Petrochemical Industries
(Petrochemical Factory)
Business Plan
2018
1
1- Exclusive summary
1- Exclusive summary
Company name: - state Company for Petrochemical Industries.
Date of foundation: - 1977 according to article 4, paragraph (2) of the Law of Institutions of the
Ministry of Industry and Minerals No. 90 for the year 1970 amended and by the decision of the
Board of Directors of the General Establishment for Chemical Industries No. (6) taken in session
(3) held on 23/2/1977 and ratified by the Ministry of Industry and Minerals by letter No. 22/3/1497
on 13/3/1977. Pursuant to the decision of the Council of Ministers No. (360) for the year 2015
issued by the Cabinet of Ministers No. (10/1/14/31733) on 8/10/2015 and the merger of public
companies belonging to the Ministry of Industry and Minerals, State Company for Petrochemical
Industries with the State Company for paper industries to become the name of the new company
is the State Company for Petrochemical Industries and the company was registered in the Ministry
of Commerce / Corporate Registration Department - Public Companies Division on 15/11/2016.
Department of administration: - Basrah - Khor Al-Zubair.
Place of registration: - Baghdad.
The law governing the company: - The Public Companies Law No (22) of 1997.
Nature of activity and specialization: - Commodity industry activity.
Number of sites and branches: - The Company has four factories (petrochemical plant / Basra
governorate, Basrah paper mill / Basrah governorate, Missan paper mill / Maysan governorate and
School requirements factory / Baghdad governorate).
Nominal capital: - 4212516 thousand dinars.
The main objectives of the company: - Production of the material below:
petrochemical Basrah paper mill Missan paper mill School Requirements
plant Factory
HDPE Board Board (many Exercise books
types)
LDPE Writing & printing Paper (many Egg trays
paper types)
PVC Corrugated boxes Egg trays Waste compaction
Master batch
Nitrogen liquid
A brief description of the factory: -The petrochemical factory (the state company of
petrochemical industries SCPI before the merger) established in 1977 as a petrochemical complex
by contract signed with Lummus / USA and Thyssen / Germany with a capital cost of 1.1 billion$.
The project continued carrying out until September 1980 when Iraqi – Iranian war started,
at the same time the commissioning activities were interrupted, so the complex was put
under the preventive maintenance during the war time. At the end of 1987 the complex
operated again, in July, 1988 the Chlorine and Caustic soda plant started working for
water treatment and to feed the national industries. After that the other product plants are
operated as a test operation according to the original contract during the 1st seven
months from the year 1990, they continued working until 2/8/1990 which stopped because
of the 2nd gulf war. The reconstruction started in 25/5/1991 and achieved in August, 1991
and all the plants became ready for operation.
2
2- Factory objectives
The petrochemical plant aims to reach 100% of the design capacities of the factory's production
lines, thus adding value to the labor market, achieving profits, expanding and leading the market and
building a distinctive brand.
- The following table shows the production lines required to increase their production capacity to 100% of their
design capacity:
-
products design capacity (ton/year)
HDPE 30000
LDPE 60000
PVC 60000
Agricultural Films 15000
Chlorine liquid 42000 / old plant
46200 / new plant
Flake caustic soda 42000 / old plant
51810 / new plant
3- Factory tasks
The petrochemical industry is a strategic transformational industry because it converts natural gas
into products that are integrated into various industrial and life sectors as economic alternatives to
traditional raw materials and strengthens the national economy by eliminating the import of these
materials from abroad. The factory tasks are to produce high and low density polyethylene, polyvinyl
chloride powder, Agricultural films, chlorine and caustic soda in addition to the master batch and
PVC compounding where the products of the factory are characterized as high quality and conform
to the standard specifications and suitable prices:
produced as a Al Furat
Liquid chlorine 42000 construct new
liquid company
chlorine and soda
plant with capacity: Al Furat
produced as a liquid or 46200 t/y - chlorine company
Caustic soda 42000
solid 51810 t/y - soda (product
liquid)
produced as waste bags It isn’t included in with good mechanical Private
Plastic Bags 3850
or public use bags rehabilitation specifications sectors
The project produces gas with good Private
Nitrogen Liquid 1770 / liquid New project
& liquid specifications sectors
3
4- Product and customer value proposition
The customer value proposition for the factory production is high quality produced according to
the international standards with accepted prices and the customer values propositions are:
1-High density polyethylene HDPE: plastic pellets produced according to international
specifications standards and food grades, different grades of this product are produced,
each grade has its own specification.
2-Low density polyethylene LDPE: plastic pellets produced according to international
specifications standards and different grades, each grade has its own specification.
3-Agricultural films: It is characterized by the thickness of (125-200) microns and width (4-9)
m, these sheets are enrolled as big rolls and used for the production of low density
polyethylene pellets (type 463) and therefore possess the required mechanical
specifications.
4-Liquid Chlorine: It is produced in the form of liquid filled in cylinders of 1 ton per cylinders.
5-Caustic Soda: produced from chlorine as a liquid (48%) or solid (70-73) %.
6-Poly vinyl chloride (P.V.C): It powder produced in three grades, this production is stopped
now (no VCM).
5- Peoples
The following table shows the employee segments according to academic achievement:
950
450
-50
Master Engineer Chemical Physics Administr Law Others Diploma High below
Number 9 202 58 21 76 15 92 750 1435 755
The total factory employees (staff) are (3413) on the 31st of July, 2018 with monthly salary
(1.192) million dinar /employee.
The factory management has good experience and efficiency to manage the factory and the
administrative department controls its duties by different computer soft wares like Human
resource system, staff system and so on.
The factory needs to build its capabilities specifically in sales and marketing as well as
maintenance, production and technician operation programming to fit the carrying achievement
factory as high levels to equal to the advance of world countries because Iraq have not had
international relations for many years ago.
It has been putting 2 M$ for training the factory employees.
4
6- Marketing and Sales
Most of factory production is sold directly to the private plastic factories and merchants, and some of
the production is sold by contracts with the governmental companies.
There is no competition company inside Iraq and the unique competitor is the foreign importation
.The local market volume for HDPE is (30000) ton/year, LDPE (80000) ton/year, agricultural films
(10000) ton/year, plastic bags (20000) ton/year, nitrogen liquid (11000) ton/year, Chlorine (10000)
ton/year, Caustic Soda (800) ton/year and PVC (6000) ton/year.
The markets are divided into three segments, two of them are local segments which are:
1- Private plastic factories.
2- Governmental companies and ministries.
The third segment is exporting companies to outside Iraq and merchants.
The factory aims to reach a selling volume (75000) tons of HDPE & LDPE /year, (60000) tons of
PVC /year, (15000) tons of Agri. sheets /year, (5950) tons of Chlorine /year and (51470) tons of
Caustic Soda /year with revenues reach to (282516) Million Iraqi dinars (equal 243.548 M$).
When the factory reaches to capacities close to the design capacity, the company has to think about
expansion the exporting companies segment to exploit the production surplus.
8- Current status
The location of the company is outside the city (Basrah) and because of being inside security fence
makes stable security conditions, because of decreasing the natural gas quantity ,its consumption &
expansion of electrical projects to increase the electrical power, so the natural gas for SCPI is fewer
than its needs.
Available units in the factory:
- Management buildings.
- Building of production plants.
- Many stores to store products, chemicals and assistance and all the company's requirement.
- Medical center.
- Home buildings No (550)
1. Ethylene plant
2. HDPE plant
5
3. LDPE plant
4. VCM plant
5. PVC plant
6. Agricultural films plant
7. Plastic Bags
8. Chlorine and caustic soda plant
In addition to the above there is a utility and service unit.
The raw materials which are used in the production processes are:
For LDPE /
For HDPE /
EP-30
EP-350
These Catalysts used in polymerize operation as initiators which analyze to radicals which make
the reaction beginning according to the polymerize operation conditions.
LDPE & HDPE produced as plastic pellets, however PVC produced as powder and they filled in
bags.
Chlorine produced as liquid and filled in a cylinder of 1 ton.
The plan aims to rehabilitate the production plants of the company with0 schedule during the first
and second years of qualification as follows:
First year: Starting rehabilitation in the 1st six months to reach 100 % of the design capacity for
HDPE, LDPE & Agricultural films and rehabilitation of VCM & PVC all year and build new
chlorine & soda plant.
Second year: Continuing rehabilitation VCM, PVC build new chlorine & soda plant.
Third year: Operating chlorine & soda plant, operating VCM and PVC.
6
10-Finance & Reporting
The petrochemical factory aims to produce an investment plan for two years to increase
production capacities to 100% of designed capacities (for HDPE, LDPE, PVC, VCM, Agricultural
films plants and the new plant of Chlorine & Caustic soda).
The petrochemical factory planning to invest (237.58) M$ as follows:
16.95 M$ to rehabilitation of Utility & Service unit
53.3 M$ to rehabilitation of Ethylene plant
8.75 M$ to rehabilitation of LDPE plant
7.3 M$ to rehabilitation of HDPE plant
30 M$ to rehabilitation of P.V.C plant
30 M$ to rehabilitation of V.C.M plant
77.58 M$ to construct new chlorine and soda plant with capacity 140 ton/day
1.45 M$ to rehabilitation of Agricultural films and Plastic Bags plants
12.25 M$ Miscellaneous
The annual revenues will be (243.548) M$ after completing the rehabilitation in 2nd year.
The period of investment capital recovery will be (3) years (11) months ,The investment file which
has the investment plan above has been sent to Ministry of Industry & Minerals for studying and
declare it to investment.
The table below shows revenue during the years of investment by the production and sales
schedule described in chapter 4 p. 33.
Invest account Revenues
st nd st nd rd th th th th
(M$) 1 year 2 year 1 year 2 year 3 year 4 year 5 year 6 year 7 year
7
The chart below shows the evolution of revenues and profits for investment years according to (the
production cost, investment money and annual revenues table) in chapter 5 p.37:
200 138.038
115.1 115.1 115.1
100 69.019
0
2018 2019 2020 2021 2022
-100 -29.557
-200
-191.213
-300
The chart below shows the actual revenues & profits from 2015 to 2017:
Revenues
revenues , expenses & losses for years (2015-2017) Expenses
52.887 Losses
60 53.517
50.439
M$
40
20
0.558 1.078 0.621
0
2015 2016 2017
-20
-40
8
2- Product and customer value proposition
Services provided
- The petrochemical factory produces the following final products:
1-High density polyethylene HDPE: plastic pellets produced according to international
specifications standards and food grades, different grades of this product are produced,
each grade has its own specification.
2-Low density polyethylene LDPE: plastic pellets produced according to international
specifications standards and food grads, different grades of this product are produced,
each grade has its own specification.
3-Agricultural films: they are plastic sheets of thickness (125-200) micron and width (4-9) m,
these sheets are enrolled as big rolls, LDPE pellets (463) used to produce these sheets so
this product has good mechanical specifications.
4-Liquid Chlorine: produced as liquid filled in 1 ton per cylinder.
5-Caustic Soda: produced from chlorine as a liquid (48%) or solid (70-73) %.
6-Poly vinyl chloride (P.V.C): powder produced in three grades, this production is stopped
now (no VCM).
Process of production
The natural gas enters the ethylene plant to produce ethane gas, which is cracked by thermal
furnaces to ethylene gas. The methane gas extracted from the ethane production unit is considered
as fuel to the boilers and power generating machines. However, if the ethylene plant is stopped,
natural gas is the main feeder of Utility & Service unit and gas turbine unit. Ethylene gas is used in
the production of:
High density polyethylene pellets / After polymerization of a special reactor under certain pressures and
temperatures, the high density plastic pellets are produced according to Phelps technology and are used
in the manufacture of chips, pipes, pipes and household appliances, they are produced in the form of
pellets and packed in bags and sent to stores for marketing purposes. Some of them are sent to a plastic
bag plant.
Low density polyethylene pellets / After polymerization with special reactors under high pressure and
temperature, low density plastic pellets are produced according to QUANTUM - USI technology with
international specifications, type of food and two production lines. Three different types of pellets with
special specifications can be produced and used in industry Agricultural films, channel lining and in the
manufacture of containers and household items, which are also produced in the form of pellets and sent
part of it to the factory of production of agricultural films and plastic bags plants, the bulk of which is sent
to the warehouses after fill it for the purpose of marketing.
V.C.M. powder / Chlorine and ethylene are used in special reactors for the production of mono-phenyl
chloride, diethylene chloride is cracked into PVC and hydrochloric acid HCL.
Raw salt is the main material for the production of chlorine and caustic soda through the electrolysis
of saline solution in the diaphragm cells, which reacts with ethylene gas in special reactors in the
VCM plant to produce EDC, the cell liquid contains 8% of caustic soda, Evaporators that use vapor
and medium pressure for soda production within the concentration of 70%. Caustic soda enters as
raw material in many industries such as paper industry, vegetable oil, soap and silk. The liquid
chlorine is sent to the VCM plant and the other part is marketed to the beneficiaries. after being filled
in liquid form with 1 ton/ cylinder, the caustic soda is stored as a liquid substance at a concentration
of 48% or solid at 70-73% concentration.
9
Available Capacity Compare to Design Capacity
100 Design Capacity
Products thousands of ton/year
84 Available
80 Capacity
60
60 60
36 42
40
30
18
20 15 13.5
0 0 3.08 0 1.77
1.77
3.85
0
LDPE HDPE Agr. Films Liquid Caustic Plastic P.V.C nitrogen
Chlorine Soda bags liquid
11
6- Caustic Soda: It's important material in oil refineries where it's injected in crude oil &
maturation to adsorb CO2 & H2S & used to removing sulfur compounds from oil derivatives
& to activate auxiliaries & in fertilizer industries , part of it used in ethylene and utilities
unites as a fuel gas .
12
Competing in service
The main competitive companies are:-
- The main competitor with regard to plastic pellets and agriculture films is the import
companies from outside Iraq and they deals with plastic factories in the private sector and the
farmers, but with regard to liquid chlorine and caustic soda there is one competitor inside Iraq
which is Al-Furat state company for chemical industries, but its production is so low compared
with SCPI, this company deals with the Ministry of municipalities and work for selling this
product (chlorine & caustic soda).
- The new developments that expected from the competitors are the entering new grades of the
plastic pellets to the market that’s can be used in different fields.
- There is no hindrance for entering to the local market, but for the international markets
especially the Middle East market it can be accessed after improving the packaging of the
product and the process of charging process.
13
The route of the petrochemical industries development in the Middle East as shown in fig. below:-
- We can see from the figure above the production capacity of petrochemicals reach high levels
(millions tons/year) with a continuance ascending. At the same time the maximum capacity of
SCPI is 150000 tons/year (design capacity) and this is very low compared with petrochemical
group capacities in the neighboring countries, so it is preferable for the general trends to
establish a new petrochemical group with a high capacity to be alignment with the
international capacities.
- It’s useful to make partnerships with ministry of oil to insure supplying raw materials (natural
gas) required for production process & with suppliers to provide chemical materials and
catalyst.
- Establishing complementary projects like (It hasn't been putting money for these projects in
short – term investment, but they can be done by SCPI, private sector or mixed investment
according to the company and the investor policy after completing the rehabilitation):-
1-Big plastic tanks project / which used in storing water, chemical materials and fuels.
2-Poly ethylene pipes project / with different types such as irrigation pipes, pipes which are
used for transporting drinking water, industrial water, sewage water, chemical materials and
gas distribution.
14
- The table below describe the difference between the competitive products and the equal
company products for 2018 and expected for the following four years:
Price Price
The competitive The equal
Products (thousands (thousands
products company products
of dinars) of dinars)
Poly propylene Poly propylene 1215 -- --
Poly styrene Poly styrene 1240 -- --
Development of services
1. Establishment of a polypropylene production unit (proposed in the long-term investment
plan at a cost of $ 1 billion).
2. Establishment of a plant to separate the waste / an investment file has been prepared and
the Ministry of Industry and Minerals has been approached to obtain the qualifications of the
technical undersecretary to promote the project through the conclusion of a partnership
contract with the private sector. The project is economically feasible and achieves financial
returns that contribute to maximizing the financial resources of the company. (Nitrogen and
oxygen, argon).
15
Quality system
- There is a quality management department in the factory with (11) employees and will be ready to
apply the quality management system in accordance with the standard ISO9001,2015, when
operating the production plants of the factory, knowing that the factory continues to provide
educational courses and guide the members on the quality management system.
- The amount of (2) million dollars for the purpose of application in the factory, knowing that the
factory is constantly providing educational and guidance on the quality system.
- To obtain ISO certification the project must be passed six stages:-
2. Preparation
3. Documentation
4. Application
5. Revision
6. Recording
These stages demand (12-24) months for enough duration in the presence of experienced factory
for preparing ISO with high experience.
16
3- People
Existing employee structure
The total number of the factory employees now in 31/7/2018 (3413) distributed as below:-
Description Total
PH & M.Sc 9
Engineer 202
Chemical 58
Physics 19
Bachelor
Administrations & Economic 76
Law 15
Others 92
Diploma 750
High school 1435
Below High school 755
950
450
-50
PH & Engineer Chemical Physics Administr Law Others Diploma High below
Number 9 202 58 21 76 15 92 750 1435 755
employment level(2000-2017)
5000
employees
number of
0
2 0 10 2 0 11 2 0 12 2 0 13 2 0 14 2 0 15 2 0 16 2 0 17 2 0 18
N um be rs 4 16 5 4 116 4065 3974 3849 3749 3 6 14 3530 3 4 13
Year
17
Direct Manager
18
The departments of the company
1. Board Of Directors Determined the policy of the company & take important decisions
2. Director General General management & supervising the implementation of company policies
3. Deputy General Director Doing the general manager’s action in case of his absence as well as managing some technical sections
4. Petrochemical factory
5. Basrah paper Mill
6. Myssan paper Mill
7. School Requirements factory
The petrochemical factory contains of many departments as in table below:-
Date of obtaining
Period of the current
No. Name Responsibility Degree Specialist
duty
position
21
Staff skills
The factory employees, especially the old ones, have experience and skills. The factory was
established under the contract of Lummus / USA and Thyssen / Germany, therefore, most of the
staff in the United States were dispatched and trained. The production plants were also operated
in the presence of the licensed companies as well as the factory has witnessed rehabilitation
work for more than once and has been qualified by the cadres of the factory
21
Human Resources processes
The procedures applied in human resources department controlled by computer system are:
1- Human resource system / this system developed by saving system instead of dossiers.
