Primavera (P٦)
اﻟﻤﺤﺎﺿﺮة اﻷوﻟﻲ
Planning of Scheduling -١
Resources of Cost -٢
Updating of Reporting -٣
primavera ﻓﺎﺋﺪة
Planning -١
Cost -٢
Time -٣
Report -٤
Control -٥
Scope -٦
Primavera = p٦ إﺻﺪارات
P٦-١
P٦-٢
P٦-٣
-
-
Enterprise
(EPS) Enterprise project structure
Projects
(WBS) Work brake down structure
Activity
ﺑﯿﺎﻧﺎت ﻣﺘﻐﯿﺮة
planning ---------------Primavera
. ﻧﻘﺪر ﻧﺪﺧﻞ ﺑﯿﺎﻧﺎت ﻓﻲ أي وﻗﺖprimavera ﻓﻲ
planning ﻓﺎﺋﺪة
ھﻨﻘﺴﻢ اﻟﻤﺸﺮوع-
ﻣﺜﺎل-
Hospital Project
G F Sec
Enterprise
EPS
PROJECT
Column----------customize
ﻟﻌﻤﻞ ﻣﺸﺮوع ﺟﺪﯾﺪ clickﯾﻤﯿﻦ ﻋﻠﻲ أي ﻣﺸﺮوع وﺑﻌﺪﯾﻦ ﻧﺨﺘﺎر new project
ھﻮ ھﯿﻜﻞ ھﺮﻣﻲ ﺗﻨﻈﯿﻤﻲ اﻟﻐﺮض ﻣﻨﺔ ﺗﻘﺴﯿﻢ ﻣﺸﺮوﻋﺎت اﻟﺸﺮﻛﺔ ﺑﻐﺮض اﻟﻤﺘﺎﺑﻌﺔ
) وﯾﺘﻢ إدﺧﺎﻟﺔ ﻣﺮة واﺣﺪة ( .
ID EC٠٠٥٣٠
---------fixtureﺗﺮﻛﯿﺐ أﻓﯿﺎش
--------- Paintدھﺎﻧﺎت
------ Combined bar -اﻷواﻣﺮ اﻟﺘﻲ ﯾﻤﻜﻦ ﺗﻨﻔﯿﺬھﺎ ﻓﻲ اﻟﺸﺎﺷﺔ اﻟﻤﻔﺘﻮﺣﺔ اﻷن.
----- Lay out -ﯾﺤﺘﻮي ﻋﻠﻲ ﻣﺸﺮوع واﺣﺪ ﻓﻘﻂ أو ﺟﺰء ﻣﻦ اﻟﻤﺸﺮوع.
-ﻓﻲ اﻟﻄﺒﺎﻋﺔ ھﯿﻄﺒﻊ اﻟﻤﻮﺟﻮد ﻗﺪاﻣﺔ .
Lay out -ﻟﻌﺪد اﻟﻤﺸﺮوﻋﺎت ،أو ﻣﺸﺮوع ،أو ﺟﺰء ﻣﻦ اﻟﻤﺸﺮوع
-ﯾﻤﻜﻦ ﻋﻤﻞ ) ( save Lay outﻣﻦ ﻗﺎﺋﻤﺔ view
-ﻣﻦ ﻗﺎﺋﻤﺔ Save Lay out ----------- Lay out ------ view
-أو ------ open Lay outھﯿﻔﺘﺢ Lay outﺟﺪﯾﺪ
اﻟﻤﺤﺎﺿﺮة اﻟﺜﺎﻧﯿﺔ
-ﺻﻔﺤﺔ Resources
-أﺿﺎﻓﺔ ﻧﺸﺎط
