electrical installation, you must always disconnect all
Device
external AC supply fuses, as well as internal battery and load fuses/ breakers.
hazard

WARNING: For safety reasons (high leakage current and high touch current) you
must always connect the AC earth wire (PE) to the terminals, before you connect the
Electric
shock AC input cable(s).

WARNING: The batteries represent a major energy hazard. To avoid short-circuit of


battery poles, you must always remove metallic objects — uninsulated tools, rings,
Electric
shock watches, etc. — from the vicinity of the batteries.

WARNING: Flatpack2 60V DC systems are only to be installed in Restricted Access


Electric Locations (RAL). Access must be limited by use of tool, i.e. lock and key.
shock

This product is CE marked and


complies with all current requirements
for relevant standards and directives.

Head Office
Eltek Energy AS Copyright © Eltek Energy AS, Norway 2005
PO Box 2340 Strømsø; N-3003 Drammen; Norway This document may be changed without notice
Tel:+47 32 20 32 00 — Fax:+47 32 20 32 10 Art. No. 356804.173, Issue 5, 2006 Nov
E-mail: eltek@eltekenergy.com Internet: www.eltekenergy.com Published 2006-11-25
DOCUMENTING YOUR TASKS
Check off, fill in and sign the check lists and forms shown below.
This is the easiest way of documenting your work during installation, commissioning and maintenance of
Flatpack2 PS systems, avoiding reading thick manuals.
You find all the check lists and forms in the quick start guide, in the pullout section in the middle. You can also
print them out directly from the CD-ROM.

System
Installation

Check off 1

System Specific Drawings


Location of components, schematic and
connection drawings, specific documents or
manuals (if applicable)

Refer to system
specific documents

More
information
Installation Check List
Form

Fill in 2
CD-ROM User
Documentation, FP2
Manuals for rectifier and
controller, check lists, prod-
uct catalogue & presenta-
tions, software and more…

Circuit Distribution List


Form

Commissioning and
Maintenance
DOCUMENTING YOUR TASKS
Check off, fill in and sign the check lists and forms shown below.
This is the easiest way of documenting your work during installation, commissioning and maintenance of
Flatpack2 PS systems, avoiding reading thick manuals.
You find all the check lists and forms in the quick start guide, in the pullout section in the middle. You can also
print them out directly from the CD-ROM.

System
Commissioning

Fill in and
sign 1

System
Maintenance

Fill in and
sign 1

Commissioning Procedure
Form

More
information

Maintenance Procedure
Form

More
information

System Specific Drawings


Location of components, schematic and
connection drawings, specific documents or
manuals (if applicable)

CD-ROM User
Documentation, FP2
Manuals for rectifier and
controller, check lists, prod-
uct catalogue & presenta-
tions, software and more…

System Specific Drawings


Location of components, schematic and
connection drawings, specific documents or
manuals (if applicable)

CD-ROM User
Documentation, FP2
Manuals for rectifier and
controller, check lists, prod-
uct catalogue & presenta-
Installation tions, software and more…