(PIPING) A011-00-16-43-SS-01 CAPTIVE POWER PLANT Rev.0 PARADIP REFINERY PROJECT Page 1 of 2
LIST OF STANDARD SPECIFICATIONS
(PIPING)
CAPTIVE POWER PLANT
PROJECT : CPP- PARADIP REFINERY PROJECT
OWNER : INDIAN OIL CORPORATION LIMITED
PMC : ENGINEERS INDIA LTD.
JOB NO. : A011
0 27.07.2009 ISSUED FOR BIDS KKM HC ATD
Rev. Prepared Checked Approved Date Purpose No by by by
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
LIST OF STD. SPECIFICATIONS SECTION: E-1 (PIPING) A011-00-16-43-SS-01 CAPTIVE POWER PLANT Rev.0 PARADIP REFINERY PROJECT Page 2 of 2
LIST OF STANDARD SPECIFICATIONS
SPECIFICATION Rev No. of
S.No. TITLE NO. No. Shts 1 Standard specification for hot insulation of 6-44-0002 4 53 vessels, piping and equipments. 2 Standard specification for cold insulation 6-44-0003 1 32 of vessels, piping and equipment. 3 Standard specification for shop & field 6-44-0004 3 48 painting 4 Standard specification for fabrication and 6-44-0012 3 13 erection of piping 5 Standard specification for inspection, 6-44-0013 3 9 flushing and testing of piping systems. 6 Standard specification for pressure testing 6-44-0017 1 10 of erected piping. Standard welding specification for 7 fabrication of piping 6-77-0001 3 29
8 Welding Charts 6-77-0005 4 30
Standard specification for PMI at 9 vendor's works 6-81-0001 1 7 Standard specification for application of torque and hydraulic bolt tension for flange 10 joints 6-76-0002 1 28
Standard specification for non-destructive
11 examination requirements of piping 6-44-0016 5 20
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved