ITEM DESCRIPCIÓN UND Veces Largo Ancho

OE02 ESTRUCTURAS
OE02.1 MOVIMIENTO DE TIERRAS
OE02.1.1 EXCAVACIONES
OE02.1.1.1 EXCAVACIÓN MANUAL
Z-1, EXTREMOS m3 6.00 1.20 0.80
Z-2, CENTRO m3 3.00 1.00 1.00
C-C (Corte A-A), EJE A-A ENTRE EJE 1-1 Y EJE 3-3 m3 2.00 4.35 0.80
C-C (Corte B-B) m3 1.00 4.75 0.70
C-C (Corte C-C) m3 2.00 3.40 0.60
C-C (Corte D-D Y E-E) m3 1.00 3.40 0.50
C-C (Corte H-H) m3 1.00 2.64 0.50
C-C (Corte I-I) m3 2.00 3.93 0.40
C-C (Corte J-J Y K-K) m3 1.00 6.00 0.60
OE02.1.2 CORTE m3
A= 19.32
OE02.1.3 RELLENOS
OE02.1.3.1 RELLENOS CON MATERIAL PROPIO m3
PARA ZAPATAS A= 6.768
PARA CIMIENTOS CORRIDOS A= 18.82
PARA MATERIAL DE CORTE A= 19.32

OE02.1.4 NIVELACIÓN INTERIOR Y APISONADO m2


A= 6.768
A= 18.82
A= 19.32
OE02.1.5 ELIMINACIÓN DE MATERIAL EXCEDENTE
F= 1.15 V=

OE02.2 CONCRETO SIMPLE

OE02.2.1 CIMIENTOS CORRIDOS F´c=175 KG/CM2


C-C (Corte A-A), EJE A-A ENTRE EJE 1-1 Y EJE 3-3 m3 2.00 4.35 0.80
C-C (Corte B-B) m3 1.00 4.75 0.70
C-C (Corte C-C) m3 2.00 3.40 0.60
C-C (Corte D-D Y E-E) m3 1.00 3.40 0.50
C-C (Corte H-H) m3 1.00 2.64 0.50
C-C (Corte I-I) m3 2.00 3.93 0.40
C-C (Corte J-J Y K-K) m3 1.00 6.00 0.60

OE02.2.2 SOLADO E=4"


Z-1, EXTREMOS m2 6.00 1.20 0.80
Z-2, CENTRO m2 3.00 1.00 1.00
C-C (Corte A-A), EJE A-A ENTRE EJE 1-1 Y EJE 3-3 m2 2.00 4.35 0.80
C-C (Corte B-B) m2 1.00 4.75 0.70
C-C (Corte C-C) m2 2.00 3.40 0.60
C-C (Corte D-D Y E-E) m2 1.00 3.40 0.50
C-C (Corte H-H) m2 1.00 2.64 0.50
C-C (Corte I-I) m2 2.00 3.93 0.40
C-C (Corte J-J Y K-K) m2 1.00 6.00 0.60

OE02.2.3 SOBRECIMIENTO

OE02.2.3.1 CONCRETO
m3 3.00 6.25 0.15
m3 1.00 -1.70 0.15
m3 3.00 2.25 0.15
m3 1.00 1.75 0.15
m3 1.00 1.85 0.15
m3 1.00 3.19 0.15
OE02.2.3.2 ENCOFRADO
m2 4.00 6.25
m2 2.00 -1.70
m2 6.00 2.25
m2 2.00 1.75
m2 2.00 1.85
m2 1.00 6.07

OE02.2.4 FALSO PISO E=4"


m2 A= 36.760

OE02.3 CONCRETO ARMADO

OE02.3.1 ZAPATAS
OE02.3.1.1 CONCRETO F´c=210kg/cm2
Z-1, EXTREMOS m3 6.00 1.20 0.80
Z-2, CENTRO m3 3.00 1.00 1.00
OE02.3.1.2 ACERO F´y=4200kg/cm2 kg

OE02.3.1.3 ENCOFRADO Y DESENCOFRADO m2 16.00 0.70

OE02.3.2 COLUMNAS 0.25x0.25


OE02.3.2.1 CONCRETO F´c=210kg/cm2
COLUMNAS Y SECCIÓN m3 9.00 0.25 0.25
ENDENTADO m3 14.00 0.55 0.12
OE02.3.2.2 ACERO F´y=4200kg/cm2 kg
C-1 As Log
C-1 As Transv
C-2
C-2
OE02.3.2.3 ENCOFRADO Y DESENCOFRADO m2
C-1 EXT 6.00 0.75 2.80
C-1 CENT 3.00 1.00 2.80
C-2 3.00 0.65 2.80

