2) Worker was doing grinding job without using Face shield to be provided to worker. Immediate
face shield, if grinding disc will accidently Grinders and discs should inspect before
crack it can cause severe injury to face and use. Prior to each use
eyes. Awareness should be given to workers
regarding hazards of grinding job without face
1 month
shield.
3) Emergency door was blocked with cabinet in Supervisor was informed to remove the Immediate
workshop office, so in case of emergency Cabinet.
workers can’t escape from the workshop Replace faulty emergency lights of escape
resulting in serious burn or harm. and two route.
emergency lights on escape route was not Give awareness to all workers that 1 day
working emergency door should not be blocked
Provide sufficient space of cabinet in 1 day
workshop office for placement of cabinet.
1month
4) Electrical cable was found in damage Damage electrical cables to be removed from Immediate
condition, which can cause electrocution to service.
workers in case of accidental touch Provide
work instructions for electrical cables 2 weeks
inspection.
Reroute all electric cables to prevent
One month
accidental damage.
5) Volatile paint solvent cans were found Chemical cans to be covered and must be Immediately
uncovered in open air can generate enough placed in storage cabinets in well-ventilated
vapours to break fire and chemical spillage area.
hazard resulting is asthma, lungs problem, Provide safe system of work to prevent this
even cancer and environmental problems 2 weeks
practice, and provide training.
Provide spill control program
1 month
6) Observed trailing cables in the access can Allcables should be arranged properly. Immediately
cause slip, trip and falling of personnel Area should inspected by an assigned worker
causing injury to workers for any obstacle in area.
Give awareness to all workers about cable
daily
management through tool box talk.
1 week
7) Observed a fork lift reversing in area without Assign a banks man for reversing FLT. Immediately
banks man may struck to worker resulting in Audible warning device to be installed at fork
severe injury & may cause property lift. 1 Month
damage. All
fork lift operators should be given
training about FLT operation and proper
reversing procedure. Regular
8) Observed a worker using carpenter saw for Provide dust mask to worker. Immediate
wood cutting, without wearing dust mask
that may cause asthma and other
Provide PPE to the workers during the work
respiratory problems to worker
and continuous observation of the worker. Prior to work
Provide
training to the worker about the use
of PPE and also communicate the importance
of health and safety during the work
continuously
9) I observed that water cooler was kept on a Remove water cooler from welding machine. Immediately
welding machine which was not in running
condition; but leakage of water may cause
Water cooler must be placed in a designated
electrocution to worker when it is run or can
water shelter. 1 day
burn the skin or body tissues, may cause
death .
Repair or replace the welding machine and
place in proper storage area after the use.
Weekly
10) Office workshop’s door lock was damaged, Informed the supervisor about door lock Immediate
may cause injury to any worker through condition
contact with damaged lock can cut skin and Lock should be repair immediate
body part as well.
During
the inspection highlight the sharp
edges and give the control measures.
1 Week
All
doors must be checked for any damage
by a competent person.
One week
11) Handle of baby grinder was found in Informed the supervisor Immediate
damage condition can cause injury and
vibration may lead to numbness, blenching Immediate
Handle of baby grinder and improper RPM
of fingers to the operator. and incorrect
Disc should be replaced.
matching disc was being used that can be
broken and cause severe injury to worker
All tools must be inspected prior to use. Daily
Inspect all hand and power tools by
competent person. continue
13) Found Protruding nails in the area and All protruding nails should remove from area Immediate
accumulation of wood dust carpenter and made floor free from wood dust
working area. These nails may puncture foot
and also lead to tripping slipping hazards , Good housekeeping must be ensured on
wood dust may cause asthma and dermal daily basis. daily
disease to carpenter.
Provide training to the staff about house
keeping and it’s importance in health and
one week
safety.
14) During chipping job I found head of chisel in Replace the damage chisel with new one and Immediate
damage condition, can cause hand injury or provide face shield to worker during chipping
splashing of broken pieces of chisel can work.
cause injury to face or eyes of the worker. Before starting work an inspection must b
Daily
conduct to remove all the damage equipment
from the work
Carry
out inspection of store tool to identify
damage tool and replace damage tool with the
new one
1 month
15) Acetylene cylinder not kept in trolley, in case Provide trolley for cylinder with chain. Immediate
of fall down cylinder can be damage and
Provide the proper storage place and
abrupt leakage of gas can cause fire &
procedure must be communicated to the Daily
Explosion lead to tremendous property
worker.
damage and workers lives.
Prior to use cylinders check its physical
condition and carryout soap test before each
use. Daily
Conduct inspection of all pressurised
cylinders.
