Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
RESOLVED, to rescind the Building Department Fee Schedule ordinance which became
effective on February 14, 2007, and to adopt the following ordinance:
The following schedule of fees shall be charged by the New Hartford Building Department
based on the values and information set forth below:
D. Tents $25.00
G. Refund Policy: The Town will charge a fee of $20.00 or 10% of the fee paid,
whichever is higher
H. Public Safety Fee: We must collect a fee of $0.26/$1,000.00 of the value of each
permit for the CT Department of Public Safety.
I. If the Town should require expert technical consultation in review of building plans
and/or construction, the costs of such consultation shall be paid to the Town by the
owner in addition to the permit fee.
This ordinance shall become effective fifteen (15) days after its publication in a newspaper
having circulation in the Town of New Hartford.
Effective Date: