Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
B.2- New
Underpasses/Overpasses
(1) Foundation + Sub-structure: On
completion of the foundation work
including foundations for wing and return
walls, abutments, piers upto the abutment/
pier cap
(2) Sub-structure:
(2) Sub-Structure
(2) Sub-Structure
(1) Foundations
(2) Sub-Structure
(3) Super-Structure (Including bearings)
(1) Foundation
(2) Sub-structure
Lined Drain
Unlined Drain
a) Bus Bays
b) Truck lay byes
c) Rest areas
Breast Wall
Retaining Wall
(x) Tunnel
Investigation & Detail Design
Portal
(a)Northern
(b)Southern
Main Tunnel
Site Facility Costs
Electro and Mechanical Equipment
roject Highway shall be as specified below:
Percentage weightage
29.69
14.90
16.52
15.53
9.80
-
-
13.56
-
-
-
-
11.72
9.89
50.93
0.63
0.52
2.46
6.87
16.98
-
-
-
-
3.79
1.34
0.16
-
0.58
0.21
0.93
1.94
13.47
13.50
-
1.60
-
4.69
4.70
52.49
0.26
0.35