SETIEMBRE 2020
FICHA TECNICA
►UBICACION
DISTRITO PANAO
PROVINCIA PACHITEA 1,687,755.91
REGION HUANUCO 347,507.85
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
0.00
###
RESUMEN DE PLANILLA DE METRADOS N° 01
01 MANTENIMIENTO PERIODICO
01.01 OBRAS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 0.00% 0.000 50.00% 0.500 50.00% 0.50 50.00% 0.50
01.01.02 TRAZO Y REPLANTEO km 22.11 0.00% 0.000 36.18% 8.000 36.18% 8.00 63.82% 14.11
01.02 PAVIMENTOS
01.02.01 CAPA NIVELANTE E=0.05CM m3 209.50 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 209.50
01.02.02 MATERIAL GRANULAR DE CANTERA PARA ESTABILIZADO E=0.15M m3 15,108.69 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 15,108.69
01.03 TRANSPORTE
01.03.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1KM m3k 15,318.26 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 15,318.26
01.03.02 TRANSPORTE DE MATERIAL GRANULAR MAYOR A 1KM m3k 99,923.98 0.00% 0.000 30.23% 30,204.770 30.23% 30,204.77 69.77% 69,719.21
01.03.03 TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1KM m3k 1,328.60 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 1,328.60
01.03.04 TRANSPORTE DE MATERIAL EXCEDENTE MAYOR A 1KM m3k 19,380.48 0.00% 0.000 29.06% 5,631.080 29.06% 5,631.08 70.94% 13,749.40
OBRAS DE ARTE Y DRENAJE
01.04
01.04.01 RECONFORMACION DE CUNETAS m 22,110.00 0.00% 0.000 34.42% 7,610.000 34.42% 7,610.00 65.58% 14,500.00
01.05 SEÑALIZACION
01.05.01 INSTALACION DE POSTES KILOMETRICOS und 22.00 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 22.00
01.05.02 SEÑALES PREVENTIVAS und 22.00 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 22.00
01.05.03 SEÑALES REGLAMENTARIAS und 3.00 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 3.00
01.05.04 SEÑALES INFORMATIVAS und 3.00 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 3.00
01.06 IMPACTO AMBIENTAL
01.06.01 RECUPERACION AMBIENTAL DE AREAS OCUPADAS ha 0.39 0.00% 0.000 0.00% 0.000 0.00% 0.00 100.00% 0.39
01.07 EMERGENCIA SANITARIA
01.07.01 EMERGENCIA SANITARIA COVID 19 glb 1.00 0.00% 0.000 30.00% 0.300 30.00% 0.30 70.00% 0.70
VALORIZACION DE OBRA N° 01
►ENTIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL
"EJECUCION DEL DE PACHITEA
MANTENIMIENTO - PANAO
PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO: EMP. PE-18 B (PURUPAMPA) MONTO REFERENCIAL : 1,757,166.55 INC. IGV
►OBRA : - YANUNA - CHINCHAUCRO - MINTA PUNTA - EMP. HU - 894 (HUASCAPAMPA) L=21.70 KM. DISTRITO PANAO, PROVINCIA
PACHITEA - HUÁNUCO" MONTO CONTRATADO FASE II : 1,458,448.24 INC. IGV
►CONTRATISTA : CONSORCIO YANUNA PLAZO DE EJECUCION : 90 DIAS
►INSPECTOR : ING. WALTER JUAN TABORI ESCUDERO FECHA DE INICIO : 18/09/20
►RESIDENTE : ING. NEPER GARCIA VARA
►MODALIDA DE EJECUCION : A SUMA ALZADA FECHA DE TERMINO : 16/12/20
01 MANTENIMIENTO PERIODICO
01.01 OBRAS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 5,712.40 5,712.40 0.00% 0.00 0.00 50.00% 0.50 2,856.20 50.00% 0.50 2,856.20 50.00% 0.50 2,856.20
01.01.02 TRAZO Y REPLANTEO km 22.11 619.80 13,703.78 0.00% 0.00 0.00 36.18% 8.00 4,958.40 36.18% 8.00 4,958.40 63.82% 14.11 8,745.38
01.02 PAVIMENTOS
01.02.01 CAPA NIVELANTE E=0.05CM m3 209.50 33.29 6,974.26 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 209.50 6,974.26
01.02.02 MATERIAL GRANULAR DE CANTERA PARA ESTABILIZADO E=0.15M m3 15,108.69 39.96 603,743.25 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 15,108.69 603,743.25
01.03 TRANSPORTE
01.03.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1KM m3k 15,318.26 5.60 85,782.26 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 15,318.26 85,782.26
01.03.02 TRANSPORTE DE MATERIAL GRANULAR MAYOR A 1KM m3k 99,923.98 1.53 152,883.69 0.00% 0.00 0.00 30.23% 30,204.77 46,213.30 30.23% 30,204.77 46,213.30 69.77% 69,719.21 106,670.39
01.03.03 TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1KM m3k 1,328.60 5.43 7,214.30 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1,328.60 7,214.30
01.03.04 TRANSPORTE
OBRAS DE ARTEDE MATERIAL EXCEDENTE MAYOR A 1KM
Y DRENAJE m3k 19,380.48 1.60 31,008.77 0.00% 0.00 0.00 29.06% 5,631.08 9,009.73 29.06% 5,631.08 9,009.73 70.94% 13,749.40 21,999.04
01.04
01.04.01 RECONFORMACION DE CUNETAS m 22,110.00 3.65 80,701.50 0.00% 0.00 0.00 34.42% 7,610.00 27,776.50 34.42% 7,610.00 27,776.50 65.58% 14,500.00 52,925.00
01.05 SEÑALIZACION
01.05.01 INSTALACION DE POSTES KILOMETRICOS und 22.00 240.74 5,296.28 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 22.00 5,296.28
01.05.02 SEÑALES PREVENTIVAS und 22.00 509.80 11,215.60 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 22.00 11,215.60
01.05.03 SEÑALES REGLAMENTARIAS und 3.00 522.81 1,568.43 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 3.00 1,568.43
01.05.04 SEÑALES INFORMATIVAS und 3.00 981.58 2,944.74 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 3.00 2,944.74
01.06 IMPACTO AMBIENTAL
01.06.01 RECUPERACION AMBIENTAL DE AREAS OCUPADAS ha 0.39 10,392.79 4,053.19 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 0.39 4,053.19
01.07 EMERGENCIA SANITARIA
01.07.01 EMERGENCIA SANITARIA COVID 19 glb 1.00 31,784.00 31,784.00 0.00% 0.00 0.00 30.00% 0.30 9,535.20 30.00% 0.30 9,535.20 70.00% 0.70 22,248.80
COSTO DIRECTO TOTAL FR = 1.000000 1,044,586.45 0.00% 0.00 9.61% 100,349.33 9.61% 100,349.33 90.39% 944,237.12
GASTOS GENERALES (10.32176131%) 107,819.72 0.00% 0.00 9.61% 10,357.82 9.61% 10,357.82 90.39% 97,461.90
UTILIDAD (8.00%) 83,566.92 0.00% 0.00 9.61% 8,027.95 9.61% 8,027.95 90.39% 75,538.97
SUB TOTAL 1,235,973.09 0.00% 0.00 9.61% 118,735.10 9.61% 118,735.10 90.39% 1,117,237.99
I.G.V. (18.00%) 222,475.16 0.00% 0.00 9.61% 21,372.32 9.61% 21,372.32 90.39% 201,102.84
PRESUPUESTO REFERENCIAL 1,458,448.24 0.00% 0.00 9.61% 140,107.42 9.61% 140,107.42 90.39% 1,318,340.82
FACTOR DE RELACION
PRESUPUESTO CONTRATADO FR = 1.000000 1,458,448.24 0.00% 0.00 9.61% 140,107.42 9.61% 140,107.42 90.39% 1,318,340.82
5
VALORIZACION DE OBRA N° 01
►ENTIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DE PACHITEA - PANAO
: "EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO:
EMP. PE-18 B (PURUPAMPA) - YANUNA - CHINCHAUCRO - MINTA PUNTA - EMP. HU - 894
►OBRA (HUASCAPAMPA) L=21.70 KM. DISTRITO PANAO, PROVINCIA PACHITEA - HUÁNUCO"
►CONTRATISTA : CONSORCIO YANUNA
►SUPERVISOR : ING. WALTER JUAN TABORI ESCUDERO
►RESIDENTE : ING. NEPER GARCIA VARA
►MODALIDA DE EJECUCION : A SUMA ALZADA
AMORTIZACION DEL
ADELANTO DIRECTO
D.S. Nº 017-79-VC
FORMULA:
AMORT = AxVAL/C
DONDE:
TOTAL 0.00
PARTIDA DESCRIPCION UND PRECIO AVANCE ANTERIOR AVANCE MENSUAL AVANCE ACUMULADO SALDO
PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
01 MANTENIMIENTO PERIODICO 1,044,586.45 0.00% 0.00 9.61% 100,349.33 9.61% 100,349.33 90.39% 944,237.12
SUB TOTAL 1,044,586.45 0.00% 0.00 9.61% 100,349.33 9.61% 100,349.33 90.39% 944,237.12
FACTOR DE RELACION
COSTO DIRECTO TOTAL 1,044,586.45 0.00% 0.00 9.61% 100,349.33 9.61% 100,349.33 90.39% 944,237.12
GASTOS GENERALES (10.32176131%) 107,819.72 0.00% 0.00 9.61% 10,357.82 9.61% 10,357.82 90.39% 97,461.90
UTILIDAD (8.00%) 83,566.92 0.00% 0.00 9.61% 8,027.95 9.61% 8,027.95 90.39% 75,538.97
SUB TOTAL 1,235,973.09 0.00% 0.00 9.61% 118,735.10 9.61% 118,735.10 90.39% 1,117,237.99
I.G.V. (18.00%) 222,475.16 0.00% 0.00 9.61% 21,372.32 9.61% 21,372.32 90.39% 201,102.84
PRESUPUESTO REFERENCIAL 1,458,448.24 0.00% 0.00 9.61% 140,107.42 9.61% 140,107.42 90.39% 1,318,340.82
PRESUPUESTO CONTRATADO 1,458,448.24 0.00% 0.00 9.61% 140,107.42 9.61% 140,107.42 90.39% 1,318,340.82
RESUMEN
% DE
CONCEPTO AVANCE MONTO A COBRAR
MENSUAL
AMORTIZACION DEL
ADELANTO DE MATERIALES
D.S. Nº 017-79-VC
FORMULA:
AMORT = AxVAL/C
DONDE:
TOTAL 0.00
Sep-20
"EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO: EMP. PE-18 B (PURUPAMPA) - YANUNA -
OBRA
CHINCHAUCRO - MINTA PUNTA - EMP. HU - 894 (HUASCAPAMPA) L=21.70 KM. DISTRITO PANAO, PROVINCIA PACHITEA - HUÁNUCO"
80%
70%
11.09
60%
50%
40%
30%
20%
10%
0%
9/18/2020 10/1/2020 11/1/2020 12/1/2020
90%
CAL ENDARI O PROGRAMADO CAL ENDARI O I NTERNO CAL ENDARIO REAL
80%
70%
11.09
60%
50%
40%
30%
20%
10%
0%
9/18/2020 10/1/2020 11/1/2020 12/1/2020
20%
10%
0%
9/18/2020 10/1/2020 11/1/2020 12/1/2020
A DE OBRA
12/1/2020
12/1/2020
SES)
ADO
PAGOS
PROGRAMADO EFECTUADO
S/. S/.
