Sei sulla pagina 1di 28

Issue date: 07th January-2010 Latest Projects Now

Master Code Company Name Sector


ACC Ltd. Cements
Airport Authority of India Ltd. Airlines & Aviation
Areva T&D India Ltd. Power Generation/ Transmissio
Artech Steel Industries (P) Ltd. Metallurgical Industries
Bharat Forge Ltd. Metallurgical Industries
Chennai Metropolitan Water Supply And Sewe Water Supply
Chettinad Cement Corporation Ltd. Cements
CLP Power India (P) Ltd. Power Generation/ Transmissio
CLP Power India (P) Ltd. Power Generation/ Transmissio
Cyber Employees Welfare Society (P) Ltd. Infrastructure / Construction /
Dharani Sugars and Chemicals Ltd. Fermentation
Emami Cement Ltd. Cements
Goodwill Spaces & Infrastructure (P) Ltd. Infrastructure / Construction /
Government of Punjab Infrastructure / Construction /
Graffiti Exports Ltd. Garment / Textiles/ Accessories
GVK Power and Infrastructure Ltd. Power Generation/ Transmissio
GVK Power and Infrastructure Ltd. Power Generation/ Transmissio
GVK Power and Infrastructure Ltd. Power Generation/ Transmissio
Hindustan Sanitaryware and Industries Ltd (HSICement Products
Ind-Barath Energy (Utkal) Ltd. Power Generation/ Transmissio
Infrastructure Corporation of Andhra Pradesh Food Processing/ Beverages
Jaiprakash Associates Ltd. Cements
Jindal Steel Ltd. Metallurgical Industries
Kamineni Group Hospitals/Healthcare
Karnataka Public Works, Ports & Inland Water Highways
Keerthi Industries Ltd. Power Generation/ Transmissio
KITCO Ltd. Utility Hub
Madras Cements Ltd. Sugar
Maharashtra State Power Generation Corpora Power Generation/ Transmissio
Mahindra Aerospace (P) Ltd (MAPL). Airlines & Aviation
Mirah Group. Hotels / Resorts
Modern Insulators Ltd. Garment / Textiles/ Accessories
Nirma Ltd. Cements
Oriental Bank of Commerce Banks
Oswal Woollen Mills Ltd. Garment / Textiles/ Accessories
Petronet LNG Ltd. Gas
Public Works Department Highways
ReGen Powertech (P) Ltd. Power Generation/ Transmissio
Reliance Power Ltd. Power Generation/ Transmissio
Royal Enfield Motors Ltd. Automobiles
S S Breweries (P) Ltd. Fermentation
Sartorius India (P) Ltd. Medical Equipments
Shantha Steel & Power (P) Ltd. Power Generation/ Transmissio
Shriram Properties Ltd. Infrastructure / Construction /
Siruguppa Sugars & Chemicals Ltd Power Generation/ Transmissio
State Bank Of India (SBI) Power Generation/ Transmissio
Sterlite Industries (I) Ltd. Power Generation/ Transmissio
Sterlite Industries (I) Ltd. Power Generation/ Transmissio
Supertech Ltd. Infrastructure / Construction /
Supertech Ltd. Infrastructure / Construction /
Thermax Ltd. Power Generation/ Transmissio
Toshi Group. Chemicals
Trimex Sands (P) Ltd. Chemicals
Universal Success Enterprises Ltd. Ports
Uralungal Labour Contract Cooperative SocietyInfrastructure / Construction /
Urbtech India Developers (P) Ltd. Infrastructure / Construction /
Varun Industries Ltd. Metallurgical Industries
Videocon Industries Ltd. Infrastructure / Construction /
Latest Projects Now
Project Status Project Brief
ACC is implementing its fully automated cement grinding
Under Implementation
plant atAuthority
Airport Kudithini of in Karnataka.
India has plans to set up a new
Planning Stage domestic terminal of the Biju Patnaik Airport at
Bhubaneswar
Areva T&D India in Orissa.
has plan to construct air-insulated
Planning Stage
substation at Nawada in Harayana.
Artech Steel Industries plans to set up Benefication and
Planning Stage
Iron
BharatOreForge
Pellets manufacturing
commissions unitfully
its new in Karnataka.
integrated Ring
Recently Commissioned Rolling Facility at its Centre for Advanced Manufacturing,
Baramati
Chennai Metroin Maharashtra.
Water plans to set up desalination plant at
Planning Stage
Nemili in Tamil
Chettinad Cement Nadu.
is expanding its cement manufacturing
Under Implementation unit along with coal based power plant at Karikkali in Tamil
CLP
Nadu. Power India has announced to set up a wind power
Planning Stage projects at five places like Gujarat, Maharashtra,
Karnataka,
CLP Rajasthan
Power India and Tamil Nadu.
is implementing its wind power project at
Under Implementation
Pune inEmployees
Cyber Maharashtra. Welfare Society is developing an
Under Implementation integrated residential township at Tellapur in Andhra
Pradesh.
Dharani Sugars and Chemicals is setting up distillery unit at
Under Implementation
Villupuram district of Tamil Nadu.
Planning Stage Emami Cement plans to set up a fully integrated cement
plant in Chhattisgarh.
Under Implementation Goodwill Spaces & Infrastructure is developing shopping
mall at Uttarakhand.
Punjab Government plans to set up a self-contained
Planning Stage integrated IT and knowledge industry park at Rajpura in
Graffiti
Punjab.Exports plans to manfacture all types of textiles
Planning Stage garments and clothing accessories at Haridwar in
Uttarakhand.
GVK Power and Infrastructure is implementing its coal
Under Implementation
based thermal power plant at Goindwal Sahib in Punjab.
Under Implementation GVK Power and Infrastructure is implementing its Hydro
power project at Shrinagar in Jammu & Kashmir.
Under Implementation GVK Industries is implementing its coal based thermal
power plant at Goindwal Sahib in Punjab.
Planning Stage Hindustan Sanitaryware and Industries plans to set up a
faucet manufacturing unit in Rajasthan.
Under Implementation Ind-Barath Energy Utkal is setting up a coal based thermal
power plant atCorporation
Infrastructure Sahajbahal in ofOrissa.
Andhra Pradesh plans to
Planning Stage develop a multiple food processing units and related
Jaiprakash
infrastructure Associates
at variousLimited (JAL)inhas
locations recently
Andhra Pradesh.
Recently Commissioned commissioned a cement project in joint venture with SAIL
at Bhilai
Jindal in Chattisgarh.
Steel plans to set up a stainless steel plant at Jajpur
Planning Stage
in Orissa.
Under Implementation Kamineni Hospital is setting up a hospital at Vijayawada in
Andhra
Karnataka Pradesh.
Public Works, Ports & Inland Water Transport
Planning Stage plans to implement road upgradation at Hosakote in
Karnataka.
Keerthi Industries plans to set up a bagasse based co-gen
Planning Stage
power plant at Balanagar in Andhra Pradesh.
Planning Stage KITCO plans to set u a new mobility hub at Vytilla in Kerala.
Planning Stage Madras Cements, a Ramco Group company plans to set up
aMaharashtra
greenfield sugar
Power plant at Thirukovilur
Generation in Tamil Nadu.
Corporation
Under Implementation (MAHAGENCO) is implementing Super Thermal Power
Mahindra Group plans in
Station at Chandrapur toMaharashtra.
enter aerospace segment by
Planning Stage manufactruing two-to-twenty-seater aircraft at Bangalore
in Karnataka.
Under Implementation Mirah Group is setting up five hotels in Goa, Alapuzzha
(Kerala), Chennai, Lonavala and Mahabaleshwar.
Under Implementation Modern Insulators is expanding the capacity of partially
oriented yarn at Nana village in Gujarat.
Planning Stage Nirma plans to set up a new cement manufacturing unit
along with thermal power plant at Mahuva in Gujarat.
Under Implementation Oriental Bank of Commerce is constructing Bank’s branch
office building at Chowk Purani Kotwali in Punjab.
Planning Stage Oswal Woollen Mills plans to expand capacity of its existing
plant at Ludhiana in Punjab.
Under Implementation Petronet LNG is setting up an onshore LNG re-gasification
terminal at Puthuvypeen in Kerala.
Under Implementation Public Works Department is constructing Ring road bypass
near IG stadium at Delhi.
Planning Stage ReGen Powertech and Indian Energy has signed an
agreement to set up a wind farm at Theni in Tamil Nadu.
Under Implementation Reliance Power is implementing its coal based power plant
at Shahjahanpur
Royal in Uttar
Enfield, Eicher groupPradesh.
Motorbike manufacturer plans
Planning Stage to double the capacity of its Thiruvottiyur plant at Chennai
in
S STamil Nadu.plans to set up a brewery unit at Bhondsi in
Breweries
Planning Stage
Haryana.
Sartorius India is a provider of process and laboratory
Recently Commissioned equipment to the biotechnology segment. The company
has recently
Shantha Steelcommissioned a new plant in
& Power is implementing Karnataka.
a coal based power
Under Implementation
plant at Koppal in Karnataka.
Shriram Properties is developing an integrated township at
Planning Stage
Madhurwada in Andhra Pradesh.
Siruguppa Sugars & Chemicals is setting up a bagasse based
Under Implementation
power plant at Desanur in Karnataka.
State Bank of India (SBI) has announced to set up a wind
Planning Stage
power plants at various locations in India.
Sterlite Energy is implementing its coal based sub-critical
Under Implementation
thermal power plant at Jharsuguda district of Orissa.
Sterlite Energy plans to set up super-critical thermal power
Planning Stage
plant at Banawala in Punjab.
Supertech plans to set up housing project at Noida in Uttar
Planning Stage
Pradesh.
Supertech plans to set up an IT Park at Greater Noida in
Planning Stage
Uttar Pradesh.
Thermax is setting up a solar power plant at Shive village
Under Implementation
Maharashtra.
Toshi Group is setting up a new ethyle acetate
Under Implementation
manufacturing
Trimex unit to
Sands plans at Bulandshahar in Uttar
set up a Titanium Pradesh.
Dioxide
Planning Stage manufacturing unit along with a Thermal power plant at
MarripaduSuccess
Universal village in Andhra Pradesh.
Enterprises plans to develop a port at
Planning Stage
Bhogat in Gujarat.
Uralungal Labour Contract Cooperative Society plans to set
Planning Stage
up IT Park at Nellikode in Kerala.
Urbtech India Developers is constructing a commercial
