Key Plan:

01-01 01-03 01-05 01-07 01-09 01-11 01-13 01-15 01-17 01-19 01-21

2 01-11 01-12 01-13 01-14


01124

8000 8000 8000


DETAIL 10 DETAIL 10
01-A FOR DETAIL REFER FOR DETAIL REFER
01-A1 TO DRAWING Nr 01126 TO DRAWING Nr 01126

01-B
01-A
EP-02
FBE DETAIL 3
01-C EP-05 FOR DETAIL REFER
FBE EP-01 TO DRAWING Nr 01126
DETAIL 5 FBT
Legends:
FOR DETAIL REFER
DETAIL 4 TO DRAWING Nr 01126 ET-01
FBT
01-D FOR DETAIL REFER EQUIPOTENTIAL BUSBAR
TO DRAWING Nr 01126

6650
Y/G XLPE INSULATE COPPER CABLE, AS
INIDICATED IN THE DRAWING AND
01-E ABBREVIATIONS
COPPER TAPE CONNECTED TO STEELWORK IN
REINFORCED CONCRETE SLAB
01-F

01-A1
01-G
DETAIL 4 DETAIL 10
EP-03
FOR DETAIL REFER FOR DETAIL REFER
TO DRAWING Nr 01126 TO DRAWING Nr 01126
01-H
LV & ELECTRICAL ROOM 1
DETAIL 10
01-I FOR DETAIL REFER
TO DRAWING Nr 01126

9650
Notes:
01-J DETAIL 4 01.- LINEAR DIMENSIONS ARE IN MILLIMETERS UNLESS
EP-04 OTHERWISE STATED.
FOR DETAIL REFER 02.- SURVEY LEVELS, CHAINAGES AND COORDINATES ARE IN
TO DRAWING Nr 01126 METERS UNLESS OTHERWISE STATED.
03.- ALL COORDINATES AND LEVELS REFER TO QATAR
01-K NATIONAL GRID AND QATAR NATIONAL DATUM 1995.
04.- THIS DRAWING MUST BE READ IN CONJUNCTION WITH
DETAIL 10 OTHER RELEVANT ARCHITECTURAL, STRUCTURAL,
FOR DETAIL REFER ELECTRICAL AND MECHANICAL DRAWINGS AND REPORTS.
TO DRAWING Nr 01126 05.- TRACKS AND ROADS LAYOUT, HARDSCAPING,
01-L LANDSCAPING, BUILDING PERIMETER SIDEWALKS AND
A PARKING AREAS MAY VARY DURING DS2 DESIGN OF
BUILDINGS.
01174 06.- THE CONTRACTOR SHALL CHECK AND VERIFY ALL
01-B
DIMENSIONS, LEVELS AND ANY CONTENT OF THIS DRAWING
BEFORE WORKS START, AND SHALL NOTIFY ANY
DISCREPANCY OR DOUBT TO THE DESIGNER.

2 DETAIL FOR EARTHING


1 GROUND FLOOR 01124 SCALE 1 : 100
01124 SCALE 1 : 1000
0 10 20 40 60 80 0 0.5 1 2 3 4 Revit Links Used
Revit Links RevN Rev.Date Stage Status
3 M010-MSI-ENG-04-ARC-MD3-RSDT101-ZZ-00001 DS2
M010-MSI-ENG-04-CIV-MD3-RSDT101-ZZ-00001 DS2

Reference Document:
- THIS DRAWING IS BASED ON MMHKT CONCEPT DESIGN LAYOUTS
AND RELEVANT REPORTS.

B01. STABLING HALL

Drawing Revision History:


TRANSFORMER ROOM MV SWITCHGEAR ROOM LV ROOM 1 LV ROOM 2 LV ROOM 3 3 Rev Description App. Date

CONNECTION OUT OF SCOPE


Y/G PVC INSULATED COPPER
DETAIL 05 DETAIL 03 DETAIL 04 DETAIL 04 DETAIL 04 3 ISSUED FOR APPROVAL DS2 M.K. 30/12/2017
FOR DETAIL FOR DETAIL REFER TO FOR DETAIL REFER TO FOR DETAIL REFER TO FOR DETAIL REFER TO EARTH NOTES 2 ISSUED FOR APPROVAL DS2 M.K. 20/07/2017
REFER TO DRAWING Nr 01126 DRAWING Nr 01126 DRAWING Nr 01126 DRAWING Nr 01126 1 ISSUED FOR APPROVAL DS2 M.K. 20/05/2017
D:\DT-01\ELE.rvt