2- Payroll list system / it is working by providing the computer information about employees
(permission, absence, bonus…). .
3- Vehicles system / stocktaking of company vehicles.
4- Retirement system is existing and working.
5- Punishment system is existing and working.
6- Incentive system/there was no incentive system since 2003.
And other systems.
The company management will start rehabilitation process to all units for reaching to the higher
production capacity to win high revenues & profits.
22
4- Marketing & Competition
Factory Products
- The customer value proposition for the factory production is high quality produced according
to the international standards with accepted prices and the customer values propositions are:
1-High density polyethylene HDPE: plastic pellets produced according to international
specifications standards and food grades, different grades of this product are produced,
each grade has its own specification (explained in Chapter 2 - Customer value proposition).
2-Low density polyethylene LDPE: plastic pellets produced according to international
specifications standards and different grades, each grade has its own specification
(explained in Chapter 2 - Customer value proposition).
3-Agricultural films: It is characterized by the thickness of (125-200) microns, which is very
desirable thickness and is characterized by good resistance to weather conditions and a
longer time compared to what is in the domestic market as well as the appropriate price,
these agricultural covers can be treated by UV stabilizer as customized.
4-Liquid Chlorine: Which is a major substance in the sterilization of drinking water and the
bulk is used for the production of phenyl chloride V.C.M which is used in the production of
P.V.C powder, and has a high purity of 98.5% minimum.
5-Caustic Soda: Which is an important material used in oil refineries where it is treated with
crude oil and natural gas for the removal of CO 2 and H2S. It is also used in fertilizers,
detergents, soap, water treatment and pharmaceutical plants, and consumes in ethylene
plant and utility sector.
6-Poly vinyl chloride (P.V.C): It is used for the manufacture of solid and nylon chips, pipe
production, electrical wire insulators, plastic rails and flexible pipes. It is produced in world
standard specifications and in three categories.
Existing customer base
The main customers for petrochemical company are:
1- The companies of public sector.
2- The companies of mixed sector.
3- The companies of private sector.
There is no contract with any beneficiary sector now.
23
- The most important customers excluded from the petrochemical products and the needs of
each sector of products are shown in the following table (the ratio of dealing with customers
was calculated as 100% of the design capacity): -
factory share in the customer handling
sector needs of products
Sector coverage ratios by type of
(tons)
requirements product
- Most of the factory production is directly sold to the plastic factories of the private sector and the
merchants, in addition to contracts with governmental sectors like the ministries of agriculture,
municipalities & work and oil and some of the companies in the ministry of industry.
- The following table shows the quantity and the value of the annual sales according to the factory
products for years 2015-2017.
(million of
(million of
Product
dinar)
dinar)
dinar)
value
value
value
(ton)
(ton)
(ton)
Qty
Qty
Qty
Agri. films 7 14 25 50 10 19
Plastic bags 5 15 298.5 801 -- --
Nitrogen Liquid -- -- 704 176 25 6
Total 29 1032 25
24
production path for years 2015-2017)
2000
sales(millon Dinars)
1032
0 29 20
ye a rs 2015 2016 2017
The table below describes the percentage of sales according to the customers (sales of 2015 -
2017):
-The percentage of sales that goes to the four large customers are (sales of 2015 - 2017):-
Market volume
The current local market volume for each segment is as table below:-
C
PE
PE
gs
da
s
ui
rin
m
PV
ba
HD
so
LD
liq
Fil
lo
tic
en
tic
ch
ri.
as
og
us
ag
pl
ca
tr
ni
The plastic pellets are the main products of the factory, and the local market volumes of these
pellets which are represented by (plastic factories in the private sector and governmental
companies) are close with our products, therefore, the petrochemical plant mainly targets export
companies and traders to market most of its products.
HDPE
30000
public sector
15000 mixed sector
10000
6000 6120 6240 6370 6495
5000 1500 1530 1560 1590 1625
0 2018 2019 2020 2021 2022
LDPE 64945
70000 60000 61200 62425 63670
60000
market volume (ton)
50000
private sector
40000 public sector
30000 20270 20675 mixed sector
19100 19480 19870
20000
10000
0
2018 2019 2020 2021 2022
26
PVC
6000 5100 5200 5306 5410
5000
2000
1000 1020 1040 1060 1080
1000
0
2018 2019 2020 2021 2020
Agricultural films
8000 7500 7500 7500 7500 7500
7000
market volume (ton)
6000
5000
4000
private sector
3000 2500 2500 2500 2500 2500 public sector
2000
1000
Liquid Chlorine
11000
10800
10800
market volume (ton)
10600
10600
10400
10400
10200
10200
public sector
10000
10000
9800
9600
27
Caustic Soda
450
440440
market volume (ton)
440
430430
430
420420
420
390
380
Public sector: The growth percentage is 2% yearly where it's expected rehabilitating most of
governmental companies which use plastic pellets.
Private sector: The growth percentage is 2% yearly where it's expected re operating the plastic
plants within coming years and increasing their numbers.
The table below describes the comparison between the current local market volume and the
expected sales:-
28
Product percent to market volume
%
6650%
5650%
4650%
3650%
2650%
1650%
650%
-350%
HDPE LDPE PVC agrig. Films chlorine caustic soda
Nature of competition
1. The nature of the competition in terms of the type of products / the products of the factory
are characterized by high quality and within the international specifications and the variety
of varieties of high and low density polyethylene and PVC powder to include most of the
required requirements for these products. The company seeks after the implementation of
the plan of work to seek the establishment of complementary production of polypropylene
and complementary industries to match the equivalent products located in the local
market.
2. The nature of the competition in terms of product prices / the prices of the products of the
factory are suitable compared to the prices of the equivalent products.
1. Rehabilitation of the complex with all its plants & managements especially which stopped
many years ago.
3- Achieving the largest revenues which share with development and enlargement in future.
The current status & the next stages that develop product
Actually if we make analysis sight to the current status for petrochemical industries under
absence market and product arrangement laws , we will find the development and progress
29
actions for this industry are under ambition level because of absence the laws and
legislations which limit the plastic products exporting from neighboring countries.