ﻧﺬھﺐ إﻟﻲ ﺻﻔﺤﺔ اﻟﻨﺸﺎط ) ، ( Activityوﻧﻘﻒ ﻋﻠﻲ أﺳﻢ اﻟﻤﺸﺮوع وﻧﻌﻤﻞ Add +
ﺷﻜﻞ اﻟﺸﺎﺷﺔ
ﻣﺠﻤﻮﻋﺔ
Enterprise
Project
Resources
ﻣﺠﻤﻮﻋﺔ
Activates project
WBS
Bot Top
اﻟﻤﺤﺎﺿﺮة اﻟﺜﺎﻟﺜﺔ
ﻟﻔﺘﺢ ﻣﺸﺮوع ﻧﻌﻤﻞ clickﯾﻤﯿﻦ ﻋﻠﻲ اﻟﻤﺸﺮوع وﻧﺨﺘﺎر open project -
اﻷﯾﻜﻮﻧﺔ ▼ clickﻋﻠﯿﮭﺎ No Bottom Layout -
اﻷﯾﻜﻮﻧﺔ ♂ clickﻋﻠﯿﮭﺎ ﯾﻈﮭﺮ Details -
اﻷﯾﻜﻮﻧﺔ ♀ ------ Zoom In ----- -
Time اﻷﯾﻜﻮﻧﺔ ﺳﺎﻟﺐ ------ Zoom out ----- -
▲
Leveling --------ﻋﻠﻲ ﻧﻔﺲ اﻟﻤﺴﺘﻮي اﻟﺴﮭﻢ اﻟﺸﻤﺎل ◄ ►
أﻋﻠﻲ اﻟﻤﺴﺘﻮي ،واﻟﺴﮭﻢ اﻟﯿﻤﯿﻦ أﻗﻞ ﻣﺲ ▼
Arrangement
ﺗﺤﺖ ،وﻓﻮق
ﻣﺜﺎل ﻟﺘﻘﺴﯿﻢ
ﺷﺮﻛﺔ أﻟﻔﺎ ﻟﻠﻤﻘﺎوﻻت
) Dates اﻟﺘﻮارﯾﺦ (
A٥
B٥
Stsrt ١٠ oct
oct ١٠
Start date
data date
Actual start
اﻟﻤﻔﺮوض – Actual Start - Data Date – Start Dateﯾﺒﺪأ ﻣﻊ ﺑﻌﺾ . -
Data Dateﻋﺸﺎن . update -
Data Dateھﻮ ﺗﺎرﯾﺦ ﻋﻤﻞ اﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ. -
Data Dateھﻮ ﺗﺎرﯾﺦ أدﺧﺎل اﻟﺒﯿﺎﻧﺎت. -
Start date
Data date
data date -ﺗﺎرﯾﺦ ﻣﺘﻐﯿﺮ اﻟﺠﺰء اﻟﻤﻨﺘﮭﻲ ﻟﻮﻧﺔ أزرق ،اﻟﺠﺰء اﻟﻠﻲ ﻟﺴﮫ ھﺎ ﯾﺸﺘﻐﻞ ﻟﻮﻧﺔ أﺧﻀﺮ
Enterprise
EPS
Project
WBS
Activities
ﻛﻞ ﻣﺸﺮوع ﻟﮫ ) (WBSﺧﺎص ﺑﮫ -
EPSھﻮ ھﯿﻜﻞ ھﺮﻣﻲ ﺗﻨﻈﯿﻤﻲ اﻟﻐﺮض ﻣﻨﮫ ﺗﻘﺴﯿﻢ ﻣﺸﺮوﻋﺎت اﻟﺸﺮﻛﺔ ﺑﻐﺮض اﻟﻤﺘﺎﺑﻌﺔ . -
WBSھﻮ ھﯿﻜﻞ ھﺮﻣﻲ ﻟﺘﻘﺴﯿﻢ اﻷﻋﻤﺎل ﺑﻄﺮﯾﻘﺔ ﻣﻨﻄﻘﯿﺔ ) ﺗﻔﺘﯿﺖ اﻷﻋﻤﺎل ( ﻟﻌﻤﻞ ﺗﺤﻜﻢ ، -
وﻣﺘﺎﺑﻌﺔ ﻟﻠﻤﺸﺮوع .
ﻟﻮ اﻟﻤﺸﺮوع ﻣﺘﻘﻄﻊ ﺟﺎھﺰ ﻧﺸﺘﻐﻞ ﻋﻠﻲ اﻟﺠﺎھﺰ . -
ﻣﻤﻜﻦ ﻧﻘﺴﻢ اﻟﻤﺸﺮوع ) (WBSطﺒﻘﺎ -
Gas Station
School Project
Wing A Wing B
Activities
Col Slab
COL SLAB
-
-
Activities
اﻟﻤﺤﺎﺿﺮة اﻟﺮاﺑﻌﺔ
) Activities اﻷﻧﺸﻄﺔ (
ﻧﺘﯿﺠﺔ ------- projectاﻧﺘﻘﻠﺖ إﻟﻲ ﺷﺎﺷﺔ اﻷﻧﺸﻄﺔ ﻣﺒﺎﺷﺮة ---------ﻣﻦ Defaults -
------ Original durationاﻟﻮﻗﺖ اﻷﺻﻠﻲ ﻟﻠﻨﺸﺎط -
ﻹظﮭﺎر ---------- dﻣﻦ ﻗﺎﺋﻤﺔ ---- editﻧﺨﺘﺎر Time ----- user preferences -
---------- Unitﻧﺨﺘﺎر ʘ show as unit / duration -
Activities ID
ASIG٠١+٢ -
ﻋﺸﺎن ﻧﻐﯿﺮ IDﻧﺬھﺐ ﻟﺸﺎﺷﺔ ----Projectﻣﻦ ﻋﻨﺪ Defaults. -
ﻟﻮ دﺧﻠﺖ -------- (٠٢ ) Incrementﯾﺘﻐﯿﺮ .Increment -
ﻟﻨﻘﻞ اﻟﻨﺸﺎط ﻧﻌﻠﻢ ﻋﻠﯿﮭﻢ وﻧﺴﺤﺐ ﻣﻦ أﻗﺼﻲ اﻟﺸﻤﺎل . -
----- Clickﻋﻠﻲ ▼ ﻣﻦ ﻋﻨﺪ .Activity ID -
ﺗﺮﺗﯿﺐ اﻷﻧﺸﻄﺔ ) ( Plannerھﻮ اﻟﻠﻲ ﯾﺤﺪد. -
أھﻢ ﻋﻤﻮدﯾﻦ ﻟﻠﺘﺮﺗﯿﺐ ▼ . Activity ID ▼ Start -
ﻓﻲ إدﺧﺎل اﻷﻧﺸﻄﺔ ادﺧﻞ --------- enter ------ﺳﮭﻢ ﻷﺳﻔﻞ ▼. -
١٠٠ -
-------------ھﺬا اﻟﺘﺮﺗﯿﺐ ﻟﯿﺲ ﻟﮫ ﻣﻌﻨﻲ. ٨ -
٩٠ -
Successors
A
B
Predecessors
excavate Predecessors
P.C excavate
R.C P.C
Four Type -٥
. اﻷھﻢ---- Finish – Start -٦
A
F.S F.F
B
S.S
S.F
B
Default
Lag = zero -
Lag = +ve -
٢ + L *٢ = ﻣﺜﺎل ﻓﻚ اﻟﺸﺪة-
Start – Start -٧
B
S.S With +ve Lag
وﻟﯿﺪ ﻋﺒﺪ اﻟﺮازق/م ١٩
ﺷﺮح ﺑﺮﻧﺎﻣﺞ ﺑﺮﯾﻤﺎﻓﯿﺮا
B
A
B
ﻧﺠﺎرة
ﺣﺪادة
اﻟﻤﺤﺎﺿﺮة اﻟﺨﺎﻣﺴﺔ
) Input -اﻟﻤﺪﺧﻼت (
Activities -١
Duration -٢
Relation -٣
D =١٠d
( TF ) Total Float -اﻟﺮﺻﯿﺪ اﻟﻜﻠﻲ اﻟﻤﺘﺎح ھﻮ اﻟﻮﻗﺖ اﻟﺬي ﯾﻤﻜﻦ أن ﯾﺘﺄﺧﺮه اﻟﻨﺸﺎط دون
اﻟﺘﺄﺛﯿﺮﻋﻠﻲ ﻧﮭﺎﯾﺔ اﻟﻤﺸﺮوع ،واﻷﻧﺸﻄﺔ اﻟﻤﺮﺗﺒﻄﺔ ﺑﮫ
B D
A F
C E
A
B
Float
C
D
ﻣﯿﻄﻠﻌﺶ ﺑﺎﻟﺴﺎﻟﺐTF -١
Must date ﻣﺶ أﻛﺒﺮ ﻣﻦFinish date -٢
Student Syndrome ﻋﺸﺎن اﻟﻘﺎﻋﺪة ﺑﺘﻘﻮل--- Must Finsh ﯾﻔﻀﻞ ﻣﻨﺪﺧﻠﺶ -
( ) اﻟﻄﺎﻟﺐ ﺑﯿﺬاﻛﺮ ﺗﺤﺖ ﺿﻐﻂ
اﻟﻤﺴﺎر اﻷطﻮل ﻓﻲ اﻟﻤﺸﺮوع ھﻮ اﻟﻤﺴﺎر اﻟﺤﺮج -
أﻗﻞ ﻣﻦ ﯾﻮﻣﯿﻦ------ T.F -
Setting ﻧﻔﺘﺢ----- Project ﻧﺮوح ﺻﻔﺤﺔ -
Total Float Less Than or equal to
ʘ Longest path
Copy Relationship
Copy – past of Activities -
A B C D
