MINUTES OF MEETING
QP Circulation:
Nabil Elsaid : EDD/23 Those present, plus;
Mohamed Harris : EDT/334
Dana Al-Masseh : EBN/104 QP
Anirban Datta : EBN/1 ED
Subhash : EDT 3112 EDD
CNE
EBN
Contractor
EDD/2
Husam Khilla : Deputy General Manager CNE/1
OEF(D)
Swamy Sannapu : Project Manager
EDT/1/2/3
Mohammad Hussein : Lead Structural/Civil Engineer EDT/227
Radwan Rafiq : Civil Project Coordinator EDD/5
EBN/41
Syam Sankarankutty : Planning Engineer
Abigail Buan : Document Controller TADMUR
Bhupendra Pal Chabra : Contractor Representative (QDC) Azzam Kalaoun
Sai Sreedhar : Project Coordinator (QDC)
Navnith Pillai : Project Engineer (QDC)
Pradeesh Pradeep : Lead Architect (QDC)
Venue:
Next Meeting: Time:
A-71 EDD Conference Rm
30 November 2011 08:00 am
QP Al-HandasaComplex
Summary: This meeting was convened as a progress meeting for the subject project;
Contract Effective Date : 01 August 2011
Contract Completion : 30 June 2013
MINUTE
MINUTE ACTION
No.
1.0 Introduction
1.1 QP advised TADMUR that the Effective Date of the Contract is TADMUR
01.08.2011 and Completion Date is 30.06.2013 (23 months).
2.0 Safety
Nothing to report.
3.0 Communication
Nothing to report.
5.0 Mobilization
Tadmur informed that all the project key personals CVs have been
INFO
5.2
approved by QP.
6.4 TADMUR informed QP that all the interfacing projects are reviewing and TADMUR
all the observations have to be documented and submitted to QP.
Progress Meeting
Day: Wednesday
Venue: QP Al-Handasa Bldg. TADMUR
7.2
Time: 8:00 AM
Progress Breakdown
CUMULATIVE UP TO LAST
NET THIS WEEK CUMULATIVE UP TO DATE
LEVEL 1 WEEK
WORK
WEIGHT
DESCRIPTION
S PLAN ACTUAL VARIANCE PLAN ACTUAL VARIANCE PLAN ACTUAL VARIANCE
% % % % % % % % %
Engineering 10.00% 3.44 1.50 -1.94 0.21 0.20 -0.01 3.65 1.70 -1.95
Procurement 50.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Onshore
Fabrication / 35.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Construction
Commissioning &
5.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Start-up
Total 100.00% 3.44 1.50 -1.94 0.21 0.20 -0.01 3.65 1.70 -1.95
TADMUR
7.4 Invoicing
Department.
8.1 TADMUR informed QP that the Project Organization Chart has been INFO
approved.
9.0 Sub-Contractors
9.3 approved with comments by QP and issued on 16th November 201. TADMUR
QP advised TADMUR to send CVs of focal point for CGM on urgent
basis.
10.0 Engineering
10.3 Design in Jaleha project once TADMUR gives the clearance. INFO
TADMUR informed QDC to proceed with the same for the new
control building and finish the design as soon as possible.
11.0 Procurement
and records.
12.0 Construction
12.1 TADMUR shall be responsible for obtaining all work permits INFO
including his Subcontractors.
12.2 TADMUR Safety Officer is required at all times during Construction INFO
stage.
13.0 Commissioning
Nothing to report.
14.1 INFO
Project Quality Plan has already been submitted for QP’s approval.
15.0 Project Dossier & As-built
Nothing to report
MINUTE
MINUTE ACTION
No.
Date: Date: