Risks Risk Type


1 Physical Injury (during moving or installation) Safety
2 Late arriving furniture Equipment
3 Power failure during lab equipment commissioning Equipment
4 Failure of UWS connectivity Equipment
5 Damaging equipment during move Equipment
6 Movers are absent Personnel
7 Damaging Experiments Research
8 Failed Drainage Facility
9 Exploding equipment Facility
10 Pipe Burst Facility
11 Available inventory matches requirements
12 Power outlets don't match layout
13 Fire alarm pulled during move
14 Building codes change for regulatory items
15 Elevator fails

E-mail to: mehtabhavin@live.com


One Person
Team Name:

Page 1
Sheet1
Qualitative Quantitative
Probability Impacting Rating Probability Cost Impact Schedule Impact
Low High
Medium Low
Low Low
Medium Medium
Medium High
Low Low
Medium High
Low High
Low High
Low High
Low Medium

Page 2
Sheet1

Risk Owner Risk Response