No Relations ----- B/ C/
Formatting
Filter by -
Group And Sort by -
Layout -
Filter -١
Design Of Filter -
ﻣﮭﻢ------- Copy -
ﺷﻤﺎلclick وshift ﻧﺨﻠﻲ اﻟﺘﻌﻠﯿﻢ ﻋﻠﻲ ﻛﻠﺔ ﺑﺄﺳﺘﺨﺪام-------- ctrl c -
paste وﺑﻌﺪﯾﻦ----- ( ﯾﻤﯿﻦclick) ﻋﻦ طﺮﯾﻖ------- copy ﻧﻌﻤﻞ-
ʘ only between copied activities وﻧﺨﺘﺎر-
--- Equalاﻟﻄﺮق
اﻟﻤﺤﺎﺿﺮة اﻟﺴﺎدﺳﺔ
ﻟﯿﺲ ﺑﺎﻟﻀﺮورة ﻋﻠﻲ اﻷطﻼق أن زﻣﻦ اﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ﻛﺎم ﯾﻮم ) ﯾﺨﺘﻠﻒ ( أھﻢ ﺷﺊ-
ﯾﻜﻮن ﻣﻨﻄﻘﻲsummary bar
Duration ﯾﺘﻐﯿﺮ--------- Lag ﺑﻨﻐﯿﺮ-
Table Font and Row ---------- view ﻣﻦ ﻗﺎﺋﻤﺔ-
Font and Color ﻣﻦ------------- وﻟﻮﻧﺔ، Activities ﻟﺘﻐﯿﯿﺮ ﻓﻮﻧﺖ-
Default اﻷﻓﻀﻞ داﺋﻤﺎ اﻟﻠﻲ ھﻮ------------ primavera ﺗﺼﻤﯿﻢ-
Row Height -
اﻷن------- ʘ Keep Current Height
اﻟﻮﺿﻊ اﻷﻣﺜﻞ------ Optimize height by row content
أﺣﺘﺎر ----- Select height by row content
# Line Number -
Group and Sort by -
ﻷظﮭﺎر اﻟﻤﻠﺨﺺ ﻓﻘﻂʘ Show Summaries only
Bars -
Remaining work ------ ( ﻧﺸﺎط ﻣﺮن ) أﺧﻀﺮ-
Bars ﻧﻘﺪر ﻧﻐﯿﺮ ﻟﻮﻧﺔ وﻧﺨﻔﯿﺔ ﻣﻦ
اﻷﺻﻞ ھﻮ اﻷﻓﻀﻞ داﺋﻤﺎDefault -
Filter ----- Bar ﺑﯿﺮﺑﻂPrimavera -
Bar ﻧﻀﯿﻔﺔ ﻟﻠـ------- Filter ﺗﺼﻤﯿﻢ-
Remaining work Remain Bar أﺧﻀﺮ ﻣﺮن-
Actual work Actual Bar أزرق ﺷﻐﺎل-
Critical Remaining Critical Bar أﺣﻤﺮ ﺣﺮج-
Remain Bar ﻋﻠﻤﺎ ً ﺑﺄن
Bar Style Bar Settings Bar Labels
Shape
Color
Pattern
Row ------------- Update ھﻨﺴﺘﺨﺪﻣﺔ ﻓﻲ
Data date
ھﺎم--- Resources
Resource = anything needed to get the work done -
ﻛﻞ ﻣﺎﯾﻠﺰم ﻹﻧﺠﺎز اﻟﻌﻤﻞ
primavera ----- ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠـ-
Types of resource -
Material ، Non Labor ، Labor -
Units of Resource -
kg ، ton ، m ، m٢ ، m٣ ------ Material
Labor or non-Labor = Time units -
day/day --------- ٥ man*days/day
hr. /day --------- ٤٠man*hrs. /day
D = Quantity / No of Res * out put -
Resource ﯾﺒﻘﻲ ﻋﺮﻓﺖ ﻛﺎم------- Duration أﻧﺖ ﻋﺮﻓﺖ-
