OGL 320 Project Plan

Re-
Planned Re- Planned Actual Actual Actual
Planned Planned
Product Tasks Subtasks End Planned time to Start End time Contingency plans
Start Date Start Risk Assessment
Date End Date invest Date Date invested
Date

Reference and In case of technical issues, power outage,


Academic
Read academic show sickness, and work overload from my current job,
Integrity 8/20/20 8/20/20 8/21/20 8/21/20 1 hour 8/21/20 8/21/20 20 mins
integrity rules accountability Initial accessibility to a one-day cushion should be allowed to complete
Agreement
to comply Canvas for this course the assignment.

Practice and In case of technical issues, power outage,


Read and
Course learn how to sickness, and work overload from my current job,
comment on
Structure use and 8/20/20 8/20/20 8/20/20 8/20/20 1 hour 8/20/20 8/20/20 45 mins Initial accessibility to a one-day cushion should be allowed to complete
document about
Conversation interact in Canvas and Perusall the assignment.
course overview.
Perusall

Learn new In case of technical issues, power outage,


Watch and
PM terms and sickness, and work overload from my current job,
submit a quiz on
Terminology concepts 8/20/20 8/22/20 8/22/20 8/22/20 4 hours 8/22/20 8/22/20 2 hours Issues with accessing a two-day cushion should be allowed to complete
project
Quiz related to video. the assignment.
terminology...
projects.

Watch and
Learn through
submit a quiz on
an interview
Conversation a video that Sister-In law’s baby In case of family obligation, technical issues,
that indicates a
with a PM demonstrates an shower for close family power outage, sickness, and work overload from
PMs 8/20/20 8/22/20 8/22/20 8/22/20 4 hours 8/22/20 8/22/20 2 hours
Part 1 Video understanding of due to COVID. my current job, a two-day cushion should be
experience in
Quiz concepts in a allowed to complete the assignment.
managing a
conversation
project.
with a PM.

Learn through
Watch and Sister-In law’s baby In case of family obligation, technical issues,
an interview
submit a quiz on shower for close family power outage, sickness, and work overload from
that indicates a
a video that due to COVID. my current job, a two-day cushion should be
PMs 8/20/20 8/22/20 8/22/20 8/22/20 4 hours 8/22/20 8/22/20 2 hours
demonstrates an allowed to complete the assignment.
experience in
understanding of
managing a
concepts in a
project.
conversation
with a PM.

Conversation Review saved 8/22/20 8/22/20 8/22/20 8/22/20 15 mins 8/22/20 8/22/20 10 mins
with a PM PlayPosit
Part 1 Video questions and Technical issues Incase unable to save Q&A from video quiz. I will
Quiz answers from saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project.

Read and Share thoughts In case of technical issues, power outage,


Chapters 1&2
understand and apply sickness, and work overload from my current job,
from
chapters 1&2 understanding 8/22/20 8/24/20 8/24/10 8/24/10 8 hours 8/24/20 8/24/20 3 hours Possible issues with a two-day cushion should be allowed to complete
O’Connell
from O’Connell through Perusal transferring the assignment.
2011
2011 Perusall. my grade.

Read and Share thoughts In case of technical issues, power outage,


Chapters 1&2 understand and apply sickness, and work overload from my current job,
in Wiefling chapters 1&2 in understanding 8/23/20 8/25/20 8/25/10 8/25/10 8 hours 8/25/20 8/25/20 3 hours Possible issues with a two-day cushion should be allowed to complete
2007 kickoff Wiefling 2007 through Perusal transferring the assignment.
kickoff Perusall my grade.

Learn new
Watch and Issues with accessing In case of technical issues, power outage,
concepts and
submit a quiz on video. sickness, and work overload from my current job,
Baseline try to apply on
a video that a two-day cushion should be allowed to complete
Assessment my own 8/23/20 8/25/20 8/25/20 8/25/10 8 hours 8/25/20 8/25/20 2 hours
demonstrates an the assignment.
Video Quiz Baseline
understanding of
Assessment
what a Baseline
Video
is and how it is
important.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 8/25/20 8/25/20 8/25/20 8/25/20 10 mins 8/25/20 8/25/20 6 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project

Project Create and


Baseline share a
Assessment baselines
Prepare by
Video assessment In case of technical issues, power outage,
drafting ideas
video sickness, and work overload from my current job,
of what my
Problems recording or a two-day cushion should be allowed to complete
baseline is.
8/25/20 8/27/20 8/27/20 8/27/20 6 hours 8/28/20 8/28/20 3 hours uploading recorded the assignment.
video.

