Sei sulla pagina 1di 3

CLIENT :

Pejabat Setiausaha Syarikat, Tkt 2, Ibu


Pejabat Tenaga Nasional Berhad, No.
129, Jlan Bangsar, 59200 Kuala Lumpur,
Wilayah Persekutuan Kuala Lumpur

CONTRACTOR :
TNB Engineering Corporation Sdn Bhd
Level 18, Amcorp Mall, Persiaran Barat,
46000 Petaling Jaya, Selangor

TEL: 03-79582121 FAX: 03-79582626

CONTRACT NO. : TNB (N) 9/2017

PROJECT TITLE : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SOLAR FARM DAN SEBUAH PEJABAT DI ATAS LOT
32888, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT UNTUK TETUAN TENAGA NASIONAL

REFERENCE NO. : CHGG/MS/UGC/TEST/LAYING

METHOD STATEMENT

132kV Underground Power Cable Site Test


(Before Laying Work)

0 First issue IHI October-17


1 IHI December-17

Revision Description By Date


Ref: JMS-CIR-01
ARUSS SYNERGY SDN. BHD.
No 67-1A, Tingkat 1, Blok 4, Revision: 01
Dataran Otomobil, Seksyen 15,
40200 Shah Alam, Selangor.
S/T Reg: (TKL)KPE/849712D/2012 - 132kV

METHOD OF STATEMENT
132kV UNDERGROUND CABLE SITE TEST

Test before laying work

i. Sheath/Screen to Earth/Ground IR Test

Test Equipment
1. IR Tester

Procedure

a. Apply the sandpaper to the cable to clean up the test area from graphite
b. Using Insulation Test Set, test between sheath and earth.
c. Switch on the IR tester and press the test button.
d. Record the resistance at highest value.

Required Pass Criteria

No short to ground.

COMPILED BY : REVIEWED BY : APPROVED BY :


Designation Tester Manager Service Engineer
Name Wan Badri Wan Awang Norkam Ibrahim Ir. Mohd Yusop Ithnin

Signature
Date
Ref: JMS-CIR-01
ARUSS SYNERGY SDN. BHD.
No 67-1A, Tingkat 1, Blok 4, Revision: 00
Dataran Otomobil, Seksyen 15,
40200 Shah Alam, Selangor.
S/T Reg: (TKL)KPE/849712D/2012 - 132kV

ARUSS SYNERGY SDN. BHD.


No 67-1A, Tingkat 1, Block 4, Jalan Pahat.
Dataran Otomobil, Seksyen 15, 40200 Shah Alam, Selangor.
Reg. Suruhanjaya Tenaga: (TKL)KPE/849712D/2012 (KONTRAKTOR PERKHIDMATAN - 132kV)
ROUTE Installation : FEEDER/CIRCUIT NO
Client :
TO Tender No :
Contract No :
SHEATH & CORE INSULATION TEST
General Data & Information
Cable Type and Size : Sheath Bonding Method :
Rated Voltage : Length :
Rated Current : Test procedure ref: : MOS/SAT/01
Cable Manufacturer : Date/Time of Test :
Testing Equipment Details Reason for testing :
Equipment Used: Serial No/Tag No: Calibration Due Date

No TEST DESCRIPTION R-Phase Y-Phase B-Phase

1 Phasing
2 Sheath/screen to Earth/Ground 5kV IR Test
Requirement: No short to ground

3 Sheath/screen to Earth/Ground Hi-pot Test (N/A)


Requirement: Withstand the test
Test Voltage: kV Duration: 1min
4 Conductor

5 Other Test

Comment By Service Engineer:

Witnessed By (Client): Verified By : Tested By:

(Signature) (Signature)

Name: Name:

Staff No: Page:

COMPILED BY : REVIEWED BY : APPROVED BY :


Designation Tester Manager Service Engineer
Name Wan Badri Wan Awang Norkam Ibrahim Ir. Mohd Yusop Ithnin

Signature
Date

Potrebbero piacerti anche