Resource for one activity should be available -
وﺗﻮﺟﺪ ﻣﺴﺎﺣﺎت، و ﻧﺸﻐﻠﺔ، ﻧﻘﺪر ﻧﺠﯿﺒﮫ
ﻋﻤﻞ ﺑﺮﻧﺎﻣﺞ زﻣﻨﻲ----- Schedule -
Relations ، Duration ، Activities ----- Input -
Duration driven schedule -
Resource are available ﺑﯿﻌﺘﺒﺮ----------- Primavera
% ٩٥ ----- Resource Loading -
Cost ، Resource اﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ﺑﯿﻄﻠﺐ-
Res = ٥
Res = ٢
Res = ٣
Res = ٧
٥ ١٠ ٢ ٧
Resource Loading -١
Aggregation -٢
Reschedule to account for the resources -
Leveling ------------- Schedule + Resources -
Activity
Duration
Relations
Resource Driven Schedule -
Resources -
Enterprise ﻣﻦRes ﻧﻌﺮف Definition -١
user Res ﻧﺨﺼﺺAssignment -٢
Aggregation -٣
primavera Res ﺑﺮﻧﺎﻣﺞ زﻣﻨﻲ ﻣﺤﻤﻞ ﺑﺎﻟـ Leveling -٤
non Labor ، Labor ، material ﯾﺄﻣﺎResources -
ﺑﺎﻟﻤﮭﻨﺔ أو اﻷﺳﻢResources ھﯿﺎﻛﻞ ھﺮﻣﯿﺔ ﯾﻤﻜﻦ ﻧﻌﺮفResources -
Resource ﺷﺎﺷﺔ-
Res ID Res Name Res Type
ﻋﻤﺎل Labor
ﻣﻌﺪاتNon Labor
ﻣﻮاد Material
General Details
ﻧﻔﺲ ﻧﺘﯿﺠﺔ اﻟﻠـ ﺧﺼﺼﺘﮭﺎ ﻟﻠﻤﺸﺮوعResources ﻧﺘﯿﺠﺔ اﻟﻠـ-
Activity Calendar----------- Friday -
ﻣﺎﯾﻨﻔﻌﺶ اﻟﻜﻼم دة ﺧﻄﺄ---------Resource Calendar ---------- Sat & Sun -
Default units / Time ١d / d -
١day/d ﺑﯿﻌﺘﺒﺮھﺎprimavera ﻟﻮ ﻣﺨﺼﺼﺘﺶ------------- ﯾﻮﻣﯿﺔ ﻓﻲ اﻟﯿﻮم-
Labor & Non Labor ھﺎم ﺟﺪا ﻓﻲ------------ Max Units / Time -
Material ﻣﺶ ﻣﮭﻢ ﻓﻲ------------ Max Units / Time -
ﺑﺴﺎﻋﺔ اﻟﻌﻤﻞ أﻓﻀﻞResource ﺗﻌﺮﯾﻒ-
Example -
Ex / day ١
A
Ex / day ١
B
١ ٢ ١
اﻟﻤﺤﺎﺿﺮة اﻟﺴﺎﺑﻌﺔ
ﻣﮭﻤﯿﻦPIM & PMP -
Resource Assignment -
Resources ﺗﻌﺮف------------- In defecation -١
Resources ﺗﺨﺼﺺ-------------- Assignment -٢
Profile -٣
Leveling -٤
ﻓﺎﺋﺪﺗﺔ ﺗﻘﻠﯿﻞ أدﺧﺎل اﻟﺒﯿﺎﻧﺎت-------- Default ------ ١ d/d -
Activities ﻟﻤﻌﻈﻢ اﻟـ------ d = ٥ -
٥ = Default -
Resources إدﺧﺎل------- Assignment
Labor & non Labor طﺒﻘﺎ ﻟﻠﻤﺘﻮﻓﺮRemaining units / Time -
Material ------- Remaining Units -
ﺟﻨﯿﺔ١٠٠ = ﻧﺪﺧﻞ ﯾﻮﻣﯿﺔ اﻟﻌﺎﻣﻞ-
Standard Rate ﻣﻦ------- ﺟﻨﯿﺔ١٠٠٠ = ﻧﺪﺧﻞ ﯾﻮﻣﯿﺔ اﻟﺤﻔﺎر-
Admin & Edit ﻧﻐﯿﺮ اﻟﻌﻤﻞ ﻣﻦ ﻗﺎﺋﻤﺔ-
Units/time = ٥ d/d
Remaining units = ٥*١٠ = ٥٠d -
Budget units = ٥٠d -
Actual units = ٠.٠ -
Remaining cost = ٥٠ * ١٠٠ = ٥٠٠٠ LE -
Budget Cost = ٥٠٠٠ LE -
ﻟﺴﺔ ﻣﺸﺘﻐﻠﺶ---------- Actual Cost = ٠.٠ LE -
PCT = ٣٠٪
Data date
OD = ١٠ d
RD = ١٠ d
PC = ٠
Data date OD = ١٠ d
Actual Remaining
PC = ٢٠ % RD = ٨ d
Deficit
+ Add expenses -
+ Add Budgeted Cost -
Remaining Expense Cost ﻧﻀﯿﻒ ﻋﻤﻮد-
( ﻣﻦ اﻟﺸﺮﯾﻂ ) ﻟﻠﺴﺮﻋﺔResource ﻣﻤﻜﻦ ﻧﻌﻠﻢ ﻋﻠﻲ اﻷﻧﺸﻄﺔ ﻛﻠﮭﺎ وﻧﺨﺘﺎر-
Resource ﯾﻔﻀﻞ ﺗﻌﺮﯾﻒ اﻟﺰﻟﻂ ﻛـ------ زﻟﻂ-
ً اﻷﻓﻀﻞ واﻷدق ﻏﺎﻟﺒﺎ Cost & Units ﻋﺒﺎرة ﻋﻦResource -
Cash Flow ---------- Expense -
Cost ( Cash Flow ) Expenses & ( Units ) Resources ------ اﻟﺴﻮق-
Price
Cost Mark Up
اﻹدارة اﻟﻌﻠﯿﺎ
Direct In direct
Ex ١٠٠٠٠٠٠ ١٠٠٠٠٠ = ١٠٪
. %١٠ ﻣﻤﻜﻦ ﻧﻌﻤﻞ ﻧﺸﺎط وﻗﺘﺔ ﯾﺴﺎوي وﻗﺖ اﻟﻤﺸﺮوع ﻛﻠﮫ وﺗﻜﻠﻔﺘﺔ-
.( اﻟﺸﺮﻛﺔ+ )اﻟﺠﮭﺎز اﻟﻔﻨﻲIndirect -
. اﻷولResource ﻟﻮ ﻓﻲ ﺟﺰء ﯾﺘﻜﺮر ﻧﺪﺧﻞ-
Resource profile -
Assign Activity -
project ﻣﻤﻜﻦ اﻟﻤﺎﻟﻚ ﯾﻄﻠﺐ-
Labor Schedule & Material Schedule
By Resource ( each resource at time ) -
ﻣﻨﺤﻨﯿﺎت Profile -١
Table -٢
Cost & Resources اﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ﻣﺤﻤﻞ ﺑﺎﻟـ-
By Resource ٢ -
٢
By Activity -
٢
ﯾﻮم اﻟﺘﺠﻤﯿﻊ
اﻟﻤﺤﺎﺿﺮة اﻟﺜﺎﻣﻨﺔ
Resources
enterprise ﻋﻠﻲ ﻣﺴﺘﻮي------ Definition ( enterprise data ) -
ID & Name & Units & Calendar & Max units -
Activity ﻋﻠﻲ ﻣﺴﺘﻮي-- -------- Assignment ( Loading ) -
D = Quantity / no of res * out put -
اﻟﻤﻔﺮوض اﻟﻌﺪد اﻟﻠﻲ ﯾﺨﻠﺺ اﻟﻌﻤﻞ------- ( ) ﻣﻌﺮﻓﺶNo of Res -
، وﻧﻌﻤﻞ ﺑﺮﻧﺎﻣﺞ زﻣﻨﻲ، (D)duration وﺑﻌﺪﯾﻦ ﻧﺸﻮف، ﯾﻔﺮض---- No of Res -
.وﻧﺸﻮف اﻟﻌﺪد ﻣﻨﺎﺳﺐ وﻻ ﻻء
profile ( usage ) --------- Project ﻋﻠﻲ ﻣﺴﺘﻮي-
. ﻛﺎم طﻦ أﺳﻤﻨﺖ ﻛﻞ ﯾﻮم-------- Material Schedule -
Profile