Practice
recording to
avoid any
errors and
audio issues

Share thoughts In case of technical issues, power outage,


Read and
Chapters and apply sickness, and work overload from my current job,
understand
10&11 in understanding 8/27/20 8/29/20 8/29/20 8/29/20 6 hours 8/29/20 8/29/20 3 hours Possible issues with a two-day cushion should be allowed to complete
chapters 10&11
Wiefling 2007 through Perusal transferring the assignment.
in Wiefling 2007
Perusall my grade.

In case of technical issues, power outage,


Learn about
Watch and sickness, and work overload from my current job,
Product quality criteria
submit quiz on Issues with accessing a two-day cushion should be allowed to complete
Specifications and product
quality criteria 8/27/20 8/29/20 8/29/20 8/29/20 4 hours 8/29/20 8/29/20 2 hours video. the assignment.
and Quality specifications
and product
Criteria Quiz through a
specifications
video and quiz.
through a video
and quiz.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 8/29/20 8/29/20 8/29/20 8/29/20 8 mins 8/29/20 8/29/20 6 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project

In case of technical issues, power outage,


Watch a rubric sickness, and work overload from my current job,
Learn about
Rubric video that ties in Issues with accessing a two-day cushion should be allowed to complete
quality
Quality with quality 8/27/20 8/29/20 8/29/20 8/29/20 4 hours 8/29/20 8/29/20 2 hours video. the assignment.
assurances to
Criteria Quiz assurances and
use on project.
take a quiz on
concepts from
the video.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 8/29/20 8/29/20 8/29/20 8/29/20 8 mins 8/29/20 8/29/20 6 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project

Engage in
De Reyck In case of technical issues, power outage,
reading material Look for ways
2010 about sickness, and work overload from my current job,
from De Reyck to engage and
Effective 8/30/20 9/1/20 9/1/20 9/1/20 6 Hours 9/1/20 9/1/20 3 hours Possible issues with a two-day cushion should be allowed to complete
2010 about apply concepts
Project Perusal transferring the assignment.
Effective Project with the clients
Planning my grade.
Planning
Watch Planning Learn to In case of technical issues, power outage,
Planning for for understand sickness, and work overload from my current job,
Contingencie Contingencies concepts in a 9/1/20 9/3/20 9/3/20 9/3/20 4 hours 9/3/20 9/3/20 2 hours Issues with accessing a two-day cushion should be allowed to complete
s video Quiz video and project video. the assignment.
complete quiz planning video.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 9/3/20 9/3/20 9/3/20 9/3/20 8 mins 9/3/20 9/3/20 6 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply fron video.
concepts for
the project

Learn and In case of technical issues, power outage,


Project Watch Project understand sickness, and work overload from my current job,
Planning Planning Video concepts in a 9/1/20 9/3/20 9/3/20 9/3/20 4 hours 9/3/20 9/3/20 2 hours Issues with accessing a two-day cushion should be allowed to complete
Video Quiz and take quiz project video. the assignment.
planning video.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 9/3/20 9/3/20 9/3/20 9/3/20 8 mins 9/3/20 9/3/20 6 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply fron video.
concepts for
the project

Read and
In case of technical issues, power outage,
Work Break engage in Look for ways
sickness, and work overload from my current job,
Down learning material to engage and
9/3/20 9/5/20 9/4/20 9/5/20 6 hours 9/5/20 9/5/20 3 hours Possible issues with a two-day cushion should be allowed to complete
Structures about work apply concepts
Perusal transferring the assignment.
(WBS) break down with the clients.
my grade.
structures

Practice with Labor Day possible In case of holiday, technical issues, power
Create a list of
an exercise of Celebrations or need outage, sickness, and work overload from my
Products, task and
properly apply for extra work hours current job, a two-day cushion should be allowed
Tasks, and subtasks and
products, 9/3/20 9/5/20 9/4/20 9/5/20 6 hours 9/5/20 9/5/20 4 hours this week. to complete the assignment.
Subtasks submit through a
tasks, and
Assignment group
subtasks in a
discussion.
project plan.