Also most of the plastic factories which took place a large area in product market have
converted to wholesales , and some of them moved to neighboring countries to work there
, so it must be made:-
- By division the market to three segments (the private sector, governmental companies and the
private exporting companies), all of these segments prefer products with suitable prices and
compatible to the international standard specifications, the company can give preference to the
price of the large amounts where saves selling price to the customer.
31
2- Direct sales without discount (for big quantities).
2- Display the products through participation in the annual exhibitions held in Iraq and
neighboring countries and the issuance of annual files to identify the products and the
company has a website on the web displays products and direct contact with customers.
3- Make contacts with public, private and mixed companies by entering the websites of some of
them in addition to direct contact to know their annual needs of plastic granules, what grades
of desired products, quantities to be shipped in a contract or direct sale, as well as advice in
the field of manufacturing and how to produce plastics.
- There is no customer service process (transfer operations and delivery of the product to
customers) currently, the process of delivering products to customers is through direct sales and
to win the trust of customers in the future, we suggest the following:
a. Accreditation of agents in the local market
b. Delivery of the product to the customer
c. Open private agencies in the world markets (as is the case in the countries of the world)
First year: Starting rehabilitation in the 1st six months to reach 100 % of the design capacity for
HDPE, LDPE & Agricultural films) and rehabilitation of VCM & PVC all year and build new
chlorine & soda plant.
Second year: Continuing rehabilitation VCM, PVC build new chlorine & soda plant.
Third year: Operating chlorine & soda plant, operating VCM and PVC.
31
The current final prices of the products that have been adopted in calculating the productions
and sales capacities are shown in the table below:
32
Products 2018 2019 2020 2021 2022
production
production
production
production
production
revenues
revenues
revenues
revenues
revenues
capacity
capacity
capacity
capacity
capacity
Self-use
Self-use
Self-use
Self-use
Self-use
Annual
Annual
Annual
Annual
Annual
Annual
Annual
Annual
Annual
Annual
sales
sales
sales
sales
sales
HDPE 15000 15000 27000 -- 30000 30000 54000 -- 30000 30000 54000 -- 30000 30000 54000 -- 30000 30000 54000 --
LDPE 30000 22500 41062 7500 60000 45000 82125 15000 60000 45000 82125 15000 60000 45000 82125 15000 60000 45000 82125 15000
Agr.
7500 7500 12000 -- 15000 15000 24000 -- 15000 15000 24000 -- 15000 15000 24000 -- 15000 15000 24000 --
films
Liquid
- - - - - - - - 46200 5950 4921 40250 46200 5950 4921 40250 46200 5950 4921 40250
chlorine
Caustic
- - - - - - - - 51810 51470 51470 340 51810 51470 51470 340 51810 51470 51470 340
Soda
P.V.C - - - - - - - - 60000 60000 66000 -- 60000 60000 66000 -- 60000 60000 66000 --
Total 80062 Million dinar 160125 Million dinar 282516 Million dinar 282516 Million dinar 282516 Million dinar
sales 69.019 Million Dollar 138.038 Million Dollar 243.548 Million Dollar 243.548 Million Dollar 243.548 Million Dollar
Master batch
Nitrogen liquid
The petrochemical factory aims to produce an investment plan to invest (237.58) M$ for two
years to increase production capacities to 100% of designed capacities (for HDPE, LDPE, PVC,
VCM, Agricultural films plants and the new plant of Chlorine & Caustic soda) as follow:
34
Schedule of projects completion
Cost
Utility & Service unit Jan. Feb. Mar. Apr. May Jun.
(M$)
Rehabilitation Al Muftia unit (replace
2.5
intake pipe + new Intake pump)
Rehabilitation the primary treatment 1
Rehabilitation R.O. unit 2.2
Rehabilitation Demi. water unit 1.7
Rehabilitation the boiler No.2 of them and
2.25
new pumps for them No.2
Replace condensate carbon filter &
0.85
polisher
Rehabilitation the old nitrogen unit and
0.85
new closed chilled system
Rehabilitation the wasted pipes (air, water
1.3
and steam pipes) & Acces.
New air compressor and rehabilitation the
1.7
old air compressor
New cooling tower , new rotation chilled
water pump with motor, new chemicals 2.6
injection system and Chlorination device
Cost
Ethylene plant Jan. Feb. Mar. Apr. May Jun.
(M$)
Re-tubing of heating exchangers 4.05
Cost
HDPE plant Jan. Feb. Mar. Apr. May Jun.
(M$)
New extruder with 5 ton/hr 2.5
Rehabilitation control and balance of
0.25
catalyst system
Rehabilitation isobutene compressor and
2
accessories system
Rehabilitation Freon unit of isobutene
0.25
system
Rehabilitation reactor and accessories 0.75
New pump (syndyne) and spare parts GA-
0.2
6402
Rehabilitation the blower for GB-6501 0.1
Rehabilitation hydrogen compressor GB-
0.5
6101 for producing new grate of HDPE
Rehabilitation heat exchangers 0.75
35
Cost
LDPE plant Jan. Feb. Mar. Apr. May Jun.
(M$)
Rehabilitation of Reactors ( for 2 lines) 1.5
Rehabilitation of primary & secondary
1.5
compressors
New blowers No.2 1
Supply : 1)spilt units for extruder & peroxide
1
storage 2) peroxide car
Re tubing pipes for ED heat exchanger of
1.5
primary and high pressure compressors
New pumps No.4 (pump + motor) 0.75
Rehabilitation and update instrument system for
1.5
all plant
Cost
Agricultural films plant Jan. Feb. Mar. Apr. May Jun.
(M$)
New building for agricultural plant 0.1
New complete chilled water system 0.75
Spare parts for one line 0.5
New cutting machine No.7 and other spare
0.1
parts for plastic foils plant
Miscellaneous Cost 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
(M$)
New building for petrochemical factory
1
administration
Rehabilitation of factory roads 1
Rehabilitation of the maintenance workshops 0.75
Supply materials and devices for Quality
0.25
control sector
Rehabilitation of the lighting system in factory 0.75
New crane 30 ton No. 1 , truck 40 ton No. 1
and excavator No.1
New land cruiser No. 10
New coaster bus (28 passenger) No. 4 for staff
3.5
New kia car (14 passenger) No.4 for staff
New tankers (16000 litter) No.1 and fire truck
No.1
New ambulance No. 1 and lorry car 16 ton No.