Under Implementation
complex at Gautam Budh Nagar in Uttar Pradesh.
Varun Industries has announced to set up a stainless steel-
Planning Stage
cum-alloy steel plant at Rohat in Rajasthan.
Videocon Group is setting up an IT park at Salt Lake, West
Planning Stage
Bengal.
ACC is implementing its fully automated cement grinding plant at Kudithini
Airport
in Bellary Authority
district of of Karnataka
India has plans with an to set up a newofdomestic
investment around Rs. terminal
3,700 of
the Bijuto
million Patnaik
produce Airport
1.2 in Bhubaneswar
MTPA. Project Summery
The project district
is expectedof Orissato with
produce an Portland Project Cost
Areva
investmentT&D India ofusing has plan
around Rs. to construct
1,440 million. 400TheKV air-insulated
project comprises substation
towork
handle at
Slag
Nawada Cement in Faridabad slag from
district Bellary
of Haryana region. with As anDecember
investment 2009, of around onRs.
capacity
Artech
project isofin800
Steel passengers
Industries
progress. plans and alsoup
to set further plans toand
Benefication convertIron powernewPellets
Ore domestic 3,700 Million
760 millions.
terminal into The project
international involves
terminal in bysupply
2010. ofConstruction
two 315 MVA work on project
manufacturing
transformers, unit
high with a capacity of 1.2 MTPA at Kunigal Taluk in Tumkur
Bharat
is expected
district Forge
of startvoltage
tocommissions
Karnataka soon.
with an
circuit
its newbreakers,
investment fully integrated
of
instrument
around Ring
Rs.
transformers
Rolling
4550 Facility
million.
and its
Asat of 1,440 Million
T&D
Centre products.
for Advanced as of December
Manufacturing, 2009, work
Baramati on project
in is
Maharashtra. in planning The stage.
new
December
Chennai 2009,
Metro work
Water on
plans project
to setupis in
upto planning
100 stage,
MLD desalination The project
plant has
at m,Nemili 760 Million
ring
clearedrolling facility
by State canLevel
High makeClearance
rings a maximum diameter of 4.5
in Tiruvallur
maximum district
height of of
up Tamil
to 500 Nadu.
mm As Committee
and ofmaximum
December (HLC)
2009,
weight
in work
of
August
up
2009.
on3T
to the The
it will
work
project is likely
is in to start in
planning 8-9 months.
stage, bids invited for construction, commissioning, 4550 Million
caters
Chettinad to WindCement Energy, Defense,its
is expanding Oilcement
& Gas, manufacturing
Mining, Material unit Handling
from 2 MTPA
performance
CLP Power
Equipment and guarantee
India, a part
Bearing oftest,
CLP
Industry. operation
Group The has &announce
maintenance
investment was to set
Rs.of3500100a mld
up wind
million. power 3500 Million
to
CLP 4.5 MTPA
Power
desalination along
India,
plant a with
part
is inlike coal
fo CLP
progress. based
Group power
is plant
implementing
VAMaharashtra,
Tech Wabag,Karnataka, from 15
its
in partnershipMW
wind to 45
power
with MW IDE at
projects
Karikkali at
in five
Dindigul places district Gujarat,
of Tamil Nadu. As of December Rajasthan
2009, work and
on
project
Technologies-
Tamil named
Nadu 'Andhra
Israel are Lake
lowest wind farm'
bidder, in
work Pune
order district
is yet ofto Maharashtra
be issued. to
Cyber
the Employees
project
generate iswith
113.6 in MW an investment
Welfare
progress,
power. Society
around
The
of30isaround
projectdeveloping
per iscent Rs. work
36,000
to be an is million
integrated
execute completed toresidential
initsphases.
generate
and Phase-I
600 MW.
township
remaining The
at
work company
Tellapur
is in
expected is to
Hyderabad fund
to an
complete investment
district by of Andhra
last through
quarter Pradesh
of own
2010. on cash
6.4 acresof
with
reservesgenerating
andan also capacity
plans to set of 56 MW and Phase-II with generating capacity
of
57.6landMW. with Enercon investment
has appointedof uparound 5MWRs.
as
solar
1150
manufacturer
power
million. farm
for
in Maharashtra
It comprises
the project. 10 on
Work
and
towers Gujarat.
of The
10progress project
flrs with total is in nascent stage. 36,000 Million
project
Dharani isSugars
in and and
Chemicals is400 is
flats and
scheduledsetting for car parking facility
upcompletion
100 KLPD by 3rdofquarter
distillery
800 cars.
asof
unit2009,
The
part of
Company
2010.
Punjab has
Government appointed plans NCCto set as Civil
up Contractor.
a self-contained As of December
integrated IT and NA
integrated
work onCement sugarismill
project complex
inpark
progress, at
Site Villupuram
leveling district
work of
started Tamiland Nadu
is with
slatedwithforan
Emami
knowledge
investment industry
of plans
around toRs. set
at
750 upmillion.
a fully
Rajpura inintegrated
Patiala
As of cement
district
December of2009, plant
Punjab work on on an
1,276
completion
installed
acres ofisland. by
capacity second
to
The&project half
produce of 2011.
3.1
is tostatutoryMT
develop in Chhattisgarh
in phases with with an
residential investment of 1150 Million
project
Goodwill in progress,
Spaces All the
Infrastructure clearances
is developing are in
shopping place
mallacre andand
named is 'G social
City
around Rs.
infrastructure
expected 17500 million.
facilities
for commissiond As
suchinas6on of December
health
months. care, 2009, around
recreation, 400
health of
clubs and land is 750 Million
Mall' at NH-74
acquired. in Uttarakhand
The construction is expected 3 acres toof landbywith
start midan 2010 investment
and completion of
hotels.
around IT Park comprises software companies, hardware manufacturing
is slatedRs.
companies, by 750
2012. million. Company has appointed G City Construction as a
multimedia, 17500 Million
Civil Contractor & Sumit consultancy
Goel as an Architect. firms, educationAs of December and training 2009, work
institutions,
on project is in progress and is scheduled for completionInformation
Exhibition centres including IT-BPO. Punjab by end of 2011. & 750 Million
Communication Technology has appointed as nodal agency to implement
Graffiti
GVK PowerExports and plans to manfacture all types ofits textiles garments and at
the
GVK project.
Power
clothing and Infrastructure
accessories Infrastructure
at Haridwar
is
is implementing
implementing
in Uttarakhand. itsAs Hydro
coal
of basedpower
November
project
thermal 2009, power NA
Shrinagar
plant at district of
Goindwal Jammu
Sahib in & Kashmir
Amritsar with of
district anPunjab
investment with of around
an investment Rs. of
project
27,000 is beingtoapproved and Further details arecomprisesawaited.
around million
Rs. 30,000generate million to330 MW. The
generate 600project
MW. It comprisesfour twounits steam of
82.5
turbinesMW. of Bharat
300 MW Heavy each. Electricals
As of now, Ltd (BHEL)
the work hasis appointed
in progress. for electro- 30,000 Million
GVK Industries
Ind-Barath
mechanical Energy
work is implementing
Utkal,
for the and a part
project. itsAs
of 600
Ind-Barath
of nowMW January
coal
Groupbased thermal
is setting
2010, work uppower
isaincoalplant
Hindustan
at Goindwal Sanitaryware
Sahib in Amritsar Industries
district of plans
Punjab to set up
with an a investment
faucet of
based
progress. thermal power
manufacturing in plant
unitmillion. Rajasthan at Sahajbahal
with an investmentnear Banaharpali of onaround in Jharsuguda
Rs.is800 27,000 Million
around of
district Rs.Orissa
30,000 on 600 acresAs of of December
land with 2009,
an work
investment project
of around in
Rs.
million.
Infrastructure
progress. As of December
Corporation 2009, work onPradesh
of Andhra projectplans is in planning
to develop stage. The
a multiple 30,000 Million
31,500
constructionmillion to generate
willunits
beginand shortly 700 MW. The
andinfrastructure project
the unit will becomes has got approvals,
operational out
by of
food
total processing
investment cost Rs. related
7,300 million for equity on PPP basis
component at various
and remaining
early 2011. Madanapalli in Chittoor district, Krishna, Guntur, Nizamabad in
locations 800 Million
amount islike
Jaiprakash raised
Associates by the company
Limited (JAL) through
has recently debts.commissioned
As of December a 2.22009,MTPA
Andhra
work Pradesh.
is in progress The and project
is scheduledhas approved
for by the state
completion by government.
1st quarter As of
of with
2011. 31,500 Million
cement project named ‘Bhilai Jaypee Grinding
December 2009, project is in nascent stage and is scheduled for completion Plant' in joint venture
SAIL
by at Bhilai in Durg district of Chattisgarh on 10 hectares of land with an
2013. NA
Jindal
Karnataka
investmentSteel,Publica stainless
of Works,
around steel
Rs. Ports
2780 manufacturing
&million.
Inland As ofcompany
Water Transport
December plans plans
2009, to Project
set up ahas
to implement
stainless
road
commissioned. steel plant
upgradation to at
D. Jajpur
Hosahalli in Jajapur
cross –district
Devanagundiof Orissa – to produce 1.6
Santhetopu Road in of 2780 Million
Kamineni
MTPA. The Hospital
projectinisisBangalore
setting
to develop up a in new 100 bedded
phases. Phase-Ihospital
comprises at Vijayawada
to produceof0.8
3 km
Andhra at Hosakote
Pradesh. As of December district of Karnataka with an investment
Keerthi
MTPA
around andIndustries
Rs. Phase-II
6 million. plans
expected
As of to December
settoupadd a2009,
20
0.8 MW
2009,
work
MTPA on
work bythe
bagasse on
project
endbased
theof project
2014. is in progress
co-generation NA
and is expected
power plant at for completion
Balanagar by 2013. Kamineni isAndhra
in talks withisbanks in to
planning
finance thestage, administrative approvals are received for the project,with an
project.
in Ranga Reddy district of Pradesh
investment
tendering of
processaround Rs.
