PROJECT No.: 20407
PROJECT TITLE: Shuqaiq Phase-3 - Water Transmission System -B2 & C

DOCUMENT TRANSMITTAL

FROM TO Pöyry Transmittal Ref. No.:


EH-RR-C-1296
SR EH RR SR EH RR
Date: 16.09.2019
SF ER RF SF ER RF
RTCC Transmittal Ref. No:
EF EF RR-EH-D-1296

Page 1 of 2

The following enclosed commented documents/drawings/review sheets are included

PROJECT DRAWING NO. REV. P S CRS NO Description/Title

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

C 0 5 - U U 0 0 - Q - 7 8 5 6 0 2 A EH-RR-C-1296 PS1, EMG- FFUW, LIGHTING LAYOUT AND LIGHTING FIXTURE SCHEDULE

C 0 5 - U X 0 0 - Q - 7 8 6 2 0 2 A EH-RR-C-1296 PS1, EMG -FFUW, FIRE ALARM LAYOUT AND RISER DIAGRAM

C 0 5 - U X 0 0 - Q - 7 8 6 3 0 2 A PS1, EMG- FFUW, FIRE ALARM SYSTEM LINEAR HEAT DETECTION SYSTEM
EH-RR-C-1296
LAYOUT

C 0 5 - Y E 0 1 - Q - 7 8 7 1 0 2 B EH-RR-C-1296 PS1, EMG- FFUW, SMALL POWER LAYOUT

C 0 5 - Y E 0 1 - Q - 7 8 7 2 0 2 B EH-RR-C-1296 PS1, EMG- FFUW, HVAC POWER DISTRIBUTION AND FEEDER SCHEDULE

C 0 5 - Y E 0 1 - Q - 7 8 7 3 0 2 B EH-RR-C-1296 PS1, EMG -FFUW, LV POWER FEEDER ROUTING LAYOUT

C 0 5 - Y E 0 1 - T - 7 8 5 6 B 1 B PS1, EMG FF-UW, SINGLE LINE DIAGRAM AND LOAD DISTRIBUTION


EH-RR-C-1296
SCHEDULE (3 Sheets)

C 0 5 - Y E 4 1 - Q - 7 8 5 9 0 2 B PS1, EMG -FFUW, BELOW ABOVE GROUND EARTHING AND LOCATION OF


EH-RR-C-1296
LUGS LAYOUT

C 0 5 - Y E 4 3 - Q - 7 8 5 9 0 2 B EH-RR-C-1296 PS1, EMG- FFUW, LIGHTNING PROTECTION AND PROTECTED AREA LAYOUT

C 0 5 - Y F 6 0 - Q - 7 8 5 6 0 2 B PS1, EMG- FFUW, TELEPHONE SYSTEM CONDUIT ROUTING AND CABLING &
EH-RR-C-1296
BLOCK DIAGRAM AND DETAILS LAYOUT

P : PURPOSE CODES : S : STATUS CODES :


0 : For Distribution A : Approved to Proceed
1 : Issued for Approval B : Approved to Proceed; Subject to Comments
2 : Issued for Construction C : Rejected to be Resubmitted
3 : Issued for Information D : For Information Only
4 : As Built

CC: SR(PED)

SF(SVC)

EF
Nikolaos Aronis
Engineering Manager - Owner's Engineer