1
Rehab. of quality management building &
2
obtain ISO 9001
New software 1
Staff training 2
Project management
The Director of the Petrochemical Factory shall supervise the implementation strategy, with the
work team preparing the plan to carry out its tasks according to its competence and endeavor to
overcome the obstacles and difficulties such as the availability of raw materials and reserves or
obtaining funding for the implementation of the project plan.
36
Short - term investments
The petrochemical factory aims to produce an investment plan to invest (237.58) M$ for two
years to increase production capacities to 100% of designed capacities (for HDPE, LDPE, PVC,
VCM, Agricultural films plants and the new plant of Chlorine & Caustic soda).
16.95 M$ to rehabilitation of Utility & Service unit
53.3 M$ to rehabilitation of Ethylene plant
8.75 M$ to rehabilitation of LDPE plant
7.3 M$ to rehabilitation of HDPE plant
30 M$ to rehabilitation of P.V.C plant
30 M$ to rehabilitation of V.C.M plant
77.58 M$ to construct new chlorine and soda plant with capacity 140 ton/day
1.45 M$ to rehabilitation of Agricultural films and Plastic Bags plants
12.25 M$ Miscellaneous
The annual revenues will be (243.548) M$ after completing the rehabilitation in 2 nd year.
The period of investment capital recovery will be (3) years (11) months, noting that the revenues for
the last three years have been confirmed on the assumption of the prices of the products.
-The production cost, investment money and annual revenues shown in table below:
(M$)
Desc. 1st year 2nd year 3rd year 4th year 5th year 6th year 7th year
- The table above points that the profits will start in the 3 rd year in succession.
Anticipated Bottlenecks
1- The raw materials may be limited from the gas committee of southern region as well as
decreasing the natural gas pressure.
2- The spare parts may not reach in invest work time.
37
Supply Chain
- The production is effected on the basis that the type of product is a continuous model,
considering that the products are desirable from different sectors.
- The project system of the factory as shown in the following block diagram starting from
entering raw materials which are :
Production Process
- Ethylene factory
Design capacity: 132000 tons annually
Privilege Company: Lummis/American
Ethylene is produced from the natural gas, and production of Ethylene passes through two stages:
1. stage of Ethane production
2. stage of Ethylene production
The ethane system was designed to produce 23.9 tons per hour, around 168128 ton of ethane per
year, at a percentage of 97.2, mol% of the natural gas. The quantity of natural gas used depends on
the percentage of ethane which varies among (12%, 16% & 19%).
The ethylene system was designed to produce 19.77 tons per hour, around 132015 ton of ethylene per
year, at a percentage of %99.9. The material was balanced on 7000 operating hours per year.
The process of ethane and ethylene production goes through the following stages:-
1- AMINE SYSTEM
In this system, the natural gas is extracted from the carbon dioxide using the amine solution by
absorption inside the tower DA-1101 where the carbon dioxide is removed into the atmosphere.
38
2- ETHANE SYSTEM
In this system, methane gas is separated after the process of cooling and separation of natural
gas. Methane is separated into the tower DA-1201 and used as fuel inside the plant and used as
fuel for power generators and boilers in the power department. In the utility department, the
ethane gas is also separated in the tower DA-1202, cooled and stored in SURGE DRUM to be
introduced into thermal breakers to produce ethylene.
3- FURNACES SYSTEM
Ethane is evaporated before it entered into the furnaces where the furnaces crack interance
temperature at a temperature of 852 °C and ethane is interred with the 1:3 dried steam. 60% of
the interance ethane is converted to different gases, including ethylene. The resulting gases by
special heat exchangers are cooled in special exchangers to a temperature of 315 °C.
4- QUENCHCOOLING SYSTEM
In this system, the thermal cracking outlet of ethane are cooled to a temperature of 40°Can
disposed from the heavy hydrocarbon materials in the tower DA-1301 and water is produced at
80 °C to be used in heat exchange operations for a number of heat exchangers.
5- COMPRESSOR SYSTEM (CHARGE GAS GB -1401)
In this system, the process of raising the gas pressure with five stages of pressure (KPA-3763
KPA40) and separation of heavy hydrocarbons and heavy water from the gases resulting from
the process of thermal cracking, and between the third and fourth stages of this stage , these
gases of carbon dioxide and gas hydrogen sulphide are clearanced in the tower DA-1401 by
using sodium hydroxide.
6- ETHYLENE SYSTEM
This system consists of several stages:
First: the production stage of methane and hydrogen after the drying of gas in the dryers FF-
1401 are cooled in several heat exchangers working with propane gas .Methane gas is
separated in the tower DA-1501 at a temperature of up to -98 °C and hydrogen gas is separated
at a temperature up to – 145 °C in the system COLD BOX PA – 1501.
Methane is used as a fuel and hydrogen gas in the process of removing ethane and ethylene
from the acetylene in the reactor DC-1601.
Second: the separation stage of ethylene and ethane gas and a small amount of acetylene in the
tower DA-1601 from the top of the tower and the outputs of the lower tower are sent to the flare
at present.
Third: the stage of the release of hydrogen gas from carbon monoxide in the reactor DC-1501
after its production in COLD BOX where interaction is the presence of nickel as a catalyst.
4H2+CO→H2+CH4+H2O
Fourth: the stage of the clearance of ethane and ethylene from the gas of acetylene in the
reactor DC-1501 where the process of interaction between hydrogen and acetylene with the
presence of palladium as a catalyst.
C2H2 + H2 → C2H4
Fifth: the stage of ethylene production in the tower DA-1602 where in this tower the separation of
ethylene gas at the top of the tower at the temperature of -29°C and ethane at the bottom of the
tower and at -6°C degrees and pressure HPA1968.
Ethylene is pumped into units with special pumps or cooled to a temperature of -96°C and sent
to the tank FB-9201.
Sixth: DA-1605 DA-1604 DEPROPANIZER & DEBUTANIZER SYSTEM
In this tower DA-1604, the propane and propylene gases are separated, where they are used for
cooling in the compressor GB -1701.The Butadiene gas is produced in the tower DA-1605 and
sent to the system FUEL GAS.