is Generation 400
underway, project million. Company
is funded has appointed
by National Bank for Avante
Maharashtra
Garde as project Power consultant. As of Corporation
December (MAHAGENCO) is
2009, work on project is in
Agriculture
KITCO plans
implementing and
to2x500Rural
set u aMW Development
new mobilityare
Chandrapur (NABARD).
hub at Vytilla
Super Thermal in Ernakulam
Power district
Station in of 6 Million
planning
Madras stage,
Cements, certain
aofRamco clearances
Group awaited from to the State Government.
Kerala
Chandrapur
The on
project 27isdistrict
acres
slated of land
for with
Maharashtra.
completion an company
investment
BGR
by the
plans
Energy
last of around
Systems
quarter
set
of
upRs. a1210
has
2011.
greenfield
been million.
awarded As 400 Million
sugar
of plant along
December 2009, with
work a cogeneration
on the project power
is in and an alcohol
planning stage, plant atis
project
the turnkey contract
Thirukovilur in Villupuram for balancedistrict ofofplant
Tamil atNadu
a costonof240 Rs.16,320
acres ofmillion. land with The
awaiting
scope of for preliminary
work includes report
design, approval
supply, from
engineering, cabinet. erection, testing and 1210 Million
an investment
Mahindra Group of plans
around to Rs.enter 4500 million. As
aerospace of December
segment 2009, work on
by manufactruing
commissioning
project is in planning of all balance
stage work of the Plant including mechanical, two- 4500 Million
to-twenty-seater aircraft at Bangalore
electrical, civil and structural works. As of December 2009, work in Karnataka with an investmenton project of
around Rs. 1750 million. The project comprises
is in progress and is scheduled for completion by second quarter of 2012. to manufacture 475
aircrafts. The group has also acquired two Australia based Aero staff and
Gippsland Aeronautics companies. 1750 Million
Mirah Group is setting up five hotels in Goa, Alapuzzha (Kerala), Chennai
(Tamil Nadu), Lonavala and Mahabaleshwar (Maharashtra) with an
Modern
investment Insulators
of around is expanding
Rs. 2000 crore. the capacity
As of December of partially oriented
2009, workyarn from
on project
12000
is TPA
in progress to 37000 TPA at Nana village in Surat district of Gujarat. As of
Nirma
December plans2009,toand setworkisupscheduled
aon new project1.91forMTPAcompletion cement
is in progress
bymanufacturing
second quarter of 2010.
and is scheduledunit for along
20000 Million
with 50 MWby
completion thermal
second power
quarter plant at Mahuva in Bhavnagar district of
of 2010.
Oriental
Gujarat. Bank
As of of Commerce
December 2009, is constructing
work on the Bank’s
project branch office building
is intoplanning stage, at
Oswal
Public
Chowk Woollen
Works
Purani Mills,
Department
Kotwali a inSusidiary
is
Patiala of
constructing Nahar
district of Group
Ring
Punjab road plansbypass
with an expand
near
investmentIG capacity
stadium
of of
Petronet
Company
ReGen
its LNG
has
Powertech,
existing cottonis setting
appointed a upMin
Chennai-based
spinning an
plantonshore
Mec from LNG
Consultancy
company
16 MMPA re-gasification
andPvt.
to Ltd.
Indian
22 as
MMPA terminal
an
Energy, by an at
Consultant.
adding
at
aroundDelhiRs.
Puthuvypeen with 45an in investment
million.
Ernakulam As of districtof around
December Rs.
2009,
of investment
Kerala 6543 work
with million.
an It is 5.5
oninvestment
project is km long, 4
inofprogress
around
independent
more
lane 12,000
having power
2cotton
carriage producer
spindles
ways. 2.5 has
Itwith
isMTEU.signed
an
clover leafanshaped of around
and will Rs. 800
decongest million
the
and
Rs. is
agreement scheduled
32,000 million
to for
to completion
set upItofawillhandle
wind farm by second IHI, quarter
Japan hasof 2010.
appointed as EPC 45 Million
at Ludhiana
trafiic on the district
road. Punjab.
connect Theat Theni
project
Geeta district
is expected
colony to of
and Tamil
to
end beNaduready
near onby turnkey
Salimgarh 1st
Contractor.
basis
quarter to of The company
generate
2010. 49.5 MW. also The has further
project is toexpansion
developLtd plan from 2.5
in phases. TheMTEU phase-I to 800 Million
fort.
Reliance
5 Company
MTEU. Power
As of hasis
December appointed
implementing 2009, Simplex
its coal
constructionInfrastructure
based power
work is inplant to implement
progress named and 'Rosa
is
comprises
proposed an installation
project. As of of 11 turbines
December 2009, of 1.5 MW each tois generate total
Power
expected
16.5 MW Project'
to
and at Shahjahanpur
becomes
Phase-II operational
comprises district
by
22 end
turbinesofwork
ofUttar onPradesh
2011.
of 1.5
project
MW with
each
in an
progress,
to investment
generate 32,000 Million
around
of around 40% Rs.ofThe the work
60,000 million is over and is scheduled
toisgenerate 1,200 MW. for completion
The project by
is to second
total
quarter 33 ofMW. 2010. investment to be done by Indian Energy through mix of 6543 Million
develop
debt and in phases.
equity. The Shanghai
land has Electric
acquired (Group)and Company
project is has
scheduled appointedfor as
Royal
EPC Enfield, Eicher
contractor. Phase-I group Motorbike
comprises Unit-I manufacturer
and Unit-II plansgenerating
with to double the
completion
capacity by end of 2010. plant from 50000 to 100000 units at Chennai in NA
capacity of of its
600Thiruvottiyur
MW, work on Unit-I has started. Phase-II work is expected
Tamil
to Nadu withby an1st investment of2012.
around Rs. 1300 million. As of December
Sgo
S2009, on stream
Breweries
work on plans
project to setquarter
is in up planning
of
a brewery stage unit and with a capacitytoofcommence
istownship
expected 151 KLPD at by
60,000 Million
Shriram
Bhondsi Properties
in Gurgaon isdistrict
developing of an integrated
Haryana. As of December named
2009, ‘Shriram
work on
first
Global quarter
Sartorius Indiaof 2010.
is a provider of process and laboratory equipment to the 1300 Million
projectEntropolis’
Shantha isSteel
in planning
&segment.
Powerat Madhurwada
stage,
isThe Necessary
implementing in Visakhapatnam
clearences
a coal based district
haspowerbeen receivedof Andhra
plant to from
biotechnology
Pradesh
the state on 80
government acres of andland. work company
Projectin will
expectedhas be recently
implemented
to commencecommissionedin byphases
end-Iof a&new it
2010.
generate
plant on the 52 MW
outskirts in Koppal district
ofresidential
Bangaloreapartments of Karnataka
in Karnataka&with in phases.
an Phase
investment will
of Rs.
comprises
generate 10of 2572
MW with nos. an investment of around 206
Rs. 450 nos. villas,
million. IT
As ofSEZ,
Siruguppa
450 million.
mall/ Sugars
multiplex, & Chemicals
hotel, hospital is&setting
school. up a bagasse
Company hasbased
appointed power plant to
JURONG 450 Million
December
generate
Sterlite 2009,
28.2
Energy, MW work
a part at on
Desanur
ofLtd. the
Vedanta project
in Bellaryis in progress
district of and is
Karnataka. scheduled
Avant itsfor
Garde 450 Million(Phase-
Consultants
State Bank
completion
Sterlite Energy,of(India)
by India
end
a part Pvt.
(SBI)
of 2010.
of has
Vedantaas an Group
announced Consultant.
Group
company
to
planssetAs upof
to aisDunkerley
set
implementing
December
wind
up power 2009,
super-criticalplants coal
workat I)
has
based
on been
the appointed
sub-critical
project is in as
thermal
progressproject power
and consultant,
isplant
scheduledat Gannon
Jharsuguda
for district
completion as
of
by the
Orissa
end civil
of with
various
Talwandi
contractor locations
thermal
andof BHELlike
power Maharashtra,
as the plant at Tamil
Banawala Nadu in and
Mansa Gujarat
district toof generate
Punjab 9
with
an
2011.
MW, investment
5 MW and around
1.5 MW Rs.major82,000
respectively
equipment
million
on tosupplier
turnkey generate
basis
by2,400
to
the company.
cater MW
to from
its head
As
an
12.49investment
of December
MTPA of
2009,
of around
coaland work
linkage. Rs. 93,200
on SEPCO-III
project is has million
in progressto generateandasisEPC 1,980
scheduled MW from
for for
offices.
around
completion Operations
7.90by MTPA of coal
lastcomprises
quarter maintainance
linkage.
ofto 2010. toappointed
Theisproject handled is tofromby
be thedevelop
Contractor
project in phases.
the project.
contractors.The Unit-I project isEPCin nascent generate stage 600 MW
andproject.
further As 2.57
details MTPA
are yet coalto be
SEPCO
linkage has
and appointed
is expected asto contrator
complete by for
4th the
quarter of 2010. of December
Work on
Supertech,
finalised.
2009, Company a real hasestatereceived developer plans
provisional to
coal set up
linkage an eco-friendly
from Rampia housing
block in NA
project at
project is in progress
Noida inPPA and is Buddha
Gautam scheduled Nagar for completion
district of Uttarby 3rd quarter
Pradesh onof12.6
Orissa.
2011. Long-term signed with the PSEB providing for the sale of 82,000 Million
acres
1,841.40 of land
MW with
of power an investment
to PSEB. Work of around Rs. 6,000
ontoproject million. The project
Supertech,
comprises a real
1,700 estate
units and developer
investment plans is to up is
setfunded
be aninITthrough
planning
Park named stage
internal
and is
scheduled for
'Supertech completion
Software Park' by
at 2014. Noida district of Uttar Pradesh on
Greater 93,200 Million
acurrals and
Thermax customer advances. Contsruction work iscompany likely to is start fromup
40,000
1st Sq.Ltd,
quarter Mtr. energy
of plant
2010of land and
and with environment
an investment
is scheduled for
management
of aroundby
completion Rs. setting
3,000 million.
mid-2013. The 6,000 Million
aproject
solar power at Shive village in Pune
comprises 100 units with ultra-modern facilities and 10,00,000 sq. district of Maharashtra with an
investment
ft. built up area.of around
The project Rs. 150 million
is inethyle
nascentto generate 250 KW.
stage.manufacturing unit with a The land has 3,000 Million
Toshi
acquired Groupand isproject
setting isup a new
expected to goTPA acetate
on stream
Trimex
Uralungal
capacity Sands
of Labour
35 plans
KLPD to
Contract
at set up a 50000
Cooperative
Bulandshahar in Titanium
Society,
Uttar a in
Pradesh.
18 months
Dioxide
Construction time from
As of manufacturing
Society
December plans
zero
unit
to setdate
along
up of
first commencement.
with IT a 100
Park MW
named Thermal
'UL Cyberpower Park' plant
at at Marripadu
Nellikode in village
Kozhikode in by 150 Million
2009,
Universalwork on
Success the project
Enterprises is in progress
plans to develop and is scheduled
a port at2009, for
Bhogat completion
in Jamnagar
Srikakulam
district of
first quarter district
Kerala
of 2010. on of25.11
Andhra acres Pradesh.
of land Aswith of December
an investment of work
around on Rs.the
district
project of
is Gujarat
in planning on 1000
stage acres
and isof land
expected with to an investment
commence by of around
second Rs.
quarter
6,000
20000 million.
Varun Industries,
million. The
As project
aofstainless
December is to
steeldevelop
2009, in
manufacturer
work two
on phases with
and exporter
project is in total built
has stage,
planning up
of
area2010
of
announced & Completion
3.1 million
to Developers
setand up aft.by
sq DPR second
Phase
stainless isquarter
-Isteel-cum-alloy
to develop of 2012. onsteelbuilt up area
plant ofBritish
at Rohat 14 lakh
in Pali
Land
Urbtechacquisition
India is
is in progress
constructing company
a commercial has appointed
complex named
sqft and
district
Maritime, ofis expected
Rajasthan
Ahmedabad to
with be
as operational
total
a investment
Consultant. by 2011.
of Phase
around -II
Rs. is
8,000expected
million totobe 20000 Million
'Urbtech
Videocon NPX'
Group (NehruisMTPA. Place
settingThe Extension)
up an IT park at Sector
along with 153 thein Gautam
hotel at Budh
Salt Lake Nagar
developed
produce
district of
subsequently.
1,20,000
Uttar Pradesh on
The
5
project
project
acres of
is to
is awaiting
land. develop
It
toin
comprises
get environment
phases.
G+15 Phase-I
flrs. within
Company
Kolkata
clearance
investment district
toofstart of the
around West Bengal
construction
Rs. 2,300 on 3.8
work.
million. million
Project sqcomprises
ft of land with an for
facilities 6,000 Million
has appointed
investment of D F Architect
around Rs. 9,000 as an Architect.
million. The As of
project December
is to 2009, work
developed on
making
project is stainless
in progress steeland flatsisand other high
scheduled for quality stainless
completion by end steel andinalloy
of 2010.
phases. The proposed hotel is to cater
steel items including rounds, angles, wire rods, channels, structural, long to IT and ITES sector. Shapoorji
Pallonji
products. and Ahluwalia Construction companies has appointed to develop 8,000 Million
the project. Phase-I comprises 1 million sq ft of IT space and is slated for
completion by end of 2010. 9,000 Million
Vol
Projetct Capacity Project Location EDC
1.2 MTPA Kudithini, Karnataka
NA Bhubaneswar, Orissa NA
400 KV Nawada, Haryana
1.2 MTPA Kunigal, Karnataka
Baramati in Maharashtra
100 MLD Nemili, Tamil Nadu
4.5 MTPA Karikkali, Tamil Nadu 2010
(Expanded) & 45
600
MWMW (Expanded) Gujarat, Maharashtra, NA
Karnataka, Rajasthan, Tamil
113.6 MW Pune,
Nadu Maharashtra 2010
Tellapur, Andhra Pradesh 2011
100 KLPD Villupuram, Tamil Nadu 2010
3.1 MT Chhattisgarh 2012
NH-74, Uttarakhand 2011
NA Rajpura, Punjab NA
Haridwar,Uttarakhand ,India.
600 MW Goindwal Sahib, Punjab NA
330 MW Srinagar, Jammu & Kashmir NA
600 MW Goindwal Sahib, Punjab
Rajasthan 2011
700 MW Sahajbahal, Orissa 2011
NA Madanapalli, Krishna, Guntur, 2013
Nizamabad
2.2 MTPA Bhilai, Chattisgarh
1.6 MTPA Jajpur, Orissa 2014
100 Bed Vijayawada, Andhra Pradesh 2013
Hosakote, Karnataka
20 MW Balanagar, Andhra Pradesh 2011
Vytilla, Kerala
Thirukovilur, Tamil Nadu
2x500 MW Chandrapur, Maharashtra 2012
475 aircrafts Bangalore, Karnataka
Goa, Alapuzzha (Kerala), 2010
Chennai (Tamil Nadu),
37000 TPA Nana village,
Lonavala and Gujarat
Mahabaleshwar 2010
(Expanded) (Maharashtra).
Cement -1.91 Mahuva, Gujarat
MTPA & Thermal
Power – 50 MW Chowk Purani Kotwali, Punjab 2010
22 MMPA Ludhiana, Punjab 2010
(Expanded)
2.5 MTEU Puthuvypeen, Kerala 2011
Near IG stadium, Delhi 2010
49.5 MW Theni, Tamil Nadu 2010
1,200 MW Shahjahanpur, Uttar Pradesh NA
100000 Units Chennai, Tamil Nadu
151 KLPD Bhondsi, Haryana
Bangalore, Karnataka
52 MW Koppal, Karnataka 2010
Apartments-2572 Madhurwada, Andhra Pradesh 2011
& Villas-206
28.2 MW Desanur, Karnataka 2010
9 MW, 5 MW, 1.5 Maharashtra, Tamil Nadu, NA
MW Gujarat
2,400 MW Jharsuguda, Orissa 2011
1,980 MW Banawala, Punjab 2014
NA Noida, Uttar Pradesh 2013
NA Greater Noida, Uttar Pradesh NA
250 KW Shive village, Maharashtra NA
35 KLPD Bulandshahar, Uttar Pradesh 2010
Titanium Dioxide Marripadu village, Andhra 2012
– 50000 TPA & Pradesh
Thermal Power Bhogat, Gujarat
Plant
NA – 100 MW Nellikode, Kerala NA
G+15 flrs Gautam Budh Nagar, Uttar 2010
Pradesh
1,20,000 MTPA Rohat, Rajasthan NA
NA Salt Lake, West Bengal 2010
Project Address Tel No
Kudithini, Distt. Bellary-583101, Karnataka.
Biju Patnaik Airport, Distt. Bhubaneswar-751020, Orissa. 0674-2596300/ 2596322
Nawada, Distt - Faridabad, Haryana
Taluk-Kunigal, Distt - Tumkur - 572130, Karnataka
Baramati, Distt - Pune - 413102, Maharashtra 020-26702638, 2682 4666
Nemili, Distt - Tiruvallur - 631201, Tamil Nadu
Karikkali, Distt - Dindigul - 624703, Tamil Nadu
Gujarat, Maharashtra, Karnataka, Rajasthan, Tamil Nadu. NA
Andhra Lake wind farm, Distt. Pune-411001, Maharashtra. NA
Tellapur, Distt - Hyderabad, Andhra Pradesh
Kalayanallur village, Sankarapuram Taluka, Distt - Villupuram -
606401, Tamil Nadu
Chhattisgarh
NH-74, Uttarakhand
Rajpura, Distt. Patiala-140401, Punjab. NA
Haridwar,Uttarakhand ,India.
Goindwal Sahib, Distt. Amritsar-143422, Punjab. NA
Distt. Srinagar-190001, Jammu & Kashmir. NA
Goindwal Sahib, Distt. Amritsar-143422, Punjab.
Rajasthan
Ind-Barath Energy (Utkal) Ltd, Sahajbahal, Tehsil- Lakhanpur, Distt.
{Madanapalli, Distt. Chittoor},
Jharsuguda-768201, Orissa. {Krishna, Distt. Mahabub Nagar-
509352, Andhra Pradesh},{Distt. Guntur-522002, Andhra Pradesh},
{Distt. Nizamabad-503001, Andhra Pradesh} NA
Bhilai Jaypee Grinding Plant, Bhilai Steel Plant Premises, Slag Road,
Opposite Sector – 4, NMOH, Bhilai, Distt - Durg - 490001, Chattisgarh
Jajpur, Distt. Jajapur- 755001, Orissa. NA
Vijayawada, Andhra Pradesh
Taluk -Hosakote, Distt - Bangalore, Karnataka
No. 40 IDA, Balanagar, Ranga Reddy 500037 Andhra Pradesh
Vytilla, Distt - Ernakulam, Kerala
Thirukovilur, Distt - Villupuram, Tamil Nadu
Chandrapur, Distt - Chandrapur - 442404, Maharashtra 07172-220155/ 6/ 7/ 8/ 9
2nd Floor, Rockline Centre, # 54, Richmond Road, Bangalore - 560025
Karnataka 080-25595655/ 56/ 57
Goa, Alapuzzha (Kerala), Chennai (Tamil Nadu), Lonavala and
Mahabaleshwar (Maharashtra).
Nana village, Distt - Surat, Gujarat
Taluk - Mahuva, Distt - Bhavnagar - 364290, Gujarat
SCO-146, Improvement Trust Complex, 1st Floor, The Mall, Distt -
Patiala - 147001, Punjab. 0175-2215255, 2201487,
2225025
G.T. Road, Sherpur, Ludhiana-141003, Punjab. 0161-2542501/ 02/ 03/ 04/ 05/
06/ 07
Project Circle CW-11,
Puthuvypeen GNCTD
SEZ area, Executive Engineer, Kerala.
Distt. Ernakulam-682508, Commonwealth NA
Project Division, CW-113, Nirman Kuteer, Curzon Road Barracks, K G
Marg, New Delhi - 110001, Delhi 011-23385682, 23386515/
09650499322.
Distt. Theni-625531, Tamil Nadu. NA
Distt. Shahjahanpur-242001, Uttar Pradesh. NA
Tiruvottiyur High Road, Tiruvottiyur, Distt -Chennai - 600019, Tamil
Nadu 044-42043300, 42230400
Vill. Bhondsi, Tehsil- Sohna, Distt - Gurgaon - 122102, Haryana
#10, 3rd Phase, Peenya 6th Main, KIADB Industrial Area, Distt -
Bangalore - 560058 Karnataka 080-28391963/ 0461
Distt - Koppal, Karnataka
Madhurwada, Distt - Visakhapatnam - 530048, Andhra Pradesh
Siruguppa Taluk, Desanur, Distt - Bellary - 583140 Karnataka 08396-620439
Maharashtra, Tamil Nadu, Gujarat. NA
Distt. Jharsuguda-768201, Orissa. NA
Talwandi Sabo Power Plant, Banawala Village, Distt. Mansa- 151505,
Punjab. NA
Sector-137, Noida, Distt. Gautam Buddha Nagar- 201301, Uttar
Pradesh. NA
Distt. Greater Noida-201301, Uttar Pradesh. NA
F-1,7,9,10, Sikandrabad
Shive village, Industrial Maharashtra.
Distt. Pune-410501, Area, Sikandrabad, Distt - NA
Bulandshahar- 203205, Uttar Pradesh
05738-221831, 224024 /
09212318315, 09818074844,
Marripadu village, Distt - Srikakulam - 532215, Andhra Pradesh 09833016975
Shapat 3, Unit No 303A, 3rd Floor, Sarkhej – Gandhinagar Road, Distt -
Ahmedabad - 380055, Gujarat 079-40210300
Nellikode, Distt. Kozhikode- 673102, Kerala. NA
Plot No. C-1, Sector 153, Noida Expressway, Distt - Gautam Budh
Nagar, Uttar Pradesh 09711170240/ 241
Rohat, Jodhpur, Distt. Pali-306421, Rajasthan. NA
Salt Lake, Distt. Kolkata-700064, West Bengal. NA
Fax No Email Id Contact Person
Mr. R. Nand Kumar, Head-
durai.bhaskaran@accconcrete.com, vivek. Corporate Communicator
0674-2596302 apdbbsr@aai.aero NA
tde.webmaster@areva-td.com
Mr. Santosh Pandey, Manager
spandey@artechinfo.in Operations
Ms. Sarita Iyer, Corporate
020-26822598 siyer@bharatforge.com, info@bharatforge Communications
cmwssb@md2.vsnl.net.in
mdchettinadgroup@airtelmail.in
NA tushara.nair@clpindia.in Ms. Tushara Nair
NA tushara.nair@clpindia.in Ms. Tushara Nair
Mr.Voleti
voleti_ramkumar@cyberemployeeshome.orRamkumar (09966441111)

