NHIDCL/PMU-PFUTSERO
TSERO/Kohima Bypass/Compensation/VOL-I/03
3 Date: 29.10.2020
To
The Executive Director (P)
RO Kohima, NHIDCL
Email: edpkohimaoffice@gmail.com
Subject: Construction of Two Lane with Paved Shoulder of Kohima- Bypass Road Connecting
NH-39(New NH-02), NH-150(New
150(New NH
NH-02), NH-61(New NH-29), NH--39(New NH-02) from
Design Km 0.00 to Design Km 10.500(Design Length
Length-10.500
10.500 Km) in the State of Nagaland
under SARDP-NE NE on EPC Mode (Package
(Package-I)- Submission of detailed land compensation
estimates for Kohima Bypass road (Package-I) under Kohima District in the State of
Nagaland - Reg.
Ref: i) NHIDCL/RO-KOHIMA/
KOHIMA/Corres/KB-I/VOL-I/2020-21/217/463,, dated 29/09.2020.
29/0
ii)Letter No. DCP
DCP(K)/REV/2-LANE/KMA-JESS(BMP)/NH
JESS(BMP)/NH-29/2019/620,dated
28/10/2020
/2020 (Copy enclosed)
Sir,
It is to intimated that
hat 22-laning of Kohima Bypass Road Package-I from Design Km 0.00
to Design Km 10.500has has been entrusted to NHIDCL for execution. The Contract Agreements
have been signed between NHIDCL and Contractor firm.Subsequently,
ubsequently, appointing date was
issued as15/10/2020 vide letter cited under Ref (i).
2. Deputy Commissioner Kohima vide cited under Ref(ii) has submitted land compensation
estimate amounting to 29,84,40,759.60
29,84,40,759.60/-(Rupees Twenty-Nine
Nine Crores Eighty-Four
Eighty Lakhs Forty
Thousand Seven Hundred Fifty
Fifty-Nine and Sixty paisa only) only for theland
land compensation along
the proposed alignment.
Sl.
Details & Particulars Amount in Rs.
No.
1 Total Compensation Amount ₹ 28,83,48,560.00
2 Additional Establishment Charges @ 2.5% ₹ 72,08,714.00
3 Additional Contingencies Charges @ 1% ₹ 28,83,485.60
4 Grand Total ₹ 29,84,40,759.60
5 Grand Total (Say) ₹ 29,84,40,760
Page 1 of 2
4. It is to mention that tthe said projects are time bound. Also, the contractors have fully
mobilised the resources in site
site.. In view of the above, it is requested to approve the estimates and
release the payment at the earliest so as to hand over encumbrance free land to contractors and
further to avoid any claim against for delay in handing over land and for timely completion of
project.
Encl:As stated.
Yours Sincerely
(A K Singh)
General Manager (P)
NHIDCL, PMU-Pfutsero
PMU
Copy to:
1. Office file.