Activity No.

CNI-06
CNI-03
pickups

clearence.

Cables, etc.
BMS instruments
4) Cable checking
3) Cable checking

14) Spark Trials


4) Calibration & trials
4) Calibration & trials
CNI-01 Connection tightening

4) LAN cables checking

6) Cleaning and Inspection


3) Leakage if any attending

3) Position feedback checking


3) Position feedback checking
3) Restoration after T/M work

CNI-07 Lens, Lens protector glass, etc.


5) Calibration

CNI-04 2) All EWS,OWS PC CPU cleaning

Positioner cleaning and checking


Turbovisory work of TDBFP A & B

2) Air regulator checking


SADC power cylinder & positioner

9) Calibration & restoration at site.


Turbovisory work of Main Turbine.

4) Restoration after T/M clearence.

4) Calibration & trials


CNI-05 2) Positioner, Air regulator checking

Inspection of HEA Igniter Assemblies


DCS system 1) All DCS panel cleaning

All turbine and boiler side instruments


CNI-02 2) JB Cleaning & Connection tightening.
1) Removal of instuments for T/M work

2) Cleaning and checking of instruments


1) Removal of instruments for T/M work

3)Controllers Back up and change over trials


OVERHAUL ACTIVITY

1) Burner rack Valves LS cleaning and checking

5) Removal of all Flame scanners

15) Restoration at site & trials


2) Air regulator checking
1) switches, Transnsmitters cleaning and checking

7)JB Cleaning & Connection tightening


4) Restoration,Calibration/characteristics, trials after T/M

parts like PC seals, Spark tip, Limit switches, Solenoid valves,


12) Exiter box, JB Cleaning & connection tightening
3) Cleaning and checking heathiness of turbovisory & vibration

13) Replacement of damaged


10) Removal of HEA Igniter spark rod and Assemblies
1) Removal of pickups, sensors,thermocouples etc for T/M work

8) Replacement of damaged parts like

11) Cleaning and


Main turbine control valves characteristics & all pneumatic valves-
2) JB Cleaning &

1)
5) Cable Checking & calibration of turbovisory & vibration pickups

0
0

0
0
0
0
0

Status
Status
Status
Status
Status
Status
Status

Actual
Actual
Actual
Actual
Actual
Actual
Actual

Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Start Date

9/Nov/20
12/Nov/20
9/Nov/20
9/Nov/20
9/Nov/20
9/Nov/20
30/Dec/99
18/Nov/20
10/Nov/20
10/Nov/20
30/Dec/99
10/Nov/20
30/Dec/99
14/Nov/20

WIP
WIP
WIP

TODAY Start
NOT YET STARTED
NOT YET STARTED
NOT YET STARTED
Date
Review / End

30/Dec/99
29/Nov/20
30/Dec/99
28/Nov/20
30/Dec/99
28/Nov/20
30/Dec/99
26/Nov/20
30/Dec/99
25/Nov/20
30/Dec/99
1/Dec/20
30/Dec/99
27/Nov/20

9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20
1

9-Nov-20

10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20
2

10-Nov-20

11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20
3

11-Nov-20

12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20
4

12-Nov-20

13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20
5

13-Nov-20

14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20
6

14-Nov-20

15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20
7

15-Nov-20

16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20
8

16-Nov-20

17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20
9

17-Nov-20

18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20
10

18-Nov-20

19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20
11

19-Nov-20

20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20
12

20-Nov-20

21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20
13
CONTROL AND INSTRUMENTATION

21-Nov-20

22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20
14

22-Nov-20

23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20
15

23-Nov-20

24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20
16

24-Nov-20

25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20
17

25-Nov-20

26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20
18

26-Nov-20

27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20
19

27-Nov-20

28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20
20

28-Nov-20
3x660MW KORADI THERMAL POWER STATION

29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20
21

29-Nov-20
Unit # 10 AOH Progress Review Status and Bar-chart

30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20
22

30-Nov-20

1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20
23

1-Dec-20

2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20
24

2-Dec-20
Progress Review
Progress Review
Progress Review
Progress Review
Progress Review
Progress Review
Progress Review

3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20
25

3-Dec-20

4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20
26

4-Dec-20

5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20
27

5-Dec-20

6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20
28

6-Dec-20

7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20

7-Dec-20
29

8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20

8-Dec-20
30

9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20

9-Dec-20
31

10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20

10-Dec-20
32

11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20

11-Dec-20
33

12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20

12-Dec-20
34

13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20

13-Dec-20
35

14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20

14-Dec-20
36

15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20

15-Dec-20
37

16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20

16-Dec-20
38

17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20

17-Dec-20
39
Date:

18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20

18-Dec-20
40

19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20

19-Dec-20
41

20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20

20-Dec-20
42

21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20

21-Dec-20
43

22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20

22-Dec-20
44
11/13/2020

23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20

23-Dec-20
45
Activity No.

