This document provides an isolation risk assessment for work on the closed drain drum at the Sangachal Terminal. It describes isolating the drum without being able to disconnect all lines as the valves and break out spools were not included in the original design. Safety procedures have been issued and the drum will be positively isolated with spades. The proposed isolation is acceptable due to safety measures outlined in the issued procedures to mitigate risks like asphyxiation if the isolation were to fail.
This document provides an isolation risk assessment for work on the closed drain drum at the Sangachal Terminal. It describes isolating the drum without being able to disconnect all lines as the valves and break out spools were not included in the original design. Safety procedures have been issued and the drum will be positively isolated with spades. The proposed isolation is acceptable due to safety measures outlined in the issued procedures to mitigate risks like asphyxiation if the isolation were to fail.
This document provides an isolation risk assessment for work on the closed drain drum at the Sangachal Terminal. It describes isolating the drum without being able to disconnect all lines as the valves and break out spools were not included in the original design. Safety procedures have been issued and the drum will be positively isolated with spades. The proposed isolation is acceptable due to safety measures outlined in the issued procedures to mitigate risks like asphyxiation if the isolation were to fail.
Location/Area Closed Drain Drum Estimated duration of 9
isolation (hrs/days) Plant/Equipment to be Closed Drain Drum isolated P&ID Reference: D-PR-0681 Z1 ( and Revision Number Proposed Job and Isolation description that is outwith Recommended Isolation Selection Chart Inability to disconnect the flare line and condensate return line from the closed drain drum as first option. Lack of double block and bleed isolation upstream of spades as secondary option.
Precautions to be taken in support of proposed Isolation to reduce to lowest reasonably practicable
level the potential hazard Reference Procedure for Preparation of Closed Drain Drum for maintenance. Issued 14-6-00.
Reason why Recommended Isolation Selection Chart is not being applied
Valving and break out spools not included in design.
Consequences of the proposed Isolation Failing
Persons in vessel can be asphyxiated.
Safety measures for mitigation fully described in Procedure for Preparation of Closed Drain Drum for maintenance. Issued 14-6-00.
Vessel is positively isolated with spades.
IS THE PROPOSED ISOLATION ACCEPTABLE? Yes
Justification for Rejection if NO in the above section
Team Involved: Date 13-6-00
Mike Chalmers, Peter Clyne, Jerry Lilley, Mirzaga Mamedov, Jose, Abbas Islamov, Keivan Tolouli, Oleg Gul, Chander Assi