MOHAMED SATHAK ENGINEERING COLLEGE, KILAKARAI

DEPARTMENT OF CIVIL ENGINEERING

SUBJECT CODE/NAME :CE8701-ESTIMATION COSTING AND VALUATION DATE :20.10.2020 AN


BRANCH / SEMESTER : CIVIL / IV TIME : 2.30 PM to4.00 PM
ACADEMIC YEAR : 2020– 2021 MARK : 50
CO5:

CO6:

BLOOM'S TAXONOMY
Remembering Applying Evaluating
Understanding Analyzing Creating

PART A (5 x 2 = 10 marks)
CO5 A 1. What are the various types of building estimation? (2)
CO5 R 2. What are the different types of approximate estimation? (2)
CO5 An 3. What is meant by centre line method? (2)
CO6 An 4. Give the important of estimation. (2)
CO6 An 5. Define cost (2)

PART B (2 x 13 = 26 marks)
CO5 A 6. i Explain the detail about the types of estimation? (13)

13
7. i. Explain the following
a. Types of lease
b.mortgage
CO5 U
c.Methods of depreciation
d.Escalation

PART C (1 x 14 = 14 marks)
CO6 U 8. i Prepare the the report on estimate for construction of residential building and water
supply and sanitary installation (14)

******************************ALL THE BEST************************