163,989.95 140,107.42
163,989.95 140,107.42
CUADROS ESTADISTICOS DE OBRA
VALORIZACION N° 01 SETIEMBRE 2020
"EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO: EMP. PE-18 B (PURUPAMPA) - YANUNA - CHINCHAUCRO -
OBRA :
MINTA PUNTA - EMP. HU - 894 (HUASCAPAMPA) L=21.70 KM. DISTRITO PANAO, PROVINCIA PACHITEA - HUÁNUCO"
40.00%
34.21%
35.00%
PORCENTAJE
30.00%
25.00%
17.22%
20.00%
11.24%
15.00%
9.61%
10.00%
5.00%
0.00%
0.00%
0.00%
0.00%
N° 01 N° 02 N° 03 N° 04 N° 05 N° 06 N° 07
VALORIZACION N° 03 Avance Programado Avance Ejecutado
15/23
MONTOS ACUMULADOS S/.
CUADRO COMPARATIVO
1,600,000.00
1,458,448.25
1,400,000.00
1,318,340.82 1,318,340.82 1,318,340.82 1,318,340.82 1,318,340.82 1,318,340.82
1,207,357.34
1,200,000.00
1,000,000.00
800,000.00
662,977.73 Ejecutado Acumulado S/.
400,000.00
163,989.95
200,000.00
140,107.42
0.00
N° 01 N° 02 N° 03 N° 04
VALORIZACION N° 01
Deficit S/.1,318,340.82
Ejecutado 9.61% Programado Acum. 11.24%
Saldo 90.39% Ejecutado Acum. 9.61%
16/23
CUADRO COMPARATIVO CON EL 80% DEL AVANCE ACUMULADO PROGRAMADO
120.00%
% AVANCE ACUMULADO
100.00%
% Programado Acumulado
82.78%
80.00%
% Avance Ejecutado
80.00%
66.23%
60.00%
45.46%
36.37%
40.00%
11.24%
20.00%
9.61%
9.00%
0.00%
0.00%
0.00%
0.00%
N° 01 N° 02 N° 03 N° 04
VALORIZACION N° 01
VALORIZACIONES MENSUALES
160,000.00
140,000.00
120,000.00
100,000.00
80,000.00
60,000.00
40,000.00
20,000.00
0.00
N° 01 N° 02 N° 03 N° 04
17/23
ACTIVIDADES EJECUTADAS Y PORCENTAJE DE AVANCE
"EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO: EMP. PE-18 B (PURUP
OBRA YANUNA - CHINCHAUCRO - MINTA PUNTA - EMP. HU - 894 (HUASCAPAMPA) L=21.70 KM. DISTRITO PANAO, PROV
PACHITEA - HUÁNUCO"
PARTIDA DESCRIPCION
UND METRADO
01 MANTENIMIENTO PERIODICO
01.01 OBRAS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00
01.01.02 TRAZO Y REPLANTEO km 22.11
01.02 PAVIMENTOS
01.02.01 CAPA NIVELANTE E=0.05CM m3 209.50
01.02.02 MATERIAL GRANULAR DE CANTERA PARA ESTABILIZADO E=0.15M m3 15,108.69
01.03 TRANSPORTE
01.03.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1KM m3k 15,318.26
01.03.02 TRANSPORTE DE MATERIAL GRANULAR MAYOR A 1KM m3k 99,923.98
01.03.03 TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1KM m3k 1,328.60
01.03.04 TRANSPORTE DE MATERIAL EXCEDENTE MAYOR A 1KM m3k 19,380.48
01.04 OBRAS DE ARTE Y DRENAJE
01.04.01 RECONFORMACION DE CUNETAS m 22,110.00
01.05 SEÑALIZACION
01.05.01 INSTALACION DE POSTES KILOMETRICOS und 22.00
01.05.02 SEÑALES PREVENTIVAS und 22.00
01.05.03 SEÑALES REGLAMENTARIAS und 3.00
01.05.04 SEÑALES INFORMATIVAS und 3.00
01.06 IMPACTO AMBIENTAL
01.06.01 RECUPERACION AMBIENTAL DE AREAS OCUPADAS ha 0.39
01.07 EMERGENCIA SANITARIA
01.07.01 EMERGENCIA SANITARIA COVID 19 glb 1.00
DE AVANCE
REGION Huánuco
PROVINCIA Pachitea
DISTRITO Panao
PORCENTAJ
METRADO
E DE
EJECUTADO
AVANCE
0.5 50.00%
8 36.18%
0.00%
0.00%
0.00%
30204.77 30.23%
0.00%
5631.08 29.06%
7610 34.42%
0.00%
0.00%
0.00%
0.00%
0.00%
0.3 30.00%
AVANCE DE OBRA VALORIZADO VS E
OBRA "EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO: EMP.
