SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
II. CONCRETOR
Note : a) Unless or otherwise stated the coarse aggregate shall
consist of metal 10 mm and 20 mm size (metal No.1 & 2) mixed in
equal proportion or as directed and the rates shall cover the cost of
complete work including boxing, ramming, consolidating, watering
and curing.
b) In controlled concrete the determination of the proportions of
cement ,aggregate and water to attain the required strength shall be
made with the preliminary test by designing the concrete mix.

c) All the concrete items include vibrating by Mechanical vibrator.

d) In case controlled concrete cannot be used for want of testing due


to small quantity of work M 10 may be taken as equivalent to 1:3:6

M 15 = 1:2:4
M 20 = 1: 1 1/2 : 3
Providing & laying M 10 c.c. For foundation/bedding including
R2-SE-2-1 cum 6122
boxing, curing etc. complete as specified and as directed.
R2-SE-2-2 -do- -do- for full encasement or cradle -do- -do- cum 6822
R2-SE-2-3 -do- -do- in saddle block -do- -do- cum 7337
-do- -do- M 15 c.c. In foundation including boxing, curing etc.
R2-SE-2-4 cum 7335
complete as specified and as directed.
R2-SE-2-5 -do- -do- M 15 c.c. For full encasement or cradle -do- -do- cum 7354
R2-SE-2-6 -do- -do- in sides and haunches and/or in block coping-do- -do- cum 8067
R2-SE-2-7 do- -do- in saddle block -do- -do- cum 7850
R2-SE-2-8 -do- -do- in arch work -do- -do- cum 8355
R2-SE-2-9 Providing and laying M 20 c.c. In foundations -do- -do- cum 7863
-do- -do- in sides and haunches and /or block coping -do- -do-
R2-SE-2-10 cum 8575
R2-SE-2-11 -do- -do- in arch work -do- -do- cum 8863
REINFORCED CONCRETOR
Note: 1. Wastage in cutting will not be paid for. Only steel actually
fixed in position will be paid by linear measurement including hooks
& bends. No payment will be made for binding wires, pins be made
for binding wires, pins, chairs and laps and / or welding and this
should be noted while quoting the rates.
2. In working out the rates for .R.C.C. Items and steel
reinforcement, the basic rates for steel bars per tonne are taken as
mentioned in Basic Material Master, If steel is controlled in future
the necessary adjustment between the controlled rate and the rates
stated above will have to be made.
3. Note of concretor: (b) is applicable here(controlled concrete).
Providing M 15 R.C.C. Work in dhapas, beams and slabs etc. with
standard reinforcement of 1% including centering etc. and finished
R2-SE-2-12 cum 12407
smooth the exposed surface with cement sand plaster 12 mm thick
in the proportion 1:2 as directed.
R2-SE-2-13 -do- without reinforcement -do- do- cum 9110
R2-SE-2-14 -do- M20 RCC work-do- as per item no R2-SE-2-12 cum 12915
R2-SE-2-15 -do- without reinforcement -do- do- cum 9618