Seventh: THE SYSTEM OF PROPLENECOMPRESSOR GB-1801
The system consists of three stages and insure temperatures up to - 101°C used in the cooling
of gases in the system of ethane and ethylene.
Eighth: System of ethylene compressor GB-1801
Compressor system consists of three stages and includes temperatures up to -101°C used in the
cooling of gases in the system of ethane and ethylene.
39
Ninth: ISOBUTAN SYSTEM
In this system, propane gas and isobutene gas are separated by liquid gas in the two towers DA-
1204 & DA-1205. Propane is used in the compressor GB-1701 and isobutene is used in a high
density plant.
FIRST STAGE:-
It constituted of two cylinders. This stage was fed with ethylene gas from two sources both are of 200
bar, 210 bar and a temperature of 40 °C.
The first source is the gas out let of the second stage of the primary compressor and the second source
is the gas returning from the high pressure separator after being cooled and separating liquids and wax
off in the recycling gas system.
At this stage, the pressure of the ethylene gas is raised from 200 bar to 40 ° F to 650 bar and 88 ° C
and then cooled to 40 ° C by Inter-Cooler Interface Coolers.
41
SECOND STAGE:-
Consisting of four cylinders and feeding this stage with gas coming out of the first stage and can raise
gas pressure at this stage to 2400 bar and a temperature to maximum degree of 83°C and can control
the pressure and temperature according to the operational conditions of the interaction.
The temperature can be reduced by the radiator after coolers to the required reaction temperature.
The out let pressure of the second stage depends on the type of product and is controlled by the control
PIC 5110 in the main control room, which is turn controls on the PV 5110 existing under the reactor.
The control of the amount of ethylene gas inside the reactor is controlled by HV 5107 existing in the
side stream of the second stage of secondary pressure and the outlet pressure depends on the type of
product.
REACTOR SYSTEM
The reactor is of a (R102 type)(stirred auto clave reactor), and is made of special al alloy sustain
pressure and high temperature. Reactor motor immersed in the reactor. It is a three-phase power of 75
KW and speed of 720 r/min.
The reactor is a vertical cylindrical vessel length of which is 8.4 m., inside diameter is 41.3 cm, capacity
is 0.85 m3 and the gas quantity enters the reactor is 30 ton/hr.
Rate of diversion (change) inside the reactor is from 12—18 % and according to the reaction type.
The mixer makes a good distribution for temperature and reactor components homogeneity.
The compressed gas that came out of the secondary compressor enters into the reactor through two
lines then goes through the manifold and six lines came out of the to enter the reactor. The gas quantity
entered the reactor distributed by Feed splitters valves as there is a valve at each entrance of the sixth
entrances.
Polymer is produced from the reaction of ethylene with the organic peroxides by the mechanism of the
free roots resulting from disassembly of the peroxides at reaction start step quick reactions come after
proliferate step to form the polymer. Then the ending step of reactions of free root- root comes and
other ending reactions as the following reactions:-
R - O – O – R ------------- R – O
CH2 = CH2 -------------- CH2 -- CH2
R – O -------------------- R – O – CH2 – CH2 + CH2 -- CH2
R – O - CH2 – CH2 + nCH2 -- CH 2 ---------------- R – O –CH2 (CH2 – CH2) n – CH2
41
ADDITIONS USED AT LDPE PLANT:-
A1:Butylated Hydroxy Toluene (Antioxidant Agent)
E9: Diatomaceous Silica (Anti Block Agent)
E14: Poly Ethylene Glycol (Dispersing Agent)
S4: Erucylamide (Slip Agent)
A10: Di alkyl phenol sulfide (stabilizer)
PRODUCT COOLER:-
It is a dual heat exchanger pipes. The tempered water steam of middle pressure enters into the heat
exchanger exterior pipe and according to the produced polymer type to reduce the produced polymer
temperature and the gas coming outlet of the reactor.
Advantages of the product cooler are increasing the yield of product, reducing side reactions and to
guarantee the good cutting of polymer with high liquidity extent.
EXTRUDER:-
Molten polymer descending from low pressure separator is pushed by screw power to the end of
extruder where there is a screen back to get rid of polymer impurities and eliminating the oxidized
polymer.
Extruder is rotated by electrical motor that connected to the gear box a speed of which is 95- 950 r/min
whereas the extruder speed is 13- 130 r/min.
42
pierced plate and cutting by fly knife cutter which is often blades rotating by electrical motor of variable
speed from 130 – 1300 r/min with capacity of 45 kw.
DRYER:-
It is a device works with a centrifugal method whereat the drying operation of grain from water and
reducing water content of the grain going out of it to less than 0.05 % H2O and the rotating speed of
the dryer is 380 r/min.
SILOES FARM:-
There are sixteen siloes for storing the produced grains. Capacity of one silo is more than 125 ton. After
the storage of grains are being completed in silo, the said silo left for eight hours under ventilation to
get rid of ethylene emitted from the grains then completing the rotating operation of the silo content
around itself for 24/hour to mix the grains to be homogenized well and get a homogeneous liquidity
guide .
Siloes Farm is supplied with a group of crystals to carry the grains for packaging and other crystals for
ventilation with others for rotating and carrying the grains to agricultural films factory.
Manufacturing high density polyethylene depends on the technology of the American Company Philips
by Ethylene Polymerization in a Loop Reactor with a catalyst i.e.(Cr2O3).
The overall length of the reactor is 155m, 20” diameter, its size is approximately 32.3 m 3 and it has
four legs for production working on timing.
Materials enter the reaction are ethylene for Polymerization, isobutene asa carrier for the polymer and
the catalyst.
1- hexen for controlling on density and hydrogen for increasing guide of liquidity of product and
pressure is 42 ambience and temperature is 96 -110 °C.
43
The catalyst is the (Cr2O3) loaded on filaments are being activated (oxygenated) by heating with air at
a temperature reaches to 870 °C according to special heating program (depending on type of Polymer).
The produced polymer from the reactor is in powder form been changed into grains in the Extruder
system after adding heat beautifiers and others.
The factory capacity is 30000 tons a year, and each ton needs 1.1 tons of ethylene, and transfer
percentage of ethylene is around 96-98%.