Mr. Vikram Khaitan, AGM


Finance
sushilchoudhary78@yahoo.com Mr. Sushil Choudhary
Mr. R.S. Sandhu, Technical
NA pws@punjabmail.gov.in, tapidb@gmail.comAdvisor & Project Director
info@graffitiexports.com , sales@graffitiexports.com
NA info@gvk.com, cs.gvkpil@gvk.com Mr. A. Ramakrishna, Director
NA info@gvk.com, cs.gvkpil@gvk.com Mr. A. Ramakrishna, Director
info@gvk.com, cs.gvkpil@gvk.com Mr. A. Ramakrishna, Director
Ms. Ruchi Sharma, Manager
delhi@hindware.co.in Marketing
hyderabad@ibpil.co.in
Mr. P.Subbaraya Sarma, Chief
NA incaphyd@yahoo.com, cgmpincap@gmail. General Manager (Projects)
ishita.malhotra@jalindia.co.in, rajiv.srivasta Ms. Ishita Malhotra
NA info@jindalsteel.com, investorcare@jindals NA

prs-pwd@karnataka.gov.in, secytech-pwd@karnataka.gov.in, js-candb-pwd@karnataka.gov.in,

mail@kitco.in
rrkn@madrascements.co.in, kjk@madrascements.co.in
0712-220203
080-25595930 contactus@mahindraengg.com
hospitality@mirahgroup.net, info@mirahgroup.net
corporate@modern-group.com Mr. R K Vyas,
info@nirma.co.in
Mr. Virender Pathania, Chief
0175-2214133 edp_pat@obc.co.in, mbd@obc.co.in Manager
Mr. Sandeep Jain, Executive
0161- 2542509 oswal@owmnahar.com Director
NA webmaster@petronetlng.com NA
Mr. Sunil Sharma, Exective
dw@pwddelhi.in Engineer
NA info@regenpowertech.com NA
Mr. Paresh Rathod, Company
NA reliancepower.ipo@relianceada.com Secretary & Compliance Officer
044-42044443 customerservice@royalenfield.com
Dr.P.L. Ahujarai, Director
080-28398262 Mr. Nelvin D’souza, DGM

Mr. Srinivasan, Project Co-


enquiry@shriprop.com ordinator
08396-620189, 620259
NA investor.complaints@sbi.co.in, dgm.custom NA
NA kishore.kumar@vedanta.co.in, puneet.jagat NA
NA kishore.kumar@vedanta.co.in, puneet.jagat NA
NA nrisales@supertechlimited.com Mr. Nitin Kochar
NA nrisales@supertechlimited.com Mr. Nitin Kochar
Mr. A. M. Roshan, Corporate
NA igkcpl@karvy.com, roshan@thermaxindia. Communicator
05738-221831, 224024 info@toshigroupofindustries.com, sales@toshigroupofindustries.com
Mr. Nandlal Padhi, Project In-
Charge & Mr. Yogesh Bhagwat /
Mr. Prem Krishna
079-40210350 indiacontact@usel.biz
NA uralungal@ulccsltd.com Mr. K. Balakrishnan, Director
info@urbtechindia.com Ms. Anisha, Asst Manager
Mr. Varun K. Mehta, Whole Time
NA vil@varun.com Director
NA marketing@vgmail.in, secretarial@videoco NA
EPC Consultant EPC Consultant

NA
Enercon India Ltd, Enercon NA
Tower,Plot No. A-9, CTS No.
700, Veera Industrial
Estate,Veera Desai Road, Next
to Bhagavati House,Andheri
(West), Mumbai-400053,
Maharashtra. Tel: 022-
66924848, Fax: 022-66990940,
Email:
eil.marketing@enerconindia.ne
Punjab
NA Information & Comm. NA
t , Website: Corporation Limited
Technology
www.enerconindia.net
(Punjab Infotech), 5th - 6th NA
Floor, Udyog Bhawan, 18-
Himalaya Marg, Sector 17,
Chandigarh, Punjab.Tel: 0172-
3017299, 3017300 (EPABX) Fax:
0172-2701595, (Civil
Email:
G City Construction
Bharat Heavy Electricals Ltd
punjabinfotech@punjabinfotec
Contractor),
(BHEL), Chandigarh
BHEL House, Siri Fort, Mr. Sumit Goel, (Architect)
h.org Website:
New Delhi - 110049, Delhi, Tel:
www.punjabinfotech.org NA
011-26493021/26492534 Fax:
011-66337000 (multiple lines),
Mail:
NA NA
contactio@bhelindustry.com,
Website: www.bhel.com NA

Avante Garde Engineers &


Consultants (P) Ltd, No. 68 A,
NA Kundrathur High Road,
Porur NA
Porur, Chennai - 600116, Tamil
Nadu. Tel: 044-24827843,
24828717,
NA 24828718, NA
24828719, 24828720. Fax: 044-
24828531. Email:
avantgarde@vsnl.com.
ndb-pwd@karnataka.gov.in,
B G R Energy Systems Ltd, A-5,
Website:
Pannamgadu Industrial Estate,
www.avantgardeindia.com.
Ramapuram Post, Sullurpet
Village, Nellore 524401, Andhra
Pradesh India. Tel: 044-
27900181. Fax: 044-27948249.
Website: www.bgrcorp.com.
Simplex Infrastructure Ltd,
‘Simplex House’,Systems
IHI Air Handling 27, (P) Ltd,
Shakespeare Sarani, Kolkata
B-32/70, Industrial Area, –
Shivaji
700017 West Bengal. Tel: 033-
Marg, New Delhi-110015, Delhi.
23011600. Fax: 033-22835966/
Email:
65/ 64. Email:
ihiindia@rediffmail.com,ihiindia
NA
simplexkolkata@simplexinfra.n NA
@gmail.com, Website:
et, Website:
Shanghai Electric Group Co. Ltd,
www.ihiindia.com NA
www.simplexinfrastructures.co
Tel: 52082266 Fax: 52082103
m.
Email: office@shanghai-
electric.com,
NA ir@shanghai- NA
electric.com Website:
www.shanghai-electric.com NA
Bharat Heavy Electricals Ltd,
BHEL House, Siri Fort, New
Delhi
JURONG- 110049, Tel: 011-
Delhi.(India)
Consultants
26001010, 66337000.
Pvt. Ltd, Jurong house, 1/5Fax :
011-26493021, 26492534.
Palace road, Bangalore -
560001,
Email: Karnataka. Tel: 080-
22207292
contactio@bhelindustry.com.
Website: www.bhel.com Avante Garde Engineers & Consultants (P) Ltd, No. 68 A, Porur Kundrathur High Road, Porur,
NA NA
SEPCO-III, Rajasthan NA
SEPCO NA
NA NA
NA NA
NA NA