.ﻋﻠﻲ ﺣﺪيresource ﻛﻞ----- By Resource (each resource at time) -
By Activity ( each type activity ) -
Leveling
Needs > Max -
Schedule + Res -
units -------- Res ﻧﻈﺒﻂ-
أﺧﻀﺮ O Remaining early unit -
أﺣﻤﺮO Over allocated remaining early units -
أﺳﻮدO Limit = ------ Max unit -
( أﺣﻤﺮOver ) Leveling ﺑﻨﻌﻤﻞ-
Resource usage profile -
Display : open project only -
Resource usage profile options ﻧﺨﺘﺎر-
ʘ Units
Cost
Resource ( ﻏﺎﻟﺒﺎunits ) ﻛﺎﺳﻮق-
ʘ Show Limit
ʘ Show Over allocation
٧
Limit ٦ ٣٦ d
٤
unit max = ٦ ٣ ٣
٦d ٢ ٢ ٢١ d
Cost
Remaining Early √ √
Month ﯾﻔﻀﻞ ﻧﺸﻮﻓﺔ ﺑﺎﻟﺸﮭﺮ------- Cost -
Leveling ---------- over ﻋﺸﺎن ﻧﺸﯿﻞ-
Level Resource ▼ اﻟﻤﯿﺰان-
Level Resources
ʘ Level all Resources
ʘ Level resources only within activity Total Float
Trading project ------- ------- ٢٠١٧ / ٥ / ٢٥ ھﯿﺨﻠﺺ-
Leveling -
Field Name
Late Start
اﻟﻨﺸﺎط اﻟﻠﻲ ﻋﻨﺪة أﻗﻞ وﻗﺖ-
ﻟﻠﻨﺸﺎط اﻟﻠﻲ ﻋﻨﺪة أﻗﻞ وﻗﺖ---------- Resource ﻧﺸﻐﻞ-
ﻧﺰود ﻣﺪة اﻟﻤﺸﺮوع----------- Resource ﻧﺤﻞ-
Leveling Priorities
Activity Leveling Priority
٢٠١٧ Jun ١٩ اﻟﻤﺸﺮوع ھﯿﺨﻠﺺ-
Late Start اﻷﻓﻀﻞ-------- اﻟﻤﺸﺮوع أﺗﺄﺧﺮ-
Updating
Baseline Schedule -
Current Schedule -
ﻧﺴﺨﺔ ﻣﻦ اﻟﻤﺸﺮوع ﻟﻌﻘﺪ اﻟﻤﻘﺎرﻧﺎت-
Maintain Baselines ------- project ﻣﻦ ﻗﺎﺋﻤﺔ-
+ Add -------- اﻟﻤﺸﺮوﻋﺎت اﻟﻤﻔﺘﻮﺣﺔ ھﺘﻈﮭﺮ-
ʘ Save a copy of the current project as anew baseline -
ﺻﻮرة ﻟﻠﻤﺸﺮوعData Date ---- Current ﺑـBaseline ﺑﻨﻌﻤﻞ-
Data Date ﻣﺮﺗﺒﻂBaseline -
Maintain Baselines --------- project ﻣﻦ ﻗﺎﺋﻤﺔ-
Yes ---- ﻧﻔﺼﻠﮭﻢ ﻋﻦ ﺑﻌﺾRestore
export ﻧﻔﺼﻠﮭﻢ وﺑﻌﺪﯾﻦ أﻧﻘﻠﮭﻢ-
Maintain Baselines --------- project ﻣﻦ ﻗﺎﺋﻤﺔ-
ﻧﺮﺑﻄﮭﻢ ﺑﺒﻌﺾ ﺗﺎﻧﻲ------- ʘ Convert
Assign Base Lines --------- Project -
Primary , first , BL١ -
Secondary,second,BL٢ -
Tertiary,third,BL٣ -
Bars -------- Activities ﻓﻲ ﺻﻔﺤﺔ-
ʘ Primary Baseline -
Updating -
Actuals -١
Time -٢
