Sei sulla pagina 1di 3

Sutherland Global Services, Inc. | Connecticom Global Services, Inc.

Methodology and Approach

METHODOLOGY
FOR
REPLACEMENT OF PRECISION AIR CONDITIONING
UNITS FOR 9F AND 11F DATA CENTER

SUTHERLAND GLOBAL SERVICES, INC.


Philplans Corporate Center, Kalayaan Ave., Taguig City

1.1 Purpose
- This Methodology served as the general reference for the replacement and installation of New PACU
units.

Connecticom Global Network, Inc. Building Owner Representative Owner/Representative

________________________ ________________________ ________________________

Replacement of PACU Units at Data Center


9th floor Philplans Corporate Center, Taguig City
Sutherland Global Services, Inc. | Connecticom Global Services, Inc.
Methodology and Approach

1.2 Project Description


Title: New Wall Mounted Type ACU at CISCO Hub Room
Location: 9th,11th Floor Philplans Corporate Center, Taguig City
Contractor: Connecticom Global Network, Inc.
Project Details: Data Center PACU replacement Works
1.3 Scope of Work:
1. Dismantling of drywall
2. Dismantling of PACU units
3. Installation of new PACU units
4. Restoration of Affected areas
5. Punchlist & acceptance
1.4 Materials and Equipments
1. Copper Pipes and Insulations
2. wirings and support hangers
3. Drainpipes
4. Blow torch
5. Hand drill
6. Vacuum Pump
7. Refrigerant and Nitrogen tank
8. Various hand tools

1.5 Procedure:
1.5.1 Dismantling of existing unit
1. Dismantling of drywall and steel door.
2. Dismantling of Existing PACU units and refrigerant pipes.
1.5.2 Transportation and Movement
1. Forklifts to be used on carrying PACU units.
2. Transfer the PACU units to movable platform for carrying to upper floors.
3. Supply of Copper tubes, Refrigerant and drainpipe materials and consumables.
4. Supply of 2 units of ECB for Unit, existing wirings are advise to be reuse.
5. Supply of Electrical pipes and fittings, hangers and supports.
6. Installation of Copper tubes from Indoor unit to Outdoor unit.
7. Installation of Electrical piping and wirings from indoor to outdoor unit.
8. Installation of Electrical piping and wirings from outdoor unit to ECB Panel.
9. Mounting of Indoor and Outdoor Unit.

Connecticom Global Network, Inc. Building Owner Representative Owner/Representative

________________________ ________________________ ________________________

Replacement of PACU Units at Data Center


9th floor Philplans Corporate Center, Taguig City
Sutherland Global Services, Inc. | Connecticom Global Services, Inc.
Methodology and Approach
10. Leak testing, Vacuuming and Refrigerant Charging.
11. Testing and Commissioning.

Connecticom Global Network, Inc. Building Owner Representative Owner/Representative

________________________ ________________________ ________________________

Replacement of PACU Units at Data Center


9th floor Philplans Corporate Center, Taguig City

Potrebbero piacerti anche