D F Architect
Shapoorji (Architect),
Pallonji & Co Ltd,
Email:
Mira Tower, 2nd Floor, D.N. 27,
British Maritime, Ahmedabad
Sector V, Salt Lake,
mail@dfarchitects.com.Kolkata-
700091
NA West Bengal. Contact: NA
Website:
Mr. Kalpanath Banerjee Tel:
www.dfarchitects.com
033- 23354437/ 9873. E-mail:
kalpanath.banerjee@shapoorji.
NA NA
com. website:
www.kolkataonline.in Ahluwalia Contracts Indi
Address City
ACC Ltd, Cement House, 121, Maharishi Karve Road, Mumbai-400020, Maharashtra. Mumbai
Airports Authority of India, Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi- New Delhi
110003, Delhi.
Areva T&D India Ltd, E- 48/7 Okhla Industrial Area, Phase II, New Delhi – 110020 Delhi New Delhi
Artech Steel Industries (P) Ltd, No.A-4 & 5, 2nd Floor, Logix Park, Sector - 16, Noida - Noida
201301 Uttar Pradesh.
Bharat Forge Ltd, Pune Cantonment, Mundhwa, Pune - 411036 Maharashtra Pune
Chennai Metropolitan Water Supply And Sewerage Board, No.1, Pumping Station Road, Chennai
Chennai -600002 Tamil Nadu
Chettinad Cement Corporation Ltd, "Rani Seethai Hall", 5th Floor #603, Anna Salai, Chennai
Chennai - 600006 Tamil Nadu
CLP Power India (P) Ltd, 15th Floor, Oberoi Commerz Mumbai
International Business Park, Goregaon (East), Mumbai-400063
CLP Power India (P) Ltd, 15th Floor, Oberoi Commerz
, Maharashtra. Mumbai
International Business Park, Goregaon (East), Mumbai-400063
Cyber Employees Welfare Society (P) Ltd, Flat no 2, 8-2-611/3, Road No : 11, Banjara
, Maharashtra. Hyderabad
Hills, Hyderabad -500034 Andhra Pradesh
Dharani Sugars & Chemicals Ltd, PGP House 57 Sterling Road Nungambakkam, Chennai Chennai
- 600034 Tamil Nadu
Emami Ltd, 687, Anandapur E M Bypass, Kolkata - 700107 West Bengal Kolkata 
Goodwill Spaces & Infrastructure (P) Ltd, SCO 664, 2nd flr, Sector 70, Mohali, Rupnagar Rupnagar
(Ropar), Punjab
Government of Punjab, Punjab Infrastructure Dvelopment Board, Room No. 32, Floor Chandigarh
2, Pb. Civil Sectt., Sector 2, Chandigarh, Punjab.
Graffiti Exports Ltd, 23/2 Yellukunte, Old Mangam Palaya Road, Main Hosur, Bangalore Bangalore
- 560068 Karnataka
GVK Industries Ltd, Paigah House, 156-159, SP Road, Secunderabad-500003, Andhra Secunderabad
Pradesh.
GVK Industries Ltd, Paigah House, 156-159, SP Road, Secunderabad-500003, Andhra Secunderabad
Pradesh.
GVK Industries Ltd, Paigah House, 156-159, SP Road, Secunderabad-500003, Andhra Secunderabad
Pradesh.
Hindustan Sanitaryware and Industries Ltd (HSIL), Unit No 301-302, III Floor, Park Gurgaon
Centra, Sector 30, N.H-8, Gurgaon - 122001 Haryana
Ind-Barath Energy (Utkal) Ltd, C/o. Ind-Barath Power Infra Pvt Ltd, Plot No. 30-A, Road Hyderabad
No. 1, Film Nagar, Jubilee Hills, Hyderabad-500033, Andhra Pradesh.
Infrastructure Corporation of Andhra Pradesh (INCAP), # 10-2-1, III Floor, FDC Complex, Hyderabad
AC Guards, Hyderabad-500028, Andhra Pradesh.
Jaypee Balaji Cement Ltd (A Unit of Jaiprakash Associates Ltd), “JA House” 63, Basant New Delhi
Lok, Vasant Vihar, New Delhi -110057 Delhi
Jindal Steel Ltd (JSL), Jindal Centre, 12, Bhikaji Cama Place, New Delhi- 110066, Delhi. New Delhi
Kamineni Group, 3-6-96/1, Himayat Nagar, near Skyline Theatre, Hyderabad - 500029 Hyderabad
Andhra Pradesh
Karnataka Public Works, Ports & Inland Water Transport, Public Works Department, Bangalore
Karnataka Government Secretariat, 3rd Floor, Vikasa Soudha, M.S.Building,
Keerthi Industries
Dr.Ambedkar Road,Ltd, Mellacheruvu
Bangalore (Village
- 560001 & Mandal), Nalgonda - 508246 Andhra
karnataka Nalgonda
Pradesh
KITCO Ltd, P.B. No. 1820, Ravipuram, M.G Road, Cochin - 682016 Kerala Cochin
Madras Cements Ltd, Auras Corporate Centre, 98-A Dr.Radhakrishnan Salai, Mylapore, Chennai
Chennai – 600004 Tamil Nadu
Maharashtra State Power Generation Corporation Ltd (MAHAGENCO), Prakashgad, 3rd Mumbai
Floor, Plot No. G-9, A. K. Marg, Bandra (E) Mumbai - 400051 Maharashtra
Mahindra Aerospace (P) Ltd (MAPL), 2nd Floor, Rockline Centre, # 54, Richmond Road, Bangalore
Bangalore - 560025 Karnataka
Mirah Group, 208, Parvati Industrial Estate, Sun Mill Compound, Lower Parel (W), Mumbai
Mumbai - 400013 Maharashtra
Modern Insulators Ltd, 68-69 Godavari, Poachkhanwala Road, Worli, Mumbai - 400025 Mumbai
Maharashtra
Nirma Ltd, Nirma House, Ashram Road, Ahmedabad - 380009 Gujarat Ahmedabad 
Oriental Bank of Commerce, Harsha Bhawan, E Block, Connaught Place, New Delhi - New Delhi
110001 Delhi
Oswal Woollen Mills Ltd, G.T. Road, Sherpur, Ludhiana-141003, Punjab. Ludhiana
Petronet LNG Ltd, 1st Floor, World Trade Center, Babar Road, Barakhamba Lane, New New Delhi
Delhi-110001, Delhi.
Public Works Department, 12th Floor MSO Building Delhi Police Headquater New Delhi New Delhi
-110001 Delhi
ReGen Powertech (P) Ltd, No.28/11 College Road, Chennai-600006, Tamil Nadu. Chennai
Reliance Power Ltd, H Block, First Floor, Dhirubhai Ambani, Knowledge City, Navi Navi Mumbai
Mumbai-400710, Maharashtra.
Royal Enfield Motors Ltd, Tiruvottiyur High Road, Tiruvottiyur, Chennai - 600019, Tamil Chennai
Nadu
S S Breweries (P) Ltd, MGF Plaza, 4th Floor, Mehrauli Road, Gurgaon - 122001 Haryana Gurgaon
Sartorius India (P) Ltd, #10, 3rd Phase, Peenya 6th Main, KIADB Industrial Area, Bangalore
Bangalore - 560058 Karnataka
Shantha Steel & Power (P) Ltd, Rama Rukmini Nilaya, Near Water Tank, N.C. Colony Bellary
15th ward, Hospet, Bellary - 583201 Karnataka
Shriram Properties Ltd, No 40/43, 8th Main, 4th Cross, RMV Extn, Sadhashiva Nagar Banglore
Bangalore - 560080 Karnataka
Siruguppa Sugars & Chemicals Ltd, Unit-I, #28/1, Shakespeare Sarani, 11/12, Ganga Kolkata
Jamuna Building, Kolkata - 700017 West Bengal
State Bank Of India, Corporate Centre, State Bank Bhavan Madame Cama Marg, Mumbai
Mumbai-400021, Mahaeashtra.
Sterlite Industries (I) Ltd, SIPCOT Industrial Complex, Madurai Bypass Road, TV Puram Tuticorin
P.O, Tuticorin-628002, Tamil Nadu.
Sterlite Industries (I) Ltd, SIPCOT Industrial Complex, Madurai Bypass Road, TV Puram Tuticorin
P.O, Tuticorin-628002, Tamil Nadu.
Supertech Ltd, Supertech Shopprix Mall, C-134B, 2nd Floor, Sector - 61, Noida-201307, Noida
Uttar Pradesh.
Supertech Ltd, Supertech Shopprix Mall, C-134B, 2nd Floor, Sector - 61, Noida-201307, Noida
Uttar Pradesh.
Thermax Ltd, Thermax House14 Mumbai-Pune Road, Wakdewadi, Pune-411003, Pune
Maharashtra.
Toshi Group, F -8, Sikandrabad Industrial Area, Sikandrabad, Bulandshahar- 203205 Bulandshahar
Uttar Pradesh
Trimex Sands (P) Ltd, Srikakulam, Srikakulam - 532001 Andhra Pradesh Srikakulam
Universal Success Enterprises Ltd, Chowringhee Court, 4th Floor, Unit 20 & 21, 55 & Kolkata
55/1 Chowringhee Road, Kolkata - 700071 West Bengal
Uralungal Labour Contract Cooperative Society Ltd, P.O Madappally College, Vatakara, Kozhikode
Kozhikode-673102, Kerala.
Urbtech India Developers (P) Ltd, Plot No. 263, Sector-24, Faridabad, Haryana Faridabad
Varun Industries Ltd, 13, Shankeshwar Darshan, A.G. Pawar Cross Lane, Byculla (East), Mumbai
Mumbai-400027, Maharashtra.
Videocon Industries Ltd, 14 Kms Stone, Aurangabad-Paithan Road, Chitegaon, Tq. Aurangabad
Paithan, Distt. Aurangabad-431105, Bihar.
State Pin Code Tel No Fax No
Maharahstra 400020 022-66654321 022-66317440
Delhi 110003 011- 24632950 NA
Delhi 110020 011-47629100
Uttar Pradesh 201301 0120-4033333, 6666333 0120-4033444
Maharashtra 411036 020-26702777 020-26822387
Tamil Nadu 600002 044-28451300 (20 LINES) 044-28458181 
Tamil Nadu 600006 044-28292727 044-28291558
Maharashtra 400063 022-67588850 022-67588811/8833
Maharashtra 400063 022-67588850 022-67588811/8833
Andhra Pradesh 500034 99664 41111
Tamil Nadu 600034  044-28311313   044-28232074
West Bengal  700107  033-66136264   033-66136600  
Punjab 0712-5095100, 5096216 0172-5063400
Punjab 140126 0172-2742316 NA
Karnataka 560068 0-9844040594
Andhra Pradesh 500003 040-27902663/4 040-27902665
Andhra Pradesh 500003 040-27902663/4 040-27902665
Andhra Pradesh 500003 040-27902663/4 040-27902665
Haryana 122001 124-4779200 0124-4292898, 4292899
Andhra Pradesh 500033 040-23553459/ 040-23607522
23553460
Andhra Pradesh 500028 040-23321771/ 2 040-23321773
Delhi 110057 011-26141540/ 7411 011-26148890
Delhi 110066 011-26188340-50 011- 41659169
Andhra Pradesh 500029 040-23222385,
23222142
Karnataka 560001
Andhra Pradesh 508246 08683-26034 08683-25039
Kerala 682016 0484-4129000, 2357437, 0484-2357687
2357699, 2357478
Tamil Nadu 600004 044–28478666/ 656 044-28478676
Maharashtra 400051 022-26474211, 022-26475329
26475759
Karnataka 560025 080-25595655/ 56/ 57 080-25595930
Maharashtra 400013 022-40502900 022-40502901
Maharashtra 400025 022-24973269, 22-24950962
24920521
Gujarat  380009  079-27546565, 079-27546605,
27546566, 27546567, 27546603  
Delhi 110001 011-
27546568/ 69/ 70/ 71/ 011-23739768  
23417121, 23416691, 23
72/ 73/ 74  
Punjab 141003 0161-2542501/ 02/ 03/
415598, 23416021, 0161- 2542509
04/ 05/ 06/  07
23416171
Delhi 110001 011-23411411/ 011-23414271
23413130
Delhi 110001 011-23490323
Tamil Nadu 600006 044 42966200/ 201/ 044-30280199
202/ 203/ 204/ 205/
Maharashtra 400710 022-30386010
206/ 207/ 208/ 209/ 022-30376633
600019 210/ 211/ 212/ 213/
044-42043300, 044-42044443
Tamil Nadu
214/ 215/ 216/ 217/
42230400
Haryana 122001 0124-4384411
218/ 219/ 220/ 221/
560058 222/ 223/ 224/ 225/
080-28391963/ 0461 080-28398262
Karnataka 226/ 227/ 228/ 229/ 230
Karnataka 583201
Karnataka 560080 080-40229999 080-41236222
West Bengal 700017 033-22472373/ 77, 033-22401371
2476246
Maharashtra 400021  022-22883888 022-22855348
Tamil Nadu 628002 0461-6612591/ 92/ 93/ 0461-2340203
94/ 95/ 96/ 97/ 98/ 99/
Tamil Nadu 628002 0461-6612591/
6612600 92/ 93/ 0461-2340203
94/ 95/ 96/ 97/ 98/ 99/
Uttar Pradesh 201307 0120-4724100
6612600 0120-4669991
Uttar Pradesh 201307 0120-4724100 0120-4669991
Maharashtra 411003 020-25542122/ 020-25542242/
25542263 25541226
Uttar Pradesh 203205 05738-221831, 224024 / 05738-221831, 224024
09212318315,
Andhra Pradesh 532001 8942-229328
09818074844,
700071 09833016975
33 40026000 / 6150 33 22828703
West Bengal
Kerala 673102 0496-2514042/ 2516402 0496-2516402
Haryana
Maharashtra 400027 022-23727400 022-23748686
Maharashtra 431105 02431-251501/ 02/ 03/ NA
04
durai.bhaskaran@accconcrete.
com,
vivek.agnihotri@acclimited.co
m,
Joydeep.mukherjee@acclimite
d.com,
rajivkumar.bimalchand@acclim
ited.com,
Email ID
rammanohar.sowbhagya@accli Web Site Current AnnualMarket Capa
Man Power
mited.com,
www.acclimited.com 788,860.40
satendra.gautam@accconcrete.
com,
apdbbsr@aai.aero www.airportsindia.org.in NA NA NA
bss.naidu@accconcrete.com,
tde.webmaster@areva-td.com
badnur.ph@accconcrete.com, www.areva-td.co.in 265,508.00
sujata.chitre@acclimited.com,
spandey@artechinfo.in
acc-
info@bharatforge.com
InvestorSupport@acclimited.co www.bharatforge.com 205,755.00
m, www.chennaimetrowater.t
cmwssb@md2.vsnl.net.in
krishnan.chidambaram@acclim n.nic.in
mdchettinadgroup@airtelmail.i
ited.com www.chettinad.com
n
tushara.nair@clpindia.in www.clpindia.in NA NA NA
tushara.nair@clpindia.in
voleti_ramkumar@cyberemplo www.clpindia.in NA NA NA
yeeshome.org, cyberemployeeshome.org
vrk_choudary@yahoo.com,
exclvent@yahoo.com 22,302.60
contact@emamigroup.com www.emamiltd.in 74,901.00
sushilchoudhary78@yahoo.co www.goodwillindia.com
m
pws@punjabmail.gov.in, www.punjabgovt.nic.in NA
tapidb@gmail.com NA NA
info@graffitiexports.com , www.graffitiexports.com
sales@graffitiexports.com NA
info@gvk.com, www.gvk.com NA
cs.gvkpil@gvk.com 51,378.00 NA
info@gvk.com, www.gvk.com NA
cs.gvkpil@gvk.com 51,378.00 NA
info@gvk.com, www.gvk.com
cs.gvkpil@gvk.com 51,378.00
delhi@hindware.co.in www.hindwarehomes.com 66,145.70
hyderabad@ibpil.co.in www.ibpil.co.in 360
incaphyd@yahoo.com, www.incap.co.in NA
cgmpincap@gmail.com NA NA
rajiv.srivastava@jil.co.in www.jilindia.com 597,946.00
info@jindalsteel.com,
investorcare@jindalstainless.co www.jindalstainless.com 531,587.00 NA NA
m
prs-pwd@karnataka.gov.in, www.kamineni.org.in
secytech- kpwd.gov.in
pwd@karnataka.gov.in, js-
candb-pwd@karnataka.gov.in, 9,441.40
mail@kitco.in www.kitco.in
rrkn@madrascements.co.in, www.madrascements.com 253,850.00
kjk@madrascements.co.in
www.mahagenco.in
contactus@mahindraengg.com www.mahindraengineering 1,309,368.00
.com
hospitality@mirahgroup.net, www.mirahdekor.com
info@mirahgroup.net
corporate@modern-group.com www.moderninsulators.co 138,000.00 7000
m
info@nirma.co.in www.nirma.co.in 457,491.00
edp_pat@obc.co.in, www.obcindia.co.in
mbd@obc.co.in 885,647.00
oswal@owmnahar.com www.owmnahar.in NA NA NA
webmaster@petronetlng.com www.petronetlng.com 842,870.20 NA NA
dw@pwddelhi.in www.pwddelhi.in
info@regenpowertech.com www.regenpowertech.com NA NA NA
reliancepower.ipo@relianceada www.reliancepower.co.in NA
.com 33,471.60 NA
customerservice@royalenfield. www.royalenfield.com
com

