Sei sulla pagina 1di 1

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar 2012) Rev 6 31-Mar-12

SATR NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO TEST REPORT

DAILY WELD FIT-UP INSPECTION REPORT- PLANT PIPING SATR-W-2006 30-Apr-13 WELD-

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT I.D. NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM I.D. PLANT NUMBER

PURCHASE ORDER NUMBER EC/PC/MCC NO.


LAYOUT DRAWING NUMBER REV. NO
SCHEDULED INSPECTION DATE and TIME ACTUAL INSPECTION DATE and TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

SAUDI ARAMCO SATIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER SAUDI ARAMCO INSPECTION MAIN CONT. INSP LEVEL SUBCONT INSPECTION LEVEL WORK PERMIT REQ.
LEVEL

DAILY JOINT FIT-UP ANALYSIS


WELDER I.D.
FIT-UP
MATERIAL

THICKNESS

JOINT TYPE
I VISUAL
D
SPOOL

WELD
T DRAWING LINE LINE NO. WPS

NO.
I REMARKS / OBSERVATIONS

ROOT
E NUMBER NUMBER CLASS NO.
A F.C
M SPECS &

ACC

REJ
HEAT No.
GRADE

10

11

12

13

14

15

NOTES:

CONSTRUCTION REPRESENTITIVE QC INSPECTOR or SUPERVISOR MAIN CONT. QC.INSPECTOR PID REPRESENTITIVE


NAME NAME
NAME

SIGN SIGN SIGN

DATE DATE DATE