An inspection was performed on an aircraft and 11 issues were found and documented. Issues included inoperable landing and strobe lights, damaged seals and rivets, and worn brake components. Each issue was assigned a record number and the appropriate maintenance actions were planned to address the defects. The inspection report was then authorized and signed off.
An inspection was performed on an aircraft and 11 issues were found and documented. Issues included inoperable landing and strobe lights, damaged seals and rivets, and worn brake components. Each issue was assigned a record number and the appropriate maintenance actions were planned to address the defects. The inspection report was then authorized and signed off.
An inspection was performed on an aircraft and 11 issues were found and documented. Issues included inoperable landing and strobe lights, damaged seals and rivets, and worn brake components. Each issue was assigned a record number and the appropriate maintenance actions were planned to address the defects. The inspection report was then authorized and signed off.
6 NRC011 MISSING SOME RIVET AT AFT LOWER OF R/H TRANSLATING OF 7 NRC012 ENG#2 LOOSEN
8 01 RIVET UPPER OF CNA OF ENG #2 LOOESEN NRC013
SEAL OF ACAC DUCT OF L/H C-DUCT OF ENG#2
9 NRC014 WORN
10 INSPECTION OF THE ENG#2 AFTER A BIRD STRIKE NRC015
11 MAIN WHEEL #2 WORN TO LIMIT NRC019
7. AUTHORIZED STAFF 8. PRODUCTION PLANNER
(Sign & stamp) (Sign & stamp)
ISS. 02, REV. 05 - DATE: 25 NOV 2016 PAGE: /
VIETNAM AIRLINES ENGINEERING COMPANY FORM 6002
Form 6002 completion guidance
This form is used to record any findings/ defect found in primary inspection process.
Block 1. Enter name or code of the Customer, e.g. VNA
Block 2. Enter Registration mark of Aircraft, e.g. VN-A348 Block 3. Enter reference number of the Work Pack. Block 4. Enter sequential number of defect during preliminary inspection. Block 5. Enter descriptions of inspection findings/ defects. Block 6. Enter appropriate planning controller actions such as: Transfer to NRC No. etc. Block 7. Enter hand-written signature and stamp of the authorized staff. Block 8. Enter hand-written signature and stamp of the production planner.