Checklist for Pipe supports APIL-NCR-PPP-CHKL-011

June 2008

Contract / Project Name


Contract / Project No.
Boiler Type
Drawing Nos.

Sl. Checkpoints Status (Tick if Remarks


No. Confirmed)
1 Are drafting contents like dimension text, lines, grid
number, grid circle, hidden line graphics, user
defined graphics etc. are as per the Work Instruction
BKE 7301 EMC01?
2 All the parts applicable to concerned support shown
in continuous and other entities as dotted
3 Is title block/ revision block / drawing in line with
the Work Instruction BKE 7301 EMC01?
4 Is drawing scale agreed with customer/project team
implemented
5 Is title block / revision block complete as per Work
Instruction BKE 7301 EMC01?
6 Is building mentioned correctly
7 Does the support KKS match with the support at line
8 Is nominal piping diameter correct
9 Is the support function matching with stress analysis
report
10 Is the support function code matching with PDS
model
11 Is the insulation thickness matching with PDS model
12 Is the coordinate system axis shown
13 Key plan with respect to nearest grid correct
14 Does the location(E, N, EL) of support in drawing
match to that in PDS model
15 Is KKS of Pipe(s) appearing in drawing correct
16 Is the support dimensioned completely in X and Y
directions
17 Is the auxiliary/ existing structures and concrete
located in X, Y and Z directions wherever appropriate
18 Does the dimension of the support matches with
model and confirm to drawing scale
19 Is view direction for section detail is sufficient and
complete
20 Dimensions rounded of to next mm
21 For Springs hangers/ rod hanger/ snubbers
presetting, if any to meet the 4 deg criteria
22 Are all part number appearing in the drawing
mentioned in BOM
23 Is quantity of Part members correct
24 Description of part members correct
25 Check whether existing insert plates are used or plate
with anchor bolts
26 Is the standard notes is complete for the concerned
project

Checked by Approved by Date: Sh. 1 of 2


Signature : Signature :

Name : Name :
Format No. :

Checklist for Pipe supports APIL-NCR-PPP-CHKL-011

June 2008

27 Any support specific notes to be inserted

Checked by Approved by Date: Sh. 2 of 2


Signature : Signature :

Name : Name :