Sei sulla pagina 1di 1

SHEDULE - A

Name of work :- FDR to surface damages in Km. 11/0-12/0 & 14/0-20/646 of Kamkole-Kappad road.
Probable Quantity Estimate Rate in Units in
Sl. APDSS/
Description of Item Amount
No. Figures Unit Words MORT-H Figures Words Figures Words
1 2 3 4 5 6 7 8 9 10 11

Eight
hundred One
Scarifying the existing BT surface to a depth of 50mm by Mechanical means and Rupees Five
and ninety Square
1 893.00 Sqm
three
disposal off scarified material with all leads and lifts upto 1000 Mtrs. As per MORT&H 305.4 5.40 and paise 1Sqm
Meter
4822.00
(4th revision) specn. No. 305.4.3 forty Only.
square Only.
meters only

Providing, Laying, Spreading and compacting graded HT crushed stone aggregate to


Two Wet Mix macadem specification including cost,seignorage of all materials and Rupees One
hundred including premixing the material with water at OMC in Mechanical mix plant carriage thousad five One cubic
2 201.00 Cum and one of mixed material by tipper to site , laying in uniform layers with paver in base 406 1596.00 hundred and 1 Cum Meter 320796.00
cubic courses on well prepared surface and compacting with Vibratory roller to acheive the ninety six Only.
meters only desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H only
specification.406 (4th revision) for finished item of work.

Eight
Providing and applying Prime Coat with bitumen emulsion (Medium setting ) bulk
hundred One
using emulsion pressure distributor on prepared surface of Granular base including Rupees
and ninety Square
3 893.00 Sqm clearing of road surface and spraying primer at the rate of 0.60kg/sqm using emulsion 502 23.00 Twenty 1Sqm 20539.00
three Meter
pressure distributor for finished item of work as directed by the Engineer-in-Charge, three only
square Only.
as per MoRT&H specification No. 502.
meters only

Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-
Eight
25mm HBT metal with required quantity of 10-12mm size HBT key chips and 80/100
hundred As Directed Rupees One One
grade Bitumen at 72 Kgs./1Cum. of work for filling the pot holes and sealing the filled
and ninety by hundred and Square
4 893.00 Sqm
three
up pot hole, including removal of the loose material in the pot holes, trimming the
Engineer-
148.00
forty eight
1Sqm
Meter
132164.00
edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes,
square in-Charge. only Only.
compacting and finishing and blinding the surface using stone dust/sand, including
meters only
cost of all materials, T&P and labolur charges for all operations etc. complete.

478321.00
Total Items (4) Five Only. (Rupees Four lakhs seventy eight thousand three hundred and twenty one only)

Contractor Executive Engineer/R,


Division Sangareddy

Potrebbero piacerti anche