Create and
Review quality Problems with In case of technical issues, power outage,
submit a project
criteria to submitting plan or sickness, and work overload from my current job,
Project Plan plan by using 9/5/20 9/8/20 9/6/20 9/8/20 8 hours 9/7/20 9/8/20 5 hours
develop project uploading from a two-day cushion should be allowed to complete
what has been
plan. MSWord. the assignment.
learned so far.
Compare Inability to load other In case of technical issues, power outage,
Review Peers
Project plans peers Project Plans or sickness, and work overload from my current job,
project plans to
Peer Reviews to see if my issues with Canvas. a two-day cushion should be allowed to complete
gain better
of Project plan is 9/8/20 9/10/20 9/9/20 9/10/20 8 hours  9/10/20  9/10/20 2 hours the assignment.
understanding
Plan. following
and have a client
quality
prospective.
assurances.

Learn and take In case of technical issues, power outage,


quiz about sickness, and work overload from my current job,
Watch Feedback concepts in Issues with accessing a two-day cushion should be allowed to complete
Feedback
Video and take feedback as it  9/10/20  9/12/20  9/11/20 9/12/20  4 hours  9/12/20  9/12/20  8 mins video. the assignment.
Video Quiz
quiz relates to the
project plan
from a client.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 9/12/20 9/12/20 9/12/20 910/6/20 15 mins 9/12/20  9/12/20 4 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project

Take video In case of technical issues, power outage,


quiz to sickness, and work overload from my current job,
Watch Habits
Habits Video demonstrate Issues with accessing a two-day cushion should be allowed to complete
Video and take 9/12/20 9/15/20  9/14/20 9/15/20 4 hours  9/15/20  9/15/20 10 mins
Quiz understanding video. the assignment.
quiz
concepts in
habits.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 9/15/20  9/15/20  9/15/20  9/15/20 15 mins 9/15/20  9/15/20 4 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project

In case of technical issues, power outage,


Watch Biases Apply concepts
Biases Video sickness, and work overload from my current job,
Video and take to the project 9/15/20 9/17/20  9/16/20 9/17/20 4 hours  9/17/20  9/17/20  30 mins
Quiz Issues with accessing a two-day cushion should be allowed to complete
quiz about biases.
video. the assignment.

Review saved  9/17/20  9/17/20  9/17/20  9/17/20 15 mins  9/17/20  9/17/20 10 mins
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project.

Read and
Halvorson
engage in In case of technical issues, power outage,
and Rock Connect with
learning material sickness, and work overload from my current job,
(2015) and the material
about Beyond 9/15/20 9/17/20  9/16/20 9/17/20 4 hours 9/17/20 9/17/20 2.5 hours Possible issues with a two-day cushion should be allowed to complete
Desjardins and client’s
Bias by Heidi Perusal transferring the assignment.
(2018) thoughts on it.
Grant Halvorson my grade.
Contributions
and David Rock

Read and
In case of technical issues, power outage,
engage in Connect with
Cottrell sickness, and work overload from my current job,
learning material the material
(2011) Critical  9/17/20  9/19/20 9/18/20 9/19/20 8 hours  9/19/20 9/19/20  2 hours Possible issues with a two-day cushion should be allowed to complete
about critical and client’s
Thinking Perusal transferring the assignment.
thinking by thoughts on it.
my grade.
Cottrell 2011.

Take video quiz


to demonstrate In case of technical issues, power outage,
Critical Apply critical
understanding sickness, and work overload from my current job,
Thinking thinking to the  9/17/20  9/19/20  9/19/20  9/19/20 4 hours  9/19/20  9/19/20  9 mins
about the Issues with accessing a two-day cushion should be allowed to complete
Video Quiz project.
concept of video. the assignment.
critical thinking.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 9/19/20  9/19/20  9/19/20 9/19/20 15 mins  9/19/20  9/19/20 10 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project

Connect with In case of technical issues, power outage,


Read and
Chapters 7 & the material sickness, and work overload from my current job,
understand
8 in Wiefling and client’s  9/20/20  9/22/20  9/21/20 9/22/20 4 hours 9/22/20  9/22/20 2.5 hours Possible issues with a two-day cushion should be allowed to complete
chapters 7 & 8 in
2007 thoughts on it. Perusal transferring the assignment.
Wiefling 2007
my grade.

