Sei sulla pagina 1di 8

ABB Utilities GmbH RTU560

Remote Terminal Unit


Connections and Settings
Command Output Monitoring 23BA22

Application, characteristics and technical data have ence resistor (K6).


to be taken from the hardware data sheet : V Select check circuit P1 or P2 for test (K7 and
K3 or K5).
23BA22 1 KGT 150 404
V Measuring of the resistance of the selected in-
Operation terposing relay.
V Compare the measured resistance value
The 23BA22 board supervises output commands by
against the parameterized upper and lower
means of a (1 out of n) check. It checks that only one
limit.
interposing relay will be activated when the process
voltage (UD) is switched. V Check that the process voltage UD is avail-
able.
Processing function V Stop all other steps if the result is negative
(negative acknowledge to MPU).
The I/O micro controller (IOP Input output processor)
V Changeover from „CHECK“ to „SWITCH“
does the (1 out of n) check and the output switches if
position (Relays K3 or K5 off, Relays K2 or K4
the check is succesful. To do the output command a
on).
23BA20 output relay selects the object which should
be switched. The coordination of boards 23BA20 and V Activate output pulse by switching relay K1.
23BA22 is done by the MPU (Main Processing Unit) of V Inform MPU that output is started (active).
23ZG21 board. V Monitoring that UD is present during output.
V Stop output after the pulse duration time has
The sequence of a (1 out of n) check and the follow-
elapsed (K1).
ing pulse output is as follows. (see fig. 1 for the princi-
ple logic): V Stop output pulse if a failure is detected during
output
The 23BA22 board receives a request from the MPU - UD is lost
of the central control unit to do a (1 out of n) check
- Communication time out on the peripheral
and force the output. The 23BA22 will do the following
bus
steps:
V Relays K7 and K2 or K4 off.
V Check that no output is active. V Inform MPU that the output is done (finished).
V Adjustment of the measuring logic with refer-

23BA20 relays (k01...k18)


(1 out of n) check
switch over from ”CHECK” to ”SWITCH”
output pulse given by ”GO” relay
output pulse

(1 out of n) check period (with positive result)

Fig. 1: Timing diagram (1 out of n) check and pulse output

Doc. No.: 1KGT 150 437 V000 1 25


ABB Utilities GmbH

Connections and Settings 23BA22 RTU560

Local / remote key ”LOC” LED ”ST”


The LOC key on the front plate allows to inhibit any ac- The “ST“ LED indicates board errors or peripheral
tive output. If switched to local the MPU of central bus errors.
control unit is informed by a status information. An
The “ST“ LED indicates:
output request from MPU will done the (1 out of n)
check only but relays k1 and k2 or k4 will not be V board runs initialization procedure.
switched. V board is doing a cold- or warm start.
V board has dedected a memory error (RAM or
Switching from remote to local and reverse:
EPROM).
V press LOC key twice within 3 seconds. V micro controller faulty.
The LED “LOC“ will flash during that time. V no dialog via the peripheral bus for at least 2
minutes. The board is not polled by the PBP of
Is not pressed twice within the time window the
central control unit.
23BA22 will stay in the last selected mode. If switched
V Process voltage UD not available or “GO“
to local mode the “LOC“ LED is on.
relay K1 is sticking.

DC/DC--converter for measuring and LED ”PST”


digitizing logic
The “PST“ LED indicates an error at command out-
The EAP and its logic is isolated from the measuring
put:
and digitizing logic by optical isolators. The isolated
DC/DC converter to supply the check circuitry is feed V Time out PBP during active output. Any ac-
by the process voltage +24 V. tive output is stopped (switched off).
V Process voltage UD not available or “GO“
Booster relay relay K1 is sticking.

The switching capacity can be increased by use of a LED ”TM0” / ”TM1”


booster relay. See fig. 6 how the booster relay is wired
to a 23BA22 board. (1 out of n) check on P1 (TM0) or P2 (TM1) active.
TM0 / TM1 keeps on during the active output.
V Remove jumbers X501 and X502
(1 out of n) check negative:
If a booster relay (KB) is wired and X501 and X502 re-
V “TM0 / TM1“ and “PST“ flashes until the next
moved, “GO“- relay K1 than will switch booster relay
command output request is received.
KB. Relay KB will than switch the interposing relay or
the unit (object) relay directly on and off.
LED ”CO”
Signalling Die ”CO” LED indicates:

The 23BA22 board monitors and checks its function- V The output is active. Relays K1 is switched.
ality as well as the dialog via the peripheral bus. De- The ”CO” LED flashes until the next command output
tected errors are indicated and/or transmitted by the request is received in the following cases:
board:
V The process voltage UD is not available dur-
V by the red LED ”ST” on the front plate ing the command output.
V by the red LED ”PST” on the front plate V After command output the “GO“ Relay K1 is
V by diagnostic messages sticking.