CNI-07

Cables, etc.
BMS instruments

14) Spark Trials

Coal mill instruments

5) Calibration & trials


4) Calibration & trials

connection tightening
6) Cleaning and Inspection

CNI-12 Misc and Other section work


3) Position feedback checking

Lens, Lens protector glass, etc.

CNI-08 3) Position feedback/LS checking


9) Calibration & restoration at site.

Inspection of HEA Igniter Assemblies

CNI-10 Boiler & its auxiliary protection trials


2) Air regulator checking
Dampers Positioner cleaning and checking

CNI-11 Turbine and its auxiliaries protection trials


OVERHAUL ACTIVITY
1) Burner rack Valves LS cleaning and checking

5) Removal of all Flame scanners

15) Restoration at site & trials

4) All Tx,Temp Elements checking


2) Air regulator checking

7)JB Cleaning & Connection tightening

parts like PC seals, Spark tip, Limit switches, Solenoid valves,


12) Exiter box, JB Cleaning & connection tightening
13) Replacement of damaged
10) Removal of HEA Igniter spark rod and Assemblies

1)
8) Replacement of damaged parts like

CNI-09 Local Control panel and all JB - Local panel and JBs Cleaning and

Instruments removal & restoration related to other section work.


11) Cleaning and

0
0
0
0
0
0

Status
Status
Status
Status
Status

Actual
Actual
Actual
Actual
Actual

Schedule
Schedule
Schedule
Schedule
Schedule
Start Date

9/Nov/20
9/Nov/20
30/Dec/99
28/Nov/20
30/Dec/99
28/Nov/20
9/Nov/20
9/Nov/20
9/Nov/20
9/Nov/20

WIP
WIP
TODAY Start

NOT YET STARTED


NOT YET STARTED
Date
Review / End

30/Dec/99
3/Dec/20
30/Dec/99
3/Dec/20
30/Dec/99
3/Dec/20
30/Dec/99
26/Nov/20
30/Dec/99
26/Nov/20

9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20 9-Nov-20

9-Nov-20

10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20 10-Nov-20

10-Nov-20

11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20 11-Nov-20

11-Nov-20

12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20 12-Nov-20

12-Nov-20

13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20 13-Nov-20

13-Nov-20

14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20 14-Nov-20

14-Nov-20

15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20 15-Nov-20

15-Nov-20

16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20 16-Nov-20

16-Nov-20

17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20 17-Nov-20

17-Nov-20

18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20 18-Nov-20

18-Nov-20

19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20 19-Nov-20

19-Nov-20

20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20 20-Nov-20

20-Nov-20

21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20 21-Nov-20

21-Nov-20

22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20 22-Nov-20

22-Nov-20

23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20 23-Nov-20

23-Nov-20

24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20 24-Nov-20

24-Nov-20

25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20 25-Nov-20

25-Nov-20

26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20 26-Nov-20

26-Nov-20

27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20 27-Nov-20

27-Nov-20

28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20 28-Nov-20

28-Nov-20

29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20 29-Nov-20

29-Nov-20

30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20 30-Nov-20

30-Nov-20

1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20 1-Dec-20

1-Dec-20

2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20 2-Dec-20

2-Dec-20
Progress Review
Progress Review
Progress Review
Progress Review
Progress Review

3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20 3-Dec-20

3-Dec-20

4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20 4-Dec-20

4-Dec-20

5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20 5-Dec-20

5-Dec-20

6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20 6-Dec-20

6-Dec-20

7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20 7-Dec-20

7-Dec-20

8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20 8-Dec-20

8-Dec-20

9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20 9-Dec-20

9-Dec-20

10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20 10-Dec-20

10-Dec-20

11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20 11-Dec-20

11-Dec-20

12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20 12-Dec-20

12-Dec-20

13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20 13-Dec-20

13-Dec-20

14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20 14-Dec-20

14-Dec-20

15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20 15-Dec-20

15-Dec-20

16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20 16-Dec-20

16-Dec-20

17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20 17-Dec-20

17-Dec-20

18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20 18-Dec-20

18-Dec-20

19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20 19-Dec-20

19-Dec-20

20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20 20-Dec-20

20-Dec-20

21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20 21-Dec-20

21-Dec-20

22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20 22-Dec-20

22-Dec-20

23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20 23-Dec-20

23-Dec-20
Activity No.