DRAWING Nr 01126 A. RESISTANCE TO EARTH OF EARTH ELECTRODE SHALL BE MEASURED. IF NEEDED EXTRA RODS ELECTRODES SHALL Purpose of Issue:
BE INSTALLED.THE VALUE OF EARTHING TERMINATION RESISTANCE MEASURED AT ANY POINT SHALL NOT EXCEED 1 ISSUED FOR APPROVAL - DS2

CABLE 120 mm²


OHM. THE RESISTANCE OF ANY POINT IN THE LIGHTNING PROTECTION EARTH CONTINUITY SYSTEM TO THE MAIN Delivery Stage:
EARTH ELECTRODE SHALL NOT EXCEED 10 OHMS. Design Validation:
B. EARTHING GRID TO BE EXTENDED 1 M AWAY BUILDING'S EXTERNAL WALLS AND BURIED 20 CM BELOW BASEMENT
SONO Reference: Date:
SLAB AND A MINIUM OF 50 CM BELOW GROUND FLOOR LEVEL.
DVE Reference: Date:
C. RODS ELECTRODES TO BE BURIED AT SUCH A DEPTH THAT IT PENETRATES THE SUMMER WATER TABLE BY A
Client
MINIMUN OF 2 METRES.
D. ALL CONDUCTIVE ELEMENTS THAT CAN BECOME LIVE DUE AN ELECTRICAL FAULT INCLUDING AIR DUCTS, CABLE
TRAY, LADDER, TRUNKING, PIPES, CEILING GRIDS, DOOR FRAMES, RAILING, WINDOW FRAMES, STRUCTURAL STEEL
WORKS SHALL BE BONDED TO THE NEAREST COMMON EARTHING SYSTEM USING APPROPRIATELY SIZED COPPER
Qatar Railways Company
ET-01 CONDUCTORS. P.O. Box 29988
EP-02 EP-01 EP-03 EP-04 EP-05 E. ELECTRICAL ROOM CONCRETE SLAB MUST BE SEPARATED FROM ALL OTHER IN THE BUILDING. Doha - Qatar
BURIED MESH EARTH ELECTRODE

F. WET ROOMS CONCRETE SLAB MUST BE SEPARATED FROM ALL OTHER IN THE BUILDING.
G. ALL MAIN RISERS CABLES FROM EARTH ELECTRODE WILL BE VIA DISCONNECTING LINK AT THE FIRST EARTH BAR.
H. BI-METALLIC JOINTS SHALL BE USED AT CONNECTORS BETWEEN DISSIMILAR METALS.
REVIT_2015

Originator Name & Logo: Consultant Name & Logo: Contractor Name & Logo:
I. HIGH COPPER ALLOY OR SILICONE BRONZE SHALL BE CONSIDERED IN BOLTS, WASHERS AND NUTS IN BOLTED
CONNECTIONS. FERROUS HARDWARE WILL NOT BE CONSIDERED.
J. STEEL STRUCTURE POSTS SHALL BE USED AS DOWN CONDUCTORS, OR OTHERWISE SPECIFIED IN THE DRAWING AS
PER EN 62305:2010.
K. THE ELECTRICAL CONTINUITY OF STEELWORK IN REINFORCED CONCRETE SLAB, PILLARS AND BEAMS SHALL BE Mitsubishi Heavy
M010-MSI-ENG-04-MEP-MD3-RSDT010-ZZ-ZA001

ASSURED BY THE CONSTRUCTOR ACCORDING IEC 62305:2010. AFTER THE COMPLETION OF THE CONSTRUCTION, Fujita industries, LTD MMHKT Consortium
ELECTRICAL CONTINUITY SHALL BE MEASURED IN ALL INTERNAL POINTS, IN THE CASE THAT ITS VALUE INSN´T IN Doha - Qatar Doha - Qatar Doha - Qatar
ACCORDANCE WITH APPLICABLE REQUIREMENTS, ALL NECESSARY MESURES SHALL BE TAKEN TO OBTAIN THE Project:
REQUIRED VALUES. METRO PHASE 1 SYSTEMS
L. STEELWORK WITHIN REINFORCED CONCRETE STRUCTURES IS CONSIDERED TO BE ELECTRICALLY CONTINUOUS
PROVIDED THAT THE MAJOR PART OF INTERCONNECTIONS OF VERTICAL AND HORIZONTAL BARS ARE WELDED OR ROLLING STOCK AND TRACKWORK
TEST OTHERWISE SECURELY CONNECTED ACCONDING IEC 62305:2010. Contract Number: RTC/075/2013
M. CONNECTIONS OF VERTICAL BARS SHALL BE WELDED, CLAMPED OR OVERLAPPED A MINIMUM OF 20 TIMES THEIR
DIAMETERS AND BOUND OR OTHERWISE SECURELY CONNECTED ACCORDING IEC 62305-3:2010 ANNEX E. Discipline:
N. IN CASE OF STRUCTURES OF PRE-CAST REINFORCED CONCRETE, THE ELECTRICAL CONTINUITY OF THE ELECTRICAL
REINFORCING STEEL SHALL BE ESTABLISHED BETWEEN INDIVIDUAL ADJACENT PRE-CAST CONCRETE UNITS Drawing Title:
ACCONDING IEC 62305:2010. DEPOT 1 (DT.RSD)
O. THE POSITION OF COPPER TAPES CONNECTION WITH THE STEELWORK REINFORCED CONCRETE SLAB INSIDE THE B01. STABLING HALL
ELECTRICAL/TECHNICAL ROOMS ARE ONLY AN ORIENTATION AND SHALL BE ADJUSTED AND CONFIRMED ACCORDING EARTHING & BONDING
3 SCHEMATIC BUSBAR CONNECTION DIAGRAM EQUIPMENT LAYOUT. EARTHING BUSBARS
SCALE N.T.S. P. ALL Y/G XLPE INSULATED CABLES ARE LOW SMOKE ZERO HALOGEN (LS0H NOTED ALSO AS SLF) AND COMPLY WITH
01124
BS 7655 TYPE TI 1.
Q. A TEST SHALL BE MADE TO CONFIRM THE CONTINUITY OF ALL CONDUCTOR, INCLUDED THE EARTH CONTINUITY Originator: Contractor:
12/30/2017 1:42:59 PM

CONDUCTOR OF EVERY RING CIRCUIT ACCORDING TO KAHRAMAA CLAUSE 504. Drawn SENER 30/12/2017 Checked T.I. 30/12/2017
R. ALL ELECTRIC EQUIPMENT PLACED INSIDE A METALLIC ENCLOSURE SHALL BE BONDED TO THE EARTHING NETWORK Checked L.C. 30/12/2017
Approved N.S. 30/12/2017 Approved M.K. 30/12/2017
THROUGH A LOW IMPEDANCE CONNECTION THAT GUARANTEES GOOD ELECTRIC CONTINUITY.
S. EARTHING CABLES FOR POWER SUPPLY SHALL BE DIRECTLY EARTHED AT BOTH ENDS. SIGNAL/CONTROL CABLES Scale: As indicated Sheet Size: A1
SHALL BE EARTHED IN ONE END ONLY AT EQUIPMENT/SOURCE.
Drawing No: Rev:
3 T. METALLIC CABLE TRAY AND DUCTS SHALL BE EARTHED AT BOTH ENDS AND AT REGULAR INTERVALS.
M010-MSI-ENG-04-MEP-DWG-RSDT010-00-01124 3
THIS DRAWING AND ANY INFORMATION OR DESCRIPTIVE MATTER SET OUT HEREON IS LICENSED TO THE QATAR RAILWAYS COMPANY AND IS CONFIDENTIAL AND SUBJECT TO COPYRIGHT. IT MUST NOT BE DISCLOSED, LOANED, COPIED OR USED FOR MANUFACTURING, TENDERING OR FOR ANY OTHER PURPOSE WITHOUT WRITTEN PERMISSION. © QATAR RAILWAYS COMPANY.