Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Q No-3. A soil profile as shown with a silty sand (ѵ = 15 kN/m3; ѵsat = 17 kN/m3) underlain by high- (10 Marks)
plasticity clay (ѵsat = 17 kN/m3) and a peat layer (ѵsat = 16 kN/m3), followed by dense sand.
To expedite consolidation and minimize future settlement, an additional 2-m-thick fill
material, compacted to a unit weight of 19 kN/m3, will be placed on top of the silty sand
layer. The plan area of the fill is 10 m x 10 m. The fill load will be left in place for 2 years,
after which construction will begin with the fill becoming part of the permanent
foundation. Undisturbed samples collected from the clay and organic layers had the
following properties:
a. Estimate the total consolidation
settlement under the action of the fill
load? Consider both the clay and peat
layers to be normally consolidated.
b. Estimate the time for 99% primary
consolidation in each layer. Are the
layers singly or doubly drained? Explain.
c. Estimate the secondary compression
in each layer?
d. What will be the total settlement
after 2 years?
e. Determine the effective stress at
point A three months after the
application of
the fill load?