Sei sulla pagina 1di 1

BP AMOCO Attachments AIO-O-002A&B

ISOLATION RISK ASSESSMENT RECORD

Platform/site Sangachal Terminal Date: 13-6-00

Location/Area Closed Drain Drum Estimated duration of 9


isolation (hrs/days)
Plant/Equipment to be Closed Drain Drum
isolated
P&ID Reference: D-PR-0681 Z1
( and Revision
Number
Proposed Job and Isolation description that is outwith Recommended Isolation Selection Chart
Inability to disconnect the flare line and condensate return line from the closed drain drum as first
option. Lack of double block and bleed isolation upstream of spades as secondary option.

Precautions to be taken in support of proposed Isolation to reduce to lowest reasonably practicable


level the potential hazard
Reference Procedure for Preparation of Closed Drain Drum for maintenance. Issued 14-6-00.

Reason why Recommended Isolation Selection Chart is not being applied


Valving and break out spools not included in design.

Consequences of the proposed Isolation Failing


Persons in vessel can be asphyxiated.

Safety measures for mitigation fully described in Procedure for Preparation of Closed Drain Drum for
maintenance. Issued 14-6-00.

Vessel is positively isolated with spades.

IS THE PROPOSED ISOLATION ACCEPTABLE? Yes


Justification for Rejection if NO in the above section

Team Involved: Date 13-6-00


Mike Chalmers, Peter Clyne, Jerry
Lilley, Mirzaga Mamedov, Jose,
Abbas Islamov, Keivan Tolouli, Oleg
Gul, Chander Assi

Reviewed by: Date


Implemented by Date
(Isolator):

502003279.doc