One week
16) Cleaners and spray bottles found open Remove all fluids and containers from the Immediate
under wash hand basin may cause floor.
chemical reaction which is hazardous for Always ensure chemicals are covered, can
worker health chemicals can burn the skin be easily identified and stored appropriately.
by contact with it. One week
provide training and instruction to cleaning
staff regarding proper storage of chemical
cleaners and other detergent.
One month
17) Workers doing manual handling with Informed the supervisor and conduct safety Immediate
improper body posture can pose adverse session
effect on his body also cause WRULD Provide safe manual handling procedure
( Work Related Upper Limb Disorder) like with safe lifting technique to avoid
pain in back and neck or may cause ergonomic hazards. 1 Week
damage or swelling of body tissues and slip Conduct worker trainings regarding safe
disc. manual handling technique .
Continuously monitoring continue
one week
18) Inadequate no of fans are found in office Install adequate number of fans in workshop Immediately
where office shredder was being used office.
generating paper dust can cause coughing
,infection of throat, dust can cause asthma
Provide a good ventilation to remove the dust 1 Week
and other respiratory disease
and fumes from office.
Carryout
inspection of workshop to check
2 weeks
the adequacy of ventilation provide fan where
necessary.
19) A worker was using a modified / handmade Remove modified handmade tools from Immediate
tool in workshop can cause personal injury if workshop and provide inspected working
broken or contact with sharp edges. equipments.
Give
awareness to all worker regarding
hazards of using unmodified tool and give
training regarding safe use of certified 1 Week
equipment only.
Conduct
inspection of all tools and
equipments and use only certified equipment.
1 Month
20) Acetylene cylinder pressure gauge’s casing Replace the faulty gauge of cylinder. Immediate
was damaged and gauge was not showing
the accurate reading, it may lead to create
Physical condition of all cylinders should
confusion for operator to distinguish
checked before use. Daily
between empty cylinder and full cylinder .
During storage full cylinder can be placed
between empty cylinders during handling it
may cause blast or fire explosion. Provide good storage for cylinder and all
gauge must be checked.
1 Month
21) Found hydraulic jack in leaking condition, Repair the hydraulic jack Immediate
which may cause to failure of hydraulic
power , leakage of fluid can lead to Prior to work
All the equipment must be inspected by the
slipping and tripping hazard can cause
expert operator before starting work
serious head injury or broken arms of leg.
Provide
the training to the operator that how
to maintain all the parts of the hydraulic jack
One week
22) During painting paints drum and other Bring MSDS.Safety sign and provide Immediate
chemical used in paints are found open in respirator at work location
the air with out covering, handling without
wearing Respirator and gloves, no MSDS,
Check the availability of MSDS of all paints
no safety sign was placed at working site.
and other work related material which must
Exposure to paint is highly toxic e.g. Lead is 1 day
be read by the worker
toxic and paint can cause other harmful
effect on health.
Provide
awareness to all workers regarding
health effect ,hazards and control measures of
paint work.
One week
23) some worker was continuously working I provide sufficient rest to all worker during the Immediately
found that they are not given sufficient rest work
that can cause stress and fatigue. introduce the rotating shifting procedure to
Continuous to workers may lead to blood reduce the work load and reduce the duration
pressure, weaknesses and pose adverse of work to avoid the stress and fatigue One day
health effect . to reduce the work load hire new workers.
One month
24) First aid boxes was so dirty not quickly Put the first-aid box in reachable and clearly Immediately
reachable or not clearly visible in case of visible area
emergency Injured person may suffer Display safety sings with bright green colour One week
wound may become severe . toward the first aid box location so that
worker can get easy access
Provide First aid training to worker
Monitoring of allocated first aid boxes .
2Week
Continuously
25) found a mobile crane was lifting weight with move the crane from soft surface to proper Immediate
open out rigger but the base of out rigger hard surface which provide a good support to
was soft and slim wood dock was used to the outriggers Daily
support the riggers which is very common .
cause of overturning of mobile crane. Use the crane at smooth and hard place
which is suitable for supporting the outrigger
and avoid soft slippery and uneven surface 1 week
Use
purpose-made, tested stands to inspect
the base of heavy loads
prior to work
26) Waste paper bins were overflowing in Informed the supervisor
presence of any ignition source it may serve Ensure bins are emptied by assigned worker
as a fuel source to cause fire. Overflow on regular basis.
toilet bins may block the sewerage water in Immediate
toilet that contain pathogenic bacteria, Daily
viruses e.g. ecolli, hepatitis. Monitor the toilet and workplace area to
check the conditions of housekeeping.
Give
the proper training to the cleaning
1 week
workers to maintain a good standard of
housekeeping.
1month
Student number :00302880
Management Report
INTRODUCTION:-
This report provides comprehensive information regarding hazards which were identified
during inspection of WAQAS MAINTENANCE SERVICE WORKSHOP and its
surroundings on 27th September 2015 to meet the requirements of the NEBOSH IGC3
practical examination.WAQAS MAINTENANCE SERVICE WORKSHOP is
involved in engineering related works, including chemical activities, painting of
equipments, maintenance of heavy equipment (e.g. Heatexchangers ,compressors, tanks,
tube bundles, etc.) machinery involves , truck, crane, hydraulic machinery, welding,
cutting, electrical equipment like drill and arc welding plant, etc. The premises were
occupied by up to 200 staff members at one time involve in different activities.Staff work
is comprised of day and night shift. The major hazards which have been identified and
recommendations are made to avoid personal injuries to workers and property damages
are discussed below.
EXECUTIVE SUMMARY:
It is really appreciable that company showed interest and allowed inspection for the
improvement of health and safety system. After completion of the inspection it was found
that the organization has set up a proper HSE policy and HSE management system in
the workplace. There were several areas of concern, but at the same time some good
observations were also made in the workshop and its surroundings. This shows that there
is only need of minor improvement and some training for all personnel about working
safely and keeping the surroundings safe since it can develop good safety culture among
all workers and staff.
Some of the observations like use of modified / handmade tools can cause injury , poor
ventilation in workshop can cause suffocation, throat irritation, cough, sneezing and
trachea irritation. Damage lock of workshop’s door can cause cuts and bruises. Damaged
furniture in workshop can cause slips and trips and serious injury like head injury etc.
Damage handle of baby grinder may cause hand injury like cuts and also vibration
hazards. My recommendation is to provide only minor financial support in order to cope
such type of unsafe acts in the working area.
In conclusion of this report I have mentioned that with a minor concentration of
management on health and safety rules and regulations which include Health and Safety
at Work Act 1974 (HSWA), Provision and Use of Work Equipment Regulation 1998, the
International Labor Organization (ILO), Occupational Safety and Health Convention (C
155) and by following some other relevant rules can drastically reduce the accident rate
within the organization. Good health and safety management system and its
implementation help to run the business smoothly, improve the moral of the workers as it
shows the management commitment, increase the productivity.Good health and safety
management system is less costly than the huge cost on rehabilitation after accident.
Good health and safety system to avoid legal penalties and meet the requirement of
international standards. A detailed survey report with findings and its control measures
are attached. Some points are required to be addressed to management, which needs
attention to avoid any accident.
The areas which require management concentration are discussed in main finding section.
These are related to use of damage electrical equipment, failure of H & S management at
some places, risk from poor housekeeping, Risk from poor storage, chemical, paint and
there handling, PPE issue ,risk from damage work equipment and Manual handling issues
and necessary control to minimize risk disused in given table with time scale and require
budget is also mentioned. It is the moral responsibility of the employer to protect the life
of the worker because accident cause pain and suffering not only for the victim itself but
also for the friend and family members of the victim. An accident free environment is
highly desire in each and every industry, by meeting law employer can save himself from
any legal fine compensation claims and enforcement action. Good H&S culture helps to
achieve the target and aim and objective of the organization. Maintaining good health and
safety plays important role to protect from financial loses .Good Standard of Health and
safety helps to enhance the productivity and increase the communication from top to
bottom and bottom to top also increase the communication cooperation and competency
of the worker. If the identified observation will not be taken serious your organization
could face tremendous losses.
Recommendations
Recommendation Likely resource implications Priority Target date
Use good quality ofReplacement of damaged cable may cost High Immediate
electrical cable about Rs. 2500/-.
Electrical cable must
be maintained in good
condition and use
double insulated
cable to cope the risk
for electrocution.
(4,12)
Replace damage Damage Spectacle should be replaced High Immediate
female plug sceptical only PKR 500/= only
with new certified
plug and introduce
defect reporting
procedure to
overcome risk
associated with
broken female plug
(13)
it is recommended
that usage of modified
equipment must be Replace handmade tools from Medium 1 week
prohibited only workshop
ensure Certified New tool cost Approx PKR. 1100
equipment and
carryout pre use
inspection of tool
before carrying out
job(19)
It is highly Handle of baby grinder shall be High 1 day
recommended that replaced.
baby grinder never be cost of handle Approx PKR.
used without handle . 500/=
(12)