www.sartorius.com

enquiry@shriprop.com www.shriprop.com

investor.complaints@sbi.co.in,
kishore.kumar@vedanta.co.in, NA
www.sbi.co.in 9,166,701.00 NA
dgm.customer@sbi.co.in
puneet.jagatramka@vedanta.c
kishore.kumar@vedanta.co.in, www.sterlite- NA
o.in, industries.com 2,144,840.00 NA
puneet.jagatramka@vedanta.c
ramesh.nair@vedanta.co.in,siil.www.sterlite-
o.in, 2,144,840.00 NA NA
investors@vedanta.co.in industries.com
ramesh.nair@vedanta.co.in,siil.www.supertechlimited.co NA
nrisales@supertechlimited.com
investors@vedanta.co.in NA NA
m
nrisales@supertechlimited.com www.supertechlimited.co NA NA NA
m
igkcpl@karvy.com, NA
info@toshigroupofindustries.co www.thermaxindia.com 326,435.20 NA
roshan@thermaxindia.com
m, www.toshigroupofindustrie
sales@toshigroupofindustries.c s.com
om
indiacontact@usel.biz www.usel.biz
uralungal@ulccsltd.com www.ulccsltd.com NA NA 2000
info@urbtechindia.com www.urbtechindia.com
vil@varun.com www.varun.com 146,085.40 NA NA
marketing@vgmail.in,
secretarial@videoconmail.com, www.videoconworld.com 937,164.00 NA NA
contact@videoconmail.com
Group Promoters Related News & Annuncements
ACC Group Mr. N. S. Sekhsaria, C http://www.acclimited.com/newsite/announcements_2009.asp
NA Mr. V. K. Agarwal, Ch http://www.airportsindia.org.in/misc/M
Mr. Ajay Dua, Chairm http://www.areva-td.co.in/files/Press-Release-261009.pdf