26 Doc. No.: 1KGT 150 437 V000 1


ABB Utilities GmbH
RTU560 Connections and Settings 23BA22

Settings Adjustment is not necessary. This will be done auto-


matically before every (1 out of n) check period. For
this reason a reference resistor of 1 kτ. / 0.25% is con-
Settings of line-frequency nected to the check circuit by the K6 relay and values
0% and 100% are measured.
The integration time of U/f-converter should corre-
spond to line-frequency: Settings of booster relay

16 2/3 Hz and 50 Hz 60 Hz X501 / X502:


X401 If booster relay is used (see fig. 6) the jumpers X501
and X502 must be removed.

Optokoppler + UD -

k1
+
Mikro-- +24 V DC
15 V
con-- DC UDV
-
RTU Peripheriebus

troller Opto-
X502 X501
koppler

RAM K7 D f
A U
+
U
I BO
K1 -
EPROM
K2
EAP K3
K4
k6 RREF
K5 1 kτ
K6

+24 V DC k7

k5 k4 k3 k2

+ P2 - + P1 -

Fig. 2: Logic block diagram

23BA22
ST
rot PST EPROM

X401

DC/DC
TM1 Wandler
grün TM0
C0
K6 K5 K4 K3 K2 K1
rot LOC

X501

X502

Fig. 3: Board layout with setting positions

Doc. No.: 1KGT 150 437 V000 1 27


ABB Utilities GmbH

Connections and Settings 23BA22 RTU560

Process voltage
d30 z28 UD = 24 V DC to 60 V DC
+ UD -
LOC 23BA22
ST
PST ”GO”-
B TM1 k1 Relais +
U TM0 b30
S CO UDV - b28
M LOC DC 1 X502 X501
O DC
+
z30
D 2 BO - d28
U (1 out of n)-
L check
E 3

k5 k4 k3 k2
Next 23BA20 boards with Next 23BA 20 boards with
same object interposing relay type + P2 - + P1 - same object interposing relay type
d26 b26 b22 d22

d22 W02 d22 W02


b22 W01 b22 W01
z32 A01 z32 A01
k01 k01
b32 A02 b32 A02
k02 k02
d32 A03 d32 A03
k03 k03
z30 A04 z30 A04
k04 k04
b30 A05 b30 A05
k05 k05
d30 A06 d30 A06
k06 k06
z28 A07 z28 A07
k07 k07
b28 A08 b28 A08
k08 k08
d28 A09 d28 A09
k11 k11
z26 A10 z26 A10
k12 k12
b26 A11 b26 A11
k13 k13
d26 A12 d26 A12
k14 k14
z24 A13 z24 A13
k15 k15
b24 A14 b24 A14
k16 k16
d24 A15 d24 A15
k17 k17
z22 A16 z22 A16 k18
k18
23BA20 23BA20
Object interposing relay type 2
Object interposing relay type 1
23BA20 relays (k01...k18)
(1 out of n) check
Switch over from “CHECK” to “SWITCH”
output pulse given by ”GO” relay
output pulse

(1 out of n) check period (with positive result)

Fig. 4: Principle wiring diagram: 1,5 pole with 2 different object interposing relay types

28 Doc. No.: 1KGT 150 437 V000 1


ABB Utilities GmbH
RTU560 Connections and Settings 23BA22

Process voltage
z28 UD = 24 V DC to 60 V DC
d30
+ UD -
LOC 23BA22
ST
PST ”GO”-
B TM1 k1 Relais +
U TM0
S b30
CO UDV - b28
M LOC DC 1 X502 X501
O +
DC z30
D 2 BO -
U (1 out of n)- d28
L check
E 3

k5 k4 k3 k2
Next 23BA20 boards with Next 23BA20 boards with
same object interposing relay type + - same object interposing relay type
+ P2 - P1
d26 b26 b22 d22

d22 W02 d22 W02


b22 W01 b22 W01
z32 A01 z32 A01
k01 k01
b32 A02 b32 A02
k20 k02
d32 A03 d32 A03
k03 k03
z30 A04 z30 A04
k04 k04
b30 A05 b30 A05
k05 k05
d30 A06 d30 A06
k06 k06
z28 A07 z28 A07
k07 k07
b28 A08 b28 A08
k08 k08
d28 A09 d28 A09
k11 k11
z26 A10 z26 A10
k12 k12
b26 A11 b26 A11
k13 k13
d26 A12 d26 A12
k14 k14
z24 A13 z24 A13
k15 k15
b24 A14 b24 A14
k16 k16
d24 A15 d24 A15
k17 k17
z22 A16 z22 A16
k18 k18
23BA20 23BA20
Object interposing relay type 2 Object interposing relay type 1

23BA20 relays (k01...k18)


(1 out of n) check
switch over from “CHECK” to “SWITCH”
output pulse given by ”GO” relay
output pulse