HU - 894 (HUASCAPAMPA) L=21.70 KM. DISTRITO PANAO, PR
CONTRATO
CONTRATISCONSORCIO YANUNA
INSPECTORING. WALTER JUAN TABORI ESCUDERO
RESIDENTE ING. NEPER GARCIA VARA
ENTIDAD MUNICIPALIDAD PROVINCIAL DE PACHITEA - PANAO
SETIEMBRE
PRECIO
ITEM DESCRIPCION PARCIAL
PROGRAMADO
S/.
Presupuesto
MANTENIMIENTO PERIODICO
01.01 OBRAS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 5,712.40 3808.26
01.01.02 TRAZO Y REPLANTEO 13,703.78 3,425.95
01.02 PAVIMENTOS
01.02.01 CAPA NIVELANTE E=0.05CM 6,974.26
01.02.02 MATERIAL GRANULAR DE CANTERA PARA ESTABILIZADO E=0.15M 603,743.25 25,155.97
01.03 TRANSPORTE
01.03.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1KM 85,782.26
01.03.02 TRANSPORTE DE MATERIAL GRANULAR MAYOR A 1KM 152,883.69 38,220.92
01.03.03 TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1KM 7,214.30
01.03.04 TRANSPORTE DE MATERIAL EXCEDENTE MAYOR A 1KM 31,008.77 7,752.19
01.04
01.04.01 RECONFORMACION DE CUNETAS 80,701.50 32,280.60
01.05 SEÑALIZACION
01.05.01 INSTALACION DE POSTES KILOMETRICOS 5,296.28
01.05.02 SEÑALES PREVENTIVAS 11,215.60
01.05.03 SEÑALES REGLAMENTARIAS 1,568.43
01.05.04 SEÑALES INFORMATIVAS 2,944.74
01.06 IMPACTO AMBIENTAL
01.06.01 RECUPERACION AMBIENTAL DE AREAS OCUPADAS 4,053.19
01.07 EMERGENCIA SANITARIA
01.07.01 EMERGENCIA SANITARIA COVID 19 31,784.00 6,810.87
COSTO DIRECTO TOTAL 1,044,586.45 117,454.76
GASTOS GENERALES (10.32176131%) 107,819.72 12,123.40
UTILIDAD (8.00%) 83,566.92 9,396.38
SUB TOTAL 1,235,973.09 138,974.53
I.G.V. (18.00%) 222,475.16 25,015.42
COSTO TOTAL DEL MANTENIMIENTO PERIODICO 1,458,448.24 163,989.95
% DE EJECUCION MENSUAL 11.24%
% DE EJECUCION ACUMULADA 11.24%
LORIZADO VS EJECUTADO
VECINAL TRAMO: EMP. PE-18 B (PURUPAMPA) - YANUNA - CHINCHAUCRO - MINTA PUNTA - EMP.
M. DISTRITO PANAO, PROVINCIA PACHITEA - HUÁNUCO"
2,856.20 1,904.13
4,958.40 3,425.95 3,425.95 3,425.95
6,974.25
251,559.70 201,247.75 125,779.85
17,156.45 68,625.81
46,213.30 38,220.92 57,331.38 19,110.46
4,809.53 2,404.77
9,009.73 7,752.19 15,504.39
5,296.28
11,215.60
1,568.43
2,944.74
4,053.19
AL 16/12/2020