Kalyani Group Mr. B N Kalyani, Chai http://www.bharatforge.com/press/press_releases2009.asp


Dr.Niranjan Mardi (IAS), Secretary to Government MA&WS Department  and  Chairman, CMWSSB
Chettinad Group Dr. M.A.M.Ramaswamhttp://www.chettinad.com/media.htm
CLP Group Mr. Rajiv Ranjan Mish https://www.clpindia.in/media.html
CLP Group Mr. Rajiv Ranjan Mish https://www.clpindia.in/media.html
Mr. N. Rajendra, President
Mr. A Sennimalai, Direhttp://www.bseindia.com/qresann/announcecom.asp?scrip_cd=507442&sc
Emami Group Mr. Omprakash Goenka
http://www.bseindia.com/qresann/announcecom.asp?scrip_cd=531162&sc

Government Dr. Sukhbir Singh San http://punjabgovt.nic.in/news2009/ca

GVK Group Mr. G. V. Kishna Redd http://www.bseindia.com/qresann/an


GVK Group Mr. G. V. Kishna Redd http://www.bseindia.com/qresann/an
GVK Group Mr. G. V. Kishna Redd http://www.bseindia.com/qresann/announcecom.asp?scrip_cd=532708&sc
Mr. R. K. Somany, Ch http://www.hindwarehomes.com/news_room.aspx
Ind-Barath Group Mr. Muralidhar Mishra, Deputy General Manager
NA NA
Jaypee Group Mr. Manoj Gaur, Exec http://www.jilindia.com/pressrelease.htm
JSL Group Mr. Ratan Jindal, Vic http://www.bseindia.com/qresann/ann
Kamineni Group
http://kpwd.gov.in/newsandevents.asp?NewsID=81
Mr. J S Krishna Murth http://www.bseindia.com/qresann/announcecom.asp?scrip_cd=518011&sc

Mr. P R Ramasubrahmaneya Rajha, Chairman & Managing Director


Mr. P. Abraham, Chai http://www.mahagenco.in/news_genco.php
Mahindra & Mahindra
Group Mr. Keshub Mahindra, Chairman
Mirah Group Mr. Omprakash Goenka, Chairman & Managing Director
Modern Group Mr. H.S. Ranka, Chair http://www.moderninsulators.com/ie/news.htm
Nirma Group Mr. Karsanbhai K Patehttp://www.bseindia.com/qresann/an
Mr. T Y Prabhu, Chai http://www.bseindia.com/qresann/announcecom.asp?scrip_cd=500315&sc
Nahar Group Mr. Sandeep Jain, Exechttp://www.owmnahar.in/view_news.p
Joint Venture Company By
Government Mr. R. S. Pandey, Cha http://www.petronetlng.com/PressRele

Nuziveedu Seeds (P) Ltd -


NSL Group Mr. Madhusudan khemhttp://www.regenpowertech.com/news
Anil Dhirubhai Ambani
Group (ADAG) Mr. Anil Dhirubhai A http://www.bseindia.com/qresann/ann
http://www.royalenfield.com/company

Shriram Group http://shriprop.com/site/html/news.html

SBI Group Mr. O. P. Bhatt, Chair http://www.bseindia.com/qresann/ann


Vedanta Group Mr. Anil Agarwal, Cha http://www.bseindia.com/qresann/anno
Vedanta Group Mr. Anil Agarwal, Cha http://www.bseindia.com/qresann/anno
Supertech Group Mr. R. K. Arora, Chai http://supertechlimited.com/Website/
Supertech Group Mr. R. K. Arora, Chai http://supertechlimited.com/Website/
NA Mr. M. S. Unnikrishna http://www.bseindia.com/qresann/an
Toshi Group

Universal Success Group Mr. Prasoon Mukherjehttp://www.usel.biz/News.php


NA Mr. P. Rameshan, PresNA
Urbtech India Group
Varun Group Mr. Kiran N. Mehta, http://www.bseindia.com/qresann/ann
Videocon Group Mr. Venugopal Dhoot,http://www.bseindia.com/qresann/ann
Next Presence In Events & Trade Show HR_Desk Tender Link
/newsite/announcements_2009.asp http://www.acclimited.com/newsite/hr.asp
NA http://www.airportsindia. http://www.airportsindi
files/Press-Release-261009.pdf

m/press/press_releases2009.asp http://www.bharatforge.com/people/careers.asp
MA&WS Department  and  Chairman, CMWSSB http://www.chennaimetrowater.tn.nic.in/tender/te
http://www.chettinad.com/career.htm
NA https://www.clpindia.in/car NA
NA https://www.clpindia.in/car NA

resann/announcecom.asp?scrip_cd=507442&scripname=DHARAN SUG C
resann/announcecom.asp?scrip_cd=531162&scripnam http://www.emamiltd.in/careers.asp?detail=current-openings

http://punjabgovt.nic.in/government/Admi http://punjabgovt.nic.in/ http://punjabgovt.nic.i


nistrativeStructure.htm#Calendar

NA http://www.gvk.com/careersNA
NA http://www.gvk.com/careersNA
resann/announcecom.asp?scrip_cd=532708&scripname http://www.gvk.com/careers.html
s.com/news_room.aspx http://www.hindwarehomes.com/careers.aspx

http://www.incap.co.in/html/presentation. NA NA
htm
ssrelease.htm http://www.jilindia.com/jobopenings.htm
NA http://www.jindalstainless. NA

devents.asp?NewsID=81 http://kpwd.gov.in/tenders.asp
resann/announcecom.asp?scrip_cd=518011&scripname=Keerthi Inds
http://www.kitco.in/careers http://www.kitco.in/ContentDisplay.aspx?locid=24-
anaging Director http://www.madrascements.com/career/main.htm
news_genco.php http://www.mahagenco.in/ohttp://www.mahagenco.in/supplier/tender_chandra
http://www.mahindraengineering.com/ http://www.naukri.com/gpw/msengg/
http://www.mirahdekor.com/home.html
rs.com/ie/news.htm
http://www.nirma.co.in/commercial_clips. http://www.nirma.co.in/current_opening.asp
htm
resann/announcecom.asp?scrip_cd=500315&scripname=Oriental Bank https://www.obcindia.co.in/obcnew/site/Tenders.a
NA http://www.owmnahar.in/joNA
NA http://www.petronetlng.comhttp://www.petronetlng.

http://www.regenpowertech.com/events.h http://www.regenpowertech.NA
tml
NA NA http://www.reliancepowe
http://www.royalenfield.com/company/ev http://www.royalenfield.com/careers.aspx
ents.aspx

ml/news.html

NA NA NA
http://www.sterlite- http://www.sterlite-industr http://www.sterlite-indu
industries.com/investor_relations/Investor
http://www.sterlite-
_presentations.aspx http://www.sterlite-industr http://www.sterlite-indu
industries.com/investor_relations/Investor
http://supertechlimited.com/Website/adca
_presentations.aspx http://supertechlimited.com NA
mpaign.html
http://supertechlimited.com/Website/adca http://supertechlimited.com NA
mpaign.html
NA http://www.thermaxindia.coNA

http://www.usel.biz/Current-Event.php http://www.usel.biz/Career.php
NA NA NA

http://www.varun.com/index.php?events http://www.varun.com/inde NA
NA http://www.videoconworld. NA
licable Vendor Registration Form
Min.Applicable
Down LoadCriteria
Link For vendors

NA NA
http://www.areva-
td.co.in/InvitesVendor.a
sp

hennaimetrowater.tn.nic.in/tender/tendersmainpage.htm

NA NA
NA NA

il=current-openings

NA NA

NA NA
NA NA

NA NA

NA NA

ov.in/tenders.asp

itco.in/ContentDisplay.aspx?locid=24-doublesf

mahagenco.in/supplier/tender_chandrapur.php
http://www.nirma.co.in
/vendor_reg.asp
obcindia.co.in/obcnew/site/Tenders.aspx
NA NA
NA NA

NA NA
NA NA

NA NA
NA NA
NA NA
NA NA
NA NA
NA NA

NA NA

NA NA
NA NA
In Case of Listed Co Link to BSE/NSE
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=500410
NA
http://www.bseindia.com/bseplus/StockReach/AdvanceStockReach.aspx?
scripcode=522275

http://www.bseindia.com/bseplus/StockReach/AdvanceStockReach.aspx?
scripcode=500493

http://www.bseindia.com/bseplus/StockReach/AdvanceStockReach.aspx?
scripcode=590001
NA
NA

http://www1.bseindia.com/stockreach/stockreach_ak.htm?scripcd=507442
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=531162

NA

http://www.bseindia.com/stockreach/stockreach.htm?scripcd=532708
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=532708
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=532708

NA
http://www.bseindia.com/bseplus/StockReach/AdvanceStockReach.aspx?
scripcode=532532
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=532508

http://www.bseindia.com/stockreach/stockreach.htm?scripcd=518011

http://www.bseindia.com/bseplus/StockReach/AdvanceStockReach.aspx?
scripcode=500260

http://www.bseindia.com/bseplus/StockReach/AdvanceStockReach.aspx?
scripcode=500520
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=500308
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=500315
NA
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=532522

NA
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=532939

http://www.bseindia.com/stockreach/stockreach.htm?scripcd=500112
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=500900
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=500900
NA
NA
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=500411

NA

http://www.bseindia.com/stockreach/stockreach.htm?scripcd=532917
http://www.bseindia.com/stockreach/stockreach.htm?scripcd=511389

Potrebbero piacerti anche