Two types of polymers are produced: Homo-polymer & Co-polymer, of many classes.
Classes have been named at the SCPILEX CO. in three letters and four figures, as follows:
First letter: polymer type: E-Ethylene Homopolymer, H-Ethylene Copolymer
Second letter: Molecular weight: M-Medium, H-High, X-Extra High, U-Ultra
Third letter: Molecules distribution: N-Narrow, M-Medium, B-Broad, V-Very Broad
Fourth letter: It represents density after adding figure (0.9).
Last two figures represent index of liquidity.
44
Fire Water System:
It consists of 4 fire water pumps, three of them are operated via a diesel–based engine, and another
one is operated via an electric engine. Capacity of a pump is 568 M 3/ hour, with 10.34 pressure bar.
Unit of Producing Fresh Water:
This Unit produces fresh water (filtered) by using sand settlers and filters, where chloride, alum and
polymer. Production capacity is 1200 M3/hour.
Unit of the RO Water:
This Unit produces sweet water by the process of Reversible Osmosis (RO). Its capacity is 1000
m3/hour. It supplies the Unit of Ionic Exchangers and staff and complex houses with drinking water.
Salt-Free Water Unit:
This Unit disposes RO. Water of positive and negative ions. Unit capacity is 320 M3/hour. It provides
steam boilers with water.
45
Steam + water + electricity
Compressed air + N2 To all LDPE pellets
Raw water
units
Utility & service LDPE
Pellets Agriculture films
unit Ethylene Agriculture
LDPE Plant films Plant
Plastic Bags
Natural Gas Plastic Bags
Ethylene Plant
Ethylene Plant
HDPE Plant HDPE pellets
Ethylene
P.V.C
VCM P.V.C
V.C.M Plant
Salt Chlorine Plant
Chlorine & Soda
Plant
Chlorine
Caustic soda
46
- The production capacity will increase depending on investment planning for five years as
in table below:
Designed
Item 2018 2019 2020 2021 2022
Capacity
Quality Assurance
To obtain ISO certification the project must be passed six stages:-
1. Buying the raw materials and catalysts within accredited specification under authority,
analyzing and inspecting the quality control and inspect committee at delivering the materials.
2. Controlling the product operation within lab. Inspection (chemical analysis lab, wet Lab. and
gas analysis lab.).
3. Defining the specification of product grade, grade degree and the lab tests for every stage of
production in polymer lab. & giving them a (lot number) and final certification inspection.
4. Inspecting the product within storage.
5. Inspecting covering, delivering and storing.
6. Following the product with customers to stand up the problems during the manufacture.
48
6- Opportunities & Risks
Opportunities and Exploitation
The Opportunities & exceptional trading abilities for the factory products are as follows:
The petrochemical plant is located in Basrah / Khor al-Zubayr, 28 km south of Basra city and 40 km
northwest of Umm Qasr port.
The company is the only one in the country which produced plastic grades, these products are
accepted by many customers from the private and public sectors because of the quality of our
products compared to the products of the neighboring countries (Gulf Countries and Iran), they are
produced with high pressure reactors so these products has good mechanical specifications
(explained in Chapter 2).
An investment file has been prepared for the rehabilitation of the production line (ethylene / high
density polyethylene / low density polyethylene) and its units and supporting sections in the factory.
Approval of the establishment of a new plant for the production of chlorine / caustic soda in the
factory was also obtained in the form of partnership with the private sector to improve the company's
current situation.
The company exists near the Basrah harbor which makes easy exporting process.
It's expected by the government to impose laws on imported items, which will make the prices of
competitors is higher than our prices.
The factory management has good experience and efficiency qualify them to manage, run & keep
the company in such exceptional circumstances. The administrative department controls its duties
through several systems in the computer system such as people, personnel, etc. with the need to
build their capabilities, especially in the field of marketing, maintenance, production and
programming technical processes to ensure their performance and progress which happens in
many developed countries because Iraq was far from the outside world for long periods.
The MOIM has the intention to support industrial projects, plastic production factories are one of
them by giving them loans so the production will increase and then the demand on the company
production will increase too. In the case of improvement of the electrical power system in Iraq, the
plastic production plants will increase their production, which increases the volume of demand for
the company's products
The petrochemical factory has big electricity generator with design capacity (4 × 20MW/hr.), so it is
self-sufficiency but now they need to rehabilitation, there were two contracts with the John Brown
Company and the Hydraulic Industries State Company rehabilitate the four gas turbines.
Risks:
- The products of the factory are exposed to major risks , they are :
1. Market Risks: The emergence of new varieties of plastic granules produced by the Gulf and
Iranian companies and there are no new varieties in our company compared with these items
because of needing of the company's factories to rehabilitation as well as the entry of products
similar to the factory products at prices lower than the prices of factory products, It can be avoid this
risk by operating the production plants of the factory and the application of the law of protection of
the national product in addition to thinking of the production of new varieties to keep pace with the
development in the local market where there is no plan for the company to produce such items
currently (after the completion of the rehabilitation).
2. Finance Risks: The company has no capital to be capable of rehabilitating its units and raise their
capacities, we can reduce these risks by operating the factory production plants or investment
4. Operating Risks: The increase in the prices of raw materials (natural gas), which is affected by
the increase in crude oil prices as well as the lack of natural gas and therefore the lack of gas
pressure because there are no investment of southern gas completely so far, this problem can be
49
overcome after the investment of the southern region and the availability of natural gas by the oil
pipeline company.
- There are no contingency plans at present because in case of stoppage the natural gas there is
no spare in time, as well as there is no future sight (correctly) to the market volume or to demand
of products.
- Investment plan has been considered for two years with capital of (237.58) M$ where the
production capacity will be 100% of designed capacities (for HDPE, LDPE, Agricultural films,
VCM & PVC plants) and 100% for the new Chlorine and Soda plant. - The expected revenues will
be (243.548) M$ yearly after rehabilitation in the 3rd year which consider as best scenario.
When no investment money will be obtained we can shrink the money to (86.3) M$ spent on
rehabilitation of Ethylene, HDPE & LDPE plants as well as Utility unit.
The factory has gotten (120) billion dinar since 2008 from MOIM to rehabilitate its units to reach
60% of HDPE and LDPE plants.
51