Resources -٣
Book Keeping Cost -٤
Time -------- Resource Schedule Actuals -
Actual ﺑﺮﻧﺎﻣﺞ زﻣﻨﻲ ﺟﺪﯾﺪ ﯾﺤﺘﺮم
Actual Remaining
Data date
Updating
Create Baseline project -١
Collect data -٢
Identify data date -٣
Enter actual data -٤
Apply actuals & Schedule -٥
-أﺣﺪد ﻣﺠﻤﻮﻋﺔ اﻷﻧﺸﻄﺔ اﻟﻤﺘﻮﻗﻊ اﻟﻌﻤﻞ ﻟﯿﮭﺎ update
-ﻣﻦ أﯾﻜﻮﻧﺔ progress spotlight
٢٩ -أﺑﺮﯾﻞ & Status
-------- Schedule -ﻋﻨﺪ اﻟﺘﺎرﯾﺦ اﻟﺠﺪﯾﺪ ٢٩أﺑﺮﯾﻞ
-ﻧﻌﻤﻞ Baselineﺟﺪﯾﺪ ﻋﻨﺪ data dateاﻟﺠﺪﯾﺪ ٢٩أﺑﺮﯾﻞ
-ﻧﻌﻤﻞ spotlightﺑﺘﺎرﯾﺦ ٣ﻣﺎﯾﻮ ------ﻧﺤﺮﻛﺔ ﻛﺪة ﺑﺎﻟﻤﻮس ) اﻟﻠﻮن اﻷﺻﻔﺮ (
Schedule & Status -ﻋﻨﺪ ﺗﺎرﯾﺦ ٣ﻣﺎﯾﻮ
-ﻧﻌﻤﻞ Baselineﺟﺪﯾﺪ ﻋﻨﺪ data dateاﻟﺠﺪﯾﺪ ٣ﻣﺎﯾﻮ
-ﻓﺎﺋﺪة updateﻋﻤﻞ check
-ﻧﺴﺘﺪﻋﻲ ﺑﯿﺎﻧﺎت & Baselineﻧﺤﺪد Baselineاﻟﻤﻄﻠﻮب ﻋﻘﺪ ﻣﻘﺎرﻧﺔ ﻣﻌﺎة
-ﻧﺮوح ﻗﺎﺋﻤﺔ project
Assign Base Lines
Primary
ﻧﺨﺘﺎر BLاﻟﻠﻲ ﻋﺎوز ﺗﻘﺎرﻧﺔ
Primavera -ﯾﺴﻤﺢ ﻟﻚ ﺑﺎﻟﻤﻘﺎرﻧﺔ ، ٣ BLوﺑﻌﺪﯾﻦ ﻧﺮوح ﻗﺎﺋﻤﺔ اﻷﻋﻤﺪة Ⅲ
وﻧﺨﺘﺎر أﻋﻤﺪة BLاﻟﻠﻲ ﻋﺎوز أﻗﺎرن ﻣﻌﺎھﺎ .
-أﺳﮭﻞ طﺮﯾﻘﺔ ﻟﻠﻤﻘﺎرﻧﺔ ﻋﻦ طﺮﯾﻖ Bar
Level Resource & Update Schedule -
Planned Value
Value Earned +ve
+ve
Actual Value
Printing
B A
AAAA
Header -
٣ & ﯾﻔﻀﻞ ﻧﻘﺴﻢ٥ ﻣﻤﻜﻦ أﻗﺼﻲ ﻋﺪد ﻟﻠﺘﻘﺴﯿﻢ
Header
Footer
Dates Legend Info Logo Revising
Options -
ʘActivity Table
ʘ All Columns
ʘ Grid Lines
ʘ Gantt Chart
Time Scale Start PS ( Project Start ) -
Time Scale Finish PF ( Project Finish) -
( PS-١W ) ﺑﺄﺳﺒﻮعStart ﯾﻔﻀﻞ ﻗﺒﻞ-
( PF+١W ) ﺑﺄﺳﺒﻮعFinish ﺑﻌﺪ-
زي ﻣﺎھﻮ ﻻﺗﻐﯿﯿﺮ-------- Margins -
ﯾﻔﻀﻞ أن ﯾﻜﻮن ﺑﺎﻷﺳﻔﻞ---- Footer -
Divide into ٣ Include on All Pages Height ١
Section ١ Section ٢ Section ٣
%٢٥ %٥٠ %٢٥
Section ١ -
Text / Logo
Modify
ﻧﻜﺘﺐ Start date project
Finish date project
Section ٢ -
Text / Logo
Modify
ﻧﻜﺘﺐ أﺳﻢ اﻟﻤﺸﺮوع :
: اﻟﻤﺎﻟﻚ
اﻟﻤﻜﺘﺐ اﻹﺳﺘﺸﺎري :
: ﻣﮭﻨﺪس اﻟﺘﺨﻄﯿﻂ
Section ٣ -
Gantt Chart Legend
-اﻟﺸﻜﻞ اﻷﻓﻀﻞ PDF file
File -
Print Setup
ﻧﺨﺘﺎر ----- dopdf٨ﻧﻨﺰل اﻟﺒﺮﻧﺎﻣﺞ ﻣﻦ اﻟﻨﺖ ﺳﮭﻞ .
ﺗﻢ ﺑﺤﻤﺪ ﷲ