OVERHAUL ACTIVITY
Start Date

WIP

Select
Date

WITHHOLD
COMPLETED
TODAY Start
Review / End

NOT YET STARTED


TODAY Completed

9-Nov-20

10-Nov-20

11-Nov-20
28.07.2018

12-Nov-20

13-Nov-20

14-Nov-20

15-Nov-20

16-Nov-20

17-Nov-20

18-Nov-20

19-Nov-20

20-Nov-20

21-Nov-20

22-Nov-20

23-Nov-20

24-Nov-20

25-Nov-20

26-Nov-20

27-Nov-20

28-Nov-20

29-Nov-20

30-Nov-20

1-Dec-20

2-Dec-20

3-Dec-20

4-Dec-20

5-Dec-20

6-Dec-20

7-Dec-20

8-Dec-20

9-Dec-20

10-Dec-20

11-Dec-20

12-Dec-20

13-Dec-20

14-Dec-20

15-Dec-20

16-Dec-20

17-Dec-20

18-Dec-20

19-Dec-20

20-Dec-20

21-Dec-20

22-Dec-20

23-Dec-20
3x660MW KORADI THERMAL POWER STATION
Unit # 10 AOH Progress Review Status
Section :CONTROL AND INSTRUMENTATION
S PROGRESS REVIEW STATUS, as on WORK COMPLETED PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on
OVERHAUL ACTIVITY PERMIT NO.
N Friday, November 13, 2020 (%) Thursday, November 12, 2020 Wednesday, November 11, 2020 Tuesday, November 10, 2020 Monday, November 09, 2020

Turbovisory work of Main Turbine.


1) Removal of pickups, sensors,thermocouples etc for T/M
work
2) JB Cleaning & Connection tightening
3) Cleaning and checking heathiness of turbovisory &
vibration pickups
4) Restoration after T/M clearence. Will not be done as TM is not doing Bearing
CNI-01 5) Cable Checking & calibration of turbovisory & vibration Not Yet Started, TM Clearance Required. Not Yet Started, TM Clearance Required.
pickups
Inspection.

From To
Scheduled 14-Nov 27-Nov
Actual
Status NOT YET STARTED

Main turbine control valves characteristics & all pneumatic


valves-
1) Removal of instuments for T/M work
2) JB Cleaning & Connection tightening.
3) Cable checking
4) Restoration,Calibration/characteristics, trials after T/M
CNI-02 clearence. Not Yet Started, TM Clearance Required. Not Yet Started, TM Clearance Required.

From To
Scheduled 14-Nov 1-Dec
Actual
Status NOT YET STARTED

Turbovisory work of TDBFP A & B


1) Removal of instruments for T/M work
2) Cleaning and checking of instruments
3) Restoration after T/M work
4) Cable checking
5) Calibration Restoration of Turbovisory instruments will TD A and B instruments and connections
CNI-03
taken after TM work.20% removal completed for TM work. Removal Of TD A and B intruments in progress. Not Yet Started, TM Clearance Required.

From To
Scheduled 10-Nov 25-Nov
Actual 10-Nov
Status WIP

DCS system 1) All DCS panel cleaning


2) All EWS,OWS PC CPU cleaning
3)Controllers Back up and change over trials
4) LAN cables checking
CNI-04 - OWS,EWS and desks cleaning in progress.10% Not Yet Started Not Yet Started

From To
Scheduled 18-Nov 26-Nov
Actual
Status NOT YET STARTED

All turbine and boiler side instruments


1) switches, Transnsmitters cleaning and checking
2) Positioner, Air regulator checking
3) Position feedback checking
CNI-05
4) Calibration & trials Work in progress. Turbine Side SOV/CV trials in Work in progress. Turbine side all CVs /SOVs Work in Progress. Turbine side SOVs and Work in Progress
progress. 10% checking and trial work in progress control valves checking and trials in progress.