(1 out of n) check period (with positive result)

Fig. 5: Principle wiring diagram: 2pole with 2 different object relay types

Doc. No.: 1KGT 150 437 V000 1 29


ABB Utilities GmbH

Connections and Settings 23BA22 RTU560

Process voltage
UD = 24 V DC to 60 V DC
d30 z28

+ UD -
LOC 23BA22
ST
PST ”GO”-
B TM1 k1 Relais + b30
U TM0
S UDV Booster relay
CO - b28
KB
M LOC DC 1 X502 X501
O DC + z30
UD +
D 2 BO - d28 kB
U (1 out of) UD -
L check
E 3

k5 k4 k3 k2
Next 23BA20 boards with Next 23BA20 boards with
same object interposing relay type + same object interposing relay type
+ P2 - P1 -
d26 b26 b22 d22

d22 W02 d22 W02


b22 W01 b22 W01
z32 A01 z32 A01
k01 k01
b32 A02 b32 A02
k02 k02
d32 A03 d32 A03
k03 k03
z30 A04 z30 A04
k04 k04
b30 A05 b30 A05
k05 k05
d30 A06 d30 A06
k06 k06
z28 A07 z28 A07
k07 k07
b28 A08 b28 A08
k08 k08
d28 A09 d28 A09
k11 k11
z26 A10 z26 A10
k12 k12
b26 A11 b26 A11
k13 k13
d26 A12 d26 A12
k14 k14
z24 A13 z24 A13
k53 k15
b24 A14 b24 A14
k16 k64
d24 A15 d24 A15
k17 k17
z22 A16 z22 A16
k18 k18

23BA20 23BA20
Object interposing relay tape 2 Object interposing relay type 1

23BA20 relays (k01...k18)


(1 out of n) check
switch over from “CHECK” to SWITCH”
output pulse given by ”GO” relay

output pulse given by KB relay output pulse

Fig. 6: Principle wiring diagram: 2 pole with 2 different object interposing relay types and booster relay to
increase switching capacity

30 Doc. No.: 1KGT 150 437 V000 1


ABB Utilities GmbH
RTU560 Connections and Settings 23BA22

Process voltage
UD = 24 V DC to 60 V DC
d30 z28
+ UD -
LOC 23BA22
ST
PST
B k1 ”GO”-
TM1 Relais +
U TM0 b30
S CO UDV - b28
M LOC DC 1 X502 X501
O +
DC
D BO - z30
U (1 out of n) 2 d28
L check
E 3

k5 k4 k3 k2

+ P2 - + P1 -
d26 b26 b22 d22

d22 W02
b22 W01
z32 A01
k01
b32 A02
k02
d32 A03
k03
z30 A04
k04
b30 A05
k05
Matrix = d30 A06
8 x 8 = 64 relays k06
= 32 object commands z28 A07
k07
b28 A08
k08
d28 A09
k11
z26 A10
k12
b26 A11
k13
d26 A12
k14
z24 A13
object output relay k15
b24 A14
k16
d24 A15
k17
z22 A16 k18

64 matrix relays = 4 modules 23BA30 23BA20

23SK35 R0014 (23TP20/21 subrack) 23SK35 R0011

23BA22 23BA30 23BA30 23BA30 23BA30


23BA20 1-8 9 - 16 17 - 24 25 - 32
object commands only

Fig. 7: Principle wiring diagram: Object command output by matrix module 23BA30

Doc. No.: 1KGT 150 437 V000 1 31


ABB Utilities GmbH

Connections and Settings 23BA22 RTU560

Re
23TP20/21 23ET22/23 Signal identification
mark
R0031 R0011 Sub-connector Identification Meaning
1 1 z32
2 2 b32
3 3 d32
4 4 z30 BO + Booster relay contact + Fig. 6
5 5 b30 UDV + Booster relay switching voltage + Fig. 6
6 6 d30 UD + Process voltage to switch interposing relays +
7 7 z28 UD - Process voltage to switch interposing relays - Fig. 6
8 8 b28 UDV - Schaltspannung Verstärkerrelais - Fig. 6
9 9 d28 BO - Booster relay contact -
10 10 z26
11 11 b26 P2 - Check and switching circuit 2 -
12 12 d26 P2 + Check and switching circuit 2 +
13 13 z24
14 14 b24
15 15 d24
16 16 z22
17 19 A (FASTON 6,3) A
18 17 b22 P1+ Check and switching circuit 1 +
19 18 d22 P1 - Check and switching circuit 1 -
The pin configuration of 23ET22/23 subrack corresponds to the direct pin configuration of the board connector

Subrack terminal connection: 23BA22

TP20/21 ET22/23

Placement of signal terminal connectors on subracks

32 Doc. No.: 1KGT 150 437 V000 1

Potrebbero piacerti anche