OE02.3.3 VIGAS V-S 0.25x0.20


OE02.3.3.1 CONCRETO F´c=210kg/cm2
V-S m3 3.00 6.00 0.25

OE02.3.3.2 ACERO F´y=4200kg/cm2 kg


V-S As Log
V-S As Transv

OE02.3.3.3 ENCOFRADO Y DESENCOFRADO m2


FRISO V-S 1.00 6.00 0.20

OE02.3.4 LOSA ALIGERADA H=0.20


OE02.3.4.1 CONCRETO F´c=210kg/cm2
At= m3 34.74 0.09
Para losa 0.2, es 0.0875m3/m2

OE02.3.4.2 ACERO F´y=4200kg/cm2 kg

OE02.3.4.3 ENCOFRADO Y DESENCOFRADO m2


A1 7.31
A2 9.75
A3 6.75
A4 9.00
A5 1.93
A6 (area de vigas chatas y solera) 10.38

OE02.3.4.4 LADRILLO DE TECHO 30x30x15 (01dirección) UND


At= 34.74
A1 7.31
A2 9.75
A3 6.75
A4 9.00
A5 1.93
OE02.3.4.4 LADRILLO DE TECHO 30x30x15 (02direcciones) UND
At= 34.74
A1 7.31
A2 9.75
A3 6.75
A4 9.00
A5 1.93

OE03 ARQUITECTURA

OE03.01 MUROS Y TABIQUES DE ALBAÑILERIA

MUROSDELADRILLO KINGKONGDEARCILLA
(MAQUINADO) 9x12x24
Atura PARCIAL (m3) TOTAL (m3) OBSERVACIÓN

27.51
0.80 4.61
0.80 2.40
0.85 5.92
0.85 2.83
0.85 3.47
0.85 1.45
0.85 1.12
0.85 2.67
0.85 3.06
3.86
0.20 3.86

8.98
0.20 1.35 VER PLANO CAD
0.20 3.76 VER PLANO CAD
0.20 3.86 VER PLANO CAD

44.90
6.77
18.82
19.32
25.75
22.39 25.75

14.47
0.60 4.18
0.60 2.00
0.60 2.45
0.60 1.02
0.60 0.79
0.60 1.88
0.60 2.16

32.88
5.76
3.00
6.96
3.33
4.08
1.70
1.32
3.14
3.60

2.52
0.55 1.55
0.55 -0.14
0.55 0.56
0.55 0.14
0.55 0.15
0.55 0.26
26.60
0.55 13.75
0.55 -1.87
0.55 7.43
0.55 1.93
0.55 2.04
0.55 3.34

36.76
36.76 VER PLANO CAD
ENDENTADO

5.26
0.60 3.46
0.60 1.80
79.36 79.36
ENDENTADO
11.20

1.69
2.80 1.58
0.12 0.11
256.60
143.58
100.80

21.00
12.60
8.40
5.46

0.90
0.20 0.90

135.97
82.62
46.87

1.20
1.20

3.04
3.04

187.92
178.97

49.62

305
8.33

229
6.25
MORTERO DE 1.5CM

LADRILLO 9 CM 2.3 M
0.105 M
MORTERO DE 1.5CM 21.905
22 HILERAS
LADRILLO 9 CM

MORTERO DE 1.5CM

SOBRECIMIENTO

PLACAS
MALLA
MURO DE CONTENCIÓN
COLUMNAS, NUCLEO (2 O MAS ESTRIBOS)
EXCAVACIÓN DE ZANJAS

DESCRIPCIÓN UND Veces Largo Ancho Atura

ENTRE EJE A-A Y EJE 1-3 m3 2 4.35 0.7 0.8


ENTRE EJE C-C Y EJE 1-3

ENTRE EJE B-B Y EJE 1-3 m3 1 4.75 0.7 0.8

ENTRE EJE B´-B' Y EJE 2'-3 m3 1 2.17 0.5 0.8

ENTRE EJE1-1 Y EJE A-C m3 2 3.4 0.6 0.8


ENTRE EJE3-3Y EJE A-C

ENTRE EJE2-2 Y EJE A-B m3 1 1.326 0.5 0.8

EJE2'-2' m3 1 0.64 0.5 0.8

ZAPATAS 1 m3 6 1.2 0.8 0.8


ZAPATAS 2 m3 3 1 1 0.8

EXCAVACION P/ CIMIENTOS m3

EXCAVACION P/ INST. SANITARIAS


(desagüe) m3

EXCAVACION P/ INST. ELÉCTRICAS (pozo


de tierra) m3
PARCIAL (m3) TOTAL (m3)

4.872

2.66

0.868

3.264

0.5304
24.25 0.80 19.40
0.256

4.608
2.4
0.06

19.46
RELLENO CON MATERIAL DE PRESTAMO E=0.20M

DESCRIPCIÓN UND PARCIAL (m2) TOTAL (m2)

Ver plano de Autocad 19.025

19.025