Sei sulla pagina 1di 7

QUERIES of GPA at PLTU PUNAGAYA

No Queries Picture Emerson / PTCS Response PLN Response


1 Turbine Verified and found that
performance there is a deviation in few
calculation still of process parameters
abnormal (higher (mainly SH outlet steam
than 100%). PLN has flow to HP turbine, HP
checked and did turbine exhaust
calibration to all temperature and
instruments around condenser vacuum
turbine area. pressure) results in
Please give some increasing LP turbine
recommendation efficiency by 55 %. So LP
and assumption of turbine efficiency is higher
the calculation. than 100%
2 Historical trend of Fixing Historian is out of
GPA cannot found, scope of this project. this
the warning is point project is for EDS and GPA.
list not found at
Operator Computer

3 The Unit of Updated


Condenser Actual
Back Pressure is not
correct. It should be
converted into bar
absolute.

1|Page
QUERIES of GPA at PLTU PUNAGAYA
4 The trend line of This is the software
GPA summary limitations
become bold

Complete Response of GPA 1st query :


1. Verified and found that there is a deviation in few of process parameters (mainly SH outlet steam flow to HP turbine, HP turbine exhaust
temperature and condenser vacuum pressure) results in increasing LP turbine efficiency by 55 % in both units. 
Below are the value of process inputs are not matching with design HMBD data sheet. Because of this reason LP turbine efficiency
increasing up to 150 %. So kindly check these values with design value and correct it.

Process Parameters DCS Point name Online values Design Deviations Units

2|Page
QUERIES of GPA at PLTU PUNAGAYA
value

Gross Power output 10DEH103DCS.UNIT1@NET0 111.23 111 0.23 MW

Boiler Main Steam Flow MAIN-STM-FLOW.UNIT1@NET0 382.858 401.84 -18.982 TON/HR

HP Turb Exhaust Steam Temp A 10LBS50CT102.UNIT1@NET0 111.477 124.1 -12.623 DEG C

HP Turb Exhaust Steam Temp B 10LBS50CT103.UNIT1@NET0 97.9535 124.1 -26.1465 DEG C

HP Turb Exhaust Steam Temp C 10LBS50CT104.UNIT1@NET0 117.231 124.1 -6.869 DEG C

Condenser Back Pressure A 10MAG10CP101.UNIT1@NET0 -91.5756 -93.12 1.5444 KPAG

Condenser Back Pressure B 10MAG10CP102.UNIT1@NET0 -91.5756 -93.12 1.5444 KPAG

3|Page
QUERIES of GPA at PLTU PUNAGAYA

4|Page
QUERIES of GPA at PLTU PUNAGAYA

Complete Response of GPA 3rd query :


Updated back pressure in to Bar absolute in both units.

5|Page
QUERIES of EDS at PLTU PUNAGAYA
No Queries Picture Emerson / PTCS Response PLN Response
1 New Client EDS According to the scope of
cannot connect to project and the system
server, so only 2 architecture only 2 EDS clients
clients that could could be installed
be connected to
server. May we add
new client and
connect to eds
server?
2 Terminal EDS client EDS Terminal has been
9.2 cannot running working on EDS Client
at Windows 10 and 10.0.0.4 and 10.0.0.3 and
Win7 PC According to the scope of
project and the system
architecture only 2 EDS clients
could be installed
3 EDS Excel Addin EDS Excel Add-In has been
cannot be installed working on EDS Client
at Win 10 and Win 10.0.0.4 and 10.0.0.3 and
7 PC According to the scope of
project and the system
architecture only 2 EDS clients
could be installed
4 Historian trending Fixing Historian is out of
of GPA cannot scope of this project. this
appear at Operator project is for EDS and GPA.
Ovation PC. The
description is “point
list not found”.
Please fix it, so the
historian trending
can be displayed.
6|Page
QUERIES of EDS at PLTU PUNAGAYA
5 Ovation & GPA Updated
View Unit 2 cannot
display at EDS
mobile and EDS
client. The data
cannot run real
time.

7|Page