From To
Scheduled 9-Nov 28-Nov
Actual 9-Nov
Status WIP

SADC power cylinder & positioner


1) Positioner cleaning and checking
2) Air regulator checking

3) Leakage if any attending


CNI-06 4) Calibration & trials Nor yet started. Not Yet Started Not Yet Started Not Yet Started

From To
Scheduled 9-Nov 28-Nov
Actual 9-Nov
Status TODAY Start

BMS instruments
1) Burner rack Valves LS cleaning and checking
2) Air regulator checking

3) Position feedback checking


4) Calibration & trials
5) Removal of all Flame scanners

6) Cleaning and Inspection


7)JB Cleaning & Connection tightening
8) Replacement of Work in proigress. Work in Progress.
damaged parts like Lens, Lens protector glass, etc. 1) AB/CD/EF elevation oil gun pneumatic and 1) AB/CD/EF oil gun pnuematic and supply
9) Calibration & restoration at site.
electrical connection removal in progresss. connection removal work in progress. 2) Work in Progress. AB/CD/EF oil gun pnuematic
10) Removal of HEA Igniter spark rod and 2) AB/CD/EF Furnace pressure HH & LL switches A,B,C and supply connection removal work in
progress. Furnace pressure switches checking Work in Progress
CNI-07
Assemblies corner rack valves AFR replacement in removal for calibration wor completed , loop
11) Cleaning and Inspection of HEA Igniter Assemblies progress. 3)Furnace checking done. 3)AB / and calibration in progress.
12) Exiter box, JB pressure swiches restoration after calibration CD / EF corner valve rack AFR replacement
Cleaning & connection tightening completed. work in progress.
13) Replacement of damaged parts like PC seals,
Spark tip, Limit switches, Solenoid valves, Cables, etc.
14) Spark
Trials
15) Restoration at site & trials
From To
Scheduled 12-Nov 29-Nov
Actual 9-Nov
Status WIP

Coal mill instruments


1) Dampers Positioner cleaning and checking
2) Air regulator checking

3) Position feedback/LS checking 1) Coal mill Seal Air valves checking and trials
4) All Tx,Temp Elements checking
CNI-08
completed. Not yet Started Not Yet Started
5) Calibration & trials 2) Coal mill MDV checking and trials
completed.

From To
Scheduled 9-Nov 26-Nov
Actual 9-Nov
Status TODAY Start

Local Control panel and all JB - Local panel and JBs Cleaning
and connection tightening

CNI-09 Turbine side JBs cleaning work in progress. Turbine side JB cleaning work in progress Work in Progress Work in Progress
From To
Scheduled 9-Nov 26-Nov
Actual 9-Nov
Status WIP

Boiler & its auxiliary protection trials

CNI-10
From To
Scheduled 28-Nov 3-Dec
Actual
Status NOT YET STARTED

Turbine and its auxiliaries protection trials

CNI-11
From To
Scheduled 28-Nov 3-Dec
Actual
Status NOT YET STARTED

Misc and Other section work


Instruments removal & restoration related to other section
work. Work in progress.CEP B and C
CNI-12 -
WDC A and B pneumatic and electrical CWP - A MOTOR & PUMP supervisory instruments,connection removal for EM and
connections removed for TM work. connections removal for TM work. TM works in progress.
From To
Scheduled 9-Nov 3-Dec
Actual 9-Nov
Status WIP
S PROGRESS REVIEW STATUS, as on WORK COMPLETED PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on
N
OVERHAUL ACTIVITY PERMIT NO.
(%)

TODAY Start
WIP
NOT YET STARTED
TODAY Completed
COMPLETED
WITHHOLD
Select
Unit No. 10 Annual Overhaul Bar Chart (NOV-2020)-MAINTENANCE
3 X 660 MW KTPS KORADI

10-Nov-20
11-Nov-20
12-Nov-20
13-Nov-20
14-Nov-20
15-Nov-20
16-Nov-20
17-Nov-20
18-Nov-20
19-Nov-20
20-Nov-20
21-Nov-20
22-Nov-20
23-Nov-20
24-Nov-20
25-Nov-20
26-Nov-20

27-Nov-20
28-Nov-20
29-Nov-20
30-Nov-20
9-Nov-20

1-Dec-20
2-Dec-20
3-Dec-20
4-Dec-20
5-Dec-20
6-Dec-20
7-Dec-20
8-Dec-20
Total days
SR DATE

Start Day

End Day
NO ACTIVITY

DAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Control & Instrumentation
1 Turbovisory work of Main Turbine 6 19 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

2 Main turbine control valves characteristics 6 23 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

3 Turbovisory work of TDBFP A&B 2 17 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

4 DCS system 10 18 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

5 All turbine and boiler side instruments 1 20 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

6 SADC power cylinder & positioner 1 20 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

7 BMS instruments 4 21 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

8 Coal mill instruments 1 18 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

9 Local Control panel and all JB 1 18 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

10 Boiler & its auxiliary protection trials 20 25 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

11 Turbine and its auxiliaries protection trials 20 25 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

12 Misc and Other section work 1 25 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

BOILER LIGHT-UP 35 35 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

SYNCHRONIZING 35 35 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30