Read and
PMBOK 6th engage in Connect with In case of technical issues, power outage,
Edition (2017) learning material the material sickness, and work overload from my current job,
Project about (PMBOK) and client’s Possible issues with a two-day cushion should be allowed to complete
 9/20/20  9/22/20 9/22/20 9/22/20 4 hours  9/22/20 9/22/20  2 hours
Management Project thoughts on it. Perusal transferring the assignment.
Overview and Management my grade.
processes Body of
Knowledge.
PM to demonstrate
Processes understanding Take video  9/23/20  9/25/20  9/25/20  9/25/20 8 hours  9/25/20  9/25/20 30 mins In case of technical issues, power outage,
Case Study about the quiz to sickness, and work overload from my current job,
1,2, and 3 concept through demonstrate Issues with accessing a two-day cushion should be allowed to complete
Quiz each case study.
understanding video. the assignment.
on case study
1,2, and 3 in
project
management
processes.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 9/25/20  9/25/20  9/25/20 9/25/20 15 mins  9/25/20  9/25/20 10 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project

Evaluate Inability to load other In case of technical issues, power outage,


Revise and updated peers Project Plans or sickness, and work overload from my current job,
Updated Final
update project project plan  9/24/20  9/26/20  9/26/20 9/29/20 8 hours  9/29/20  10/1/20  6 hours issues with Canvas. a two-day cushion should be allowed to complete
Project plan
plan. using the rubric the assignment.
provided.

Read and In case of technical issues, power outage,


chapters 4,5, Connect with
engage with sickness, and work overload from my current job,
& 6 from the material
chapters 4,5, & 6  9/25/20  9/29/20  9/29/20 9/29/20 8 hours  9/29/20 9/29/20  2 hours Possible issues with a two-day cushion should be allowed to complete
O’Connell and client’s
from O’Connell Perusal transferring the assignment.
2011 thoughts on it.
2011 my grade.

Review past Problems with Canvas


In case of technical issues, power outage,
Update and client reviews or issues with
Submit final sickness, and work overload from my current job,
proofread to and rubric for 9/24/20 10/1/20  9/28/20 10/1/20 20 hours  9/29/20  10/1/20  8 hours Microsoft Office.
project plan a two-day cushion should be allowed to complete
submit final plan. quality
the assignment.
assurance

Read and
why people Reflect on this In case of technical issues, power outage,
engage in
fail to project and sickness, and work overload from my current job,
learning material
recognize personal Possible issues with a two-day cushion should be allowed to complete
about why
their own behaviors that 10/04/20 10/6/20 10/6/20 10/6/20 4 hours 10/6/20 10/6/20 3 hours Perusal transferring the assignment.
people fail to
incompetence may have my grade.
recognize their
reading hinder
own
article success.
incompetence

Melissa Watch and


Johnson complete quiz Reflect on 10/04/20 10/6/20 10/6/20 10/6/20 4 hours 10/6/20 10/6/20 44 mins In case of technical issues, power outage,
Interview that apply project experience of sickness, and work overload from my current job,
Video Quiz management managing a Issues with accessing a two-day cushion should be allowed to complete
Part 2 concepts with project and video. the assignment.
part to of Melissa how to identify
Johnson strengths and
interview.
opportunities.

Review saved
PlayPosit
questions and Technical issues Incase unable to save Q&A from video quiz. I will
answers from 10/6/20 10/6/20 10/6/20 910/6/20 15 mins 10/6/20  10/6/20 10 mins saving PlayPosit Q&A screen shot quiz answers.
video to apply from video.
concepts for
the project

Reflect on In case of technical issues, power outage,


Conduct a
what I have sickness, and work overload from my current job,
Project culminating
learned though 10/8/20 Store Deep a two-day cushion should be allowed to complete
Management project 10/06/20 10/8/20 10/7/20 10/7/20 4 hours 10/7/20 10/7/20 10/8/20
out this Clean scheduled the assignment.
Review management
experience of overnight.
review.
being a PM.

Potrebbero piacerti anche